Vol 5-Sg2b

Page 1

TABLE NO:1 GENERAL DESCRIPTION CATCHMENT

Satluj LATITUDE 31'11' to 31'15'

WATERS HED NO

Sg2 LONGITU DE 76'59' to 77'04'

MICRO WATERSHED NO

Sg2b

AREA(HA)

DISTRICT NAME

ALTITUDE

2192 SLOPE IN DEGREE

Solan & Shimla RAINFALL (mm)

975m to 1855m

30' to 85'

NA

CATTLE POPULATION 4190

MALE 2175

TEHSIL/BLOCK

FEMALE 2015

MILTCH 1149

OTHER 891

Arki/Kunihar/Suni /Basantpur

VILLAGE Karawanri, Tangesh, Dishadi, Panihena, Shaoli, Dargi, Sainj, Sahol, Dhaneshwar, Dharoti, Panjel, Palhar, Tikri, Nora, Hahra, Chanog, Malaun, Dharer, Sangoi, Banjal, Dhar, Mangu

SNOWFALL(mm)

TEMPERATURE(Cen)

NA

NA PROPOSED NO/NAME NA

PHOTO C:\MWS_21\Photo \SG2B\Table 1\Table1.jpg NO OF HOUSE HOLD 939

PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA

DESCRIPTION NA

TABLE 1 PHOTO Sg2b

TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL

GOVT AREA

PRIVATE AREA

COMMU AREA

TOTAL

B.AREA UNDER FOREST CATEGORY WISE : CATEGORY

DPF/RESERVE Plahana, Baag ka Naal 479.9 Cheel, Daru, Lucinia, Shegul, Fegra, Anjeer, Beul 0 to .4

0 1256

196 0

0 0

196 1256

NAME AREA (HA)

307 433 1996

0 0 196

0 0 0

307 433 2192

SPECIES DENSITY

UPF Okhru, Jaamu, Bakraal. Dhola, Panihara, Chalot 775.6 Cheel, Daru, Lucinia, Shegul, Fegra, Anjeer, Beul 0 to .2

Volume: V Chapter: 4 Page No:

68

PASTURE

OTHERS

NA NA

NA NA

NA NA

NA NA


TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS

NAME

LATITUDE AND LONGITUD E

Rowdi

31'14'34" 76'59'39"

Sohal BashaduI Sohal BashaduII TOTAL :

31'22'93" 77'03'97"

TOT AL ARE A(H A)

54

31'22'92" 77'04'08" 54

SPECIES PLANTED

SAMPL E GAP FILLIN G AREA( HA)

SURVIV AL %

2

Cheel

0

100

Due to drought.

5

Daru, Lucinia, balbari

2

60

Due to drought.

5

Lucinia, kachnar, Daru, Bahera, Jatropha

3

40

SAMP LE AREA (HA)

12

5

TOTAL GAP FILLING AREA(H A)

AREA NEEDED NEW PLANTATI ON(HA)

26

28

FENCING REQUIRED( RM)

29400

REASON S FOR FAILURE

Due to drought. 26

28

FINAL PRESCRIPT ION(Enrich ment(HA))

RATE/H AC

COST (Rs)

Enrichment = 44

27900

1227600

Energy Plantation = 10

112300

1123000

29400

2350600

TABLE 3 PHOTOS Rowdi

Sohal Bashadu-I

Volume: V Chapter: 4 Page No:

Sohal Bashadu-II

69


TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA

LATITUDE/LON GITUDE/WAYP OINT

Rawdi

31'14'34'76'59' 39"

Sohal Bashadu -I

31'22'93'77'03' 97"

Sohal Bashadu -II

31'22'92'77'04' 08"

PRESCRIPT ION Live Hedge CheckDam s Trenching Live Hedge CheckDam s Trenching Live Hedge CheckDam s Trenching

QUANTITY 450 Rms 2x1.5x1.5m 3x1.5x1.5m 1x.50x.30m 800 Rms 3x1.5x1.5m 2x1.5x1.5m 1x.50x.30m 1000 Rms 3x1.5x1.5m 2x1.5x1.5m 1x.50x.30m

AVAILABILTY OF LOCAL MATERIAL

OLD WORK NEED REPAIRING(QUAN TITY)

FINAL PRESCRIPTION NEW PRESCRIPTIO NEW N QUANTITY

COST (Rs)

