Naveen RNK undergraduate portfolio

Page 1

A R C H I T E C T U R E

PORTFOLIO R. N A V E E N K U M A R


INTRODUCTION The following collection of works being presented here has been influenced by many own experience from the projects done during my study in the MIDAS (Anna University) and also during internship and even in my practice. Thank you in advance for taking time to go through it. The curriculum has offered me a coherent approach to many design challenges and a clearer understanding of the tools and theories used in the process. Each project is approached by mediating between advanced digital mediums and physical craft to the arrive at an immaginative outcome regarding the economies and site context. My goal is to continue to pursue these new ideas and possibilities through involvement in the real world experiences. To utilize an open mind is crucial as exposure to trends and issues in design are persistently influencing my perception of architecture. Continuing my real world experience is necessary to prepare me to take leadership role in shaping the built environment, promoting practical experience and improve the living conditions of the community around the world. The architecture presented is a projection of ideas existing within the mind. It exemplifies my understanding of architecture, revealing how I have overcome the interplay between thinking and making an interwined entity. Thank you very much for your time and consideration in reviewing the presented works, a presentation of my curiosities, ambitions and design logics that I have developed over the past five years.

( R.Naveen Kumar )


CURRICULUM VITAE

R.NAVEEN KUMAR B.ARCH (2014-2019) 16-10-1996 ABOUT ME I am a highly confident, creative and dedicated person. Architecture is the vision through which i have been looking at every single in my life. The direction of my innovative thoughts and ideas towards the field is what provoked me to step into it. My goal is to be a part of an exciting and inspiring team environment, enlighting myself with practical knowledge, exploring my creativity and eloborating it through cognition.

EDUCATION

EXPERIENCE

SSLC , HSC (2012-2014)

( 1 year )

INTERNSHIP (2017) PPAL (Professionals for Planning Architecture and Landscape), New Delhi, under the guidance of Ar.Ranjan and Ar.Ruchi in the project of AIIMS,Faridabad.

SSM Lakshmiammal Matriculation Higher Secondary school, Komarapalayam.

UNDER GRADUATE - (2014-19) MIDAS (Marg Institute of Design and Architecture Swarnabhoomi), Chennai.

INTERNSHIP (2018) Designqube Architects and Interiors, Banglore, under the guidance of Ar.Bijayni Dash and Ar.Manjunath in the projects of residences in and around Banglore.

INTERESTS

SOFTWARE SKILLS

LINGUISTIC ENGLISH AUTOCAD - 9/10

TAMIL

REVIT - 8.5/10

SKETCHUP - 8.5/10

HINDI (basic) OTHER SKILLS

CONTACT : 900/1765, AATHUKARUPARAYAN KOVIL St., KURUPPANAICKENPALAYAM, BHAVANI(Tk), ERODE(Dt)- 638301 TAMILNADU +91 7667679986 +91 9566793955 naveenrnk.midas@gmail.com /naveen_rnk_ /naveenrnk1996 https://issuu.com/naveenrnk/docs/ naveen_rnk_portfolio

PHOTOSHOP - 8.5/10

Sketching

Prof. Dhushyanth.L, M.Arch(SAP), HOD, MIDAS. +91 7708888718 Prof. Naveen Balaji.J, M.Arch, +91 7397074487

ILLUSTRATOR - 7/10

Model making Communication Leadership Time management

V RAY - 8/10 LUMION - 8.5/10 3DS MAX - 5.5/10 RHINO - 5.5/10

PARTICIPATION

LECTURES

2014 - Parametric design (Fractal) by Ar.Takbir Fathima(AA school, London) & Poonam Serdesai. 2014 - Bottle workshop by Artist.Anisha vargheese 2014 - Raza workshop by Prof.Jaffer Khan(RIBA) 2015 - Bamboo workshop by Ar.Mafalda

REFERENCE

INDESIGN- 8/10

2015 - Low Cost Housing by Ar.Anupama Kundoo 2018 - Build for Billion by UltraTech competition

- Proposal and woks by Sir.Peter Cook(RIBA) - Unlearning Architecture by Prof.Martyn Hook - Documentation and Human settlement by Prof.Ranee vedamuthu - Talk on his works by Ar.Sanjay Mohe - Natural Fractals and Architecture by Ar.Rafiz Azam - Book Reading (Letters to Young Architects) by Prof. Christopher Benninger(RIBA) - Smart cities Development by Ar. Hafeez Contractor

DECLARATION I do hereby confirm that the infromation given in this is true to the best of my knowledge and belief.


“ I think space, architectural space, is my thing. Its not about facade, elevation, making image, making money, my passion is creating space. “ ( Peter Zumthar )


CONTENTS

01 02

THESIS DEVELOPMENT CENTRE FOR A COMMUNITY

COLLEGE WORKS - TRAUMA CARE CENTRE FOR ORTHO AND NEURO - AUDITORIUM FOR SCHOOL

03

...01 ...1 1 ...1 7

OFFICE WORKS - AIIMS MEDICAL COLLEGE - FACADE DETAILS, GFC DRAWINGS, SERVICES(ELECTRICAL, FIRE FIGHTING), LIBRARY, SKYWALK PROFILE, TOILET DETAILS

...19

- RESIDENTIAL PROJECTS - CONCEPT, FLOOR PLANS, 3D MASSING, GFC, FACADE, MATERIAL PALETTE, SERVICE DRAWINGS (ELECTRICAL, PLUMBING)

...27

04

COMPETITION

05

OTHER WORKS

BUILD FOR A BILLION (URBAN POOR) - ULTRATECH

BASIC WORKS AND PHOTOGRAPHY

...33 ...35


01

DEVELOPMENT CENTRE FOR

ABOUT THE PROJECT Development centre is a design approach for the development of a particular under developed community. It involves basic needs of a livelihood of a common people, particularly people struggling to establish a living in society. The design is approached with centres for different activities and requirements like Housing for living, Health care, Training centre for education and employment, accompanied by hostel facilities, Home care for elder and victims, recreational area, community gathering, commercial activities and office spaces. SITE AREA = 20 ACRE

SITE DEVELOPMENT


A COMMUNITY

SITE PLAN


H E A L T H GROUND FLOOR PLAN

2625 SQ.M

FIRST FLOOR PLAN

2175 SQ.M

C A R E


INTERMEDIATE SECOND FLOOR PLAN

2000 SQ.M

SECTION - AA

SECTION - BB

EAST ELEVATION

NORTH ELEVATION


BASEMENT FLOOR PLAN

7800 SQ.M

GROUND FLOOR PLAN

7800 SQ.M

FIRST FLOOR PLAN

3300 SQ.M

SECOND FLOOR PLAN

3300 SQ.M

COMMERCIAL CENTRE


EAST ELEVATION

SECTION - AA

SECTION - BB


TRAINING CENTRE SKILL / VOCATIONAL

GROUND FLOOR PLAN

3300 SQ.M

FIRST FLOOR PLAN

3300 SQ.M


SECTION - CC

NORTH ELEVATION

SECTION - AA

EAST ELEVATION

SECTION - BB


ROAD SECTION

PERSPECTIVE OF PARK

SITE SECTION

SITE ELEVATION

09

PEDESTRIAN PATH


POLLUTED AIR IS WITHDRAWN IN TO THE FILTER CHAMBER

POLLUTANTS ARE FILTERED IN THE CORE AND ARE GROUNDED.

OXYGEN IS SEPARATED AND CO2 IS MADE AVAILABLE FOR THE PLANT ECOSYSTEM

AIR IS PURIFIED AND RELEASED AT THE BOTTOM

10


02

TRA U M A CARE CE NT RE -

ABOUT THE PROJECT

A TRAUMA CENTRE is a hospital equipped and staffed to provide care for patients suffering fro traumatic injuries such as falls, motor vehicle collisions, or gunshot wound tre may also refer to an emergency department (also known as a “casualty “accident & emergency”) with the presence of two specialized services lik DIC AND NEUROLOGY to care for victims of major trauma. SITE AREA = 3 ACRE

CAPACITY= 120 BEDS

This site is locaed at Bombay trunk highway road, connecting Chenn This site is surrounded by a lake besides and a developing smart city is apt for the trauma centre as it is located on the highway.

