Volume: IV Chapter: 6 Page No:
224
Chapter 6: Prioritization The priority of treatment for the various Microwatersheds present in the Sf Sub catchment is as follows:
Sr No
Name of the Microwatershed
Priority of treatment
1.
Sf3b
5
The priority of treatment for the various Microwatersheds present in the Sh Sub catchment is as follows: Sr No 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16.
Name of the Microwatershed Sh1a Sh1b Sh1c Sh1d Sh1e Sh2a Sh2b Sh2c Sh2d Sh2e Sh2f Sh2g Sh2h Sh2i Sh2j Sh2k
Comprehensive CAT Plan of Satluj River Basin
Priority of treatment 5 6 7 4 5 6 6 7 6 7 6 7 6 6 8 7