9.9

50490

= 28 Nos = 20 Nos = 1500 No

Stone & local species

NA

Trenching

1x.30x.30 m= 5100 Nos

= 34 Nos = 24 Nos = 1000 No

Stone & local species

NA

Trenching

Trenching

9.9

50490

= 36 Nos = 25 Nos = 800 Nos

Stone & local species

Trenching

1x.30x.30 m= 4200 Nos

9.9

41580

NA

TABLE 4 PHOTOS Rowdi

RATE/CUM

Sohal Bashadu-I

Sohal Bashadu-II

Volume: V Chapter: 4 Page No:

70


TABLE NO:5 AGROFORESTRY TYPE OF TREE

TREES WILD FRUIT

MEDICINAL

PRESENT STATUS PRESENT NOs PRESENT SPECIES Simbal, Eucaliptus, Baan, Cheel, Bheod, Willow, Kharak, Tuni, Bans Deodar, 600 Reuni, Shisham Daru, Fegra, Anjeer, Paja, Baan, Siaru, 450 Ber, Heer, Kachnar Kakkarsingi, Aloevera, Kashmal, Kainth, Basuti, Amla, Bahera, Bhekal, Tirmur, 750 Chhincher, Banafsha, Karipatta

FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES

2200 2000

2500

NEED FOR EXTENSION

Simbal, Baan, Bheod, Willow, Kharak, Tuni, Bans Deodar, Reuni, Shisham Daru, Fegra, Anjeer, Paja, Baan, Siaru, Ber, Heer, Kachnar Kakkarsingi, Aloevera, Kashmal, Kainth, Basuti, Amla, Bahera, Bhekal, Tirmur, Chhincher, Banafsha, Karipatta

SOURCE OF PLANTING STOCK(Nearest Nursery)

Y

Sevrei & Chandi Nursery. Sevrei & Chandi Nursery.

Y

Sevrei & Chandi Nursery.

Y

TABLE NO:6 GRAZING LANDS Name

LATITUDE/LONGITUDE

AREA(HA)

Baga Ka Nal

31'14'09"76'59'47"006 -01-402Sg2b

80

SPECIES Cheel, Grass & Bushes

WEED REMOVAL

SEEDING

CLOSURE S

Yes

Yes

No

Other 16000 plants for fodder are required to be planted.

TABLE 6 PHOTOS Baga Ka Nal

Volume: V Chapter: 4 Page No:

71

PEOPLES SUGGESTION

No suggestion.

Rate/ Hac (Rs)

21700

Cost (Rs)

1736000


TABLE NO:7

TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA

AREA(HA) NA

LATITUDE/LONGITUDE NA

SPECIES NA

GAP FILLING NA

MAINTENANCE NA

NEW PLANTATION NA

SOIL CONSERVATION MEASURES(QUANTITY) NA

TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads)

NAME OF AREA

LATITUDE/ LONGITUD E

Dhanesh war (10 Kms)

31'23'05" 77'04'93"

CheckDams Brushwood Live Hedge DeflectingSpur

Sainj Khad (6 Kms)

31'22'88" 77'04'92"

CheckDams Brushwood

PRESCRIPTIO N Live Hedge DeflectingSpur

QUANTITY 1800 Rms 7x1.5x2m = 16 Nos 8x1.5x1.5m = 29 Nos 15x1.5x1.5m = 26 Nos 12x1.5x1.5m = 44 Nos 10x1.5x1.5m = 20 Nos 800 Rms 1200 Rms 7x1.5x2m = 16 Nos 8x1.5x1.5m = 17 Nos 12x1.5x1.5m = 28 Nos 10x1.5x1.5m = 18 Nos 600 Rms

AVAILAB ILITY OF LOCAL MATERIA L

OLD WORKS NEEDING REPAIR(Q UANTITY)

LIFT IRRIGAT ION(HT/ ACERAG E)

Stone & local species

NA

NA

Stone & local species

NA

NA

FINAL PRESCRIPTION NEW PRESCRIPTIO N Live Hedge DeflectingSpur

CheckDams Brushwood Live Hedge DeflectingSpur

CheckDams Brushwood

NEW QUANTITY 3000 Rms 7x1.5x2m = 5 Nos 8x1.5x1.5m = 10 Nos 15x1.5x1.5m = 8 Nos 12x1.5x1.5m = 14 Nos 10x1.5x1.5m = 6 Nos 500 Rms 1800 Rms 7x1.5x2m = 5 Nos 8x1.5x1.5m = 6 Nos 12x1.5x1.5m = 4 Nos 10x1.5x1.5m = 6 Nos 300 Rms

TABLE 8 PHOTOS Dhaneshwar

Sainj Khad

Volume: V Chapter: 4 Page No:

72

RATE/U NIT 9.6 16236 10033 10033

COST (Rs) 28800 568260 802640 1203960

10033 10033 62 9.6 16236 10033 10033 10033 62

1685544 601980 31000 17280 568260 481584 481584 601980 18600


TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/L OCATIO N NA

LATITUD E/LONGI TUDE/W AYPOINT NA

DAMAGE/R ISK TO LIFE & PROPERTY NA

MEASU RES TAKEN NA

TYPE OF SOIL AND ROCK NA

DEGREE OF SLOPES/S EVERITY NA

OCCURRENC E(Season) NA

ROAD CONSTRU CTION NA

QUA RRY NA

OTHER CONSTRU CTIONS NA

NATU RAL NA

FINAL PRESCRIPTION NEW NEW PRESCRI QUAN PTION TITY NA NA

RATE/ UNIT

COST (Rs)

TABLE NO:9A

INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Daru Citrus Guava Japani Fruit Banana Mango Papita

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local

USE OF FERTILISERS Yes No No No No No No

USE OF INSECTICIDES Yes No No No No No No

PROBLEMS FACED

Technical guidence is required. Wild animals destroys the crops.

2.CROPS : CROPS NAME Rajmash Mustard Maize Potato Wheat Urd Barley

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local

USE OF FERTILISERS No No No No No No No

USE OF INSECTICIDES No No No No No No No

PROBLEMS FACED

Technical guidence is required. Wild animals destroys the crops.

3.VEGETABLE : VEGETABLE NAME Tomato Cabbage French Beans Brinjal Ladyfinger Radish Cauliflower Peas

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local Local Local Local

USE OF FERTILISERS Yes Yes Yes Yes Yes Yes Yes Yes

Volume: V Chapter: 4 Page No:

USE OF INSECTICIDES Yes Yes Yes Yes Yes Yes Yes Yes

73

PROBLEMS FACED

Technical guidence is required. Wild animals destroys the crops.


4. LIVE STOCK : LIVE STOCK(NO) Goat/Sheep - 422 Mule/Horse - 20 Nos Ox - 449 Buffalo - 39 Cow - 1110

BREED Local Local Local Local Local & Jersey

WHETHER SELLING THE PRODUCT Yes No No Yes Yes

PROBLEM FACED Technical guidence is required. Fodder shortage is faced.

5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER

REQUIREMENT Yes Yes

AVAILABILITY

GAP PERCENTAGE 60% 50%

40% 50%

SOURCE LPG & Forest Forests

MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Amla Chhichar Kashmal Kakkarsingi Bhekal Timber Basuti Karvi Aloevera Kainth

EXISTING NAME Amla Chhichar Kashmal Kakkarsingi Bhekal Timber Basuti Karvi Aloevera Kainth

SUGGESTIONS

No Suggestion.

PEOPLES PARTICIPATION: MAIN PROBLEMS Drinking Water supply of IPH is not satisfactory as the same is not meeting the requirement of the people. No Central accomodation for visitors and meeting is held in the area. Provision of storage of drinking water is not in the various areas. Condition of the village paths is very poor. Water harvesting structuresare not available in the Sainj Khad and soild erosion is created in reiny seacon. Wild animals destroys the crops. School is not available for primary education at Jamu. Lantana bushes are spreaded in huge scale over the private and forest land.

PEOPLES PRIORITIES

SUGGESTION FOR IMPROVEMENT Scale of drinking water supply of IPH be increased to meet the requirements. Accomodation for Community Centre at Sainj, Devsthan, Judh and Majlidhar is required. Storage tanks be made at Judh, Majlijan, Jamu(Shed), and Sainj. Maintenance of the paths is required. Water harvesting structures, chekc dams with crate wire, Cement structures and drop structures be made in Sainj Khad. Managements for wild animals like planting of wild fruits in the forests be done. Primary School be opened at Jamu.

Priority.

Top Priority. Lantana bushes are required to be removed immediately.

Volume: V Chapter: 4 Page No:

74


PEOPLES PARTICIPATION

COSTING: TABLES COST

TABLE 3 2350600

TABLE 4 142560

TABLE 6 1736000

TABLE 8 7091472

Volume: V Chapter: 4 Page No:

TABLE 9 0

75

TOTAL 11320632


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.