NM Architecture & Urbanism

Page 1

NM

A RC H ITEC T URE & U RBANI S M MSc RPCV B.ARCH

[Distinction] Building and Urban Design in Development UCL - The Bartlett Development Planning Unit Honduras 2008-2010 Louisiana State University

nathan.mahaffey.pchn@gmail.com


META-NARRATIVES OF PHILIPPINE URBANSIM |

Critical Intervention Studio (BUDD)INCREMENTAL Conceptual Design Response (The Philippines) INCREMENTAL 3 META-NARRATIVES OF PHILIPPINE URBANSIM |

NM

This series of conceptual interventions is less about intervening and has more to do with exploring the idea of taking a step back as our first step forward. An interplay or blurring of the role of the ‘professional’ and the role of the ‘amateur’ could be an instrumental way for communities to begin navigating the complexity that confronts them

In this imagined space one’s perspective can expand around the big picture and envision ideal scenarios for the community.

3 INCREMENTALLY

MSc Building and Urban Design in Develoment The Bartlett Development Planning unit 2

BU3: URBAN INTERVENTION STUDIO - INDIVIDUAL DESIGN RESPONSE | [BUDD] BUILDING AND URBAN DESIGN IN DEVELOPMENT, UCL 2012/2013

2

3 POTENTIAL INCREMENTAL POTENTIAL 2

DETACHMENT DETACHMENT 1

POTENTIAL

DETACHMENT

META-NARRATIVES OF PHILIPPINE URBANSIM |

1 IMPOTENTIALITY 2 POTENTIAL

It’s important to work iteratively back and forth between the abstract (detachment) and the concrete (attachment), individual and collective, local and regional/global. Maintaining and staying stuck in one particular mode will result in a singular type of result.

BU3: URBAN INTERVENTION STUDIO - INDIVIDUAL DESIGN RESPONSE | [BUDD] BUILDING AND URBAN DESIGN IN DEVELOPMENT, UCL 2012/2013

BU3: URBAN INTERVENTION STUDIO - INDIVIDUAL DESIGN RESPONSE | [BUDD] BUILDING AND URBAN DESIGN IN DEVELOPMENT, UCL 2012/2013

3

2

2

1

In Canumay East opportunity exists to turn a dividing space into a productive space. The restrictive space below the power lines could potentially be cleared (incrementally) to create infrastructure for flood water retention and public space. Matina Arroyo could potentially take a communal approach to building a super-structure to raise and connect all houses. Construction could begin in strategic locations, as funds are availabe, to allow informal / temporary structures to be infill between them. West Habog has opprortunities to utilise empty land saturated by flood water. Floating structures could fill these spaces to continuously provide circulation, public space and green space regardless of the water level.

INCREMENTAL INCREMENTAL 3

3

INCREMENTAL

3

DETACHMENT DETACHMENT 1

POTENTIAL POTENTIAL 2

1

2

DETACHMENT

1

POTENTIAL

2

INCREMENTAL INCREMENTAL 3 POTENTIAL 3 POTENTIAL 2 INCREMENTAL 2 3 POTENTIAL

2

2

1

DETACHMENT DETACHMENT 1

1

DETACHMENT

1


Field Research Report

Baan Mangkong-Secure Housing Program (Bangkok) Weaving Urbanism in Bangkok. Analysis and proposals for CODI’s Baan Mangkok Secure Housing Program. One month of preparation research, two weeks of field research and three weeks of report writing. Collaboration between fifteen other researchers.

Responsibilities: Preliminary research, facilitated field workshops with community members and drafted proposals for planning principles and guidelines. Architectural and graphic design. Team Image Credits: -Nathan Mahaffey -JosĂŠ Francisco Vergara Perucich -Cristian Olmos

livelihood design responses

Design Pattern Explorations Addressing cross-cutting issues: - Standardized Accommodation - Land Scarcity - Urban Layout and Public Space

overcrowding design responses

3


NM

Peace Corps (Honduras)

Community Park & Playground

Community Park & Playground: - Participatory design strategies - Rainwater harvesting - Cultivation and sale of plants Projects required collaboration with community leaders, various organizations and other volunteers. Responsibilities as Project Director included: - Prepared cost estimate - Facilitated design and construction planning meetings - Design and Construction Drawings - Supervised construction.

Community Design-Build Facilitator Urban & Regional Planning Volunteer

The site work for the park removes earth from the hill creating different levels for different activities; rock walls frame the spaces. Within the areas contained by the rock wall is a level space for a playground and stepped levels for controlled planting. The areas created outside the rock wall are for less controlled planting and leaves the highest ground as a place for sitting, for watching kids at play and viewing the mountains across the valley of Jamastrรกn. The playground structures will touch the ground both inside and outside the walls, reducing them to subtle boundaries, allowing the kids to play freely. Play Structure Plan

Longitudinal Section

Transverse Section

Construction Photos

4

Site Plan

* images of completed project and high-res were lost in a flood

Community Design Workshops


Peace Corps (Honduras)

West Elevation

South Elevation

5


NM

Peace Corps (Honduras)

Community Design-Build Facilitator Urban & Regional Planning Volunteer

Rammed Earth Community Center

Collaboration with CEASO

(Centro de Ense単anza y Aprendizaje de Agricultura Sostenible Siquatepeque, Honduras) $5,000 grant funding received to cover: - Rammed Earth skills training for masons from the community. - All material costs Project required collaboration with community leaders, various organizations and other volunteers. Responsibilities as Project Director included: - Prepared cost estimate - Coordinated skills training and construction consultation with CEASO - Facilitated design and construction planning meetings - Design and Construction Drawings - Supervised construction.

East Entrance Perspective

Rammed Earth

First Student Meeting

Aerial View

PROCESS ORIENTED DESIGN

--SKILLS TRAINING AND COLLABORATIVE COMMUNITY DESIGN-BUILD PROJECT

Construction Training

6

Construction Training

East Elevation

South Elevation

Construction Process


Peace Corps (Honduras)

South Entrance Perspective

Construction Process

Construction Process

7


University of Buraimi (Oman)

Project Designer Hoehler + Partner Oman

University Masterplan - Winning Design Competition

NM Complete university masterplan and architectural design of four academic buildings.

Responsibilities included: Project design and coordination from Pre-Design through Schematic Design.

Tasks included: - Created winning design competition proposal - Sun and wind studies - Site analysis and masterplanning - Design research book - Design intent presentations - Team coordinator of schematic design drawings and design development

oncept Green roof

Pedistrian circulation sketch

PARKING COVER / GREEN RING

Pedistrian circulation concept

Masterplan sketch

TECHNICAL

Parking

RAISED PARKING RING RESEARCH

CENTRAL AXIS

COLLEGE CIRCLE

Traffic

VEHICULAR TRAFFIC

CENTRAL FACILITIES / ADMIN / FOUNDATION SOCIAL CIRCLE

HOUSING

Green

GREEN SPACE

Shinas

Masterplan Layers

Administrative & Academic Core

Gulf of Oman

Classrooms and Green Axis

COLLEGE BUILDING

Western Hajar Mountains

AMPHITHEATER

OUTER COURTYARD

UNDULATING PEDESTRIAN SURFACES PERPINDICULAR TO CENTER

Sohar Buraimi To Buraimi

Sweihan

OUTER COURTYARD

Al Ain- UAE AMPHITHEATER

Buraimi-Oman

UNDULATING PEDESTRIAN SURFACES PARALLEL TO CENTER

INNER COURTYARD

AL AIN- UAE

Regional Location Map

HOUSING & WALKWAYS 2km

Remah

Local Location Map

GREEN AXIS

COLLEGE

CAR PARK RESEARCH FACILITIES

SECTION

8

GREEN AXIS

MOSQUE COMMERCIAL RESIDENTIAL

CENTER OF COLLEGE HOUSING SPORTS

To Sohar


University of Buraimi (Oman)

Design Development of Four Academic Buildings

0 &/# ,*-. ()*+ "#"3 &'# *41/" % $ (./1

&/0

+3

*4&

#"3

12

.# #*-

*4&

#"3

12

-.#

!"# 6%7 +" 5

CE

ENTRAN

25

ENTRAN

CE

ENTRAN

5

N

0

University of Buraimi Building Program

0 OR 50 LO

1:

LE TH

BUILDING CONCEPT SKETCH Building Program based on approved requirements of 25

Conceptual Planning

F

08

A R SCOU

F

ns

ges

chan

ting

halls

mee

University of Buraimi Building Program

on

issi

adm

ll

er ha pray

and

age stor

ns ditio or ad tions ges addi tions chan s or or addi ge s chan ange ch

ns

ges

chan

ting

tion stra

ADMINISTRATION BUILDING

All images © Hoehler + Partner LLC

ditio

or ad

mee

ns ditio or ad tions ges addi tions chan s or or addi ge s chan ange ch

University of Buraimi Building Program

tion stra

regi

tion unda

mee

halls

isp

lor ncel -cha ion vice istrat n in io adm istrat in adm ce tran n en ai m

om ro ss cla

ro om ss

om ss ro cla

om ro cla ss s om ro cla ss

s om ro ss cla id

or or id

co rr

ll cre ati o

n

ha

om ro cla ss

om ro cla ss

air

st

s

cla ss

ro

om

s

stair

or ges bs la

chan

ns

tio addi

mac

UNIVERSITY OF BURAIMI labs ing ns neer labs bs PreliminaryState: Design 29.10.2011 ditio g la il engi ring or ad s

