4Sk1j

Page 1

TABLE NO:1 GENERAL DESCRIPTION CATCHMENT

WATERSHED NO

MICRO WATERSHED NO

AREA(HA)

DISTRICT NAME

TEHSIL/BLOCK

VILLAGE

PHOTO

C:\MWS_21\Photo\SK1J\Table 1\Table1.jpg

Satluj

Sk1

Sk1j

3036

Mandi

Thunag/Jhanjeli

Suwan, Bharech, Karshai, Pharaj, Ghatu, Suram, Nali, Pai, Barnalhal, Bagrohn, Karganu, Suryee, Rudan, Kandidhar, Sanjab, Lunjhi, Luharatana, Bahal, Daron , Kamand,

LATITUDE

LONGITUDE

ALTITUDE

SLOPE IN DEGREE

RAINFALL(mm)

SNOWFALL(mm)

TEMPERATURE(Cen)

NO OF HOUSE HOLD

31' 27' to 31'32'

77'17' to 77'20'

1263m 2780m

30' to 80'

NA

NA

NA

469

POPULATION

MALE

FEMALE

2288

1157

1131

OTHER 611

PROPOSED NO/NAME NA

PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM NA

CATTLE MILTCH 621

TABLE 1 PHOTO Sk1j

Volume: VIII Chapter: 4 Page No:

97

DESCRIPTION NA


TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) GOVT AREA

LAND USE AGRICULTURE LAND FOREST LAND WASTE LAND OTHERS LAND TOTAL

PRIVATE AREA

33 2090 150 152 2425

611 0 0 0 611

COMMU AREA

0 0 0 0 0

B.AREA UNDER FOREST CATEGORY WISE :

TOTAL

CATEGORY

644 2090 150 152 3036

NAME AREA (HA) SPECIES DENSITY

DPF/RESERVE Karshaibir, Chaplandi, Lather Sheel, Hall, Ghanidhar, Planidhar, Phaidhar, Shninarayan, Sural, Danot, Sainj, Bathi Shil, Surali 2123.06 Cheel, Kail, Rai, Baan, Deodar, Lucinia .0 to .4

UPF

PASTURE

OTHERS

NA NA NA NA

NA NA NA NA

NA NA NA NA

TABLE NO:3 AREA UNDER PLANTATIONS FOR LAST 15 YEARS NAME

LATITUDE AND LONGITUD E

Bathu a-I

31'46'39" 77'32'65"

Bathu a-II

31'45'89" 77'32'71"

Bohdi Sheel Dhano t Haldis hni TOTAL :

31'50'84" 77'29'49" 31'50'25" 77'28'77" 31'48'45" 77'29'57"

TOTA L AREA (HA)

SAMPL E AREA (HA)

SPECI ES PLANT ED

SAMPL E GAP FILLIN G AREA (HA)

SURVIV AL %

5

Cheel

3

40

Due to drought and grazing.

3

40

Due to drought and grazing.

1

80

2

60

2

60

5 107 5 5 5 107

25

Cheel, Daru, Kachn ar Deoda r Deoda r Deoda r

TOTAL GAP FILLIN G AREA (HA)

48

11

48

AREA NEEDED NEW PLANTATION (HA)

60

60

FENCING REQUIRED (RM)

50400

REASONS FOR FAILURE

Due to drought and grazing. Due to drought and grazing. Due to drought and grazing.