LEGEND 1. ENTRY 2. PARK 3. TWO-WHEELER 4. EMERGENCY ENTRY 5. ENTRANCE LOBBY 6. EXIT 7. AMBULANCE SLOT

8. POWER SUPPLY 9. STP 10. SERVICE PATH 11.BLOCK 1 12.BLOCK 2 13.CANTEEN 14.TO BASEMENT


ORTHO AND NEURO

om major ds. A trauma cendepartment” or ke ORTHOPAE-

SITE PLAN

10 9 14

nai and Banglore. behind. This site

12

11

8

7

4 13

5

PATH 2

VEHICLE

3 6

PEDESTRIAN BANG

SERVICE

1 A L OR

E

CHE

I NNA


A

B

C

8.00

D

10.00

E

12.00

F

12.00

G

10.00

8.00

1 8.00

RAMP UP

MALE 3.75m x 7.5m

8.00

ELECTRICAL ROOM (MV/LV)

FEMALE 3.75m x 7.5m

6.5m x 6m

UP

TOILET FIRE LIFT

3

PHYSIOTHERAPY - EXERCISE AREA

WATER POOL

DN

FIRE STAIR

DN

+0.6m LVL

CORRIDOR

CR4

MRI

UP

CR5

COLD ROOM 5m x 3m

WAITING LOUNGE

INSTRUMENT STORAGE

CR7

MALE

WAITING LOUNGE

CR2

CT

4.5m x 6m

CR6

TOILET

CR3

DARK ROOM 5 x 3m

FEMALE

4

SERVICE ENTRY/ EXIT

SERVICE

5 x 4.2m

MONITOR 5x3m

+0.15 M LVL

DN

BLOOD BANK 5m x 3m

BLOOD BANK 5m x 3m

9.00

+ 0.0 M LVL

+0.15 M LVL

4.5m x 6m

DISSECTION

RAMP DN

-3.5 M LVL

2

6.00

12m x 18m 5 x 4.2m

5 x 4.2m

X RAY

+0.3m LVL

CR1

NURSE

CORRIDOR

5.5M

BED LIFT 3m x 2.5

RECEPTION LOBBY

5.00

OFFICE 3m x 4.5m

AHU 5m x 3m

DN

KITCHEN 13.5m x 7m UTILITY 5m x 3m

+0.0 lvl

PHARMACY 5m x 7.5m

+0.0 lvl

8

EMERGENCY ENTRY

BIO- MEDICAL 5m x 3m

MINOR OT 5m x 3.5m INPATIENT

EXAMINE ROOM 5m x 7.5m

5.00

MAIN ENTRY

9

+3.0m LVL

3m x 2.5

+2.5m lvl +0.6 lvl

OBSERVATION 5m x 4.5m

ELECTRICAL ROOM 5m x 4m

3.00

BED LIFT

+2.5m lvl

7 AHU 5m x 3.5m

LIFT 3m x 1.75m

3.00

5m x 6.5m

RECEPTION

6.00

LIFT 3m x 1.75m

BROU-GHT IN DEAD

+0.6 lvl

BILLING 6.5m x 3.5m

6

AMBULANCE PARKING

UP

LIFT 3m x 1.75m

UP

LIFT 3m x 1.75m

CORRIDOR

CORRIDOR

+0.6m LVL

6.00

50.00

5

FORM EVOLUTION

CR8

MONITOR 5x3m

MONITOR 5x3m

5.00

5.00

CANTEEN 15.5m x 11.5m

MEDICAL STORAGE 5m x 3m

RECEPTION- EM

5.00

OUTPATIENT WAITING

+0.6lvl

EMERGENCY ENTRY 2

+0.6 lvl

DN

PHARMACY

10

60.5

GROUND FLOOR PLAN ZONING OF SPACES

A

B

C

1

ELECTRICAL ROOM (MV/LV) FEMALE 3.75m x 7.5m

E

F

G

GROUND 0

2 MALE 3.75m x 7.5m

D

6.5m x 6m

UP

TOILET FIRE LIFT

DN

FIRE STAIR

3

UP

EMERGENCY EXIT

CORRIDOR

4

TOILET

MALE

GENERAL WARD 18m x 15.5m

OTS GENERAL WARD 10m x 12m

FEMALE

12m x 18m

4.5m x 6m

VOLUME OF SPACES

4.5m x 6m

UP

CORRIDOR

CORRIDOR

5

CORRIDOR

UP

8.00

5m x 6.5m

AHU CCU 5m x 4.8m

G ELECTRICAL ROOM 5m x 4m

8.01 BED LIFT 3m x 2.5 AHU 5m x 3m

NURSE 3m x 4.5m

3m x 4.5m

UTILITY 5m x 3m

CCU 5m x 4.8m

TERRACE GARDEN /

MINOR OT

REFUGEE BALCONY SCRUB 5m x 3.5m

5m x 3.5m

5.3m x 8.5m

DN

8.5m x 4.5m

8.5m x 4.5m

ICU

FEMALE 3.75m x 7.5m

6.5m x 6m

UP FIRE LIFT

PHYSIOTHERAPY - EXERCISE AREA

WATER POOL

DN

FIRE STAIR

DN DN

BLOOD BANK 5m x 3m

BLOOD BANK 5m x 3m

ICU

ELECTRICAL ROOM (MV/LV)

TOILET

3

10.00

SCRUB 5m x 3.5m

MALE 3.75m x 7.5m

10

F

CORRIDOR

CR4

MRI

UP

CR5

COLD ROOM 5m x 3m

SERVICE

5 x 4.2m

CR2

CT

CR6

WAITING LOUNGE

WAITING LOUNGE

MALE

DARK ROOM 5 x 3m

MONITOR 5x3m

INSTRUMENT STORAGE

CR7

TOILET

CR3

FIRST4 FLOOR PLAN

4.5m x 6m

5.3m x 8.5m

2

UP

+2.5m lvl

MINOR OT

5m x 3.5m

9

12.01

NURSE

5m x 4.5m

FRAGMENTATION

12.00

DN

E

+2.5m lvl

7 1

D

10.00 BED LIFT 3m x 2.5

8

C

LIFT 3m x 1.75m

DN

LIFT 3m x 1.75m

DOCTOR LOUNGE

B

LIFT 3m x 1.75m

LIFT 3m x 1.75m

A

6

BROU-GHT IN DEAD

1.75m

+0.6 lvl

1.75m

UP

6

NURSE

CORRIDOR

5.5M

CORRIDOR

50.08

5

CR8

4.5m x 6m

TRAUMA CARE CR1

FINAL MASSING

CORRIDOR

5 x 4.2m

UP 1.75m

X RAY

MONITOR 5x3m

x 1.75m

5 x 4.2m

MONITOR 5x3m

FEMALE

12m x 18m

ELECTRICAL


A

B

C

D

E

F

G

1

2 ELECTRICAL ROOM (MV/LV) FEMALE 3.75m x 7.5m

6.5m x 6m

UP

TOILET FIRE LIFT

3

DN

FIRE STAIR

WARD

WARD

UP

CORRIDOR

6m x 3.5m

6m x 3.5m

UP WARD 5m x 6m

WARD 5m x 6m

WARD 5m x 6m

WARD 5m x 6m

4

TOILET

MALE

WARD 5m x 6m

4.5m x 6m

MALE 3.75m x 7.5m

OTS

WARD 5m x 6m

WARD 5m x 6m

WARD 5m x 6m

4.5m x 6m

WARD 5m x 6m

WARD 5m x 6m

FEMALE

12m x 18m

CORRIDOR

CORRIDOR

5

CORRIDOR

DN

UP LIFT 3m x 1.75m

LIFT 3m x 1.75m

LIFT 3m x 1.75m

DOCTOR LOUNGE

UP

LIFT 3m x 1.75m

DN

6

ELECTRICAL ROOM 5m x 4m

THERAPY / TREATMENT AREA. CAR PARKING RAMP BELOW

5m x 6.5m BED LIFT 3m x 2.5

BED LIFT 3m x 2.5

+2.5m lvl

+2.5m lvl

7

AHU 5m x 3m

CCU 8m x 4.5m

8

9

AHU

TERRACE GARDEN /

5m x 3.5m

REFUGEE BALCONY

DUTY DOCTOR 8m x 5m

UTILITY 5m x 3m

PRE/POST OPERATE 5m x 3.5m

CLEAN UTILITY 5m x 3m

STERILISE

STERILISE 3.5 x 2.5m

WARD 5m x 4.5m

3.5 x 2.5m

WARD 5m x 4.5m

OT 5m x 7.5m

OT 5m x 7.5m

WARD 5m x 4.5m

LAB - CASUALTY - OT AND TREATMENTIP WARD CONSULTATION FOR ORTHO

WARD 5m x 4.5m

10

SECOND FLOOR PLAN A

B

C

1

D

E

F

G

OTS (CUTOUT) FOR

GROUND +2

2

LIGHTING AND VENTILATION

ELECTRICAL ROOM (MV/LV) MALE 3.75m x 7.5m

FEMALE 3.75m x 7.5m

6.5m x 6m

UP

TOILET FIRE LIFT

3

WARD 5m x 3.5m

DN

FIRE STAIR

WARD 5m x 3.5m

UP

CORRIDOR

UP

WARD 5m x 3.5m

WARD 5m x 3.5m

4

WARD 5m x 3.5m

WARD 5m x 3.5m

WARD 5m x 3.5m

WARD 5m x 3.5m

WARD 5m x 3.5m

12m x 18m

WARD 5m x 3.5m

FEMALE

WARD 5m x 3.5m

WARD 5m x 3.5m

WARD 5m x 3.5m

TOILET

OTS

WARD 5m x 3.5m

4.5m x 6m

WARD 5m x 3.5m

WARD 5m x 3.5m

4.5m x 6m

WARD 5m x 3.5m

WARD 5m x 3.5m

WARD 5m x 3.5m

MALE

WARD 5m x 3.5m

WARD 5m x 3.5m

PHARMACY GENERAL WARD IP WARD CONSULTATION FOR NEURO

WARD 5m x 3.5m

B

LIFT DOCTOR LOUNGE

UP

LIFT 3m x 1.75m

A

CORRIDOR

DN LIFT 3m x 1.75m

6

CORRIDOR

CORRIDOR

5

C

D

DN

E

UP

F LIFT

LIFT

G

LIFT

ELECTRICAL ROOM 5m x 4m

REFUGEE BALCONY

BED LIFT 3m x 2.5

BED LIFT

+2.5m lvl

7 AHU

NURSE ROOM

5m x 3.5m

8m x 4.5m

+2.5m lvl

AHU 5m x 3m

MEDICAL STORAGE

UTILITY 5m x 3m

8m x 4.5m

18

CLEAN UTILITY 5m x 3m

WARD 5m x 3.5m

WARD 5m x 3.5m

WARD 5m x 3.5m

WARD 5m x 3.5m

2

10

WARD 5m x 3.5m

WARD ELECTRICAL 5m x 3.5m ROOM (MV/LV)