rin

iv

ee

bs

y la

restrooms

phar

chan

ll ha ati on

STACKING DIAGRAMS

om

bank

cre

cla s om ss ro cla

s ro om ss cla r id o

ll

ha n cre ati o re

co rr

re

or id co rr

co rr

P

Tender Document Program Distribution Program Distribution - Option 2 LABORATORY BUILDING

op

ssro

tions

state: 11 December 2011 © Hoehler & Partner LLC

lab

cla

ost,

re

ro om ss cla

ss ro

om

stair

rete

state: 11 December 2011 Tel +968 24 69 46 46, Fax +968 24 69 41 11 © Hoehler & Partner LLC

addi

UNIVERSITY OF BURAIMI PreliminaryState: Design 29

conc

HOEHLER & PARTNER LLC UNIVERSITY OF BURAIMIHoehler Way 3048,Villa 3927, Shatti Al Qurum Muscat & Partner LLC PreliminaryState: Design 29.10.2011 P.O.Box 750, P.C.111, Muscat, Sultunate of Oman

or ges

restrooms

restrooms stair

restrooms

bs

g la

erin

stair

s

room

ss labs gine ed al en shar ctur ite b arch g la stin e te ctur stru

cla

s om ssro cla oms ssro cla

Program Distribution - Option 2

STACKING DIAGRAMS

stair

stair

st, ba

c, po

clini

cla

s om ssro s om ssro cla oms ssro cla halls ture lec cla

ry sh

mep

Tender Document Program Distribution

HOEHLER & PARTNER LLC Way 3048,Villa 3927, Shatti Al Qurum Muscat Hoehler & Partner LLC

s lab s lab s lab s lab

tiona sta

(disp

P.O.Box 750, P.C.111, Muscat, Sultunate of Oman GENERAL FOUNDATION PROGRAM BUILDING Tel +968 24 69 46 46, Fax +968 24 69 41 11

s om ssro cla oms ssro cla oms ssro cla oms ssro cla oms ssro cla

stair

restrooms

ns ditio ns ditio or ad ges or ad chan ges bs chan ing la bs neer gi y la mac cal en labs phar hani ering mec gine l en civi

stair

oom restr m ll oo n ha restr m eatio ll oo recr tion ha restr ea hall oom recr n restr m eatio ll oo recr tion ha restr ea recr ry libra

s om ssro s om ssro s cla om ssro cla s lab ry ra lib

stair

ss

cla

air st

ACADEMIC BUILDING / ENGINEERING

room

nk

stair

mep

n

st, ba

air

ure

lect

oom restr m oo restr m oo restr m oo restr m oo restr

stair

HOEHLER & PARTNER LLC Way 3048,Villa 3927, Shatti Al Qurum Muscat Hoehler & Partner LLC

op

ry sh

tiona sta

Program Distribution - Option 2 Tender Document Program Distribution

elvi

d sh

an lay

c. s, et

om

lls

n ha

ng)

Programatic Diagrams ry libra

n

clea ing y ro neer stud engi ms, sroo clas

stair

STACKING DIAGRAMS

labs

labs

halls

air st

restrooms

GENERAL FOUNDATION PROGRAM BUILDING , cl

cl ing neer engi labs ural clean itect es arch scienc th

heal

s

lab

c, po

clini

s om ssro cla oms ssro s cla om ssro cla s lab ry libra

air

stat

ge chan s or ad ge di adm s or ad tions issio di n an tions d re gistr atio

fo eatio ral Tender Document Program Distribution Program Distribution recr- Option 2 etc. gene s, oom assr

ean

chan

P

ACADEMIC BUILDING / ENGINEERING

st

clinic

shop

oom restr m oo restr m oo restr m oo restr m oo restr

stair

ram prog

ry iona

restrooms

n eatio recr

tion unda

Program Distribution - Option 2 Tender Document Program Distribution

st

ditio

or ad

s

halls

mep

ssro

air

chan

ll

er ha pray

09

op

ry sh

tiona sta

lls

ha ure

lect

stair

ns

ges

lor ncel -cha ion vice istrat n in io adm istrat in adm ce tran n en ai m

cla

oo restr BUILDING CONCEPT SKETCH Building Program based on approved requirements of 25.07.2011

