A R C H I T E C T U R E
PORTFOLIO R. N A V E E N K U M A R
INTRODUCTION The following collection of works being presented here has been influenced by many own experience from the projects done during my study in the MIDAS (Anna University) and also during internship and even in my practice. Thank you in advance for taking time to go through it. The curriculum has offered me a coherent approach to many design challenges and a clearer understanding of the tools and theories used in the process. Each project is approached by mediating between advanced digital mediums and physical craft to the arrive at an immaginative outcome regarding the economies and site context. My goal is to continue to pursue these new ideas and possibilities through involvement in the real world experiences. To utilize an open mind is crucial as exposure to trends and issues in design are persistently influencing my perception of architecture. Continuing my real world experience is necessary to prepare me to take leadership role in shaping the built environment, promoting practical experience and improve the living conditions of the community around the world. The architecture presented is a projection of ideas existing within the mind. It exemplifies my understanding of architecture, revealing how I have overcome the interplay between thinking and making an interwined entity. Thank you very much for your time and consideration in reviewing the presented works, a presentation of my curiosities, ambitions and design logics that I have developed over the past five years.
( R.Naveen Kumar )
CURRICULUM VITAE
R.NAVEEN KUMAR B.ARCH (2014-2019) 16-10-1996 ABOUT ME I am a highly confident, creative and dedicated person. Architecture is the vision through which i have been looking at every single in my life. The direction of my innovative thoughts and ideas towards the field is what provoked me to step into it. My goal is to be a part of an exciting and inspiring team environment, enlighting myself with practical knowledge, exploring my creativity and eloborating it through cognition.
EDUCATION
EXPERIENCE
SSLC , HSC (2012-2014)
( 1 year )
INTERNSHIP (2017) PPAL (Professionals for Planning Architecture and Landscape), New Delhi, under the guidance of Ar.Ranjan and Ar.Ruchi in the project of AIIMS,Faridabad.
SSM Lakshmiammal Matriculation Higher Secondary school, Komarapalayam.
UNDER GRADUATE - (2014-19) MIDAS (Marg Institute of Design and Architecture Swarnabhoomi), Chennai.
INTERNSHIP (2018) Designqube Architects and Interiors, Banglore, under the guidance of Ar.Bijayni Dash and Ar.Manjunath in the projects of residences in and around Banglore.
INTERESTS
SOFTWARE SKILLS
LINGUISTIC ENGLISH AUTOCAD - 9/10
TAMIL
REVIT - 8.5/10
SKETCHUP - 8.5/10
HINDI (basic) OTHER SKILLS
CONTACT : 900/1765, AATHUKARUPARAYAN KOVIL St., KURUPPANAICKENPALAYAM, BHAVANI(Tk), ERODE(Dt)- 638301 TAMILNADU +91 7667679986 +91 9566793955 naveenrnk.midas@gmail.com /naveen_rnk_ /naveenrnk1996 https://issuu.com/naveenrnk/docs/ naveen_rnk_portfolio
PHOTOSHOP - 8.5/10
Sketching
Prof. Dhushyanth.L, M.Arch(SAP), HOD, MIDAS. +91 7708888718 Prof. Naveen Balaji.J, M.Arch, +91 7397074487
ILLUSTRATOR - 7/10
Model making Communication Leadership Time management
V RAY - 8/10 LUMION - 8.5/10 3DS MAX - 5.5/10 RHINO - 5.5/10
PARTICIPATION
LECTURES
2014 - Parametric design (Fractal) by Ar.Takbir Fathima(AA school, London) & Poonam Serdesai. 2014 - Bottle workshop by Artist.Anisha vargheese 2014 - Raza workshop by Prof.Jaffer Khan(RIBA) 2015 - Bamboo workshop by Ar.Mafalda
REFERENCE
INDESIGN- 8/10
2015 - Low Cost Housing by Ar.Anupama Kundoo 2018 - Build for Billion by UltraTech competition
- Proposal and woks by Sir.Peter Cook(RIBA) - Unlearning Architecture by Prof.Martyn Hook - Documentation and Human settlement by Prof.Ranee vedamuthu - Talk on his works by Ar.Sanjay Mohe - Natural Fractals and Architecture by Ar.Rafiz Azam - Book Reading (Letters to Young Architects) by Prof. Christopher Benninger(RIBA) - Smart cities Development by Ar. Hafeez Contractor
DECLARATION I do hereby confirm that the infromation given in this is true to the best of my knowledge and belief.
“ I think space, architectural space, is my thing. Its not about facade, elevation, making image, making money, my passion is creating space. “ ( Peter Zumthar )
CONTENTS
01 02
THESIS DEVELOPMENT CENTRE FOR A COMMUNITY
COLLEGE WORKS - TRAUMA CARE CENTRE FOR ORTHO AND NEURO - AUDITORIUM FOR SCHOOL
03
...01 ...1 1 ...1 7
OFFICE WORKS - AIIMS MEDICAL COLLEGE - FACADE DETAILS, GFC DRAWINGS, SERVICES(ELECTRICAL, FIRE FIGHTING), LIBRARY, SKYWALK PROFILE, TOILET DETAILS
...19
- RESIDENTIAL PROJECTS - CONCEPT, FLOOR PLANS, 3D MASSING, GFC, FACADE, MATERIAL PALETTE, SERVICE DRAWINGS (ELECTRICAL, PLUMBING)
...27
04
COMPETITION
05
OTHER WORKS
BUILD FOR A BILLION (URBAN POOR) - ULTRATECH
BASIC WORKS AND PHOTOGRAPHY
...33 ...35
01
DEVELOPMENT CENTRE FOR
ABOUT THE PROJECT Development centre is a design approach for the development of a particular under developed community. It involves basic needs of a livelihood of a common people, particularly people struggling to establish a living in society. The design is approached with centres for different activities and requirements like Housing for living, Health care, Training centre for education and employment, accompanied by hostel facilities, Home care for elder and victims, recreational area, community gathering, commercial activities and office spaces. SITE AREA = 20 ACRE
SITE DEVELOPMENT
A COMMUNITY
SITE PLAN
H E A L T H GROUND FLOOR PLAN
2625 SQ.M
FIRST FLOOR PLAN
2175 SQ.M
C A R E
INTERMEDIATE SECOND FLOOR PLAN
2000 SQ.M
SECTION - AA
SECTION - BB
EAST ELEVATION
NORTH ELEVATION
BASEMENT FLOOR PLAN
7800 SQ.M
GROUND FLOOR PLAN
7800 SQ.M
FIRST FLOOR PLAN
3300 SQ.M
SECOND FLOOR PLAN
3300 SQ.M
COMMERCIAL CENTRE
EAST ELEVATION
SECTION - AA
SECTION - BB
TRAINING CENTRE SKILL / VOCATIONAL
GROUND FLOOR PLAN
3300 SQ.M
FIRST FLOOR PLAN
3300 SQ.M
SECTION - CC
NORTH ELEVATION
SECTION - AA
EAST ELEVATION
SECTION - BB
ROAD SECTION
PERSPECTIVE OF PARK
SITE SECTION
SITE ELEVATION
09
PEDESTRIAN PATH
POLLUTED AIR IS WITHDRAWN IN TO THE FILTER CHAMBER
POLLUTANTS ARE FILTERED IN THE CORE AND ARE GROUNDED.
OXYGEN IS SEPARATED AND CO2 IS MADE AVAILABLE FOR THE PLANT ECOSYSTEM
AIR IS PURIFIED AND RELEASED AT THE BOTTOM
10
02
TRA U M A CARE CE NT RE -
ABOUT THE PROJECT
A TRAUMA CENTRE is a hospital equipped and staffed to provide care for patients suffering fro traumatic injuries such as falls, motor vehicle collisions, or gunshot wound tre may also refer to an emergency department (also known as a “casualty “accident & emergency”) with the presence of two specialized services lik DIC AND NEUROLOGY to care for victims of major trauma. SITE AREA = 3 ACRE
CAPACITY= 120 BEDS
This site is locaed at Bombay trunk highway road, connecting Chenn This site is surrounded by a lake besides and a developing smart city is apt for the trauma centre as it is located on the highway.
LEGEND 1. ENTRY 2. PARK 3. TWO-WHEELER 4. EMERGENCY ENTRY 5. ENTRANCE LOBBY 6. EXIT 7. AMBULANCE SLOT
8. POWER SUPPLY 9. STP 10. SERVICE PATH 11.BLOCK 1 12.BLOCK 2 13.CANTEEN 14.TO BASEMENT
ORTHO AND NEURO
om major ds. A trauma cendepartment” or ke ORTHOPAE-
SITE PLAN
10 9 14
nai and Banglore. behind. This site
12
11
8
7
4 13
5
PATH 2
VEHICLE
3 6
PEDESTRIAN BANG
SERVICE
1 A L OR
E
CHE
I NNA
A
B
C
8.00
D
10.00
E
12.00
F
12.00
G
10.00
8.00
1 8.00
RAMP UP
MALE 3.75m x 7.5m
8.00
ELECTRICAL ROOM (MV/LV)
FEMALE 3.75m x 7.5m
6.5m x 6m
UP
TOILET FIRE LIFT
3
PHYSIOTHERAPY - EXERCISE AREA
WATER POOL
DN
FIRE STAIR
DN
+0.6m LVL
CORRIDOR
CR4
MRI
UP
CR5
COLD ROOM 5m x 3m
WAITING LOUNGE
INSTRUMENT STORAGE
CR7
MALE
WAITING LOUNGE
CR2
CT
4.5m x 6m
CR6
TOILET
CR3
DARK ROOM 5 x 3m
FEMALE
4
SERVICE ENTRY/ EXIT
SERVICE
5 x 4.2m
MONITOR 5x3m
+0.15 M LVL
DN
BLOOD BANK 5m x 3m
BLOOD BANK 5m x 3m
9.00
+ 0.0 M LVL
+0.15 M LVL
4.5m x 6m
DISSECTION
RAMP DN
-3.5 M LVL
2
6.00
12m x 18m 5 x 4.2m
5 x 4.2m
X RAY
+0.3m LVL
CR1
NURSE
CORRIDOR
5.5M
BED LIFT 3m x 2.5
RECEPTION LOBBY
5.00
OFFICE 3m x 4.5m
AHU 5m x 3m
DN
KITCHEN 13.5m x 7m UTILITY 5m x 3m
+0.0 lvl
PHARMACY 5m x 7.5m
+0.0 lvl
8
EMERGENCY ENTRY
BIO- MEDICAL 5m x 3m
MINOR OT 5m x 3.5m INPATIENT
EXAMINE ROOM 5m x 7.5m
5.00
MAIN ENTRY
9
+3.0m LVL
3m x 2.5
+2.5m lvl +0.6 lvl
OBSERVATION 5m x 4.5m
ELECTRICAL ROOM 5m x 4m
3.00
BED LIFT
+2.5m lvl
7 AHU 5m x 3.5m
LIFT 3m x 1.75m
3.00
5m x 6.5m
RECEPTION
6.00
LIFT 3m x 1.75m
BROU-GHT IN DEAD
+0.6 lvl
BILLING 6.5m x 3.5m
6
AMBULANCE PARKING
UP
LIFT 3m x 1.75m
UP
LIFT 3m x 1.75m
CORRIDOR
CORRIDOR
+0.6m LVL
6.00
50.00
5
FORM EVOLUTION
CR8
MONITOR 5x3m
MONITOR 5x3m
5.00
5.00
CANTEEN 15.5m x 11.5m
MEDICAL STORAGE 5m x 3m
RECEPTION- EM
5.00
OUTPATIENT WAITING
+0.6lvl
EMERGENCY ENTRY 2
+0.6 lvl
DN
PHARMACY
10
60.5
GROUND FLOOR PLAN ZONING OF SPACES
A
B
C
1
ELECTRICAL ROOM (MV/LV) FEMALE 3.75m x 7.5m
E
F
G
GROUND 0
2 MALE 3.75m x 7.5m
D
6.5m x 6m
UP
TOILET FIRE LIFT
DN
FIRE STAIR
3
UP
EMERGENCY EXIT
CORRIDOR
4
TOILET
MALE
GENERAL WARD 18m x 15.5m
OTS GENERAL WARD 10m x 12m
FEMALE
12m x 18m
4.5m x 6m
VOLUME OF SPACES
4.5m x 6m
UP
CORRIDOR
CORRIDOR
5
CORRIDOR
UP
8.00
5m x 6.5m
AHU CCU 5m x 4.8m
G ELECTRICAL ROOM 5m x 4m
8.01 BED LIFT 3m x 2.5 AHU 5m x 3m
NURSE 3m x 4.5m
3m x 4.5m
UTILITY 5m x 3m
CCU 5m x 4.8m
TERRACE GARDEN /
MINOR OT
REFUGEE BALCONY SCRUB 5m x 3.5m
5m x 3.5m
5.3m x 8.5m
DN
8.5m x 4.5m
8.5m x 4.5m
ICU
FEMALE 3.75m x 7.5m
6.5m x 6m
UP FIRE LIFT
PHYSIOTHERAPY - EXERCISE AREA
WATER POOL
DN
FIRE STAIR
DN DN
BLOOD BANK 5m x 3m
BLOOD BANK 5m x 3m
ICU
ELECTRICAL ROOM (MV/LV)
TOILET
3
10.00
SCRUB 5m x 3.5m
MALE 3.75m x 7.5m
10
F
CORRIDOR
CR4
MRI
UP
CR5
COLD ROOM 5m x 3m
SERVICE
5 x 4.2m
CR2
CT
CR6
WAITING LOUNGE
WAITING LOUNGE
MALE
DARK ROOM 5 x 3m
MONITOR 5x3m
INSTRUMENT STORAGE
CR7
TOILET
CR3
FIRST4 FLOOR PLAN
4.5m x 6m
5.3m x 8.5m
2
UP
+2.5m lvl
MINOR OT
5m x 3.5m
9
12.01
NURSE
5m x 4.5m
FRAGMENTATION
12.00
DN
E
+2.5m lvl
7 1
D
10.00 BED LIFT 3m x 2.5
8
C
LIFT 3m x 1.75m
DN
LIFT 3m x 1.75m
DOCTOR LOUNGE
B
LIFT 3m x 1.75m
LIFT 3m x 1.75m
A
6
BROU-GHT IN DEAD
1.75m
+0.6 lvl
1.75m
UP
6
NURSE
CORRIDOR
5.5M
CORRIDOR
50.08
5
CR8
4.5m x 6m
TRAUMA CARE CR1
FINAL MASSING
CORRIDOR
5 x 4.2m
UP 1.75m
X RAY
MONITOR 5x3m
x 1.75m
5 x 4.2m
MONITOR 5x3m
FEMALE
12m x 18m
ELECTRICAL
A
B
C
D
E
F
G
1
2 ELECTRICAL ROOM (MV/LV) FEMALE 3.75m x 7.5m
6.5m x 6m
UP
TOILET FIRE LIFT
3
DN
FIRE STAIR
WARD
WARD
UP
CORRIDOR
6m x 3.5m
6m x 3.5m
UP WARD 5m x 6m
WARD 5m x 6m
WARD 5m x 6m
WARD 5m x 6m
4
TOILET
MALE
WARD 5m x 6m
4.5m x 6m
MALE 3.75m x 7.5m
OTS
WARD 5m x 6m
WARD 5m x 6m
WARD 5m x 6m
4.5m x 6m
WARD 5m x 6m
WARD 5m x 6m
FEMALE
12m x 18m
CORRIDOR
CORRIDOR
5
CORRIDOR
DN
UP LIFT 3m x 1.75m
LIFT 3m x 1.75m
LIFT 3m x 1.75m
DOCTOR LOUNGE
UP
LIFT 3m x 1.75m
DN
6
ELECTRICAL ROOM 5m x 4m
THERAPY / TREATMENT AREA. CAR PARKING RAMP BELOW
5m x 6.5m BED LIFT 3m x 2.5
BED LIFT 3m x 2.5
+2.5m lvl
+2.5m lvl
7
AHU 5m x 3m
CCU 8m x 4.5m
8
9
AHU
TERRACE GARDEN /
5m x 3.5m
REFUGEE BALCONY
DUTY DOCTOR 8m x 5m
UTILITY 5m x 3m
PRE/POST OPERATE 5m x 3.5m
CLEAN UTILITY 5m x 3m
STERILISE
STERILISE 3.5 x 2.5m
WARD 5m x 4.5m
3.5 x 2.5m
WARD 5m x 4.5m
OT 5m x 7.5m
OT 5m x 7.5m
WARD 5m x 4.5m
LAB - CASUALTY - OT AND TREATMENTIP WARD CONSULTATION FOR ORTHO
WARD 5m x 4.5m
10
SECOND FLOOR PLAN A
B
C
1
D
E
F
G
OTS (CUTOUT) FOR
GROUND +2
2
LIGHTING AND VENTILATION
ELECTRICAL ROOM (MV/LV) MALE 3.75m x 7.5m
FEMALE 3.75m x 7.5m
6.5m x 6m
UP
TOILET FIRE LIFT
3
WARD 5m x 3.5m
DN
FIRE STAIR
WARD 5m x 3.5m
UP
CORRIDOR
UP
WARD 5m x 3.5m
WARD 5m x 3.5m
4
WARD 5m x 3.5m
WARD 5m x 3.5m
WARD 5m x 3.5m
WARD 5m x 3.5m
WARD 5m x 3.5m
12m x 18m
WARD 5m x 3.5m
FEMALE
WARD 5m x 3.5m
WARD 5m x 3.5m
WARD 5m x 3.5m
TOILET
OTS
WARD 5m x 3.5m
4.5m x 6m
WARD 5m x 3.5m
WARD 5m x 3.5m
4.5m x 6m
WARD 5m x 3.5m
WARD 5m x 3.5m
WARD 5m x 3.5m
MALE
WARD 5m x 3.5m
WARD 5m x 3.5m
PHARMACY GENERAL WARD IP WARD CONSULTATION FOR NEURO
WARD 5m x 3.5m
B
LIFT DOCTOR LOUNGE
UP
LIFT 3m x 1.75m
A
CORRIDOR
DN LIFT 3m x 1.75m
6
CORRIDOR
CORRIDOR
