08 2021
KUCHING HISTORICAL T R A N S P O R TAT I O N M U S U E M 01 02 03 04
PRECEDENT STUDY (GROUP) S I T E A N A LY S I S ( G R O U P ) DESIGN BRIEF (GROUP) ARUS ISTHMUS
Nazifah Binti Muhammad Abdullah 2017654744 AAR 680
08
PORTFOLIO
08 2021 TA B L E O F C O N T E N T S
01 02 03 04
PRECEDENT STUDY / VEHICLES AND ART TRANSPORTATION
SITE ANALYSIS
DESIGN BRIEF
KUCHING HISTORICAL TRANSPORTATION MUSEUM / ARUS ISTHMUS
1
PRECEDENT STUDY VEHICLES AND ART TRANSPORTATION In a group of four, we were tasked to conduct a precedent study on specifieed topics. My group was tasked to do a precedent study on ART Transportation. ART, which will be implemented in Kuching being a mode of public transport increasing connectivity within Sarawak. Isthmus, the proposed site of the Kuching Historical Transportation Museum, is the starting point of one of the lines for ART. This study will be useful in the planning and programmes of the Museum. With online research and by contacting relevant officials, here was what we gathered:
ABOVE: Board composition of the precedent study
2
SITE ANALYSIS KUCHING HISTORICAL T R A N S P O R TAT I O N M U S E U M
In a studio effort, groups were divided into different topics to cover every aspect of site analysis. My group was in charge of the topography and climate of site in board 03. We did a site visit, conducted releveant observatins, documentation and research. From there, we composed a board to concise the information gathered that would be used as reference for the whole studio when doing site planning, conceptualization and design. The following are all the boards for complete composition of site analysis :
3
DESIGN BRIEF KUCHING HISTORICAL T R A N S P O R TAT I O N M U S E U M
In a group of four, we were tasked to derive a design brief based on the information and project information provided. We came up with a detailed brief to help us strenghten and conceptualize the Kuching Historical Transportation Museum in the next phase for our individual designs.
4
ARUS ISTHMUS KUCHING HISTORICAL T R A N S P O R TAT I O N M U S E U M
VIDEO LINK After the previous tasks, the final task was to design the Kuching Historical Transportation Museum that satisfies the requirements, brief and scope of the project. The image below is the overall composition of the board. The following pages are close ups of the board. Apart from that, a link for the rendered walkthrough video is provided or scan the qr code above : https://youtu.be/9oAXmq-zqOM Since the beginning of time, the river has been the Host being a catalyst ,connecting and sustaining civilizations... The Museum will act as a host for regeneration and transformation much like the river is a host for transport, living and culture. The Museum looks to work with light and compression to provide an engaging spatial experience for visitors whilst taking cues from Sarawak’s culture and riverine transportation history which concludes at the riverside promenade. The building brings focus on Sarawak’s riverine transportation whilst echoing the history and culture through the architecture.
ARUS ISTHMUS KUCHING HISTORICAL TRANSPORTATION MUSEUM
NAZIFAH BINTI MUHAMMAD ABDULLAH 2017654744 AP2438A AAR 680