FINAL PRESCRIPTI ON(Enrichm ent(HA))

RATE/ HAC

COST (Rs)

Enrichment = 60

27900

1674000

Energy Plantation = 0

0

0

50400

1674000

Volume: VIII Chapter: 4 Page No:

98


TABLE 3 PHOTOS Bathua-I

Bathua-II

Dhanot

Haldishni

Bohdi Sheel

Volume: VIII Chapter: 4 Page No:

99


TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA

LATITUDE/LON GITUDE

PRESCRIPTIO N CheckDams Live Hedge Trenching CheckDams

Bethwa-I

31'46'39" 77'32'65"

BethwaII

31'45'89" 77'32'71"

Bohdi Shil

31'50'84" 77'29'49"

Danot

31'50'25" 77'28'77"

CheckDams Live Hedge Trenching Trenching

Haldeshn i

31'48'45" 77'29'57"

CheckDams Live Hedge

CheckDams Live Hedge Trenching Live Hedge CheckDams Trenching CheckDams

QUANTITY 2x1.5x1.5m=20 Nos 100 Rms 1x.50x.30m=1000 Rms 3x1.5x1.5m=20 Nos 3x1.5x1.5m=20 Nos 2x1.5x1.5m=40 Nos 100 Rms 1x.50x.30m=1000 Rms 100 Rms 3x1.5x1.5m=25 Nos 1x.50x.30m=1000 Rms 2x1.5x1.5m=20 Nos 3x1.5x1.5m=20 Nos 2x1.5x1.5m=30 Nos 200 Rms 1x.50x.30m=2000 Rms 1x.50x.30m=2000 Rms 3x1.5x1.5m=30 Nos 2x1.5x1.5m=40 Nos 200 Rms

AVAILABILTY OF LOCAL MATERIAL

OLD WORK NEED REPAIRING (QUANTITY)

Stone & local species

Stone & local species

Stone & local species

Stone & local species

Stone & local species

NA

NA

NA

NA

NA

FINAL PRESCRIPTION NEW NEW PRESCRIPTION QUANTITY

RATE/C UM

COST(Rs)

Trenching

1x.30x.30 m= 3600 Nos

9.9

35640

Trenching

1x.30x.30 m= 3000 Nos

9.9

29700

Trenching

1x.30x.30 m= 3600 Nos

9.9

35640

Trenching

1x.30x.30 m= 3600 Nos

9.9

35640

Trenching

1x.30x.30 m= 4200 Nos

9.9

41580

TABLE 4 PHOTOS Bathua-I

Bathua-II

Haldishni

Volume: VIII Chapter: 4 Page No:

100


Dhanot

Bohdi Sheel

TABLE NO:5 AGROFORESTRY TYPE OF TREE TREES WILD FRUIT MEDICINAL

PRESENT STATUS PRESENT NOs PRESENT SPECIES 350 Kail, Cheel, Rai, Tosh, 450 Jamun, Bemi, Shegul Chora, Rishta, Patish, Karu, 600 Rakhal

FUTURE REQUIREMENT FUTURE NOs FUTURE SPECIES 5200 Kail, Cheel, Rai, Tosh, 7000 Jamun, Bemi, Shegul Chora, Rishta, Patish, Karu, 7500 Rakhal

NEED FOR EXTENSION Y Y

SOURCE OF PLANTING STOCK(Nearest Nursery) Baidhar Nursery. Baidhar Nursery.

Y

Baidhar Nursery.

TABLE NO:6 GRAZING LANDS Name Bhareha h Karshai Suwan

LATITUDE/LONGIT UDE 31'46'21"77'32'87" 006-02-491Sk1j 31'46'95"77'32'53" 006-03-492Sk1j 31'45'65"77'33'07" 006-01-490Sk1j

AREA (HA) 40 40 40

SPECIES Grass & Cheel Grass & Cheel Grass & Cheel

WEED REMOVAL

SEEDING

CLOSURES

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Other Requirement of 12000 fodder plants Requirement of 12000 fodder plants Requirement of 12000 fodder plants

Volume: VIII Chapter: 4 Page No:

PEOPLES SUGGESTION Required to be fenced. Required to be fenced. Required to be fenced.