5
C
D
DN
E
UP
F LIFT
LIFT
G
LIFT
ELECTRICAL ROOM 5m x 4m
REFUGEE BALCONY
BED LIFT 3m x 2.5
BED LIFT
+2.5m lvl
7 AHU
NURSE ROOM
5m x 3.5m
8m x 4.5m
+2.5m lvl
AHU 5m x 3m
MEDICAL STORAGE
UTILITY 5m x 3m
8m x 4.5m
18
CLEAN UTILITY 5m x 3m
WARD 5m x 3.5m
WARD 5m x 3.5m
WARD 5m x 3.5m
WARD 5m x 3.5m
2
10
WARD 5m x 3.5m
WARD ELECTRICAL 5m x 3.5m ROOM (MV/LV)
FEMALE 3.75m x 7.5m
6.5m x 6m
UP
TOILET FIRE LIFT
3
WARD
WARD
UP
WARD 5m x 6m
WARD 5m x 6m
WARD 5m x 6m
WARD 5m x 6m
MALE
WARD 5m x 6m
DN
FIRE STAIR
CORRIDOR
6m x 3.5m
6m x 3.5m
WARD 5m x 3.5m
THIRD FLOOR PLAN 4
TOILET
WARD 5m x 3.5m MALE 3.75m x 7.5m
WARD 5m x 3.5m
4.5m x 6m
9
OTS
WARD 5m x 6m
FLOOR PLANS
WARD 5m x 6m
CORRIDOR
CORRIDOR
WARD 5m x 6m
4.5m x 6m
WARD 5m x 6m
CORRIDOR
UP
DN
UP FT 1.75m
1.75m
1.75m
DN
FT 1.75m
WARD 5m x 6m
5
FEMALE
12m x 18m
6
COMMON LOBBY
TERRACE GARDEN /
5m x 6.5m
ELECTRICAL
TERRACE GARDEN
A
B
C
D
E
F
G Ground 7 30.00 Ground 6 25.80 Ground 5 21.60 Ground 4 17.40 Ground 3
G+5
13.20 Ground 2 9.00 Ground 1 4.80 Ground 0 0.60 ground 0.00 Base -1 -3.50 Base 2 -7.00
SECTION - AA G+4 G
F
E
D
C
B
A Ground 7 30.00 Ground 6 25.80 Ground 5 21.60 Ground 4 17.40 Ground 3 13.20 Ground 2 9.00 Ground 1 4.80 Ground 0 0.60 ground 0.00 Base -1 -3.50 Base 2 -7.00
G+3
SECTION - BB
Ground 7 30.00 Ground 6 25.80 Ground 5 21.60 Ground 4 17.40 Ground 3 13.20 Ground 2 9.00
G+2
Ground 1 4.80 Ground 0 0.60 ground 0.00
SOUTH ELEVATION
Ground 7 30.00 Ground 6 25.80 Ground 5 21.60
G+1
Ground 4 17.40 Ground 3 13.20 Ground 2 9.00 Ground 1 4.80 Ground 0 0.60 ground 0.00
EAST ELEVATION
15
TRAUMA CARE
GROUND FLOOR
A
B
C
8.00
D
10.00
E
12.00
F
12.01
G
10.00
8.01
1 DN
2 MALE 3.75m x 7.5m
ELECTRICAL ROOM (MV/LV)
FEMALE 3.75m x 7.5m
6.5m x 6m
UP
TOILET FIRE LIFT
3
WATER POOL
FIRE STAIR
DN DN
BLOOD BANK 5m x 3m
BLOOD BANK 5m x 3m
PHYSIOTHERAPY - EXERCISE AREA
DN
CORRIDOR
UP
CR5
CR4
MRI COLD ROOM 5m x 3m
SERVICE
WAITING LOUNGE
CR2
CT
WAITING LOUNGE
MALE INSTRUMENT STORAGE
CR7
TOILET
4
CR6
CR3
DARK ROOM 5 x 3m
4.5m x 6m
5 x 4.2m
MONITOR 5x3m
X RAY
5 x 4.2m CR1
3m x 2.5
7
RECEPTION
BILLING 6.5m x 3.5m
BED LIFT
RECEPTION LOBBY
OBSERVATION 5m x 4.5m
3m x 2.5
+2.5m lvl
AHU 5m x 3m
DN
KITCHEN 13.5m x 7m
OFFICE 3m x 4.5m
UTILITY 5m x 3m
+0.0 lvl
PHARMACY 5m x 7.5m
+0.0 lvl EMERGENCY ENTRY
ELECTRICAL ROOM 5m x 4m
3.00
BED LIFT
+2.5m lvl +0.6 lvl
AHU 5m x 3.5m
LIFT 3m x 1.75m
UP
LIFT 3m x 1.75m
3.00
5m x 6.5m
LIFT 3m x 1.75m
BROU-GHT IN DEAD
+0.6 lvl
LIFT 3m x 1.75m
CORRIDOR
5.5M
CORRIDOR
UP
6
8
CORRIDOR
MONITOR 5x3m
MONITOR 5x3m
5
NURSE
CR8
4.5m x 6m
5 x 4.2m
FEMALE
12m x 18m
BIO- MEDICAL 5m x 3m
MINOR OT 5m x 3.5m INPATIENT
EXAMINE ROOM 5m x 7.5m
MAIN ENTRY
9
5.00
5.00
CANTEEN 15.5m x 11.5m
MEDICAL STORAGE 5m x 3m
RECEPTION- EM OUTPATIENT WAITING
+0.6lvl
EMERGENCY ENTRY 2
+0.6 lvl
DN
PHARMACY
10
60.59
HVAC LAYOUT
GROUND FLOOR A
B
C
D
E
F
G
1
2 ELECTRICAL ROOM (MV/LV) MALE 3.75m x 7.5m
FEMALE 3.75m x 7.5m
6.5m x 6m
UP
TOILET FIRE LIFT
DN
FIRE STAIR
3
OTS GENERAL WARD 10m x 12m
FEMALE
12m x 18m
4.5m x 6m
4
TOILET
MALE
GENERAL WARD 18m x 15.5m
UP
4.5m x 6m
EMERGENCY EXIT
CORRIDOR
CORRIDOR
CORRIDOR
5
CORRIDOR
UP LIFT 3m x 1.75m
DN
LIFT 3m x 1.75m
LIFT 3m x 1.75m
DOCTOR LOUNGE
UP
LIFT 3m x 1.75m
DN
6
ELECTRICAL ROOM 5m x 4m
5m x 6.5m BED LIFT 3m x 2.5
7 AHU CCU 5m x 4.8m
3m x 4.5m
3m x 4.5m TERRACE GARDEN /
UTILITY 5m x 3m
CCU 5m x 4.8m
SCRUB 5m x 3.5m
MINOR OT SCRUB 5m x 3.5m
5m x 3.5m
5.3m x 8.5m
5.3m x 8.5m
AHU 5m x 3m
REFUGEE BALCONY
MINOR OT
5m x 3.5m
9
BED LIFT 3m x 2.5
NURSE
NURSE
5m x 4.5m
8
+2.5m lvl
+2.5m lvl
ICU
8.5m x 4.5m
8.5m x 4.5m
ICU
10
HVAC LAYOUT
FIRST FLOOR
HVAC SERVICES
16
THE AUDITORIUM (FOR SCHOOL)
FORM EVOLUTION A 1
2
3
4
5
6
7
1
2
3
4
5
6
7
DN
A
A
FOOD COURT
B
FOOD COURT BELOW
R
O
CO
ID
RR
RR
ID
O
CO
R
B
CONTROL ROOM UP
C SHOP
SHOP
SHOP
SHOP
SHOP
C
SHOP
P
SHO
DN
SHOP
SHOP
SHOP
SHOP
SHO
SHOP
P
SHOP
SHOP
SHOP
SHOP
SHO
P DN
SHOP
UP
DN
UP
P
ET(M
)
D
BY
ET(F)
UP
UP
UP
UP
B ICE CO
E
DN
DN
GREEN ROOM
B
SERV
DN
INFO DESK
RRID OR
UP
INFO DESK
GREEN ROOM
GREEN ROOM
STAGE
GREEN ROOM
DN
DN
TOIL
TOIL
LOB
E
DN
SHO
DN
UP
P
SHO
D
UP
SHOP
UP
SHOP
UP
DN
P SHO
STAGE
GREEN ROOM
GREEN ROOM
F
F GUEST ENTRY
BACK STAGE
BACK STAGE DN
UP
G
G
A
PLAN AT 2M LVL
PLAN AT 7M LVL ROOF LEVEL
ROOF LEVEL
LEVEL +14.5
LEVEL +14.5
3RD FLOOR LEVEL
3RD FLOOR LEVEL
LEVEL +10.9
LEVEL +10.9
2ND FLOOR LEVEL
2ND FLOOR LEVEL
LEVEL +7.45
LEVEL +7.45
1ST FLOOR LEVEL
1ST FLOOR LEVEL
LEVEL +3.95
LEVEL +3.95
PLINTH LEVEL LEVEL +0.9 GROUND LEVEL LEVEL 0.0
PLINTH LEVEL LEVEL +0.9 GROUND LEVEL LEVEL 0.0
SECTION - BB
17
SECTION - AA
OPERATE ROOM
CEILING
ROOF CATWALK
GLAZED PANELS
GREEN ROOM
FOOD COURT
SHOPS
BACK STAGE
ACOUSTIC PANELS STAGE
SECTIONAL VIEW ASPECT This auditorium is designed with two levels of seatings, each has a capacity of 300 seats. This 600 seated auditorium is located in a main area where many commercial offices are located. It can also be used by them for their conventional meetings and functions. This auditorium thus makes a landmark to that particular region which is more attracted visually.
