Vol 10 : Estimate

Page 1

Volume: X Chapter: 5 Page No:

179

Chapter 5: Estimates & Cost Models

Per Hac. cost Model for Replinishment/Enrichment planting Sr. Name No 1 Survey and demarcation of plantation and area I/C marking of seditions, path preparation of map. 2 Cutting and preparation of wooden posts 1.8 mtr and 8 to 10 CM dia I/C debarking and fashioning the top 15 cm in conical shape 3 Carriage of fence posts upto 2 mtr long and 8 to 10 cm dia over distance 0.5 KM 4 Preparation and digging of holes 20-30 cm dia & 45 cm deep 5 Fixing of wooden posts I/C strutting 6 Carriage of barbed wire bundles up hill over an overage distance of 1 km

Area

Rate

1 hac 80 Nos

1500 949.9

80 Nos 80 Nos 80 Nos 1.36 qtls.

499.95 per % per KM 665.1 per % 510.45 per % 125.10 per qtl per Km. 3.45 per Rmt. 3.00 per Rmt 7.95 per Rmt 124.9 350 per % 699.9 per % 139.95 per % 200.50 per % 133.25 per % per Km. 160.05 per % 5500 5 per plant 6.30 per Rm L/S G.Total Or Say

7 8 9 10 11 12 13 14 15

Streching and fixing of barbed wire with U-stapple in each strand (4 strand) Interlacing of thorny bushes with barbed wire obtained from planting side Preparation of inspection path 60 cm wide Layout of pits/patches Digging of pits (30x30x30) cm Digging of pits (45x45x45) cm Filling of pits (30x30x30) cm Filling of pits (45x45x45) cm Carriage of Plants in P/bags from Nursery site over an average distance of 0.5 Km.

960 Rmt. 240 Rmt. 35 Rmt.

16 17 18 19 20

Planting of entire Plants I/C ramming raised in P/bages Cost of B/Wire/U-nail Nursery Cost of P/bags raised Plants 100 Trenches (Size 1x.30x.30m) Weeding hoeing

700 No. 1.36 qtls. 700 No. 100 Nos 1 Hac

Comprehensive CAT Plan of Satluj River Basin

200 500 200 500 700

No. No. No. No. No.

Non Tribal 1500.00 759.92

Tribal

199.98 532.08 408.36 170.10

249.98 665.10 510.45 212.60

3312.00 0.00 278.25 124.90 700.00 3499.50 279.90 1002.50 466.38

4140.00 0.00 347.81 156.13 875.00 4374.38 249.88 1253.13 582.97

1120.35 7480.00 3500.00 630.00 2000.00 27964.22 27900.00

1400.44 9350.00 4375.00 787.50 2500.00 34855.26 35000.00

1875.00 949.90


Volume: X Chapter: 5 Page No:

Per Hac. cost Model for Grazing Land Sr. Name No 1 Survey and demarcation of plantation and area I/C marking of seditions path & preparation of map. 2 Cutting and preparation of wooden posts 1.8 mtr and 8 to 10 CM dia I/C debarking and fashioning the top 15 cm in conical shape 3 Carriage of fence posts upto 2 mtr long and 8 to 10 cm dia over distance 0.3 KM 4 5 6

Preparation and digging of holes 20-30 cm dia & 45 cm deep Fixing of wooden posts I/C strutting Carriage of barbed wire bundles up hill over an overage distance of 1 km

7

Streching and fixing of barbed wire with U-stapple in 4 strand

8

Interlacing of thorny bushes with barbed wire obtained from planting side

9

Preparation of inspection path 60 cm wide

10

Preparation of gradoni treanchies 30x30

11 12

Layout of pits/patches Digging of pits (45x45x45) cm

13

Filling of pits (45x45x45) cm

14

Carriage of Plants in P/bags from Nursery site over an average distance of 0.3 Km.

15

Planting of entire Plants I/C ramming raised in P/bages

16

Planting of grass tufts in gradoni structure/treanchies over ridge

17 18

Cost of B/Wire/U-nail Nursery Cost of P/bags raised Plants

19

Cost of grass tufts

20

contingencies

Comprehensive CAT Plan of Satluj River Basin

Area

Rate

1 hac 60 Nos

1500 949.9

60 Nos 60 Nos 60 Nos 1.08 qtls. 720 Rmt. 240 Rmt. 35 Rmt. 200 Rmt. Ha 200 No. 200 No. 200 No. 200 No. 2000 No. 1.08qtl 200 No. 2000 No.