cla

air

mee halls

labs

oom restr m oo restr m oo restr m oo restr m

s om ssro s om ssro s om ssro cla s lab ry libra cla

n

st

rage

clea ing y ro neer stud engi ms, sroo clas

co rri

do r

ge chan s or ad ge di adm s or ad tions issio di n an tions d re gistr atio

st

n eatio recr ng)

elvi

d sh

an lay

isp

ry (d

libra

ram prog

c. s, et

m sroo

ns ditio ns or ad ditio ges or ad chan anges ch

sto

oom restr m ll oo n ha restr m eatio ll oo recr tion ha restr ea hall oom recr n restr m eatio ll oo recr tion ha restr ea recr ry ra lib

stair

n datio

foun

, clas labs

ditio

or ad

lls

ha ting

restrooms

ADMINISTRATION BUILDING

restrooms

restrooms

Tender Document Program Distribution

ral

gene

ges

chan

ry sh

iona

stat

stair

tion stra

regi

ns

clinic

ops

halls

air

and

chan

bs n la s, etc. om

labs

nk

air

chan

n eatio recr

st

on

issi

adm

addi

r

pute

com

labs

st

or ges

lls

ll

ean

g cl erin bs

ne engi la ural clean itect es arch scienc th heal

om

P.O.Box 750, P.C.111, Muscat, Sultunate of Oman Tel +968 24 69 46 46, Fax +968 24 69 41 11

ns ditio ns or ad ditio ges or ad chan anges ch

tions

ns ditio or ad tions ges addi ditions ns ditio changes or or ad s or ad chan ange ges ch chan age stor mee

rage

GENERAL FOUNDATION PROGRAM BUILDING

HOEHLER & PARTNER LLC Way 3048,Villa 3927, Shatti Al Qurum Muscat Hoehler & Partner LLC

er ha pray

sto

ll

STACKING DIAGRAMS

lor ncel -cha ion vice istrat n in io adm istrat in adm ce tran n en ai m

ditio

or ad

er ha pray

08

ADMINISTRATION BUILDING

ha ting

ges

chan

n

stair

ng)

elvi

d sh

an lay

restrooms

sroo

ry (d

libra

ge chan s or ad ge di adm s or ad tions issio di n an tions d re gills str g ha atio

tin

tion

l fo

ea ra Program Distribution -recrOption 2 etc. gene ms, , clas labs

ns

chan

Tender Document Program Distribution BUILDING CONCEPT SKETCH Tender Document Program Distribution Program Distribution - Option 2 Building Program based on approved requirements of 25.07.2011

Conceptual Planning

cla s ro om ss cla

s ro om clinic

ry sh

iona

stat

re ram prog

st, ba

c, po

clini

ss

or ad

ops

halls

oom restr m ll oo n ha restr m eatio ll oo recr tion ha restr ea hall oom recr n restr m eatio ll oo recr tion ha restr ea recr ry libra

air

Conceptual Planning

tion crea

com

restrooms

ll

er ha pray

and

chan

ll

er ha pray

bs

r la

pute

or ges or chan anges ch

ns ditio

st

sion

is adm

ges

lor ncel -cha ion vice istrat n in io adm istrat in adm ce tran n en mai

restrooms

restrooms

University of Buraimi Building Program

lor ncel -cha ion vice istrat n in io adm istrat in adm ce tran n en ai m

rage

stair

age stor

lls

ha ting

ADMINISTRATION BUILDING

nk

cla

ns

ges

chan

tions addi ditions ad

sto

tin mee

co rri do r

regi

Tender Document Program Distribution

stair

and

ssro

cla

air

on

tion stra

stair

lls

g ha

FLOOR

issi

adm

ge

chan

air

ll

er ha pray

Bu

om

ns

ditio

ad s or

st

lor ncel -cha ion vice istrat n in io adm istrat in adm ce an tr n en mai

08

tual

Concep

25

restrooms

restrooms

GROUND

n

air

lls

g ha

tin mee

ge chan s or ad ge di adm s or ad tions issio di n an tions d re gistr atio

st

1:500 SCALE

chan

st

5

0

rage

ll

er ha pray

Program Distribution - Option 2

08

Conceptual Planning

ns ditio or ad tions ges addi ditions ns ditio changes or or ad s or ad chan ange ges ch chan e ag stor

lor ncel -cha ion vice istrat n in io adm istrat in adm ance tr n en mai

Program Building Buraimi rsity ofProgram based BUILDING CONCEPT SKETCH Unive BuildingPla on approved requirements of 25.07.2011 nning

University of Buraimi Building Program

N

sto

University of Buraimi Building Program

BUILDING CONCEPT SKETCHConceptual Planning Building Program based on approved requirements of 25.07.2011

Tender Document Program Distribution

Conceptual Planning

ditio

or ad

halls

mee

regi

restrooms

restrooms

lor ncel -cha ion vice istrat n in io adm istrat in adm ance tr n en mai

ditio

or ad

9


NM

German University of Technology in Oman (GUtech)

Project Designer Hoehler + Partner Oman

Student Housing - Masterplan and Architectural Design

Architectural design and masterplanning of four student housing buildings dealing with energy efficiency and sustainable design in a desert climate. Design development through construction documentation and tendering.