FEMALE 3.75m x 7.5m

6.5m x 6m

UP

TOILET FIRE LIFT

3

WARD

WARD

UP

WARD 5m x 6m

WARD 5m x 6m

WARD 5m x 6m

WARD 5m x 6m

MALE

WARD 5m x 6m

DN

FIRE STAIR

CORRIDOR

6m x 3.5m

6m x 3.5m

WARD 5m x 3.5m

THIRD FLOOR PLAN 4

TOILET

WARD 5m x 3.5m MALE 3.75m x 7.5m

WARD 5m x 3.5m

4.5m x 6m

9

OTS

WARD 5m x 6m

FLOOR PLANS

WARD 5m x 6m

CORRIDOR

CORRIDOR

WARD 5m x 6m

4.5m x 6m

WARD 5m x 6m

CORRIDOR

UP

DN

UP FT 1.75m

1.75m

1.75m

DN

FT 1.75m

WARD 5m x 6m

5

FEMALE

12m x 18m

6

COMMON LOBBY

TERRACE GARDEN /

5m x 6.5m

ELECTRICAL

TERRACE GARDEN


A

B

C

D

E

F

G Ground 7 30.00 Ground 6 25.80 Ground 5 21.60 Ground 4 17.40 Ground 3

G+5

13.20 Ground 2 9.00 Ground 1 4.80 Ground 0 0.60 ground 0.00 Base -1 -3.50 Base 2 -7.00

SECTION - AA G+4 G

F

E

D

C

B

A Ground 7 30.00 Ground 6 25.80 Ground 5 21.60 Ground 4 17.40 Ground 3 13.20 Ground 2 9.00 Ground 1 4.80 Ground 0 0.60 ground 0.00 Base -1 -3.50 Base 2 -7.00

G+3

SECTION - BB

Ground 7 30.00 Ground 6 25.80 Ground 5 21.60 Ground 4 17.40 Ground 3 13.20 Ground 2 9.00

G+2

Ground 1 4.80 Ground 0 0.60 ground 0.00

SOUTH ELEVATION

Ground 7 30.00 Ground 6 25.80 Ground 5 21.60

G+1

Ground 4 17.40 Ground 3 13.20 Ground 2 9.00 Ground 1 4.80 Ground 0 0.60 ground 0.00

EAST ELEVATION

15

TRAUMA CARE

GROUND FLOOR


A

B

C

8.00

D

10.00

E

12.00

F

12.01

G

10.00

8.01

1 DN

2 MALE 3.75m x 7.5m

ELECTRICAL ROOM (MV/LV)

FEMALE 3.75m x 7.5m

6.5m x 6m

UP

TOILET FIRE LIFT

3

WATER POOL

FIRE STAIR

DN DN

BLOOD BANK 5m x 3m

BLOOD BANK 5m x 3m

PHYSIOTHERAPY - EXERCISE AREA

DN

CORRIDOR

UP

CR5

CR4

MRI COLD ROOM 5m x 3m

SERVICE

WAITING LOUNGE

CR2

CT

WAITING LOUNGE

MALE INSTRUMENT STORAGE

CR7

TOILET

4

CR6

CR3

DARK ROOM 5 x 3m

4.5m x 6m

5 x 4.2m

MONITOR 5x3m

X RAY

5 x 4.2m CR1

3m x 2.5

7

RECEPTION

BILLING 6.5m x 3.5m

BED LIFT

RECEPTION LOBBY

OBSERVATION 5m x 4.5m

3m x 2.5

+2.5m lvl

AHU 5m x 3m

DN

KITCHEN 13.5m x 7m

OFFICE 3m x 4.5m

UTILITY 5m x 3m

+0.0 lvl

PHARMACY 5m x 7.5m

+0.0 lvl EMERGENCY ENTRY

ELECTRICAL ROOM 5m x 4m

3.00

BED LIFT

+2.5m lvl +0.6 lvl

AHU 5m x 3.5m

LIFT 3m x 1.75m

UP

LIFT 3m x 1.75m

3.00

5m x 6.5m

LIFT 3m x 1.75m

BROU-GHT IN DEAD

+0.6 lvl

LIFT 3m x 1.75m

CORRIDOR

5.5M

CORRIDOR

UP

6

8

CORRIDOR

MONITOR 5x3m

MONITOR 5x3m

5

NURSE

CR8

4.5m x 6m

5 x 4.2m

FEMALE

12m x 18m

BIO- MEDICAL 5m x 3m

MINOR OT 5m x 3.5m INPATIENT

EXAMINE ROOM 5m x 7.5m

MAIN ENTRY

9

5.00

5.00

CANTEEN 15.5m x 11.5m

MEDICAL STORAGE 5m x 3m

RECEPTION- EM OUTPATIENT WAITING

+0.6lvl

EMERGENCY ENTRY 2

+0.6 lvl

DN

PHARMACY

10

60.59

HVAC LAYOUT

GROUND FLOOR A

B

C

D

E

F

G

1

2 ELECTRICAL ROOM (MV/LV) MALE 3.75m x 7.5m

FEMALE 3.75m x 7.5m

6.5m x 6m

UP

TOILET FIRE LIFT

DN

FIRE STAIR

3

OTS GENERAL WARD 10m x 12m

FEMALE

12m x 18m

4.5m x 6m

4

TOILET

MALE

GENERAL WARD 18m x 15.5m

UP

4.5m x 6m

EMERGENCY EXIT

CORRIDOR

CORRIDOR

CORRIDOR

5

CORRIDOR

UP LIFT 3m x 1.75m

DN

LIFT 3m x 1.75m

LIFT 3m x 1.75m

DOCTOR LOUNGE

UP

LIFT 3m x 1.75m

DN

6

ELECTRICAL ROOM 5m x 4m

5m x 6.5m BED LIFT 3m x 2.5

7 AHU CCU 5m x 4.8m

3m x 4.5m

3m x 4.5m TERRACE GARDEN /

UTILITY 5m x 3m

CCU 5m x 4.8m

SCRUB 5m x 3.5m

MINOR OT SCRUB 5m x 3.5m

5m x 3.5m

5.3m x 8.5m

5.3m x 8.5m

AHU 5m x 3m

REFUGEE BALCONY

MINOR OT

5m x 3.5m

9

BED LIFT 3m x 2.5

NURSE

NURSE

5m x 4.5m

8

+2.5m lvl

+2.5m lvl

ICU

8.5m x 4.5m

8.5m x 4.5m

ICU

10

HVAC LAYOUT

FIRST FLOOR

HVAC SERVICES

16


THE AUDITORIUM (FOR SCHOOL)

FORM EVOLUTION A 1

2

3

4

5

6

7

1

2

3

4

5

6

7

DN

A

A

FOOD COURT

B

FOOD COURT BELOW

R

O

CO

ID

RR

RR

ID

O

CO

R

B

CONTROL ROOM UP

C SHOP

SHOP

SHOP

SHOP

SHOP

C

SHOP

P

SHO

DN

SHOP

SHOP

SHOP

SHOP

SHO

SHOP

P

SHOP

SHOP

SHOP

SHOP

SHO

P DN

SHOP

UP

DN

UP

P

ET(M

)

D

BY

ET(F)

UP

UP

UP

UP

B ICE CO

E

DN

DN

GREEN ROOM

B

SERV

DN

INFO DESK

RRID OR

UP

INFO DESK

GREEN ROOM

GREEN ROOM

STAGE

GREEN ROOM

DN

DN

TOIL

TOIL

LOB

E

DN

SHO

DN

UP

P

SHO

D

UP

SHOP

UP

SHOP

UP

DN

P SHO

STAGE

GREEN ROOM

GREEN ROOM

F

F GUEST ENTRY

BACK STAGE

BACK STAGE DN

UP

G

G

A

PLAN AT 2M LVL

PLAN AT 7M LVL ROOF LEVEL

ROOF LEVEL

LEVEL +14.5

LEVEL +14.5

3RD FLOOR LEVEL

3RD FLOOR LEVEL

LEVEL +10.9

LEVEL +10.9

2ND FLOOR LEVEL

2ND FLOOR LEVEL

LEVEL +7.45

LEVEL +7.45

1ST FLOOR LEVEL

1ST FLOOR LEVEL

LEVEL +3.95

LEVEL +3.95

PLINTH LEVEL LEVEL +0.9 GROUND LEVEL LEVEL 0.0

PLINTH LEVEL LEVEL +0.9 GROUND LEVEL LEVEL 0.0

SECTION - BB

17

SECTION - AA


OPERATE ROOM

CEILING

ROOF CATWALK

GLAZED PANELS

GREEN ROOM

FOOD COURT

SHOPS

BACK STAGE

ACOUSTIC PANELS STAGE

SECTIONAL VIEW ASPECT This auditorium is designed with two levels of seatings, each has a capacity of 300 seats. This 600 seated auditorium is located in a main area where many commercial offices are located. It can also be used by them for their conventional meetings and functions. This auditorium thus makes a landmark to that particular region which is more attracted visually.

18


03

THIS DRAWING IS THE PROPERTY OF ARCHITECT AND MATA AMRITANANDMAYI MATH AND SHALL NOT BE USED IN ANY WAY WITHOUT THEIR WRITTEN PERMISSION.

OFFICE WORKS

NOTES: 1. 2. 3. 4.

ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED. WRITTEN DIMENSIONS ARE TO BE FOLLOWED. DRAWING NOT TO BE SCALED. ALL DRAWINGS ARE TO BE CHECKED AND CO-RELATED WITH THE RELEVANT ARCHITECTURAL, STRUCTURAL AND OTHER CONSULTANTS DRAWINGS. ANY AMBIGUITY IS TO BE BROUGHT TO THE NOTICE OF THE ARCHITECTS IMMEDIATELY.

KEY PLAN

STATUS:

SIGNATURE:

REMARK:

CLIENT:

MATA AMRITANANDMAYI MATH D3 SHANTI KUNJ, VASANT KUNJ NEW DELHI-110070 PROJECT:

MEDICAL COLLEGE BLOCK PROPOSED INSTITUTE(SUPER SPECIALTY HOSPITAL, MEDICAL COLLEGE AND NURSING COLLEGE), FARIDABAD SCALE:

DATE:

1:50

12.09.17

DEALT:

CHECKED:

REV. NO:

DWG NO:

NAVEEN RUCHI DRAWING TITLE:

TOILET LAYOUT T2 MC BLOCK 1 LGF ARCHITECTS

H-1470,BASEMENT FLOOR, CHITTRANJAN PARK, NEW DELHI - 110009. PH: 011-26274983,40560775 EMAIL : aimsppal@gmail.com

(Professionals for planning architecture and landscape)

THIS DRAWING IS THE PROPERTY OF ARCHITECT AND MATA AMRITANANDMAYI MATH AND SHALL NOT BE USED IN ANY WAY WITHOUT THEIR WRITTEN PERMISSION.

NOTES: 1. 2. 3. 4.

ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED. WRITTEN DIMENSIONS ARE TO BE FOLLOWED. DRAWING NOT TO BE SCALED. ALL DRAWINGS ARE TO BE CHECKED AND CO-RELATED WITH THE RELEVANT ARCHITECTURAL, STRUCTURAL AND OTHER CONSULTANTS DRAWINGS. ANY AMBIGUITY IS TO BE BROUGHT TO THE NOTICE OF THE ARCHITECTS IMMEDIATELY.

KEY PLAN

STATUS:

SIGNATURE:

REMARK:

CLIENT:

MATA AMRITANANDMAYI MATH D3 SHANTI KUNJ, VASANT KUNJ NEW DELHI-110070 PROJECT:

MEDICAL COLLEGE BLOCK PROPOSED INSTITUTE(SUPER SPECIALTY HOSPITAL, MEDICAL COLLEGE AND NURSING COLLEGE), FARIDABAD SCALE: DATE:

REV. NO:

12.09.17 DEALT:

CHECKED:

DWG NO:

NAVEEN RUCHI DRAWING TITLE:

TOILET LAYOUT T2 MC BLOCK 1 LGF ARCHITECTS

H-1470,BASEMENT FLOOR, CHITTRANJAN PARK, NEW DELHI - 110009. PH: 011-26274983,40560775 EMAIL : aimsppal@gmail.com

(Professionals for planning architecture and landscape)

19

TOILET DETAILS


THIS AND WRITT

D

C

D

C

485

175

ST

1460

855

900

NOTE 1.ALL MENT 2.WR DRAW 3. AL CO-R STRU ANY THE A

A

A

2600

B 985

B

750

855

1475

PLAN

FIRST FLOOR TOILET T1 PLAN ELEVATION B

ST

ST

300

450

450

R

300

300

450

REVISIO

730

DATE

PROJ

265

250

450

250

480

900

120

315

300

1200

300

300

300

300

R

RES

H-1

DELHI--

SCALE:

1:20

DEALT:

ELEVATION D

ELEVATION A

NAV

ELEVATION C

DRAW

TOILE FIRST

ARCH

PP

A

E

(Professio architectu

THIS DRAWING IS THE PROPERTY OF ARCHITECT AND MATA AMRITANANDMAYI MATH AND SHALL NOT BE USED IN ANY WAY WITHOUT THEIR WRITTEN PERMISSION.

1310

NOTES:

200

ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED. WRITTEN DIMENSIONS ARE TO BE FOLLOWED. DRAWING NOT TO BE SCALED. ALL DRAWINGS ARE TO BE CHECKED AND CO-RELATED WITH THE RELEVANT ARCHITECTURAL, STRUCTURAL AND OTHER CONSULTANTS DRAWINGS. ANY AMBIGUITY IS TO BE BROUGHT TO THE NOTICE OF THE ARCHITECTS IMMEDIATELY. 115

C

KEY PLAN

600

300

300

300

rem.

530

300

480

1025

300

D

495

1510

575

REMARK:

SIGNATURE:

645

E

520

STATUS:

600

865

1200

D

320

230

175

250 120

640

600

125 1000

1190

B

115

1015

Toilet Layout -T2 Master Bedroom

Section D

330

Flooring Layout -T2 Master Bedroom

Toilet RCP-T2 Master Bedroom

290

H-1470,BASEMENT FLOOR, CHITTRANJAN PARK, NEW DELHI - 110009. PH: 011-26274983,40560775 EMAIL : aimsppal@gmail.com

Section A

235 155

2210

450

1175

1170

450

1170

125

E

Section B

Section C

260

1200 150

TOILET LAYOUT T2 MC BLOCK 1 LGF ARCHITECTS

320

450

150

DRAWING TITLE:

300

NAVEEN RUCHI

50 1015

710

DWG NO:

455

CHECKED:

145

DEALT:

120

REV. NO:

12.09.17

E 270

425

150

PROPOSED INSTITUTE(SUPER SPECIALTY HOSPITAL, MEDICAL COLLEGE AND NURSING COLLEGE), FARIDABAD

390

445

PROJECT:

1040

235

1190

1190

1190

600

MEDICAL COLLEGE BLOCK

SCALE: DATE:

300

A

CLIENT:

MATA AMRITANANDMAYI MATH D3 SHANTI KUNJ, VASANT KUNJ NEW DELHI-110070

260

B

900

480

450

50

450

C

600

230

475

1135

300

905

1370

REM.

115

1. 2. 3. 4.

1015

Section E

(Professionals for planning architecture and landscape)

PPAL

20


LIBRARY SECTION

 - SECTION A LIBRARY



21

SKYWALK PROFILE


LEVEL - 1

FLOOR PLANS - LIBRARY

LEVEL - 2

22

4TH FLOOR - 1200 SQ. METERS

LIBRARY - LEVEL 2

ALL DIMENSIONS AR WRITTEN DIMENSION DRAWING NOT TO BE ALL DRAWINGS ARE RELEVANT ARCHITEC DRAWINGS. ANY AM ARCHITECTS IMMEDI

D

CHECKED:

DATE:

23.09.17

SCALE:

1:250

R0

RE

PROPOSED INSTIT MEDICAL COLLEGE FARIDABAD

MEDICAL COLLEGE

PROJECT:

MATA AMRITANAN D3 SHANTI KUNJ, NEW DELHI-11007

CLIENT:

(Professionals for pl

ARCHITECTS

L 4TH FLOO

CONSULTANTS: LIBRARY

DRAWING TITLE:

NAVEEN RUCHI

DEALT:

R

R

SCALE: DATE:

1:250 23.09.17 STATUS:

PROPOSED INSTIT MEDICAL COLLEG FARIDABAD

MEDICALMEDI COLLEG

PROJECT:

MATA AMRITANAN D3 SHANTI KUNJ, NEW DELHI-11007 BLOCK-1

CLIENT:

KEY PLAN

1. 2. 3. 4.