18
03
THIS DRAWING IS THE PROPERTY OF ARCHITECT AND MATA AMRITANANDMAYI MATH AND SHALL NOT BE USED IN ANY WAY WITHOUT THEIR WRITTEN PERMISSION.
OFFICE WORKS
NOTES: 1. 2. 3. 4.
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED. WRITTEN DIMENSIONS ARE TO BE FOLLOWED. DRAWING NOT TO BE SCALED. ALL DRAWINGS ARE TO BE CHECKED AND CO-RELATED WITH THE RELEVANT ARCHITECTURAL, STRUCTURAL AND OTHER CONSULTANTS DRAWINGS. ANY AMBIGUITY IS TO BE BROUGHT TO THE NOTICE OF THE ARCHITECTS IMMEDIATELY.
KEY PLAN
STATUS:
SIGNATURE:
REMARK:
CLIENT:
MATA AMRITANANDMAYI MATH D3 SHANTI KUNJ, VASANT KUNJ NEW DELHI-110070 PROJECT:
MEDICAL COLLEGE BLOCK PROPOSED INSTITUTE(SUPER SPECIALTY HOSPITAL, MEDICAL COLLEGE AND NURSING COLLEGE), FARIDABAD SCALE:
DATE:
1:50
12.09.17
DEALT:
CHECKED:
REV. NO:
DWG NO:
NAVEEN RUCHI DRAWING TITLE:
TOILET LAYOUT T2 MC BLOCK 1 LGF ARCHITECTS
H-1470,BASEMENT FLOOR, CHITTRANJAN PARK, NEW DELHI - 110009. PH: 011-26274983,40560775 EMAIL : aimsppal@gmail.com
(Professionals for planning architecture and landscape)
THIS DRAWING IS THE PROPERTY OF ARCHITECT AND MATA AMRITANANDMAYI MATH AND SHALL NOT BE USED IN ANY WAY WITHOUT THEIR WRITTEN PERMISSION.
NOTES: 1. 2. 3. 4.
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED. WRITTEN DIMENSIONS ARE TO BE FOLLOWED. DRAWING NOT TO BE SCALED. ALL DRAWINGS ARE TO BE CHECKED AND CO-RELATED WITH THE RELEVANT ARCHITECTURAL, STRUCTURAL AND OTHER CONSULTANTS DRAWINGS. ANY AMBIGUITY IS TO BE BROUGHT TO THE NOTICE OF THE ARCHITECTS IMMEDIATELY.
KEY PLAN
STATUS:
SIGNATURE:
REMARK:
CLIENT:
MATA AMRITANANDMAYI MATH D3 SHANTI KUNJ, VASANT KUNJ NEW DELHI-110070 PROJECT:
MEDICAL COLLEGE BLOCK PROPOSED INSTITUTE(SUPER SPECIALTY HOSPITAL, MEDICAL COLLEGE AND NURSING COLLEGE), FARIDABAD SCALE: DATE:
REV. NO:
12.09.17 DEALT:
CHECKED:
DWG NO:
NAVEEN RUCHI DRAWING TITLE:
TOILET LAYOUT T2 MC BLOCK 1 LGF ARCHITECTS
H-1470,BASEMENT FLOOR, CHITTRANJAN PARK, NEW DELHI - 110009. PH: 011-26274983,40560775 EMAIL : aimsppal@gmail.com
(Professionals for planning architecture and landscape)
19
TOILET DETAILS
THIS AND WRITT
D
C
D
C
485
175
ST
1460
855
900
NOTE 1.ALL MENT 2.WR DRAW 3. AL CO-R STRU ANY THE A
A
A
2600
B 985
B
750
855
1475
PLAN
FIRST FLOOR TOILET T1 PLAN ELEVATION B
ST
ST
300
450
450
R
300
300
450
REVISIO
730
DATE
PROJ
265
250
450
250
480
900
120
315
300
1200
300
300
300
300
R
RES
H-1
DELHI--
SCALE:
1:20
DEALT:
ELEVATION D
ELEVATION A
NAV
ELEVATION C
DRAW
TOILE FIRST
ARCH
PP
A
E
(Professio architectu
THIS DRAWING IS THE PROPERTY OF ARCHITECT AND MATA AMRITANANDMAYI MATH AND SHALL NOT BE USED IN ANY WAY WITHOUT THEIR WRITTEN PERMISSION.
1310
NOTES:
200
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED. WRITTEN DIMENSIONS ARE TO BE FOLLOWED. DRAWING NOT TO BE SCALED. ALL DRAWINGS ARE TO BE CHECKED AND CO-RELATED WITH THE RELEVANT ARCHITECTURAL, STRUCTURAL AND OTHER CONSULTANTS DRAWINGS. ANY AMBIGUITY IS TO BE BROUGHT TO THE NOTICE OF THE ARCHITECTS IMMEDIATELY. 115
C
KEY PLAN
600
300
300
300
rem.
530
300
480
1025
300
D
495
1510
575
REMARK:
SIGNATURE:
645
E
520
STATUS:
600
865
1200
D
320
230
175
250 120
640
600
125 1000
1190
B
115
1015
Toilet Layout -T2 Master Bedroom
Section D
330
Flooring Layout -T2 Master Bedroom
Toilet RCP-T2 Master Bedroom
290
H-1470,BASEMENT FLOOR, CHITTRANJAN PARK, NEW DELHI - 110009. PH: 011-26274983,40560775 EMAIL : aimsppal@gmail.com
Section A
235 155
2210
450
1175
1170
450
1170
125
E
Section B
Section C
260
1200 150
TOILET LAYOUT T2 MC BLOCK 1 LGF ARCHITECTS
320
450
150
DRAWING TITLE:
300
NAVEEN RUCHI
50 1015
710
DWG NO:
455
CHECKED:
145
DEALT:
120
REV. NO:
12.09.17
E 270
425
150
PROPOSED INSTITUTE(SUPER SPECIALTY HOSPITAL, MEDICAL COLLEGE AND NURSING COLLEGE), FARIDABAD
390
445
PROJECT:
1040
235
1190
1190
1190
600
MEDICAL COLLEGE BLOCK
SCALE: DATE:
300
A
CLIENT:
MATA AMRITANANDMAYI MATH D3 SHANTI KUNJ, VASANT KUNJ NEW DELHI-110070
260
B
900
480
450
50
450
C
600
230
475
1135
300
905
1370
REM.
115
1. 2. 3. 4.
1015
Section E
(Professionals for planning architecture and landscape)
PPAL
20
LIBRARY SECTION
- SECTION A LIBRARY
21
SKYWALK PROFILE
LEVEL - 1
FLOOR PLANS - LIBRARY
LEVEL - 2
22
4TH FLOOR - 1200 SQ. METERS
LIBRARY - LEVEL 2
ALL DIMENSIONS AR WRITTEN DIMENSION DRAWING NOT TO BE ALL DRAWINGS ARE RELEVANT ARCHITEC DRAWINGS. ANY AM ARCHITECTS IMMEDI
D
CHECKED:
DATE:
23.09.17
SCALE:
1:250
R0
RE
PROPOSED INSTIT MEDICAL COLLEGE FARIDABAD
MEDICAL COLLEGE
PROJECT:
MATA AMRITANAN D3 SHANTI KUNJ, NEW DELHI-11007
CLIENT:
(Professionals for pl
ARCHITECTS
L 4TH FLOO
CONSULTANTS: LIBRARY
DRAWING TITLE:
NAVEEN RUCHI
DEALT:
R
R
SCALE: DATE:
1:250 23.09.17 STATUS:
PROPOSED INSTIT MEDICAL COLLEG FARIDABAD
MEDICALMEDI COLLEG
PROJECT:
MATA AMRITANAN D3 SHANTI KUNJ, NEW DELHI-11007 BLOCK-1
CLIENT:
KEY PLAN
1. 2. 3. 4.
NOTES:
THIS DRAWING IS THE PROPERT AND SHALL NOT BE USED IN AN
CONSULTANTS:
STATUS:
MEDI
H
TOM OF NKEN SLAB. 00mm LVL
SB-1
E
SB-
P1
SB-2
SB-
E
E
P2
PRESS1
PRESS2
E
E
ST-1
DESCRIPTION
P4
E
P3
E
E
E
SB-3 BOTTOM OF SUNKEN SLAB. +3375mm LVL
ELECTRICAL DRAWING SLEEVE-1
SLEEVE-1
REF GRID
OWER GROUND FLOOR P1
TOM OF KEN SLAB. 00mm LVL
P2
SL SLEEVE-1
SL B2/Y1 PRESS1
PRESS2
B2/Y2
FHC:-01 10
B2/Y3
B2/Y5 B1/Y1
B2/Y4
12
P4
P3
ST-1
BOTTOM OF SUNKEN SLAB. +3375mm LVL
VSL
VSL
VSL
VSL
FIRE FIGHTING SYSTEM
REF GRID
LOWER GROUND FLOOR AIIMS MEDICAL COLLEGE 23
DATE
REV. NO
SHAFT LEGEND TYPE CHILLED WATER
ELECTRICAL
PRESSURIZATION
P8
PASSENGER LIFT
FIRE / SERVICE LIFT
E PASSENGER LIFT
FIRE / SERVICE LIFT
-6
FHC CUTOUT
E
P5
ELEC LV-1
-5 PRESS-3
E
E
RAIN WATER PIPE
PRESS-4
300MM WIDE CABLE TRAY
150MM WIDE CABLE TRAY
E 150MM WIDE CABLE TRAY
150MM WIDE CABLE TRAY
PLUMBING
R1
E
SB-3
E
SB-4
LDB-1
LPDB-10
PDB-1
UPSDB-1
THIS DRAWING AMRITANANDM WITHOUT THEI
EDB-1
SB-1
NOTES:
SB-2
1. 2. 3. 4.
ALL DIMEN WRITTEN DRAWING ALL DRAW RELEVANT DRAWING ARCHITEC
P6
P7
E STATUS:
ELEC MV-1
CONSULTANTS:
E
E
KEY PLAN
SB-4
GOO
PPAL
BOTTOM OF BEAM. +3125 MM LVL
VSL
BOTTOM OF SLAB. +3675 MM LVL
BLOCK-1
VSL
SLEEVE-2
BOTTOM OF SUNKEN SLAB. (AS SPECIFIED) VSL
BLOCK-2
BLOCK-3
VSL
PASSENGER LIFT
FIRE / SERVICE LIFT
PASSENGER LIFT
FIRE / SERVICE LIFT
MATA AMRI
D3 SHANTI SHAFT LEGEN TYPE
NEW DELHICHILLED WATE
PROJECT: ELECTRICAL
MEDICAL CO
PRESSURIZATIO PROPOSED MEDICAL CO FARIDABAD
P8
SLEEVE-2
REVISIONS: CLIENT: DATE REV
SLEEVE-2
SCALE:
DATE:
1:100
30.08
FHC CUTOUT DEALT: CHECK
NAVEEN RUC
ELEC LV-1
P5
SLEEVE-1
PRESS-3
DRAWING TITLE:
RAIN WATER PI
PRESS-4
SLEEVE-2
VSL
B2/Y6
B2/Y6'
B1/Y2
R1
VSL SLEEVE-1
SLEEVE-1
SLEEVE-1
FHC:-02
BLOCK-1 LOWER G ELECTRI ARCHITECTS
B2/Y7 B1/Y7
B2/Y7'
PLUMBING
(Professionals fo
P6
P7
11
STATUS:
ELEC MV-1
BOTTOM OF BEAM. +3125 MM LVL BOTTOM OF SLAB.
VSL
VSL
VSL
VSL
+3675 MM LVL
BOTTOM OF SUNKEN SLAB. (AS SPECIFIED)
LOWER GROUND FLOOR
BLOCK-1
BLOCK-2
CONSULTANT
24
CLIENT:
MATA AM D3 SHAN NEW DEL PROJECT:
MEDICAL
PROPOS MEDICAL FARIDAB SCALE:
DA
1:100
30
DEALT:
CH
NAVEEN R
DRAWING TITL
F A C A D E
D E S I G N
UP
3'-7"
1'-5"
8'-3"
21'' 9'-9" 3'-6"
1'-4"
1'-9"
W2
9'-3''
9" ED
1' 1'
D2
LIVING
1'-6" UP
5'-6"
6'-1"
6'-6"
MASTER BEDROOM
9'-3''
9'-10"
20'6''
5'-7" 3'
9'' WALL
D1
3'-6" 1'-8"
40'
4'-7"
1'
1
16'-8"
1'
2
D2
1'-6"
3'
2'-9"
D2
2' loft above door
4 3
WARDROBE
TOILET 3'10"X6'1"
PUJA 3'0''x4'7''
23
3'-5"
1'
10"
2'-3"
22
5
16'-6"
1'-8"
21
7
6'-2"
D1
4'-9"
V2
1'-6"
2' loft above door
20
6
KITCHEN
19
16'
16'-6"
8
6'
1'
TOILET 4'0"X6'1"
BEDROOM
18
10 9
10'
2'-2"
V2
2'-10"
W4
1'-6"
1'-10"
1'-8"
17
11
1'
12'-1"
16
2'-3"
7'-11"
13
7'-8"
15
12
1'-9"
SD1
14
1'
W2
2'-6"
8'-8"
7'
UTILITY 6'x3'
4'-7"
27''
1'-6"
W2
3'-4"
1'-6"
3'
29.5''
60'
2'-7"
W5
UP
3'-11"
30' ROAD
10'
9'
18'
1'
15'-9"
25.5''
5'
1'
1'
1'
6'-7"
9"
9"
9"
9"
1'
14'-5"
1'
30' ROAD
GROUND FLOOR
NORTH
G+1,G+2 - (TYPICAL)
7'-5"
8'-3"
21'' BALCONY
9'-9"
2'-3"
10'-5"
1'-5"
5'-6"
3'-7"
6'-1" 7'-11"
8'-8"
7'-8"
6'-6"
2'
2'
UTILITY 6'4''X2'9''
6'-4"
1'-9"
SD2
2'-9"
W3
5'-6"
4'-7"
2'-6"
2'-2"
3'-5" 4'-2"
1'
V1
5' SD1
V1 BALCONY
1'-4"
2'-3"
6'
TOILET 4'0"X5'11"
5'-8"
TOILET 4'0"X5'11"
BEDROOM
1'-6"
W2
D2
5'-11"
10'
MASTER BEDROOM
D1
D2
2' loft above door
7'-5"
7'-8"
1'-5"
6'-9"
9'-8"
5'
8'-3"
4'-10"
14'-10"
1'-6"
D1
1'
1'
8'-6"
LIVING
8'-3"
16'-6"
8'-10"
PUJA 3'0''x4'10''
D2
10'
3'-6"
9'-3''
3'
KITCHEN
BALCONY
D2
W2
19'-11"
BEDROOM
W1
MASTER BEDROOM
9'-3''
3'
13'-10"
2'-3"
D1
19'-11"
2'-9"
BALCONY
10'-5"
4'-7"
LIVING
D1
10'
2'-8"
6'-11" 2'-5"
8'-4"
5'-7"
SD3
3'
D1
11'-4"
15'-3"
12' 1'-7"
UP
3'-1"
D2
D2
1'-6"
3'-5"
WARDROBE
LIVING
1
D1
13'-1"
23''
2
1'
10"
PUJA 3'0''x4'10''
20
D1
2' loft above door
3'-10"
19
3
10'-3"
8'-5" 4'-2"
40'
9"
8'-10"
D2
18
4
6'-2"
D1
4'-9"
V2
1'-6"
2' loft above door
17
1'
TOILET 4'0"X6'1"
BEDROOM
KITCHEN
2'-2"
V2
2' loft above door
TOILET 3'6"X6'3"
3'
6 5
1'
10'
16
D1
3'-10" 3'-5"
15
6'
2'-3"
2' loft above door
V1
13 14
7
1'-6"
2' loft above door
12
10
MASTER BEDROOM
11
8
W3
7'
W2
2'-6"
SD1
9
4'-5"
UTILITY 6'x3'
1'
2'-9"
KITCHEN
1'-6"
10"
W2
2'-7"
D2
14'-10"
9'-8"
6'-11"
1'-6"
4'-10"
TOILET 4'0"X6'1"
1'-7"
W1
5'-10"
SD1
1'
V2
3'-7"
2'
9" 6'-1"
UTILITY
27''
3'
60' 7'-4"
25.5''
14'-8"
NORTH
60'
2'-3"
BALCONY
L30
SP27 P27
2'
2'-11"
2'
2'-10"
2' SWL10 SF3 SL10 P17 SP17
3'-9"
SWL18 SF6 SL21 P38 SP38
1'
3'-9"
L21
SL22 P39 SP39
1'-6"
SWL17 SG SE L22 SL23
2'-7"
WL17
L23
BALCONY
L23
NORTH
SOIL STACK
COLD WATER SUPPLY GRAY WATER DOWN TAKE
3'-6"
SOIL STACK
GRAY WATER DOWN TAKE
1'-6"
L20
1'-6" ML6
F6
2'-9"
1'-6" 1'-6"
SL12 P18 SP18
3'-10"
2'-3"
WL16
P31 SP31 P30 SP30
L21
MASTER BEDROOM
2'-7"
L19
1'-6"
4'-5"