Condition 1: “Outside”

- maximum articulation - relationship to principle green corridor

Condition 2: “Inside”

- less articulation & more building mass - relationship to interior courtyard

This document is confidential. Neither whole or any part of this document shall be disclosed to any third party without prior written consent of Hoehler&Partner LLC.

Condition 3: “In-between”

- Subtle articulation - Relationship to adjacent facade

LEGEND AND ABBREVIATION KEY

Symbols:

FINISHED FLOOR LEVEL

RAW CEILING

SECTION / ELEVATION

TOP EDGE FINISHED TOP EDGE RAW UNDER EDGE FINISHED

Responsibilities included: Project design and coordination from Design Development through Construction Documentation.

SECTION NO.

Condition 1: “Outside”

Condition 2: “Inside”

Condition 2: “Inside”

Condition 3: “In-between”

Condition 3: “In-between”

- maximum articulation - maximum articulation - relationship to principle green corridor - relationship to principle green corridor

- less articulation & more building mass - less articulation & more building mass - relationship to interior courtyard - relationship to interior courtyard

DRAWING NO.

DETAIL NO.

DETAIL-MARKER

DRAWING NO.

UNDER EDGE RAW

Condition 1: “Outside”

Materials:

- Subtle articulation - Relationship to adjacent facade

- Subtle articulation - Relationship to adjacent facade

1 : 100:

0

Tasks included: - Elevation studies - Facade design - Team coordinator of Construction Documentation and Detailing.

5

1

10 m

REVISIONS

2

ELEVATION - 4 SCALE

B

1:100

11 /05 /07

A

Elevation Studies

REV

11 /04 /13

DATE

AG

-

AG

TENDERING

DRAWN

CONTENTS

This document is confidential. Neither whole or any part of this document shall be disclosed to any third party without prior written consent of Hoehler&Partner LLC.

AR . 5 . A02 . HO3 . 100 . 00 . 00 . A . 0 Sector

Phase

Planning Type

Detail Number

Scale

Plan Type

Part of Plan

Rev

Status

Path + Filename CAD: P:\GUHO_GU Housing\05-planning CAD\05_04_application planning\ARCHL\housing-3\ARCHITECTURAL\DETAILED\2- ELEV & SEC\AR.5.A02.HO3.100.00.00.B.0.dwg

LEGEND AND ABBREVIATION KEY

Content

HOUSING - 3 - ELEVATION - 3 & 4 Phase

TENDERING

Drawn: AG

Size: DIN A1

Scale: 1:100

Date: 05 FEB 11

Symbols:

FINISHED FLOOR LEVEL

RAW CEILING

SECTION / ELEVATION

TOP EDGE FINISHED TOP EDGE RAW UNDER EDGE FINISHED UNDER EDGE RAW

HO3

N

DETAIL-MARKER

4

SECTION NO. DRAWING NO.

DETAIL NO. DRAWING NO.

Materials:

Project

GUtech German University of Technology in Oman (Phase One) Housing Quarters

Client

OES Oman Educational Services LLC PO Box 1815, Athaibah PC 130, Muscat, Sultanate of Oman

User

German University of Technology in Oman

1 : 100:

PO Box 1816, Athaibah PC 130, Muscat, Sultanate of Oman Project Management & General Planning

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

0

5

1

10 m

Architect

Hoehler & Partner LLC

REVISIONS

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Structural Engineering

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Mechanical Engineering

Hoehler & Partner LLC

1

1

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Landscape Architect

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

SCALE

ELEVATION - 4

2

ELEVATION - 3

SCALE

B

1:100

11 /05 /07

A

1:100

REV

Reference Drawing Sector

Phase

Planning Type

Detail Number

Scale

Plan Type

Part of Plan

Rev

11 /04 /13

DATE

AG

-

AG

TENDERING

DRAWN

CONTENTS

AR . 5 . A02 . HO3 . 100 . 00 . 00 . A . 0

Status

Sector

Phase

Planning Type

Detail Number

Scale

Plan Type

Part of Plan

Rev

Status

Path + Filename CAD: P:\GUHO_GU Housing\05-planning CAD\05_04_application planning\ARCHL\housing-3\ARCHITECTURAL\DETAILED\2- ELEV & SEC\AR.5.A02.HO3.100.00.00.B.0.dwg