NOTES:

THIS DRAWING IS THE PROPERT AND SHALL NOT BE USED IN AN

CONSULTANTS:

STATUS:

MEDI


H

TOM OF NKEN SLAB. 00mm LVL

SB-1

E

SB-

P1

SB-2

SB-

E

E

P2

PRESS1

PRESS2

E

E

ST-1

DESCRIPTION

P4

E

P3

E

E

E

SB-3 BOTTOM OF SUNKEN SLAB. +3375mm LVL

ELECTRICAL DRAWING SLEEVE-1

SLEEVE-1

REF GRID

OWER GROUND FLOOR P1

TOM OF KEN SLAB. 00mm LVL

P2

SL SLEEVE-1

SL B2/Y1 PRESS1

PRESS2

B2/Y2

FHC:-01 10

B2/Y3

B2/Y5 B1/Y1

B2/Y4

12

P4

P3

ST-1

BOTTOM OF SUNKEN SLAB. +3375mm LVL

VSL

VSL

VSL

VSL

FIRE FIGHTING SYSTEM

REF GRID

LOWER GROUND FLOOR AIIMS MEDICAL COLLEGE 23


DATE

REV. NO

SHAFT LEGEND TYPE CHILLED WATER

ELECTRICAL

PRESSURIZATION

P8

PASSENGER LIFT

FIRE / SERVICE LIFT

E PASSENGER LIFT

FIRE / SERVICE LIFT

-6

FHC CUTOUT

E

P5

ELEC LV-1

-5 PRESS-3

E

E

RAIN WATER PIPE

PRESS-4

300MM WIDE CABLE TRAY

150MM WIDE CABLE TRAY

E 150MM WIDE CABLE TRAY

150MM WIDE CABLE TRAY

PLUMBING

R1

E

SB-3

E

SB-4

LDB-1

LPDB-10

PDB-1

UPSDB-1

THIS DRAWING AMRITANANDM WITHOUT THEI

EDB-1

SB-1

NOTES:

SB-2

1. 2. 3. 4.

ALL DIMEN WRITTEN DRAWING ALL DRAW RELEVANT DRAWING ARCHITEC

P6

P7

E STATUS:

ELEC MV-1

CONSULTANTS:

E

E

KEY PLAN

SB-4

GOO

PPAL

BOTTOM OF BEAM. +3125 MM LVL

VSL

BOTTOM OF SLAB. +3675 MM LVL

BLOCK-1

VSL

SLEEVE-2

BOTTOM OF SUNKEN SLAB. (AS SPECIFIED) VSL

BLOCK-2

BLOCK-3

VSL

PASSENGER LIFT

FIRE / SERVICE LIFT

PASSENGER LIFT

FIRE / SERVICE LIFT

MATA AMRI

D3 SHANTI SHAFT LEGEN TYPE

NEW DELHICHILLED WATE

PROJECT: ELECTRICAL

MEDICAL CO

PRESSURIZATIO PROPOSED MEDICAL CO FARIDABAD

P8

SLEEVE-2

REVISIONS: CLIENT: DATE REV

SLEEVE-2

SCALE:

DATE:

1:100

30.08

FHC CUTOUT DEALT: CHECK

NAVEEN RUC

ELEC LV-1

P5

SLEEVE-1

PRESS-3

DRAWING TITLE:

RAIN WATER PI

PRESS-4

SLEEVE-2

VSL

B2/Y6

B2/Y6'

B1/Y2

R1

VSL SLEEVE-1

SLEEVE-1

SLEEVE-1

FHC:-02

BLOCK-1 LOWER G ELECTRI ARCHITECTS

B2/Y7 B1/Y7

B2/Y7'

PLUMBING

(Professionals fo

P6

P7

11

STATUS:

ELEC MV-1

BOTTOM OF BEAM. +3125 MM LVL BOTTOM OF SLAB.

VSL

VSL

VSL

VSL

+3675 MM LVL

BOTTOM OF SUNKEN SLAB. (AS SPECIFIED)

LOWER GROUND FLOOR

BLOCK-1

BLOCK-2

CONSULTANT

24

CLIENT:

MATA AM D3 SHAN NEW DEL PROJECT:

MEDICAL

PROPOS MEDICAL FARIDAB SCALE:

DA

1:100

30

DEALT:

CH

NAVEEN R

DRAWING TITL


F A C A D E

D E S I G N







 

 

UP

3'-7"



1'-5"

8'-3"

21'' 9'-9" 3'-6"

1'-4"

 

1'-9"

W2

9'-3''

9" ED

1' 1'

D2

LIVING

1'-6" UP

5'-6"

6'-1"

6'-6"

MASTER BEDROOM

9'-3''

9'-10"

20'6''

5'-7" 3'

9'' WALL



D1

3'-6" 1'-8"

40'

 

4'-7"

1'

1

16'-8"

1'

2

D2

1'-6"

3'

2'-9"

D2

2' loft above door

4 3

WARDROBE

TOILET 3'10"X6'1"

PUJA 3'0''x4'7''

23

 

3'-5"

1'

10"

2'-3"

22

5

16'-6"

1'-8"

21

7

6'-2"

D1

4'-9"

V2

1'-6"

2' loft above door

20

6

KITCHEN

19

16'

16'-6"

8

6'

1'

TOILET 4'0"X6'1"

BEDROOM

18

10 9

10'

2'-2"

V2

2'-10"

W4

1'-6"

1'-10"

1'-8"

17

11

1'

12'-1"

16

2'-3"

7'-11"

13

7'-8"

15

12

 

1'-9"

SD1

14

1'

W2

2'-6"

8'-8"

7'

UTILITY 6'x3'

4'-7"

27''

1'-6"

W2

3'-4"

 

1'-6"

3'

29.5''

60'

2'-7"

W5

  

UP

3'-11"

  30' ROAD

10'



9'



18'





1'

15'-9"

  25.5''

5'

1'

1'

1'

6'-7"

9"

9"

9"

9"

 

1'

14'-5"

1'

30' ROAD 





 

 





 

 

GROUND FLOOR

NORTH



G+1,G+2 - (TYPICAL)

7'-5"

8'-3"

21'' BALCONY

9'-9"

2'-3"

10'-5"

1'-5"

5'-6"

3'-7"

6'-1" 7'-11"

8'-8"

7'-8"

6'-6"

2'

2' 

UTILITY 6'4''X2'9''

6'-4"

1'-9"

SD2

2'-9"

 

W3

5'-6"



4'-7"



2'-6"

2'-2"

3'-5" 4'-2"

1'

V1

5' SD1

V1 BALCONY

1'-4"

2'-3"

6'

TOILET 4'0"X5'11"

5'-8"

TOILET 4'0"X5'11"

BEDROOM

1'-6"

W2

D2

5'-11"

10'

 MASTER BEDROOM

D1

D2

2' loft above door

7'-5"

7'-8"

1'-5"

6'-9"



9'-8"

5'

8'-3"

4'-10"

14'-10"

1'-6"

D1

1'

1'

8'-6" 

LIVING

8'-3"

16'-6" 

 

 

8'-10"

PUJA 3'0''x4'10''

D2

10'

3'-6"

9'-3''

3'

KITCHEN

BALCONY

D2

W2

19'-11"

BEDROOM

W1

MASTER BEDROOM

9'-3''

3'

13'-10"

2'-3"

D1

19'-11"

2'-9"

BALCONY

10'-5"

4'-7"

LIVING

D1

10'

2'-8"

6'-11" 2'-5"

8'-4"

5'-7"

SD3

3'

D1

11'-4"

15'-3"

12' 1'-7"

UP

3'-1"

D2

D2

1'-6"

 

3'-5"

WARDROBE

LIVING

1

D1

13'-1"

23''

2

1'

10"

PUJA 3'0''x4'10''

20

D1

2' loft above door

3'-10"



19

3

10'-3"

8'-5" 4'-2"

40'

9"

8'-10"

D2



18

4

6'-2"

D1

4'-9"

V2

1'-6"

2' loft above door

17

1'

TOILET 4'0"X6'1"

BEDROOM

KITCHEN

2'-2"

V2

2' loft above door

TOILET 3'6"X6'3"

3'

6 5

1'

10'

16

D1

3'-10" 3'-5"



15

6'

2'-3"

2' loft above door

V1

13 14

7

1'-6"

2' loft above door

 

12

10

MASTER BEDROOM

 

11

8

W3



7'

W2

2'-6"

SD1

9

4'-5"

UTILITY 6'x3'

1'

2'-9"

KITCHEN

1'-6"

10"

 

W2

2'-7"

D2

14'-10"

9'-8"

6'-11"

1'-6"

4'-10"

TOILET 4'0"X6'1"

1'-7"

W1

5'-10"

SD1

1'

V2

3'-7"

2'

9" 6'-1"

 

UTILITY

27''

3'

60' 7'-4"

  

25.5''

14'-8"

  NORTH






 

 

60'

2'-3"

BALCONY

L30

SP27 P27

2'

2'-11"

2'

2'-10"

2' SWL10 SF3 SL10 P17 SP17

3'-9"

SWL18 SF6 SL21 P38 SP38

1'

3'-9"

L21

 SL22 P39 SP39

1'-6"

SWL17 SG SE L22 SL23

2'-7"

WL17

L23

BALCONY

L23



 

 





 

 

NORTH

SOIL STACK

COLD WATER SUPPLY GRAY WATER DOWN TAKE

3'-6"



SOIL STACK



 

GRAY WATER DOWN TAKE

 



1'-6"

L20

1'-6" ML6



F6

2'-9"

1'-6" 1'-6"

SL12 P18 SP18

3'-10"

2'-3"