SP37 P37 SWL18 SL20 RF6 SF6
SWL16 SE SG ML4
WL18
1'-6"
3'-6"
L18
4'-8"
SP36 P36
1'-6"
L10
WL10
P40 SP40 SML6
2'-3" F5
2'-7"
L17
ML5
L20
SP35 P35
1'-6"
P41 SP41 SML5
2'-3"
SL14 SL15 SF4 RF4 SWL13 P28 SP28 SWL15 SF5 RF5 SL19 P28 SP28
WL15
3'-6"
L16
SML4
L9
F3
4'-5"
5'-11"
WL13
L10
1'
4'-1" F4
L19
SP34 P34 SP33 P33 SP32 P32
5'-11" L15
L18
BALCONY
P21 SP21 SML2 SE SG P22 SP22 SML1
2'-3"
SWL7 SF2 RF2 SL8 P7 SP7 SL3 SL4 SF1 RF1 SWL5 P6 SP6
4'-1"
L15
SP15 P16 SP16
1'-6"
L30
SF8 SWL21 SL29 P53 SP53 SL30
P20 SP20 SML3
3'-6"
3'-6" 2'-3" SL2 SL3 SWL4 P1 SP1
1'-6"
2'-3"
WL11
SWL11
1'-6" L29
2'-10"
1'-6"
1'-4"
1'-6"
SL13 SL14 SWL12 P23 SP23
LIVING
1'-11"
KITCHEN
1'-6"
L28
1'-6"
4'-4"
SP25 P25 WL14 SP26 P26
F8
2'
2'
WL12
L9
2'-3" 4'-5" P15
P11 SP11 P12 SP12 P13 SP13
SWL15 SL18 SF5 P29 SP29
BALCONY
2'
1'-3"
1'-6"
SL27 SP45 P45
L27
1'-3"
4'-4"
4'-4"
L27
P50 SP50 P51 SP51 P52 SP52
L4
2'
WL21
SF3 RF3 SL9 SWL10 P14 SP14
L4
L14
L16
P19 SP19 SL11
5'-11"
WL4
L14
1'-7"
L12
1'-6"
8'-10"
SWL14 SL16 SE SL17 P24 SP24
ML3
L12
L11
SE SG SWL9
WARDROBE
G+1,G+2 TYPICAL
L25
P46 SP46 P47 SP47 P48 SP48
WL5
F1
L13
L29
4'-8"
WL20
F7
L28
SL28 RF8 SF8 SWL21 P49 SP49
SL25 SWL20
2'
L26
1'-6" PUJA
2'-6"
LIVING
CBS
4'-8"
L25
5'
L13
WL9
WARDROBE
SWL8 ML1
3'-9"
L3
DB
L1
ML2
L8
8'-10"
DB
SL24
2' WL19
SWL2 SL1
WL8
1'-6"
F2 L7
L2
1'-6"
3'-2"
L24
L26
4'
3'-4"
P42 SP42
3' SP44 P44
SWL1
UP
L24
1'-6"
ML7
PUJA
4'-8"
SP9 P9 SP10 P10
L3
L2
L34
SWL19 SL26 RF7 SWL19
P43 SP43 SML7
F9
19 20
1
P60 SP60 SWL24 SF9 SL34
18
DB
SE SG SWL22
WL22
FROM GF
2
1'-6"
L34
2'-3"
17
4
1'-6"
5'-9" 2'-6"
3'-9" P54 SP54
40'
2'-6"
1'-6"
6 5
1'-6"
SP2 P2 SL6 SE SL5 SWL6
L5
16
3
P59 SP59 SF9 4'-1" RF9 SWL24 SL35
L31
15
L8
WL7
KITCHEN
1'-6"
1'-6"
5'-9"
SP61 P61 SL36
L35
WL24
PL1
14
7
MASTER BEDROOM
SL33 SL32 SWL23 P58 SP58 SPL1 SL31
13
9
L5
L7
3'
P4 SP4 WL6 P3 SP3
WL3
3'
10
2'-3"
L32
12
8
L35
eq
TO SF
11
4'-10"
ML8
WL23 P55 SP55
L36 SE SG SWL25
WL25
P62 SP62 SML8
P56 SP56
eq
1'-4"
AC
1'-4"
2'-6" L32
WL2
L6
SWL3
2'-10"
1'-6"
4'-5"
2'-6"
2'-11"
P5 SP5
3'-5"
SWL7 SL7 SF2 P8 SP8
L33
P57 SP57
GRAY WATER DOWN TAKE
HOT WATER SUPPLY
HOT WATER SUPPLY COLD WATER SUPPLY COLD WATER SUPPLY HW
HW
HW
13
9
16
6
17
5 FROM GF
4 3
18 19 20
2 1
BEDROOM
15
7
MASTER BEDROOM
KITCHEN
14
8
BALCONY
12
10
WARDROBE
TO SF
11
HW
HW
PUJA
UP
SOIL STACK GRAY WATER DOWN TAKE COLD WATER SUPPLY
HOT WATER SUPPLY HW
LIVING
PUJA
HW
HW
GRAY WATER DOWN TAKE
HW
BALCONY
WARDROBE
KITCHEN
LIVING
RAIN WATER PIPE
MASTER BEDROOM
HW
HW
HW
HW
BALCONY
HOT WATER SUPPLY COLD WATER SUPPLY
COLD WATER SUPPLY
SOIL STACK
G+1,G+2 TYPICAL
GRAY WATER DOWN TAKE
NORTH
3'-6"
4'-2" 10
ROAD
4'-3"
FFL 18'-6" RFL 10'-0"
2'
12 11
BALCONY 11'6" X 6'0"
10'-1"
9"
GATE
4'-2"
FFL 8'-0" RFL 10'-0"
95°
1''
9
LVL = 0'-0"
1'
PLAN
E
11'-4"
5'-10"
9"
ENTRY 7'3" X 8'3"
8
48°
7
3'
4'-2"
MS RAILING
DESIGNED NAVEEN MANJUNATH : NTS BY : SCALE
1' 5'-10"
4"
ARCHITECT :
GROUNDDRAWING FLOOR TITLE LINTEL : COMPOUND WALL DETAILS LVL +15'6"
7ARCHITECT :
#320- ARCADE Brigade Metropolis, Whitefield Main Road, Bengaluru - 48
HANDRAIL DETAILS
10'
10'-2"
BALCONY 11'6" X 6'0"
4"
2'
GROUND FLOOR LVL +8'0"
B
PROJECT LOCATION :
CLIENT :
DESIGNED BY :
NAVEEN
HSR LAYOUT, BANGALORE
MR. SIDDIQUE
CHECKED BY :
MANJUNATH
1'
3'-3"
MS RAILING
DRAWING TITLE :
ARCHITECT :
FIRST FLOOR LINTEL LVL +26'0" HANDRAIL DETAILS
6"
A
11'-4"
8'-9"
06-12-2017
6"
FFL 18'-6" RFL 10'-0"
3'
1'-1"
1'
3'
1'
7' 4"
2'-10"
E
6"
8'-9"
#320- ARCAD Brigade Metrop Whitefield Main Bengaluru -
1'-3"
10'
9"
SCALE : NTS
4"
3'
1'-1"
1'
B
B
1'-5"
6"
3"
6"
2"
6'-
3'
6"
1'-1"
4'-10" 3'-7"
2'-4"
3" FIRST FLOOR LVL +18'6"
3" 1'-5"
4"
6"
6"
29°
FIRST FLOOR LINTEL LVL +26'0"
3'-
6"
6"
4"
3'-
1" R7'-
32°
3"
SECONG FLOOR LVL +29'0"
A
1'
"
'-3
10
#320- ARCA Brigade Metro Whitefield Main Bengaluru
9'
17'-6"
SECONG FLOOR LVL +29'0"
29 DATE
1'
1 2
3'-3"
8"
DRAWING TITLE :
MR. SIDDIQUE
1'-6"
:
4'-2"
1'-1"
3'
GROUND FLOOR LVL +8'0" FIRST FLOOR LVL +18'6"
A
SCALE : NTS
FIRST FLOOR LVL +18'6"
DATE
6"
1'
7
1'
2'-6"
12'-3"
E
3' CLIENT :
HSR LAYOUT, BANGALORE
MANJUNATH
4'-2"
4" 9"
4'-2" 5'
10' 3'
CLIENT :
8
1'-6" 12'-3" 4"
CHECKED BY :
9
ELEVATION
FIRST FLOOR LINTEL PROJECT LOCATION : MR. SIDDIQUE 06-12-2017 HSR LAYOUT, BANGALORE LVL +26'0"
:
4'-2"
FFL 8'-0" RFL 10'-0"
11
MS RAILING B
1'
KED :
NAVEEN DATE
DETAIL A
12
1'-1"
NED :
ENTRY 7'3" X 8'3"
GROUND FLOOR LINTEL LVL +15'6"
1'-6" 7'
4" 4" 4" 3" 1'-2"
1'-7"
3" 4" 4" 4"
4'
4"
11'-4"
PROJECT LOCATION :
06-12-2017
5''
10
SECONG FLOOR LVL +29'0"
:
eq
8"
1"
A
FFL 18'-6" RFL 10'-0"
6"
2'1' STILT FLOOR LVL -2'3"
BALCONY 11'6" X 6'0"
3'-10"
1"
eq
FIRST FLOOR LVL +18'6"
5'
1'-6"
9"
1'-1"
FIRST FLOOR LVL +18'6"
9"
PLANTER BOX 3" THK.