101

Rate/ Hac (Rs)

Cost (Rs)

21700

868000

21700

868000

21700

868000


TABLE 6 PHOTOS Suwan

Bharehah

Karshai

TABLE NO:7

TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME NA

AREA(HA) NA

LATITUDE/LONGITUDE NA

SPECIES NA

GAP FILLING NA

MAINTENANCE NA

NEW PLANTATION NA

SOIL CONSERVATION MEASURES(QUANTITY) NA

Volume: VIII Chapter: 4 Page No:

102


TABLE NO:8 PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads) NAME OF AREA Bethwa Nala (4 Kms)

LATITU DE/LON GITUDE 31'45'6 4" 77'32'5 7"

Danot Nala (3 Kms)

31'50'9 5" 77'29'4 3"

Kholti Nala (6 Kms)

31'46'8 7" 77'32'4 1"

Rudan Nala (3 Kms)

31'52'1 2" 77'30'4 9"

PRESCRIPTI ON CheckDams Live Hedge Brushwood Live Hedge Brushwood

CheckDams

CheckDams Live Hedge Retaining Wall in Gabion Brushwood Live Hedge Brushwood

CheckDams

QUANTITY 10x1.5x1.5m=20 Nos 7x1.5x1.5m=10 Nos 400 Rms 22 Rms 300 Rms 25 Rms 12x1.5x1.5m=9 Nos 6x1.5x1.5m=10 Nos 8x1.5x1.5m=10 Nos 10x1.5x1.5m=16 Nos 15x1.5x1.5m=12 Nos 7x1.5x1.5m=10 Nos 600 Rms

10x2x2.5m=12 Nos 40 Rms 300 Rms 30 Rms 10x1.5x1.5m=10 Nos 15x1.5x1.5m=12 Nos 7x1.5x1.5m=9 Nos

AVAILABI LITY OF LOCAL MATERIAL

OLD WORKS NEEDING REPAIR(QUA NTITY)

LIFT IRRIGATI ON(HT/AC ERAGE)

Stone & local species

NA

NA

Stone & local species

NA

NA

FINAL PRESCRIPTION NEW PRESCRIPTI ON NEW QUANTITY 10x1.5x1.5m=6 Nos CheckDams 7x1.5x1.5m=3 Nos Live Hedge 1200 Rms Brushwood 200 Rms Live Hedge 900 Rms Brushwood 150 Rms 12x1.5x1.5m=3 Nos 6x1.5x1.5m=3 Nos CheckDams 8x1.5x1.5m=3 Nos 10x1.5x1.5m=5 Nos 15x1.5x1.5m=4 Nos CheckDams 7x1.5x1.5m=3 Nos Live Hedge 1800 Rms

Stone & local species

NA

NA

Retaining Wall Gabion Brushwood Live Hedge Brushwood

Stone & local species

NA

NA

CheckDams

10x2x2.5m=4 Nos 300 Rms 900 Rms 150 Rms 10x1.5x1.5m=3 Nos 15x1.5x1.5m=4 Nos 7x1.5x1.5m=3 Nos

RATE/ UNIT 10033 10033 9.6 62 9.6 62 10033 10033 10033 10033 10033 10033 9.6

COST(Rs) 601980 210693 11520 12400 8640 9300 361188 180594 240792 501650 601980 210693 17280

17277 62 9.6 62 10033 10033 10033

691080 18600 8640 9300 300990 601980 210693

TABLE 8 PHOTOS Kholti Nala

Bathua Nala

Rudan Nala

Volume: VIII Chapter: 4 Page No:

Danot Nala

103


TABLE NO:9 PERFORMA FOR LANDSLIDE NAME OF AREA/LOC ATION Chattri to Mangarh (2.5 Kms)

LATITUD E/LONGIT UDE

DAMAGE/RI SK TO LIFE & PROPERTY

MEAS URES TAKEN

TYPE OF SOIL AND ROCK

NA

Property

NA

CLAY

FINAL PRESCRIPTION

DEGRE E OF SLOPE S/SEVE RITY

OCCU RRENC E(Seas on)