WL16

P31 SP31 P30 SP30

L21

MASTER BEDROOM

2'-7"

L19

1'-6"

4'-5"

SP37 P37 SWL18 SL20 RF6 SF6

SWL16 SE SG ML4

WL18

1'-6"

3'-6"

L18

4'-8"

SP36 P36

1'-6"

L10

WL10

P40 SP40 SML6

2'-3" F5

2'-7"

L17

ML5

L20

SP35 P35

1'-6"

P41 SP41 SML5

2'-3"

SL14 SL15 SF4 RF4 SWL13 P28 SP28 SWL15 SF5 RF5 SL19 P28 SP28

WL15

3'-6"

L16

SML4

L9

 

F3

4'-5"

5'-11"

WL13

L10

1'

4'-1" F4

L19

SP34 P34 SP33 P33 SP32 P32

5'-11" L15

L18

BALCONY

P21 SP21 SML2 SE SG P22 SP22 SML1

2'-3"

SWL7 SF2 RF2 SL8 P7 SP7 SL3 SL4 SF1 RF1 SWL5 P6 SP6

4'-1"

L15

SP15 P16 SP16

1'-6"

L30

SF8 SWL21 SL29 P53 SP53 SL30

P20 SP20 SML3

3'-6"

3'-6" 2'-3" SL2 SL3 SWL4 P1 SP1

1'-6"

2'-3"

WL11

SWL11

1'-6" L29

2'-10"

1'-6"

1'-4"

1'-6"

SL13 SL14 SWL12 P23 SP23

LIVING

1'-11"

KITCHEN

1'-6"

L28

1'-6"

4'-4"

SP25 P25 WL14 SP26 P26

F8

2'

2'

WL12

L9

2'-3" 4'-5" P15

P11 SP11 P12 SP12 P13 SP13

SWL15 SL18 SF5 P29 SP29

BALCONY

2'

1'-3"

1'-6"

SL27 SP45 P45

L27

1'-3"

4'-4"

4'-4"

L27

P50 SP50 P51 SP51 P52 SP52

L4

2'

WL21

SF3 RF3 SL9 SWL10 P14 SP14

L4

L14

L16

P19 SP19 SL11

5'-11"

WL4

L14

1'-7"

L12

1'-6"

8'-10"

SWL14 SL16 SE SL17 P24 SP24

ML3

L12

L11

SE SG SWL9

WARDROBE

 

G+1,G+2 TYPICAL

L25

P46 SP46 P47 SP47 P48 SP48

WL5

F1

L13

L29

4'-8"

WL20

F7

L28

SL28 RF8 SF8 SWL21 P49 SP49

SL25 SWL20

2'

L26

1'-6" PUJA

2'-6"

LIVING

CBS

4'-8"

L25

5'

L13

WL9

WARDROBE

 

SWL8 ML1

3'-9"

L3

DB

L1

ML2

L8

8'-10"

DB

SL24

2' WL19

SWL2 SL1

WL8

1'-6"

F2 L7

L2

1'-6"

3'-2"

L24

L26



4'

3'-4"

P42 SP42

3' SP44 P44



SWL1

UP

L24

1'-6"

ML7



PUJA

4'-8"

SP9 P9 SP10 P10

L3

L2

L34

SWL19 SL26 RF7 SWL19

P43 SP43 SML7



F9

19 20

1

P60 SP60 SWL24 SF9 SL34

18

DB

SE SG SWL22

WL22

FROM GF

2

1'-6"

L34

2'-3"

 

17

4

1'-6"

5'-9" 2'-6"

3'-9" P54 SP54

40'

2'-6"

1'-6"

6 5

1'-6"

SP2 P2 SL6 SE SL5 SWL6

L5

16

3

P59 SP59 SF9 4'-1" RF9 SWL24 SL35

L31

15

L8

WL7

KITCHEN

1'-6"

1'-6"

5'-9"

SP61 P61 SL36

L35

WL24

PL1

14

7

MASTER BEDROOM

SL33 SL32 SWL23 P58 SP58 SPL1 SL31

13

9

L5

L7

3'

P4 SP4 WL6 P3 SP3

WL3

3'

10

2'-3"

L32

12

8

L35

 

eq

TO SF

11

4'-10"

ML8

WL23 P55 SP55

L36 SE SG SWL25

WL25

P62 SP62 SML8

P56 SP56

eq

1'-4"

AC

1'-4"

2'-6" L32

WL2

L6

SWL3

2'-10"

1'-6"

4'-5"

2'-6"

 

2'-11"

P5 SP5

3'-5"

SWL7 SL7 SF2 P8 SP8

L33

P57 SP57

GRAY WATER DOWN TAKE

HOT WATER SUPPLY

HOT WATER SUPPLY COLD WATER SUPPLY COLD WATER SUPPLY HW

HW

HW

13

9

16

6

 

17

5 FROM GF

4 3

18 19 20

2 1

BEDROOM

15

7

MASTER BEDROOM

KITCHEN

14

8

BALCONY

12

10

WARDROBE

TO SF

11

 

 

HW

HW

 

PUJA

UP

SOIL STACK GRAY WATER DOWN TAKE COLD WATER SUPPLY

 

 

HOT WATER SUPPLY HW





LIVING

PUJA

 







HW

 

HW

GRAY WATER DOWN TAKE

HW

BALCONY

WARDROBE

KITCHEN

LIVING

RAIN WATER PIPE



MASTER BEDROOM

HW

HW

HW

HW

BALCONY

   HOT WATER SUPPLY COLD WATER SUPPLY

COLD WATER SUPPLY

SOIL STACK

G+1,G+2 TYPICAL

GRAY WATER DOWN TAKE





 

 

NORTH


3'-6"

4'-2" 10

ROAD

4'-3"

FFL 18'-6" RFL 10'-0"

2'

12 11

BALCONY 11'6" X 6'0"

10'-1"

9"

GATE

4'-2"

FFL 8'-0" RFL 10'-0"

95°

1''

9

LVL = 0'-0"

1'

PLAN

E

11'-4"

5'-10"

9"

ENTRY 7'3" X 8'3"

8

48°

7

3'

4'-2"

MS RAILING

DESIGNED NAVEEN MANJUNATH : NTS BY : SCALE

1' 5'-10"

4"

ARCHITECT :

GROUNDDRAWING FLOOR TITLE LINTEL : COMPOUND WALL DETAILS LVL +15'6"

7ARCHITECT :

#320- ARCADE Brigade Metropolis, Whitefield Main Road, Bengaluru - 48

HANDRAIL DETAILS

10'

10'-2"

BALCONY 11'6" X 6'0"

4"

2'

GROUND FLOOR LVL +8'0"

B

PROJECT LOCATION :

CLIENT :

DESIGNED BY :

NAVEEN

HSR LAYOUT, BANGALORE

MR. SIDDIQUE

CHECKED BY :

MANJUNATH

1'

3'-3"

MS RAILING

DRAWING TITLE :

ARCHITECT :

FIRST FLOOR LINTEL LVL +26'0" HANDRAIL DETAILS

6"

A

11'-4"

8'-9"

06-12-2017

6"

FFL 18'-6" RFL 10'-0"

3'

1'-1"

1'

3'

1'

7' 4"

2'-10"

E

6"

8'-9"

#320- ARCAD Brigade Metrop Whitefield Main Bengaluru -

1'-3"

10'

9"

SCALE : NTS

4"

3'

1'-1"

1'

B

B

1'-5"

6"

3"

6"

2"

6'-

3'

6"

1'-1"

4'-10" 3'-7"

2'-4"

3" FIRST FLOOR LVL +18'6"

3" 1'-5"

4"

6"

6"

29°

FIRST FLOOR LINTEL LVL +26'0"

3'-

6"

6"

4"

3'-

1" R7'-

32°

3"

SECONG FLOOR LVL +29'0"

A

1'

"

'-3

10

#320- ARCA Brigade Metro Whitefield Main Bengaluru

9'

17'-6"

SECONG FLOOR LVL +29'0"

29 DATE

1'

1 2

3'-3"

8"

DRAWING TITLE :

MR. SIDDIQUE

1'-6"

:

4'-2"

1'-1"

3'

GROUND FLOOR LVL +8'0" FIRST FLOOR LVL +18'6"

A

SCALE : NTS

FIRST FLOOR LVL +18'6"

DATE

6"

1'

7

1'

2'-6"

12'-3"

E

3' CLIENT :

HSR LAYOUT, BANGALORE

MANJUNATH

4'-2"

4" 9"

4'-2" 5'

10' 3'

CLIENT :

8

1'-6" 12'-3" 4"

CHECKED BY :

9

ELEVATION

FIRST FLOOR LINTEL PROJECT LOCATION : MR. SIDDIQUE 06-12-2017 HSR LAYOUT, BANGALORE LVL +26'0"

:

4'-2"

FFL 8'-0" RFL 10'-0"

11

MS RAILING B

1'

KED :

NAVEEN DATE

DETAIL A

12

1'-1"

NED :

ENTRY 7'3" X 8'3"

GROUND FLOOR LINTEL LVL +15'6"

1'-6" 7'

4" 4" 4" 3" 1'-2"

1'-7"

3" 4" 4" 4"

4'

4"

11'-4"

PROJECT LOCATION :

06-12-2017

5''

10

SECONG FLOOR LVL +29'0"

:

eq

8"

1"

A

FFL 18'-6" RFL 10'-0"

6"

2'1' STILT FLOOR LVL -2'3"

BALCONY 11'6" X 6'0"

3'-10"

1"

eq

FIRST FLOOR LVL +18'6"

5'

1'-6"

9"

1'-1"

FIRST FLOOR LVL +18'6"

9"

PLANTER BOX 3" THK.