Content

HOUSING - 3 - ELEVATION - 3 & 4 Phase

TENDERING

Drawn: AG

N

Size: DIN A1

Scale: 1:100

Date: 05 FEB 11

HO3

Project

GUtech German University of Technology in Oman (Phase One) Housing Quarters

Client

OES Oman Educational Services LLC PO Box 1815, Athaibah PC 130, Muscat, Sultanate of Oman

User

German University of Technology in Oman PO Box 1816, Athaibah PC 130, Muscat, Sultanate of Oman Project Management & General Planning

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Architect

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Structural Engineering

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

10

Mechanical Engineering

Hoehler & Partner LLC

2

EXTERIOR WALL SECTION-1

3

EXTERIOR WALL SECTION-2

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Landscape Architect

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11


consent of Hoehler&Partner LLC.

consent of Hoehler&Partner LLC.

LEGEND AND ABBREVIATION KEY

LEGEND AND ABBREVIATION KEY

German University of Technology in Oman (GUtech) Symbols:

FINISHED FLOOR LEVEL

RAW CEILING

SECTION / ELEVATION

TOP EDGE FINISHED TOP EDGE RAW UNDER EDGE FINISHED

Symbols:

SECTION NO.

FINISHED FLOOR LEVEL

DRAWING NO.

RAW CEILING

TOP EDGE RAW

DRAWING NO.

UNDER EDGE RAW

SECTION / ELEVATION

TOP EDGE FINISHED

DETAIL NO.

DETAIL-MARKER

UNDER EDGE FINISHED

Materials:

SECTION NO. DRAWING NO.

DETAIL NO.

DETAIL-MARKER

DRAWING NO.

UNDER EDGE RAW

Materials:

N

1 : 100:

0

5

1

N

1 : 100:

10 m

REVISIONS

0

5

1

10 m

REVISIONS

This document is confidential. Neither whole or any part of this document shall be disclosed to any third party without prior written consent of Hoehler&Partner LLC. LEGEND AND ABBREVIATION KEY

Symbols:

FINISHED FLOOR LEVEL

RAW CEILING

SECTION / ELEVATION

TOP EDGE FINISHED TOP EDGE RAW UNDER EDGE FINISHED

SECTION NO.

A

DRAWING NO.

REV

11 /07/19

DATE

AG

CONTRACT DRAWING

DRAWN

CONTENTS

DETAIL NO.

DETAIL-MARKER

AR . 7 . E02 . HO3 . 100 . 00 . 00 . A . 0

DRAWING NO.

UNDER EDGE RAW

Sector

Materials:

Phase

Planning Type

Detail Number

Scale

Plan Type

Part of Plan

Rev

Status

Path + Filename CAD: Y:\GUHO_GU Housing\05-planning CAD\05_05_final planning\ARCHL\20110719_Contract Drawing_Housing 3\1- GA PLANS\AR.7.E02.HO3.100.00.00.B.0.dwg

Content

HOUSING 3 - SECOND FLOOR PLAN

A

REV

11 /07/19

DATE

AG

CONTRACT DRAWING

DRAWN

CONTENTS

Phase

CONTRACT

N

1 : 100:

Drawn: AG

Size: DIN A1

Scale: 1:100

AR . 7 . E02 . HO3 . 100 . 00 . 00 . A . 0

Date: 06 FEB 11

Sector

Phase

Planning Type

Detail Number

Scale

Plan Type

Part of Plan

Rev

Status

Path + Filename CAD: Y:\GUHO_GU Housing\05-planning CAD\05_05_final planning\ARCHL\20110719_Contract Drawing_Housing 3\1- GA PLANS\AR.7.E02.HO3.100.00.00.B.0.dwg

0

5

1

Courtyard Section HOUSING 3 - SECOND FLOOR PLAN Content

10 m

REVISIONS

Phase

CONTRACT

Drawn: AG

Size: DIN A1

Scale: 1:100

Date: 06 FEB 11

HO3

N

Project

GUtech German University of Technology in Oman (Phase One) Student and Staff Accommodation Client

OES Oman Educational Services LLC PO Box 1815, Athaibah PC 130, Muscat, Sultanate of Oman