4"
1'-6"
E
4"
3'-6"
7
1'-5" FIRST FLOOR LINTEL LVL +26'0"
PLANTER BOX 3" THK.
9"
1''
3'-4"
2'-6"
3'-10"
SECONG FLOOR LVL +29'0"
GROUND FLOOR LVL +8'0"
1 2
9'
E
LVL+ 1'.6"
1
3'-4"
1'-6"
4.5''
3'-10"
3"
2
3
1''
4
85°
5
3'
6
PLANTER BOX (ABOVE) 3" THK.
4''
7
PLANTER BOX 3" THK.
06-12-2017
PROJECT LOCATION :
CLIENT :
DESIGNED BY :
NAVEEN
HSR LAYOUT, BANGALORE
MR. SIDDIQUE
CHECKED BY :
MANJUNATH
DATE
:
SCALE : NTS
RESIDENTIAL PROJECTS :
06-12-2017
PROJECT LOCATION :
CLIENT :
DRAWING TITLE :
4"
4' 1'-10"
OUT
IN
1'-6" 1'
IN
W3
W6
UPVC
IN
1'-2"
6"
1'-7"
4"
1'-7"
4"
4"
6' 3'-10"
1'-6"
1'-2"
4" 8"
eq eq 2'-4"
eq eq 2'-5" CORNER WINDOW FLOOR LVL
2"
2'-9" 1'-6" 7"
IN
OUT
W5
1'
1'
4'-6" 5" 5"
6'-6" 4'-6" 10"
2'-6" 2'-1"
OUT
OUT
UPVC
W2
4"
4"
OUT
UPVC
W1
2'
6' 3'-10"
1'-6"
IN
4"
2'
1'-10"
1'-9"
4"
2'-9" LINTEL LVL
2"
OUT
UPVC
W7
UPVC
W10
14 MM SQ.BRIGHT BARS GRILL IN
2'-9"
1'-8"
14 MM SQ.BRIGHT BARS @4" SPACING
2'-6"
6"
1'-6"
IN
OUT
1'-1"
2"
1'-6"
4"
2'-9"
2'-9" 1'-6" 9"
4'
6'-6"
4'
5'-6"
5'-6"
5' 4'-6"
IN
14 MM SQ.BRIGHT BARS @4" 4" 9" 4" SPACING 6"
4"
2'-6"
6'
1'-6"
2'-6"
2'-6"
2'-6"
1'-6"
4'
14 MM SQ.BRIGHT BARS @4" SPACING
1'
4"
1'
1'
5'-6"
14 MM SQ.BRIGHT BARS @4" SPACING
1'-6"
2'
GROUND FLOOR SLAB
6"
1'-6"
6'
3'-9"
5'
4'
2'-9"
UPVC
1'
8°
B
-9
"
4"
2" X 3" THK
EXPANSION GAP
DETAIL
2''
DETAIL B
5
6
1' 1'-3" 1'
BW1
"
B
7"
1'-
4'-6"
1
2
3
14 MM SQ.BRIGHT BARS
4
5
6
8
7
10
9
9'-6"
UP
9"
135
°
FFL 8'-0" RFL 10'-0"
4'-6"
11
21 20 19 18 17 16 15 14 13 12
TREAD : 10" RISER : 6"
9"
WINDOW DETAILS
DETAIL E
TERRACE
2'-6"
3''
9''
1'-1'' 4
7"
150°
1'-6"
4"
6"
4"
4"
5"
3
135
4" 6"WOODEN SHUTTER
"
150°
1'-
-9
1'
1'-9"
°
WOODEN FRAME 10" FOR BAY WINDOW
OUT
1'-9
1'-9"
'
2
15
BW2
2"
TERRACE LVL +30'6"
7
8
10
9
9'-6"
SECOND FLOOR LINTEL LVL +27'6"
9"
3'
10'
UP
1'-3"
5' IN
3'
1
1'-9"
7" 5" 5" 7"
BAY WINDOW
2'
IN
W11
4"
2"
1'-3"
4' 1'-10"
OUT
DETAIL - A
2" X 3" THK WOODEN SHUTTER
DETAIL A
B
4"
2'-3"
FLOOR LVL
15 2" 9° 10"
2''
2'-3"
4"
"
WOODEN BEADING
2
4
15
14
13
NOTE : - KINDLY REFER TO12 SITE FOR 11 STAIRCASE PRECISE DIMENSION 10 9 1'-5"
OFFICE WORKS ARCHITECT :
5
6
7
8
16
15
13
12
18
1 17
16
8
7
7'
5
6
A
15
13
12
11
10
7'
14
STAIRCASE 2 1
CAR PARK
11 10
9
3
4
9
7'-6" 9'-9"
LOBBY
2
4
3
10' 7'
14
DATE
1'-6"
2'-6"
17
10'
18
8
7
10'-2"
19
5
6
11 10
9
8 5
7 6
STORAGE / UPS
2'-6"
16
SECTION BB
:
06-12-2017
DESIGNED BY : NAVEEN
10'
17
STILT FLOOR LVL -2'3"
CHECKED BY :
7'
18
12
4"
2'-6"
11 10
PWDR ROOM
GROUND FLOOR LVL +8'0"
TOILET
19
13
STAIRCASE
7'
9
14
2'-3"
3
5
6
7
8
12
10'-2"
20
20
4
1'-5"
13
15
0"
14
16
2'-6"
15'-6"
7'
17 DETAIL A 16
18
17
GROUND FLOOR LINTEL LVL +15'6"
10'
19
18
3
2
1
10'
4''
1''
21
5''
STAIRCASE
1
TOILET
FIRST FLOOR LVL +18'6"
eq
15
21
19
STAIRCASE
15'-6"
4"
1'' 20
20
2'-6"
1'' 85°
48°
eq
1' 1'-1"
21
21
FIRST FLOOR LINTEL LVL +26'0"
1'-6"
2''
DETAIL B
95° 1'
BED ROOM
SECONG FLOOR LVL +29'0"
9"
11'-2"
21 20 19 18 17 16 15 14 13
3'-6"
3'
TREAD : 10" : 6"
4''RISER 12
7'
4'-6"
11
7'-6"
FFL 8'-0" RFL 10'-0"
LINTEL LVL
1'-7"
3'
1'-7"
7" 5" 5" 7"
BAY WINDOW
1'-9
3"
6" 5" 5" 6"
3'
6"
1'-6"
UPVC
6" X 3" THK WOODEN FRAME
6" 5" 5" 6"
1' 6" 5" 5" 6"
2' 1'-2"
OUT
W9
6" 5" 5" 6"
4'-6"
1'-7"
5' 5" 5"
10"
IN
1'-9"
'
4'-6" 2'-4"
1'-6"
6" 5" 5" 6"
1'-6" 4"
OUT
A
W8
4"
1'-9"
3'
OUT
IN
2'-1"
1'-9"
90°
2'-6"
6"
1'-9"
2'-2"
12' 6'-3"
2'-6"
1'-2"
6"
1'-6"
2"
1'-6" IN
4"
6'-6" 4'-6"
5'-6"
1'-6" 1'-6"
14 MM SQ.BRIGHT BARS @4" SPACING
10"
5'-6"
E
1'-9"
14 MM SQ.BRIGHT BARS @4" SPACING
1'
2'
1'-3"
4'
1'-6"
1'
4'-6" 2'-6"
1'-6"
1'
2'-6"
2"
12' 6'-3"
2'-6"
OUT
CW1
MANJUNATH
SCALE : NTS
PROJECT LOCATION :
CLIENT :
DRAWING TITLE :
HSR LAYOUT, BANGALORE
MR. SIDDIQUE
SECTION
ARCHITECT :
30
#320- ARCADE Brigade Metropolis, Whitefield Main Road, Bengaluru - 48
STACKED STONE CLADDING
SHERA WOOD CLADDING CONCRETE PLAIN (SEAMLESS)
GRC JAALI
WODDEN SIDINGS
WALL PAINT
WALL PAINT
Stone Cladding- Caldera grey Finish : Rustic Punch Size : 148.5x450mm SKU Code: T14851718 (might vary depending on the availability)
Eaves
Material : Everwood WPC
Chajja (Ultima allura graniza)
Wall paint
Dark Grey colour
Asian Paints (Royal Lustre) Shade: L152 Cream pie
MS Handrails(Customized) with Toughened glass
Asian Paints (Ultima allura graniza) Dark Grey colour
MS Swing Gate(Customized)
SHERA WOOD planks Bolted to MS
31
(Ultima allura graniza) Dark Grey colour
- SHERA WOOD mounted
SHERA WOOD
WALL: Asian Paint Royal Lustre (Colour: L512 Cream pie)
STONE CLADDING Caldera grey
Wooden Eeaves: WPC
METAL JALI
GREY COLOUR PAINT
WHITE STUCCO FINISH
WOODEN CLADING
Brcik cladding
GREY COLOUR PAINT
WHITE STUCCO FINISH
32
built-form
density
ISSUES IN HOUSING
time constrain
sanitation
migration
image courtesy: https://www.urbanadventures.com/Bangalore-tour-pollinate-solar-slum-tour
community participation
availablity of land
local shops
IT companies
Unintented planning
transport node
leads to the creation of these habitable spaces.
image courtesy: http://bangalore.citizenmatters.in/uploads/picture/image/17112/pic_article_ejipura_sankar.JPG
https://www.linkedin.com/pulse/business-model-serving-low-income-indians-anurag-bhatia/
by the local community + effective use of available areas.
in waste management and sanitation.