4"

1'-6"

E

4"

3'-6"

7

1'-5" FIRST FLOOR LINTEL LVL +26'0"

PLANTER BOX 3" THK.

9"

1''

3'-4"

2'-6"

3'-10"

SECONG FLOOR LVL +29'0"

GROUND FLOOR LVL +8'0"

1 2

9'

E

LVL+ 1'.6"

1

3'-4"

1'-6"

4.5''

3'-10"

3"

2

3

1''

4

85°

5

3'

6

PLANTER BOX (ABOVE) 3" THK.

4''

7

PLANTER BOX 3" THK.

06-12-2017

PROJECT LOCATION :

CLIENT :

DESIGNED BY :

NAVEEN

HSR LAYOUT, BANGALORE

MR. SIDDIQUE

CHECKED BY :

MANJUNATH

DATE

:

SCALE : NTS

RESIDENTIAL PROJECTS :

06-12-2017

PROJECT LOCATION :

CLIENT :

DRAWING TITLE :


4"

4' 1'-10"

OUT

IN

1'-6" 1'

IN

W3

W6

UPVC

IN

1'-2"

6"

1'-7"

4"

1'-7"

4"

4"

6' 3'-10"

1'-6"

1'-2"

4" 8"

eq eq 2'-4"

eq eq 2'-5" CORNER WINDOW FLOOR LVL

2"

2'-9" 1'-6" 7"

IN

OUT

W5

1'

1'

4'-6" 5" 5"

6'-6" 4'-6" 10"

2'-6" 2'-1"

OUT

OUT

UPVC

W2

4"

4"

OUT

UPVC

W1

2'

6' 3'-10"

1'-6"

IN

4"

2'

1'-10"

1'-9"

4"

2'-9" LINTEL LVL

2"

OUT

UPVC

W7

UPVC

W10

14 MM SQ.BRIGHT BARS GRILL IN

2'-9"

1'-8"

14 MM SQ.BRIGHT BARS @4" SPACING

2'-6"

6"

1'-6"

IN

OUT

1'-1"

2"

1'-6"

4"

2'-9"

2'-9" 1'-6" 9"

4'

6'-6"

4'

5'-6"

5'-6"

5' 4'-6"

IN

14 MM SQ.BRIGHT BARS @4" 4" 9" 4" SPACING 6"

4"

2'-6"

6'

1'-6"

2'-6"

2'-6"

2'-6"

1'-6"

4'

14 MM SQ.BRIGHT BARS @4" SPACING

1'

4"

1'

1'

5'-6"

14 MM SQ.BRIGHT BARS @4" SPACING

1'-6"

2'

GROUND FLOOR SLAB

6"

1'-6"

6'

3'-9"

5'

4'

2'-9"

UPVC

1'

B

-9

"

4"

2" X 3" THK

EXPANSION GAP

DETAIL

2''

DETAIL B

5

6

1' 1'-3" 1'

BW1

"

B

7"

1'-

4'-6"

1

2

3

14 MM SQ.BRIGHT BARS

4

5

6

8

7

10

9

9'-6"

UP

9"

135

°

FFL 8'-0" RFL 10'-0"

4'-6"

11

21 20 19 18 17 16 15 14 13 12

TREAD : 10" RISER : 6"

9"

WINDOW DETAILS

DETAIL E

TERRACE

2'-6"

3''

9''

1'-1'' 4

7"

150°

1'-6"

4"

6"

4"

4"

5"

3

135

4" 6"WOODEN SHUTTER

"

150°

1'-

-9

1'

1'-9"

°

WOODEN FRAME 10" FOR BAY WINDOW

OUT

1'-9

1'-9"

'

2

15

BW2

2"

TERRACE LVL +30'6"

7

8

10

9

9'-6"

SECOND FLOOR LINTEL LVL +27'6"

9"

3'

10'

UP

1'-3"

5' IN

3'

1

1'-9"

7" 5" 5" 7"

BAY WINDOW

2'

IN

W11

4"

2"

1'-3"

4' 1'-10"

OUT

DETAIL - A

2" X 3" THK WOODEN SHUTTER

DETAIL A

B

4"

2'-3"

FLOOR LVL

15 2" 9° 10"

2''

2'-3"

4"

"

WOODEN BEADING

2

4

15

14

13

NOTE : - KINDLY REFER TO12 SITE FOR 11 STAIRCASE PRECISE DIMENSION 10 9 1'-5"

OFFICE WORKS ARCHITECT :

5

6

7

8

16

15

13

12

18

1 17

16

8

7

7'

5

6

A

15

13

12

11

10

7'

14

STAIRCASE 2 1

CAR PARK

11 10

9

3

4

9

7'-6" 9'-9"

LOBBY

2

4

3

10' 7'

14

DATE

1'-6"

2'-6"

17

10'

18

8

7

10'-2"

19

5

6

11 10

9

8 5

7 6

STORAGE / UPS

2'-6"

16

SECTION BB

:

06-12-2017

DESIGNED BY : NAVEEN

10'

17

STILT FLOOR LVL -2'3"

CHECKED BY :

7'

18

12

4"

2'-6"

11 10

PWDR ROOM

GROUND FLOOR LVL +8'0"

TOILET

19

13

STAIRCASE

7'

9

14

2'-3"

3

5

6

7

8

12

10'-2"

20

20

4

1'-5"

13

15

0"

14

16

2'-6"

15'-6"

7'

17 DETAIL A 16

18

17

GROUND FLOOR LINTEL LVL +15'6"

10'

19

18

3

2

1

10'

4''

1''

21

5''

STAIRCASE

1

TOILET

FIRST FLOOR LVL +18'6"

eq

15

21

19

STAIRCASE

15'-6"

4"

1'' 20

20

2'-6"

1'' 85°

48°

eq

1' 1'-1"

21

21

FIRST FLOOR LINTEL LVL +26'0"

1'-6"

2''

DETAIL B

95° 1'

BED ROOM

SECONG FLOOR LVL +29'0"

9"

11'-2"

21 20 19 18 17 16 15 14 13

3'-6"

3'

TREAD : 10" : 6"

4''RISER 12

7'

4'-6"

11

7'-6"

FFL 8'-0" RFL 10'-0"

LINTEL LVL

1'-7"

3'

1'-7"

7" 5" 5" 7"

BAY WINDOW

1'-9

3"

6" 5" 5" 6"

3'

6"

1'-6"

UPVC

6" X 3" THK WOODEN FRAME

6" 5" 5" 6"

1' 6" 5" 5" 6"

2' 1'-2"

OUT

W9

6" 5" 5" 6"

4'-6"

1'-7"

5' 5" 5"

10"

IN

1'-9"

'

4'-6" 2'-4"

1'-6"

6" 5" 5" 6"

1'-6" 4"

OUT

A

W8

4"

1'-9"

3'

OUT

IN

2'-1"

1'-9"

90°

2'-6"

6"

1'-9"

2'-2"

12' 6'-3"

2'-6"

1'-2"

6"

1'-6"

2"

1'-6" IN

4"

6'-6" 4'-6"

5'-6"

1'-6" 1'-6"

14 MM SQ.BRIGHT BARS @4" SPACING

10"

5'-6"

E

1'-9"

14 MM SQ.BRIGHT BARS @4" SPACING

1'

2'

1'-3"

4'

1'-6"

1'

4'-6" 2'-6"

1'-6"

1'

2'-6"

2"

12' 6'-3"

2'-6"

OUT

CW1

MANJUNATH

SCALE : NTS

PROJECT LOCATION :

CLIENT :

DRAWING TITLE :

HSR LAYOUT, BANGALORE

MR. SIDDIQUE

SECTION

ARCHITECT :

30

#320- ARCADE Brigade Metropolis, Whitefield Main Road, Bengaluru - 48


STACKED STONE CLADDING

SHERA WOOD CLADDING CONCRETE PLAIN (SEAMLESS)

GRC JAALI

WODDEN SIDINGS

WALL PAINT

WALL PAINT

Stone Cladding- Caldera grey Finish : Rustic Punch Size : 148.5x450mm SKU Code: T14851718 (might vary depending on the availability)

Eaves

Material : Everwood WPC

Chajja (Ultima allura graniza)

Wall paint

Dark Grey colour

Asian Paints (Royal Lustre) Shade: L152 Cream pie

MS Handrails(Customized) with Toughened glass

Asian Paints (Ultima allura graniza) Dark Grey colour

MS Swing Gate(Customized)

SHERA WOOD planks Bolted to MS

31

(Ultima allura graniza) Dark Grey colour

- SHERA WOOD mounted

SHERA WOOD

WALL: Asian Paint Royal Lustre (Colour: L512 Cream pie)

STONE CLADDING Caldera grey

Wooden Eeaves: WPC


METAL JALI

GREY COLOUR PAINT

WHITE STUCCO FINISH

WOODEN CLADING

Brcik cladding

GREY COLOUR PAINT

WHITE STUCCO FINISH

32


built-form

density

ISSUES IN HOUSING

time constrain

sanitation

migration

image courtesy: https://www.urbanadventures.com/Bangalore-tour-pollinate-solar-slum-tour

community participation

availablity of land

local shops

IT companies

Unintented planning

transport node

leads to the creation of these habitable spaces.

image courtesy: http://bangalore.citizenmatters.in/uploads/picture/image/17112/pic_article_ejipura_sankar.JPG

https://www.linkedin.com/pulse/business-model-serving-low-income-indians-anurag-bhatia/

by the local community + effective use of available areas.

in waste management and sanitation.