User A

REV

11 /07/19

DATE

AG

German University of Technology in Oman

CONTRACT DRAWING

DRAWN

HO3

N

PO Box 1816, Athaibah PC 130, Muscat, Sultanate of Oman

CONTENTS

Project Management & General Planning

Hoehler & Partner LLC

AR . 7 . E02 . HO3 . 100 . 00 . 00 . A . 0 Sector

Phase

Planning Type

Detail Number

Scale

Plan Type

Part of Plan

Rev

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Status

Path + Filename CAD: Y:\GUHO_GU Housing\05-planning CAD\05_05_final planning\ARCHL\20110719_Contract Drawing_Housing 3\1- GA PLANS\AR.7.E02.HO3.100.00.00.B.0.dwg

Content

Architect

HOUSING 3 - SECOND FLOOR PLAN

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Phase

CONTRACT

Drawn: AG

Size: DIN A1

Scale: 1:100

Date: 06 FEB 11

Structural Engineering Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Mechanical Engineering

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

GUtech German University of Technology in Oman (Phase One) Student and Staff Accommodation

OES Oman Educational Services LLC

User

German University of Technology in Oman

Project Management & General Planning

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Landscape Architect

Project

Client

PO Box 1816, Athaibah PC 130, Muscat, Sultanate of Oman

Hoehler & Partner LLC

HO3

GUtech German University of Technology in Oman (Phase One) Student and Staff Accommodation PO Box 1815, Athaibah PC 130, Muscat, Sultanate of Oman

Hoehler & Partner LLC

N

Project

Architect

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Client

OES Oman Educational Services LLC PO Box 1815, Athaibah PC 130, Muscat, Sultanate of Oman

Structural Engineering

User

Hoehler & Partner LLC

German University of Technology in Oman PO Box 1816, Athaibah PC 130, Muscat, Sultanate of Oman

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Project Management & General Planning

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Mechanical Engineering

Architect

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Structural Engineering

Hoehler & Partner LLC

1

Hoehler & Partner LLC

SECOND FLOOR PLAN SCALE

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

1:100

Landscape Architect Reference Drawing

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Sector

Mechanical Engineering

Hoehler & Partner LLC

Phase

Planning Type

Detail Number

Scale

Masterplan

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

All images Š Hoehler + Partner LLC Landscape Architect

Hoehler & Partner LLC

Plan Type

Part of Plan

Rev

Status

Hoehler & Partner LLC

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

Architects & Engineers / Consultants PO Box 750, Shatti Al Qurum PC 111, Muscat, Sultanate of Oman, Tel +968 24 69 46 46, Fax +968 24 69 41 11

1 Reference Drawing Sector

Phase

Planning Type

Detail Number

Scale

Plan Type

Part of Plan

Rev

Status

SECOND FLOOR PLAN SCALE

1:100

Reference Drawing Sector

Phase

Planning Type

Detail Number

Scale

Plan Type

Part of Plan

Rev

Status

Site Plan (Housing)

OES Oman Educational Services LLC Scale

1:750 mts

OES Oman Educational Services LLC 11 Courtyard Perspective

Housing Elevations - Green Axis


NM

Eastern Kentucky University

Intermediate Architect PLUS one [Design + Construction]

University Coffee Shop

Pre-Design through Construction Documentation. Responsible for working independently to create highquality design presentations, meet tight deadlines, 3D modeling and rendering, create design and construction drawings, coordinate changes with engineers and received project management experience. Tasks: - Site selection and planning - Facade and material studies - 3D modeling, drawings and illustrations to explore design concepts and development. - Detailed plans, secitons & elevations.

BRICK OPTION 1 - CURVED ACCENT - Standard Brick Veneer. Colors to match context. - Curved brick inlay. - Easiest construction. Leaves no water / snow shelf. - Subtle shadow texture.

EKU - STARBUCKS

12

Brick Facade Studies Brick Option 1

3-7-08


Eastern Kentucky University

Scheme 1 Plan

Scheme 1 Aerial View

Scheme 1 Rendering

Scheme 2 Plan

Scheme 2 Aerial View

Scheme 2 Rendering

13


NM

Carroway Nicholson Condominiums 14 Housing Units

Intermediate Architect PLUS one [Design + Construction]

Pre-Design through Design Development. Tasks: - 3D modeling, drawings and illustrations to explore design concepts and development. - Detailed plans, secitons & elevations.