ROAD CONST RUCTI ON

MODER ATE

Rainy

Yes

QU AR RY

OTHER CONST RUCTI ONS

NATU RAL

No

No

Yes

NEW PRESCRIPT ION Retaining Wall Gabion

NEW QUANTITY 20x2x2.5 m=125 Nos

RATE/UNIT

COST(Rs)

17277

43192500

TABLE NO:9A

INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP) 1.Fruits FRUIT NAME Apple Bemi Chulli Pears

VARIETY(LOCAL/IMPROVED) Royal, Golden, Delicious Local Local Local

USE OF FERTILISERS Yes No No No

USE OF INSECTICIDES Yes No No No

PROBLEMS FACED Technical guidence is required. Seeds are not available in Block on due time. Monkey and stray cattle destroys the crops.

2.CROPS : CROPS NAME Barley Wheat Maize Potato Rajmash

VARIETY(LOCAL/IMPROVED) Local Local Local Local Local

USE OF FERTILISERS No No No No No

USE OF INSECTICIDES No No No No No

PROBLEMS FACED Technical guidence is required. Seeds are not available in Block on due time. Monkey and stray cattle destroys the crops.

3.VEGETABLE : VEGETABLE NAME Cabbage Cauliflower Peas Mustard

VARIETY(LOCAL/IMPROVED) Local Local Local Local

USE OF FERTILISERS No No No No

USE OF INSECTICIDES No No No No

PROBLEMS FACED Technical guidence is required. Seeds are not available in Block on due time. Monkey and stray cattle destroys the crops.

4. LIVE STOCK : LIVE STOCK(NO) Cow - 621 Ox - 216 Sheep/Goat - 375 Mule - 20

BREED Local/Jersey Local Local Local

WHETHER SELLING THE PRODUCT Yes No Yes No

PROBLEM FACED Vaterinary is not available within the area of 15 Kms.

Volume: VIII Chapter: 4 Page No:

104


5.FUEL/FODDER : FUEL/FODDER MANAGEMENT FUEL FODDER

REQUIREMENT Yes Yes

AVAILABILITY

GAP PERCENTAGE 15% 20%

85% 80%

SOURCE LPG & Forest Forests

MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS Chora Bishta Patish Karu Rakhal

EXISTING NAME Chora Bishta Patish Karu Rakhal

SUGGESTIONS

No Suggestion.

PEOPLES PARTICIPATION: MAIN PROBLEMS There is shortage of drinking water. Maximum area is blank which increases warming in the area. There is no accomodation for Community Hall in the areas. There is no drainage system of waste water in the villages. The condition of roads is poor. There is shortage of staff in dispensary and Senior Secondary School. Supply of ration in Depot is very less. The seeds of all types of crops are not being provided to the people by any agency properly. The condition of healthcare system for cattle is not satisfactory. There is frequent electricity cut and low boltage problem in all the villages.

SUGGESTION FOR IMPROVEMENT Hand pumps be installed one in each village. Lift water supply is possible from Khaltu Nal to Baslara at aprox 3Kms distance. Plantation be done in all blank areas. Accomodation for community Hall be made by Govt. Drainage system in all the villages be done. All the roads be mettalled.

PEOPLES PRIORITIES

Priority.

Adequate staff be posted to dispensary and the School. The ration supply be doubled to the existing scale. Agriculture/Horticulture seeds distribution Centre be opened in the nearby area, so that peolple meet their proper requirement of seeds. A Veterinary Hospital with doctor and sufficient medicines be opened in the area. Old electric lines are required to be replaced in approx 15 villages.

Volume: VIII Chapter: 4 Page No:

105

Top Priority.


PEOPLES PARTICIPATION

COSTING: TABLES COST

TABLE 3 1674000

TABLE 4 178200

TABLE 6 2604000

TABLE 8 4809993

TABLE 9 43192500

Volume: VIII Chapter: 4 Page No:

TOTAL 52458693

106


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.