Placemaking

Lack of awareness

SITE OPPORTUNITIES

Present housing issues and the site oppurtunities have been analysed and linked to solve the crucial issues, to make the housing idea sucessful as per the vision of INDIAN GOVERNMENT.

+

+

Single unit is linearly planned with built-in furniture that can be used flexibly, to accomodate their daily needs. It is also perforated in the front and rear for easy cross ventilation and lighting.

The clusters have been arranged in a way to get a space that will incorporate the services and the Rain water harvesting ideas.

The units have been arranged arround the courtyads to form a clusted that acts as the community space for the rehabilitated people.

DESIGN INTENT

IDENTIFIED SITE

N

LOCATION :

The site identified for this project comes under the area improvement

KORAMANALA,

perimeter of the BDA(Bengaluru Development Authority) and also has the existing slums in the fringes of the existing lake. As per propsed landuse map the identified site incorporate the housing for EWS (Economically weaker section)

BENGALURU.

As per the propsed master plan on Bangalore Development authority the identitied site in recommended to the MIXED USE area alloted for

EWS. The strength of the site is the major link road that connects Adugo-

di to Koramangala, with the transport node that acts as the vantage point.

The blocks are repeated to create a macro level courts that incorporates the services and the intermediate green spaces. It also has the grey water treatment spaces.

The puncture in the blocks have been made to bring in the good lighting. It permits the balcony in the removed volumes. All the blocks have been raised in stilts to bring in the smaller commercial activities that will be for

the community from the community.

CONCEPTUAL SITE MASTER PLAN

utility balcony 2.3 x 0.83

bath 0.9 x 1.4

1

toilet 0.75 x 1.4

courtards have been created to bring in the natural lighting, cross-ventilation and the cluster ideology to the housing

6.9 mm

kitchen 1.5 x 4.2

2

private space 2.28 x 2.2

the blocks have been stacked-up to accomodate the housing units. balcony 0.83 x 2.66

living 1.5 x 4.2

3

at each level two units have been removed, so that the floor spaces in the above also gets a community space.

carpet area: 30.6 sq.m 4.2 m estimated budget : 3.051 Lakhs

units are in m

unit plan

precast hollow core slab

4

cores have been subtracted vertically to incorporate the plumbing and the electical lines. without disturbing the idea of our cluster.

ferrocement box wall

bison board

brick wall

5

the pavilion / semi-open terrace created between the slabs have been assigned for the multiple facility.

ladder precast vertical member

MS frame precast hollow core slab cement panel door MS sheet

6

woven bamboo panel

the massing that shows the idea of PLACE MAKING IN ARCHITECTURE. MS bracing

04

gabion foundation

COMPETITION

KIT OF PARTS ASSEMBLY

a r c h i t e c t u r e i s t h e a r t o f p l a c e m a k i n g

BUILDING FOR A BILLION c a t e g o r y

u r b a n p o o r u n b u i l t

1 A

1

panel


%

m

-5

q.

ra w ja at k a er a ch lva an yi ne l ci 28 vil 52 am sq en .m it i

0 -1 SR O

es

5s 70 :5 %

ll oc al ity la pu rg e bl r f ic ri in ng to es th th e at co in ho m vi us m te in un s t g ity he cl us te r co m m un ity co ur ts

ia nt de si re

N

FIGURE GROUND PLAN

SITE MASSING

courtyard / community garden

SITE MASSING

primary school space

community terrace

space for empowerment

GF PLAN

FF PLAN

SF PLAN

site location : koramangala, bangalore. KA site area :

5705l sq.m

FAR : max 3 setbacks : 9m OSR : 10% 5705 sq.m road width : 7m (minimum) height : not more than 20m plot coverage : 60%

N

MASTER PLAN

TERRACE SPACES assembling the hollow core precast slab in place, with the help of cranes and community participation activity. The screening of approved quality will be done.

4

fabrication work will be done, after assembling the roof slab. The choice of finish will be given to the individuals, so that it will make the whole cluster look so dynamic.

5 COURTYARD

erection of precast wall panels and the precast ferrocement boxes will be done by the individual residents. So the the whole cluster will be done in parallel. it helps to save the time of construction.

assembling the hollow core precast slab in place, with the help of cranes and community participation activity. The screening of approved quality will be done.

foundation excavation and gabion wall work for raising the plinth to 600mm

it acts as the climatic factor to bring-in daylight and also it will be the major spacemaking element.

ENTRANCE PORCH

3

2

CONSTRUCTION TIMELINE

1

PATHWAY screening concrete done over the precast slabs, also acts as the floor finish and also help us to cut-down the investment on the flooring material. The versatality in the concrete finish will be selected by the inhttp://www.quadlock.com/images/decking/ dividuals. icf_deck_diagview.png

PEDESTRIAN FRIENDLY the major issues with the waster management system is the maintainence. reed bed

to regulate the system it is planned like

storage tank

each cluster will be treated there and

hollow core precast slabs that comes in the planks will the lifed by mechanical means and assembled in place to form a roof slab. it will help us to cut-down the investment on beam. the mass production of such slabs also is economical.

a nodes. the waste water generated at reused by the same user. this helps in the prevention of commotion between the community. image source :http://earth5r.org/ rainwater-harvesting/

http://www.oldcastleprecastspokane.com/core/ files/oldcastleprecastspokane/uploads/images

ferrocement block will be used in constructing the partition wall between two units so that the same box, will be used by them for the storage. UG sump RWH tank

http://www.pathofexilecurrency.us/wp-content/ uploads/2017/06/cement-planter-box-cactus

bison board an agro-waste material is used as a slab for to bring in mezzanine floor with in the unit.

recharge well

http://reedbed.ae/applications/

WATER MANAGEMENT

http://5.imimg.com/data5/DM/CS/MY3713720/fibre-cement-board-500x500.jpg

country bricks are mostly used for the internal walls, with our any plastering. It has the exposed conduicts to favour the users.

https://qph.ec.quoracdn.net/main-qimg-8b4cfb2834f390e3a40b8c2fb3cc6e44-c

precast wall units are more strucutral and it is placed one on the other to tranfer the load without much brawling.

http://www.oldcastleprecastspokane.com/core/ files/oldcastleprecastspokane/uploads/images/

woven bamboo is used in the front and the rear side to bring in the natural air to the designed units.

http://www.australianbollards. com.au/Solar%20Bollards%20 -%20Proplet3%20(25).jpg

https://www.greenlytes.com/wp-content/uploads/2014/05/All-In-oneLED-Solar-Street-Light-integral-solarpanel.jpg

https://s7g3.scene7.com/is/image// https://www.greenlytes.com/ ae235?src=ae235/9845P_P&$prodwp-content/uploads/2014/05/ All-In-one-LED-Solar-StreetImageMedium$

bollards in the pathway will be powered by solar, so

street lights in the pathway will be powered by

every house will be provided with the individual

that it will help to manage the electricity within the

solar, so that it will help to manage the electricity

solar powered LED lights, so that it also helps in

given plot.

within the given plot.

regulating and maintainence of the solar panels.

POWER MANAGEMENT

http://el.doccentre.info/eldoc1/setdev/HTGWattle-Daub-Bamboo-3.JPG

04

ferrocement door shutters are precasted and assembled in place. it also has the designed cut-outs to help in cross-ventilation withhttp://rtu.paulabbott.org/get.html?_Action=GetI-out compromising on privacy. mage&_Key=Data3143&_Id=327&_Wizard=0&

perforated MS sheet is used in the front and the rear side to bring in the natural air to the designed units. http://beautyharmonylife.com/wp-content/uploads/2016/03/perforated-metal-sheet.jpg

p l a c e m a k i n g i s t h e p o w e r f u l t o o l f o r p o l i t i c a l c h a n g e .

BUILDING FOR A BILLION c a t e g o r y

u r b a n p o o r u n b u i l t

1 A

2

panel


ARCHIMEDIAN AND PLATONIC SOLIDS

RAZA ART

EMOTE THROUGH BASIC SHAPES

FRACTALS

ORIGAMI - INFINITY

BOTTLE SCULPTURE

05

OTHER SKILLS

BASIC WORKS AND PH


HOTOGRAPHY


- R . NAVEEN KUMAR naveenrnk.midas@gmail.com

+91 7667679986 +91 9566793955


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.