Typical Section

14


Carroway Nicholson Condominiums

KEY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

8 12

15

1

14

4 13

2

7

3

13

9

16

11

KEY

ONE-CAR GARAGE MECHANICAL CLOSET LAUNDRY 1/2 BATH OFFICE ENTRY CLOSET LIVING DINING KITCHEN PANTRY BALCONY HVAC CHASE OPEN TO BELOW MASTER BEDROOM WALK-IN CLOSET MASTER BATH

12 17 11 9

1

7

10

13

2

16

15

4

13

18

14

16

3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

TWO-CAR GARAGE MECHANICAL CLOSET LAUNDRY & STORAGE BATHROOM BEDROOM ENTRY OUTDOOR STORAGE LIVING DINING KITCHEN PANTRY BALCONY HVAC CHASE OPEN TO BELOW MASTER BEDROOM WALK-IN CLOSET MASTER BATH BUILT-IN DESK

17

10 5 14

First Floor

FIRST FLOOR SECOND FLOOR THIRD FLOOR TOTAL

Second Floor

14

8

AREA SUMMARY (CONDITIONED SPACE) 12

6

5

330 525 437 1,292

14

Third Floor

6

First Floor

Unit 13 Floor Plans

AREA SUMMARY (CONDITIONED SPACE) FIRST FLOOR SECOND FLOOR THIRD FLOOR TOTAL

12

Second Floor

388 638 430 1,456

Third Floor

Typical Floor Plans

06-17-08

NICHOLSON CONDOS Unit 13 - Floor Plan

NICHOLSON CONDOS

06-17-08

Typical Unit - Floor Plan

Elevation

Site Plan

15


NM

The Rockefeller University

Junior Architect Mitchell | Giurgola Architects

Collaborative Research Center

Planning through Schematic Design. Responsible for working as a member of a team to create high quality drawings and presentations to coordinate and communicate design and construction. Tasks: - Physical Study Models - 3D models and drawings to explore complex geometries and spaces. - 3D modeling of sun studies - Detailed plans, secitons & elevations.

16

B Level Floor Plan

Transverse Section

A Level Floor Plan

East Elevation

First Floor Plan

Fifth Floor Plan


The Rockefeller University

Longitudinal Section

West Elevation

17


Bonnet Carre Spillway - Park Service Facilities BONNET CARRE SPILLWAY - Site Overview

Following the 1927 Mississippi River flood, the U.S. Army Corps of Engineers designed and built the Bonnet Carre Spillway to allow complete discharge of water from the Mississippi River into Lake Pontchartrain. The spillway site measures 7,700 feet by 5.7 miles and is located 25 miles west of New Orleans, Louisiana amidst a hot and humid sub-tropical climate. Political and social reasons for the location were essentially to protect the city of New Orleans, (whose port is the third largest in the U.S. and the fourth largest in the world) from complete annihilation.

Intervention Site

north

Lake Pontchartrain

Mississippi River

The control structure regulates the rate of change of the river’s flood waters into the spillway that spans the 7,700 ft. distance between the north and south guide levees. Comprising the structure are massive, six foot concrete weirs supporting seven thousand, ten ft. tall, wooden needles. Immediately adjacent concrete baffles break the force of the turbulent flood waters. Two cranes lift the wooden needles individually over a period of 35 hours to filter the flood water through. Although the batture area between the river and the control structure is flooded six months out of a year the structure is only fully permeated approximately once every eight years in the event of a major flood. When open, the control structure has sustained 350,000 cubic feet per second of water flow.

dry condition

annual flood level

The control structure marks a threshold between two extreme conditions, the batture and the actual spillway. The topography of the batture stretches from the river to the control structure and is constantly inundated with the Mississippi River’s rich river sediment. This condition creates an extreme rate of change of flora growth. Trees and thick brush grow here at a rapid rate of one inch per day and are just as quickly smothered by the rising river, only to begin anew. The spillway topography, on the other hand, is more static as the control structure only fully opens once every eight years. Here, trees grow to full height and stay that way.

extreme flood level

The scenario exists at this key moment where the architecture seeks to frame these extreme conditions and the historical significance of the control structures construction. The architecture attempts to become part of the and its site and provide spaces that allow the inhabitants to experience the changing levels of these extreme conditions. A national park as a recreational facility is fitting here as a stated goal of the National Park Service is to preserve historic sites and events. The National Park Service will also serve to frame the already present recreational activities of the site.

18

Architecture Undergraduate Student Work Louisiana State University

north

NM

UIA World Congress of Architecture Competition

WEST ELEVATION

MAPPING STUDIES Rate of Change

01

02

03

04

05

06

01

02

03

04

05

06


Pella Student Design Competition (1st Place)

Visual and Performing Arts Center

19


NM

A RC H ITEC T URE & U RBANI S M MSc RPCV B.ARCH

[Distinction] Building and Urban Design in Development UCL - The Bartlett Development Planning Unit Honduras 2008-2010 Louisiana State University

nathan.mahaffey.pchn@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.