Volume: VII Chapter: 6 Page No:
272
Chapter 6: Prioritization
The priority of treatment for the various Microwatersheds present in the Sj Sub catchment is as follows:
Sr No 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20.
Name of the Microwatershed
Priority of treatment
Sj1a Sj1b Sj1c Sj1d Sj1e Sj1f Sj1g Sj1h Sj1i Sj1j Sj1k Sj1m Sj2a Sj2b Sj2c Sj2d Sj2e Sj2f Sj2g Sj2h
4 4 5 5 7 7 6 6 6 6 5 6 6 5 7 7 7 6 8 7
Comprehensive CAT Plan of Satluj River Basin