180

Non Tribal 1500.00 569.94

Tribal

499.95 per % per KM 665.1 per % 510.45 per % 125.10 per qtl per Km. 3.45 per Rmt.

99.99

124.99

399.06 306.27 135.11

498.83 382.84 169.00

2484.00

3105.00

3.00 per Rmt

720.00

900.00

7.95 per Rmt

278.25

347.81

9.90 Rmt.

1980.00

2475.00

124.9 699.90 per %

124.90 1399.80

156.13 1749.75

200.50 per %

401.00

501.25

139.95 per % per Km. 160.05 per %

93.30

116.63

320.10

400.13

2.20 per %

44.00

55.00

5500.00 prt qtl 5.00 per plant

7480.00 1000.00

9350.00 1250.00

0.80 per %

1600.00

2000.00

G.Total Or Say

800 21735.72 21700.00

1000 27169.76 27000.00

1875.00 712.43


Volume: X Chapter: 5 Page No:

181

LIVE HEDGE ESTIMATE Item No

Unit

Quantity

Unit Cost

Preparation of furrows for live hedge fencing

Rms

1

0.95

Planting of live hedge plant species in furrows

Rms

1

8.65

Total

9.6

BRUSHWOOD ESTIMATE Item No

Unit

Quantity

Unit Cost

Brushwood Check dams

Rms

1

31.8

Add 96.08% increase on above i.e. on Rs 31.8

Rms

1

30.55

Total

62.35

Or Say

62

Comprehensive CAT Plan of Satluj River Basin


Volume: X Chapter: 5 Page No:

182

CHECK DAM ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

2

0.5

1

1

1

2

0.3

0.6

Rate

Unit

Amount

198.6

m3

317.76

2900

m3

9715

Say Per Rm

Check Dam Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size 1.5X1.5M a) Excavation

1.6 b) Gabion Structure

c) Apron

1

1

1

1

1

1

1

1.5

0.5

0.75

1

1

2

0.5

1

1

1

2

0.3

0.6 3.35

Total

Comprehensive CAT Plan of Satluj River Basin

10032.76

10033


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

183


Volume: X Chapter: 5 Page No:

184

CHECK DAM ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

2.5

0.5

1.25

1

1

3.5

0.3

1.05

Rate

Unit

Amount

198.6

m3

456.78

2900

m3

16820

Say Per Rm

Check Dam Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size -2X2.5M a) Excavation

2.3 b) Gabion Structure

c) Apron

1

1

1

1

1

1

1

1.5

1

1.5

1

1

2

0.5

1

1

1

2.5

0.5

1.25

1

1

3.5

0.3

1.05 5.8

Total

Comprehensive CAT Plan of Satluj River Basin

17276.78

17277


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

185


Volume: X Chapter: 5 Page No:

186

CHECK DAM ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

2.5

0.5

1.25

1

1

3.5

0.3

1.05

Rate

Unit

Amount

198.6

m3

456.78

2900

m3

19720

Say Per Rm

Check Dam Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size-2.5X3M a) Excavation

2.3 b) Gabion Structure

c) Apron

1

1

1

1

1

1

1

1.5

1

1.5

1

1

2

1

2

1

1

2.5

0.5

1.25

1

1

3.5

0.3

1.05 6.8

Total

Comprehensive CAT Plan of Satluj River Basin

20176.78

20177


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

187


Volume: X Chapter: 5 Page No:

188

CHECK DAM ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

3

0.5

1.5

1

1

4.5

0.3

1.35

Rate

Unit

Amount

198.6

m3

566.01

2900

m3

28565

Say Per Rm

Check Dam Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition.Gabions of Size 3X4M a) Excavation

2.85 b) Gabion Structure

c) Apron

1

1

1

1

1

1

1

1.5

1

1.5

1

2

2

1

2

1

1

2.5

1

2.5

1

1

3

0.5

1.5

1

1

4.5

0.3

1.35 9.85

Total

Comprehensive CAT Plan of Satluj River Basin

29131.01

29131


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

189


Volume: X Chapter: 5 Page No:

190

RETAINING WALL ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

2

0.5

1

1

1

2

0.3

0.6

Rate

Unit

Amount

198.6

m3

317.76

2900

m3

9715

Say Per Rm

Check Wall/ Retaining Wall in Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size - 1.5X1.5M a) Excavation

1.6 b) Gabion Structure

c) Apron

1

1

1

1

1

1

1

1.5

0.5

0.75

1

1

2

0.5

1

1

1

2

0.3

0.6 3.35

Total

Comprehensive CAT Plan of Satluj River Basin

10032.76

10033


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

191


Volume: X Chapter: 5 Page No:

192

RETAINING WALL ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

2.5

0.5

1.25

1

1

3.5

0.3

1.05

Rate

Unit

Amount

198.6

m3

456.78

2900

m3

16820

Say Per Rm

Check Wall/ Retaining Wall in Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size-2X2.5M a) Excavation

2.3 b) Gabion Structure

c) Apron

1

1

1

1

1

1

1

1.5

1

1.5

1

1

2

0.5

1

1

1

2.5

0.5

1.25

1

1

3.5

0.3

1.05 5.8

Total

Comprehensive CAT Plan of Satluj River Basin

17276.78

17277


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

193


Volume: X Chapter: 5 Page No:

194

RETAINING WALL ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

2.5

0.5

1.25

1

1

3.5

0.3

Rate

Unit

Amount

198.6

m3

456.78

2900

m3

19720

Say Per Rm

Check Wall/ Retaining Wall in Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size - 2.5X3M a) Excavation

1.05 2.3

b) Gabion Structure

c) Apron

1

1

1

1

1

1

1

1.5

1

1.5

1

1

2

1

2

1

1

2.5

0.5

1.25

1

1

3.5

0.3

1.05 6.8

Total

Comprehensive CAT Plan of Satluj River Basin

20176.78

20177


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

195


Volume: X Chapter: 5 Page No:

196

RETAINING WALL ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

3

0.5

1.5

1

1

4.5

0.3

1.35

Rate

Unit

Amount

198.6

m3

566.01

2900

m3

28565

Say Per Rm

Check Wall/ Retaining Wall in Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size - 3X4M a) Excavation

2.85 b) Gabion Structure

c) Apron

1

1

1

1

1

1

1

1.5

1

1.5

1

1

2

1

2

1

1

2.5

1

2.5

1

1

3

0.5

1.5

1

1

4.5

0.3

1.35 9.85

Total

Comprehensive CAT Plan of Satluj River Basin

29131.01

29131


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

197


Volume: X Chapter: 5 Page No:

198

SPUR ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

2

1

2

1

1

3

0.3

0.9

Rate

Unit

Amount

198.6

m3

575.94

2900

m3

15660

Say Per Rm

Deflecting Spur Gabions of Size – 1.5X2M a) Excavation

2.9 b) Gabion Structure

c) Apron

1

1

1

1

1

1

1

1.5

1

1.5

1

1

2

1

2

1

1

3

0.3

0.9 5.4

Total

Comprehensive CAT Plan of Satluj River Basin

16235.94

16236


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

199


Volume: X Chapter: 5 Page No:

200

SPUR ESTIMATE

Item No

No

Length

Breadth

Depth

Quantity

1

1

3

1

3

1

1

4

0.3

1.2

Rate

Unit

Amount

198.6

m3

834.12

2900

m3

28855

Say Per Rm

Gabions of Size – 2X3.5M a) Excavation

4.2 b) Gabion Structure

c) Apron

1

1

1

1

1

1

1

1.5

1

1.5

1

1

2

1

2

1

1

2.5

0.5

1.25

1

1

3

1

3

1

1

4

0.3

1.2 9.95

Total

Comprehensive CAT Plan of Satluj River Basin

29689.12

29689


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

201


Volume: X Chapter: 5 Page No:

202

SPUR ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

Deflecting Spur Gabions of Size – 2X3M

1

1

2.5

1

2.5

a) Excavation

1

1

4

0.3

1.2 3.7

b) Gabion Structure

c) Apron

1

1

1

1

1

1

1

1.5

1

1.5

1

1

2

1

2

1

1

2.5

1

2.5

1

1

4

0.3

1.2 8.2

Rate

Unit

198.6

m3

734.82

2900

m3

23780

Total

Comprehensive CAT Plan of Satluj River Basin

Amount

24514.82

Say Per Rm

24515


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

203


Volume: X Chapter: 5 Page No:

204

DROP STRUCTURE ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

3

1

3

1

1

5

0.5

2.5

Rate

Unit

Amount

198.6

m3

1092.3

2900

m3

50750

Say Per Rm

Drop Structure Gabion Gabions of Size – 3X4M a) Excavation

5.5 b) Gabion Structure

5

1

3

1

15

d) Apron

1

1

5

0.5

2.5 17.5

Total

Comprehensive CAT Plan of Satluj River Basin

51842.3

51842


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

205


Volume: X Chapter: 5 Page No:

206

DROP STRUCTURE ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

3

1

3

1

1

5

0.5

2.5

Rate

Unit

Amount

198.6

m3

1092.3

2900

m3

50750

Say Per Rm

Drop Structure Gabion Gabions of Size – 4X5M a) Excavation

5.5 b) Gabion Structure

5

1

3

1

15

d) Apron

1

1

5

0.5

2.5 17.5

Total

Comprehensive CAT Plan of Satluj River Basin

51842.3

51842


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

207


Volume: X Chapter: 5 Page No:

208

SILT DETENTION DAMS ESTIMATE

Item No Silt Detention Dams in Gabion Gabions of Size - 2X3M a) Excavation

b) Gabion Structure

c) Apron

No

1 1 1 1 1 1 1

Length Breadth Depth Quantity

1 1 1 1 1 1 1

2.5 3.5 1 1.5 2 2.5 3.5

0.5 0.3 1 1 1 0.5 0.3

Comprehensive CAT Plan of Satluj River Basin

Rate

Unit

1.25 1.05 2.3 198.6 m3 1 1.5 2 1.25 1.05 6.8 2900 m3 Total

Amount

Say Per Rm

456.78

19720 20176.78

20177


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

209


Volume: X Chapter: 5 Page No:

210

SILT DETENTION DAMS ESTIMATE

Item No Silt Detention Dams in Gabion Gabions of Size - 3X4M a) Excavation

b) Gabion Structure

c) Apron

No

1 1 1 1 1 1 1 1

Length

Breadth

1 1

3 4.5

1 1 1 1 1 1

1 1.5 2 2.5 3 4.5

Depth Quantity

0.5 0.3 1 1 1 1 0.5 0.3

Comprehensive CAT Plan of Satluj River Basin

Rate

Unit

1.5 1.35 2.85 198.6 m3 1 1.5 2 2.5 1.5 1.35 9.85 2900 m3 Total

Amount

Say Per Rm

566.01

28565 29131.01

29131


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

211


Volume: X Chapter: 5 Page No:

212

WATER HARVESTING STRUCTURE ESTIMATE Item No Water Harvesting Structure Gabions of Size - 2X4M a) Excavation

b) Gabion Structure

c) Apron

No

Length

Breadth

Depth

Quantity

2 1

1 1

3 2

1 0.5

6 1 7 2 3 4 5 6 1 21

2 2 2 2 2 1

1 1 1 1 1 1

1 1.5 2 2.5 3 2

1 1 1 1 1 0.5

Comprehensive CAT Plan of Satluj River Basin

Rate

Unit

Amount

198.6

m3

1390.2

2900 Total

m3

60900 62290.2

Say Per Rm

62290


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

213


Volume: X Chapter: 5 Page No:

214

WATER HARVESTING STRUCTURE ESTIMATE

Item No

No

Water Harvesting Structure Gabions of Size 3X4M a) Excavation

b) Gabion Structure

c) Apron

Length

2 1 2 2 2 2 2 1

1 1 1 1 1 1 1 1

Breadth Depth Quantity

3 3 1 1.5 2 2.5 3 3

1 0.5 1 1 1 1 1 0.5

Comprehensive CAT Plan of Satluj River Basin

Rate

Unit

6 1.5 7.5 198.6 m3 2 3 4 5 6 1.5 21.5 2900 m3 Total

Amount

Say Per Rm

1489.5

62350 63839.5

63840


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

215


Volume: X Chapter: 5 Page No:

216

WATER HARVESTING STRUCTURE ESTIMATE

Item No

No

Water Harvesting Structure Gabions of Size 3X5M a) Excavation

b) Gabion Structure

c) Apron

Length

Breadth

Depth Quantity

2 1

1 1

3.5 3

1 0.5

2 2 2 2 2 2 1

1 1 1 1 1 1 1

1 1.5 2 2.5 3 3.5 3

1 1 1 1 1 1 0.5

Comprehensive CAT Plan of Satluj River Basin

Rate

Unit

7 1.5 8.5 198.6 m3 2 3 4 5 6 7 1.5 28.5 2900 m3 Total

Amount

Say Per Rm

1688.1

82650 84338.1

84338


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

217


Volume: X Chapter: 5 Page No:

218

WATER HARVESTING STRUCTURE ESTIMATE

Item No

No

Water Harvesting Structure Gabions of Size 4X5M a) Excavation

b) Gabion Structure

c) Apron

Length Breadth Depth Quantity

2 1

1 1

3.5 4

1 0.5

2 2 2 2 2 2 1

1 1 1 1 1 1 1

1 1.5 2 2.5 3 3.5 4

1 1 1 1 1 1 0.5

Comprehensive CAT Plan of Satluj River Basin

Rate

Unit

7 2 9 198.6 m3 2 3 4 5 6 7 2 29 2900 m3 Total

Amount

Say Per Rm

1787.4

84100 85887.4 85887


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

219


Volume: X Chapter: 5 Page No:

220

WATER HARVESTING STRUCTURE ESTIMATE

Item No Water Harvesting Structure Gabions of Size - 4X6M a) Excavation

b) Gabion Structure

c) Apron

No

2 1 2 2 2 2 2 2 2 1

Length

Breadth

1 1

4 4

1 1 1 1 1 1 1 1

1 1.5 2 2.5 3 3.5 4 4

Depth Quantity

1 0.5 1 1 1 1 1 1 1 0.5

Comprehensive CAT Plan of Satluj River Basin

Rate

Unit Amount

8 2 10 198.6 m3 2 3 4 5 6 7 8 2 37 2900 m3 Total

Say Per Rm

1986

107300 109286 109286


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

221


Volume: X Chapter: 5 Page No:

222

DROP STRUCTURE ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

3

1

3

1

1

4

0.5

2

Rate

Unit

Amount

198.6

m3

993

2900

m3

40600

Say Per Rm

Drop Structure Gabion Gabions of Size – 3X3M a) Excavation

5 b) Gabion Structure

4

1

3

1

12

d) Apron

1

1

4

0.5

2 14

Total

Comprehensive CAT Plan of Satluj River Basin

41593

41593


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

223


Volume: X Chapter: 5 Page No:

224

Spill Way in Gabion ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

2

1

2.5

1

5.00

1

1

5

0.5

2.50

Rate

Unit

Amount

198.6

m3

993

2900

m3

47850.00

Say Per Rm

Spill Way in Gabion Gabions of Size – 5X3M a) Excavation

7.50 b) Gabion Structure

d) Apron

2

1

1

1

2.00

2

1

1.5

1

3.00

2

1

2

1

4.00

2

1

2.5

1

5.00

1

1

5

0.5

2.50 16.50

Total

Comprehensive CAT Plan of Satluj River Basin

49339.50

49340


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

225


Volume: X Chapter: 5 Page No:

226

Toe Wall Gabion ESTIMATE Item No

No

Length

Breadth

Depth

Quantity

1

1

4

1

4.00

1

1

5

0.3

1.50

Rate

Unit

Amount

Say Per Rm

Toe Wall Gabion Gabions of Size – 4X6M a) Excavation

5.50 b) Gabion Structure

d) Apron

1

1

1

1

1.00

1

1

1.5

1

1.50

1

1

2

1

2.00

1

1

2.5

1

2.50

1

1

3

1

3.00

1

1

4

1

4.00

1

1

5

0.3

1.50 15.50

198.6

m3

993

2900

m3

44950.00

Total

Comprehensive CAT Plan of Satluj River Basin

46042.30

46042.00


Volume: X Chapter: 5 Page No:

Comprehensive CAT Plan of Satluj River Basin

227