Placemaking
Lack of awareness
SITE OPPORTUNITIES
Present housing issues and the site oppurtunities have been analysed and linked to solve the crucial issues, to make the housing idea sucessful as per the vision of INDIAN GOVERNMENT.
+
+
Single unit is linearly planned with built-in furniture that can be used flexibly, to accomodate their daily needs. It is also perforated in the front and rear for easy cross ventilation and lighting.
The clusters have been arranged in a way to get a space that will incorporate the services and the Rain water harvesting ideas.
The units have been arranged arround the courtyads to form a clusted that acts as the community space for the rehabilitated people.
DESIGN INTENT
IDENTIFIED SITE
N
LOCATION :
The site identified for this project comes under the area improvement
KORAMANALA,
perimeter of the BDA(Bengaluru Development Authority) and also has the existing slums in the fringes of the existing lake. As per propsed landuse map the identified site incorporate the housing for EWS (Economically weaker section)
BENGALURU.
As per the propsed master plan on Bangalore Development authority the identitied site in recommended to the MIXED USE area alloted for
EWS. The strength of the site is the major link road that connects Adugo-
di to Koramangala, with the transport node that acts as the vantage point.
The blocks are repeated to create a macro level courts that incorporates the services and the intermediate green spaces. It also has the grey water treatment spaces.
The puncture in the blocks have been made to bring in the good lighting. It permits the balcony in the removed volumes. All the blocks have been raised in stilts to bring in the smaller commercial activities that will be for
the community from the community.
CONCEPTUAL SITE MASTER PLAN
utility balcony 2.3 x 0.83
bath 0.9 x 1.4
1
toilet 0.75 x 1.4
courtards have been created to bring in the natural lighting, cross-ventilation and the cluster ideology to the housing
6.9 mm
kitchen 1.5 x 4.2
2
private space 2.28 x 2.2
the blocks have been stacked-up to accomodate the housing units. balcony 0.83 x 2.66
living 1.5 x 4.2
3
at each level two units have been removed, so that the floor spaces in the above also gets a community space.
carpet area: 30.6 sq.m 4.2 m estimated budget : 3.051 Lakhs
units are in m
unit plan
precast hollow core slab
4
cores have been subtracted vertically to incorporate the plumbing and the electical lines. without disturbing the idea of our cluster.
ferrocement box wall
bison board
brick wall
5
the pavilion / semi-open terrace created between the slabs have been assigned for the multiple facility.
ladder precast vertical member
MS frame precast hollow core slab cement panel door MS sheet
6
woven bamboo panel
the massing that shows the idea of PLACE MAKING IN ARCHITECTURE. MS bracing
04
gabion foundation
COMPETITION
KIT OF PARTS ASSEMBLY
a r c h i t e c t u r e i s t h e a r t o f p l a c e m a k i n g
BUILDING FOR A BILLION c a t e g o r y
u r b a n p o o r u n b u i l t
1 A
1
panel
%
m
-5
q.
ra w ja at k a er a ch lva an yi ne l ci 28 vil 52 am sq en .m it i
0 -1 SR O
es
5s 70 :5 %
ll oc al ity la pu rg e bl r f ic ri in ng to es th th e at co in ho m vi us m te in un s t g ity he cl us te r co m m un ity co ur ts
ia nt de si re
N
FIGURE GROUND PLAN
SITE MASSING
courtyard / community garden
SITE MASSING
primary school space
community terrace
space for empowerment
GF PLAN
FF PLAN
SF PLAN
site location : koramangala, bangalore. KA site area :
5705l sq.m
FAR : max 3 setbacks : 9m OSR : 10% 5705 sq.m road width : 7m (minimum) height : not more than 20m plot coverage : 60%
N
MASTER PLAN
TERRACE SPACES assembling the hollow core precast slab in place, with the help of cranes and community participation activity. The screening of approved quality will be done.
4
fabrication work will be done, after assembling the roof slab. The choice of finish will be given to the individuals, so that it will make the whole cluster look so dynamic.
5 COURTYARD
erection of precast wall panels and the precast ferrocement boxes will be done by the individual residents. So the the whole cluster will be done in parallel. it helps to save the time of construction.
assembling the hollow core precast slab in place, with the help of cranes and community participation activity. The screening of approved quality will be done.
foundation excavation and gabion wall work for raising the plinth to 600mm
it acts as the climatic factor to bring-in daylight and also it will be the major spacemaking element.
ENTRANCE PORCH
3
2
CONSTRUCTION TIMELINE
1
PATHWAY screening concrete done over the precast slabs, also acts as the floor finish and also help us to cut-down the investment on the flooring material. The versatality in the concrete finish will be selected by the inhttp://www.quadlock.com/images/decking/ dividuals. icf_deck_diagview.png
PEDESTRIAN FRIENDLY the major issues with the waster management system is the maintainence. reed bed
to regulate the system it is planned like
storage tank
each cluster will be treated there and
hollow core precast slabs that comes in the planks will the lifed by mechanical means and assembled in place to form a roof slab. it will help us to cut-down the investment on beam. the mass production of such slabs also is economical.
a nodes. the waste water generated at reused by the same user. this helps in the prevention of commotion between the community. image source :http://earth5r.org/ rainwater-harvesting/
http://www.oldcastleprecastspokane.com/core/ files/oldcastleprecastspokane/uploads/images
ferrocement block will be used in constructing the partition wall between two units so that the same box, will be used by them for the storage. UG sump RWH tank
http://www.pathofexilecurrency.us/wp-content/ uploads/2017/06/cement-planter-box-cactus
bison board an agro-waste material is used as a slab for to bring in mezzanine floor with in the unit.
recharge well
http://reedbed.ae/applications/
WATER MANAGEMENT
http://5.imimg.com/data5/DM/CS/MY3713720/fibre-cement-board-500x500.jpg
country bricks are mostly used for the internal walls, with our any plastering. It has the exposed conduicts to favour the users.
https://qph.ec.quoracdn.net/main-qimg-8b4cfb2834f390e3a40b8c2fb3cc6e44-c
precast wall units are more strucutral and it is placed one on the other to tranfer the load without much brawling.
http://www.oldcastleprecastspokane.com/core/ files/oldcastleprecastspokane/uploads/images/
woven bamboo is used in the front and the rear side to bring in the natural air to the designed units.
http://www.australianbollards. com.au/Solar%20Bollards%20 -%20Proplet3%20(25).jpg
https://www.greenlytes.com/wp-content/uploads/2014/05/All-In-oneLED-Solar-Street-Light-integral-solarpanel.jpg
https://s7g3.scene7.com/is/image// https://www.greenlytes.com/ ae235?src=ae235/9845P_P&$prodwp-content/uploads/2014/05/ All-In-one-LED-Solar-StreetImageMedium$
bollards in the pathway will be powered by solar, so
street lights in the pathway will be powered by
every house will be provided with the individual
that it will help to manage the electricity within the
solar, so that it will help to manage the electricity
solar powered LED lights, so that it also helps in
given plot.
within the given plot.
regulating and maintainence of the solar panels.
POWER MANAGEMENT
http://el.doccentre.info/eldoc1/setdev/HTGWattle-Daub-Bamboo-3.JPG
04
ferrocement door shutters are precasted and assembled in place. it also has the designed cut-outs to help in cross-ventilation withhttp://rtu.paulabbott.org/get.html?_Action=GetI-out compromising on privacy. mage&_Key=Data3143&_Id=327&_Wizard=0&
perforated MS sheet is used in the front and the rear side to bring in the natural air to the designed units. http://beautyharmonylife.com/wp-content/uploads/2016/03/perforated-metal-sheet.jpg
p l a c e m a k i n g i s t h e p o w e r f u l t o o l f o r p o l i t i c a l c h a n g e .
BUILDING FOR A BILLION c a t e g o r y
u r b a n p o o r u n b u i l t
1 A
2
panel
ARCHIMEDIAN AND PLATONIC SOLIDS
RAZA ART
EMOTE THROUGH BASIC SHAPES
FRACTALS
ORIGAMI - INFINITY
BOTTLE SCULPTURE
05
OTHER SKILLS
BASIC WORKS AND PH
HOTOGRAPHY
- R . NAVEEN KUMAR naveenrnk.midas@gmail.com
+91 7667679986 +91 9566793955