2 minute read

HAE Report

Heroes Architects & 29 Engineers Heroes Architects and Engineers (HAE) (a Internship Report Dubai-based company), is an innovative façade modelling technology that allows to visualize that the Softwares Used: world’s most prestigious architects wish to bring to life out in the field. Unlike many other firms in the world, the ground-breaking façade modelling process brings the façade model to microscopic fabrication level – a completely different dimension from conventional CAD operation in the current industry.

1. U.S. Project

Advertisement

I was placed as a part of the ACP Panel Fabrication team for this project. We mainly worked on creating the BIM Model for this project using Rhino and Grasshopper. I learnt a great deal about the functions and components of Grasshopper through this project.

2. Sohar Bank

The project is based in Sohar, Oman. This structure is designed by the famous architect, Santiago Calatrava. I had to fix the catwalk designed in the facade due to minor changes in the dimensions. I worked using Rhino and had to use videos provided by my mentor in order to follow correct procedure.

This is a hotel located in Pakistan and the company was assigned on creating a façade for this project. I was assigned to learn the advantages using a foam concrete compared to using conventional masonry. Then I was assigned to create an optimization report that could be shown to the clients for this project. The report had to contain images and graphs relevant to the use of these building materials. The graphs had to display information provided in a visual manner that would provide a quick understanding.

4. Murray Road, Hong Kong

I was assigned to assist with the shop drawings for this project. My task consisted of using the polyline command and creating 3D profiles of Die details. Die profiles are the details being used in this project. I was provided with an AutoCAD file that could be used for measurement as accuracy is extremely important. I traced these profiles on Rhino. This work was extremely meticulous and had to be carefully done as the measurements are very accurate and could affect the overall project. I was assigned two supervisors for the task and given 5 pages of profiles that needed to be made.

5. Doha Canopy

The tasks assigned to me during this project were last minute touch-ups to the working drawings of sections and elevations of the design. The working drawings include minute details about materials and other profiles used in the building. My task was to annotate all materials and objects and place them in a manner that did not disturb or inconvenience the viewing of the sectional details.

This article is from: