Volume: XII Chapter: 5 Page No:
265
Chapter 5: Estimates & Cost Models
Per Hac. cost Model for Replinishment/Enrichment planting Sr. Name No 1 Survey and demarcation of plantation and area I/C marking of seditions, path preparation of map. 2 Cutting and preparation of wooden posts 1.8 mtr and 8 to 10 CM dia I/C debarking and fashioning the top 15 cm in conical shape 3 Carriage of fence posts upto 2 mtr long and 8 to 10 cm dia over distance 0.5 KM 4 Preparation and digging of holes 20-30 cm dia & 45 cm deep 5 Fixing of wooden posts I/C strutting 6 Carriage of barbed wire bundles up hill over an overage distance of 1 km
Area
Rate
1 hac 80 Nos
1500 949.9
80 Nos 80 Nos 80 Nos 1.36 qtls.
499.95 per % per KM 665.1 per % 510.45 per % 125.10 per qtl per Km. 3.45 per Rmt. 3.00 per Rmt 7.95 per Rmt 124.9 350 per % 699.9 per % 139.95 per % 200.50 per % 133.25 per % per Km. 160.05 per % 5500 5 per plant 6.30 per Rm L/S G.Total Or Say
7 8 9 10 11 12 13 14 15
Streching and fixing of barbed wire with U-stapple in each strand (4 strand) Interlacing of thorny bushes with barbed wire obtained from planting side Preparation of inspection path 60 cm wide Layout of pits/patches Digging of pits (30x30x30) cm Digging of pits (45x45x45) cm Filling of pits (30x30x30) cm Filling of pits (45x45x45) cm Carriage of Plants in P/bags from Nursery site over an average distance of 0.5 Km.
960 Rmt. 240 Rmt. 35 Rmt.
16 17 18 19 20
Planting of entire Plants I/C ramming raised in P/bages Cost of B/Wire/U-nail Nursery Cost of P/bags raised Plants 100 Trenches (Size 1x.30x.30m) Weeding hoeing
700 No. 1.36 qtls. 700 No. 100 Nos 1 Hac
200 500 200 500 700
No. No. No. No. No.
Comprehensive CAT Plan of Satluj River Basin
Non Tribal 1500.00 759.92
Tribal
199.98 532.08 408.36 170.10
249.98 665.10 510.45 212.60
3312.00 0.00 278.25 124.90 700.00 3499.50 279.90 1002.50 466.38
4140.00 0.00 347.81 156.13 875.00 4374.38 249.88 1253.13 582.97
1120.35 7480.00 3500.00 630.00 2000.00 27964.22 27900.00
1400.44 9350.00 4375.00 787.50 2500.00 34855.26 35000.00
1875.00 949.90
Volume: XII Chapter: 5 Page No:
Per Hac. cost Model for Grazing Land Sr. Name No 1 Survey and demarcation of plantation and area I/C marking of seditions path & preparation of map. 2 Cutting and preparation of wooden posts 1.8 mtr and 8 to 10 CM dia I/C debarking and fashioning the top 15 cm in conical shape 3 Carriage of fence posts upto 2 mtr long and 8 to 10 cm dia over distance 0.3 KM 4 5 6
Preparation and digging of holes 20-30 cm dia & 45 cm deep Fixing of wooden posts I/C strutting Carriage of barbed wire bundles up hill over an overage distance of 1 km
7
Streching and fixing of barbed wire with U-stapple in 4 strand
8
Interlacing of thorny bushes with barbed wire obtained from planting side
9
Preparation of inspection path 60 cm wide
10
Preparation of gradoni treanchies 30x30
11 12
Layout of pits/patches Digging of pits (45x45x45) cm
13
Filling of pits (45x45x45) cm
14
Carriage of Plants in P/bags from Nursery site over an average distance of 0.3 Km.
15
Planting of entire Plants I/C ramming raised in P/bages
16
Planting of grass tufts in gradoni structure/treanchies over ridge
17 18
Cost of B/Wire/U-nail Nursery Cost of P/bags raised Plants
19
Cost of grass tufts
20
contingencies
Comprehensive CAT Plan of Satluj River Basin
Area
Rate
1 hac 60 Nos
1500 949.9
60 Nos 60 Nos 60 Nos 1.08 qtls. 720 Rmt. 240 Rmt. 35 Rmt. 200 Rmt. Ha 200 No. 200 No. 200 No. 200 No. 2000 No. 1.08qtl 200 No. 2000 No.
266
Non Tribal 1500.00 569.94
Tribal
499.95 per % per KM 665.1 per % 510.45 per % 125.10 per qtl per Km. 3.45 per Rmt.
99.99
124.99
399.06 306.27 135.11
498.83 382.84 169.00
2484.00
3105.00
3.00 per Rmt
720.00
900.00
7.95 per Rmt
278.25
347.81
9.90 Rmt.
1980.00
2475.00
124.9 699.90 per %
124.90 1399.80
156.13 1749.75
200.50 per %
401.00
501.25
139.95 per % per Km. 160.05 per %
93.30
116.63
320.10
400.13
2.20 per %
44.00
55.00
5500.00 prt qtl 5.00 per plant
7480.00 1000.00
9350.00 1250.00
0.80 per %
1600.00
2000.00
G.Total Or Say
800 21735.72 21700.00
1000 27169.76 27000.00
1875.00 712.43
Volume: XII Chapter: 5 Page No:
267
LIVE HEDGE ESTIMATE Item No
Unit
Quantity
Unit Cost
Preparation of furrows for live hedge fencing
Rms
1
0.95
Planting of live hedge plant species in furrows
Rms
1
8.65
Total
9.6
BRUSHWOOD ESTIMATE Item No
Unit
Quantity
Unit Cost
Brushwood Check dams
Rms
1
31.8
Add 96.08% increase on above i.e. on Rs 31.8
Rms
1
30.55
Total
62.35
Or Say
62
Comprehensive CAT Plan of Satluj River Basin
Volume: XII Chapter: 5 Page No:
268
CHECK DAM ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
2
0.5
1
1
1
2
0.3
0.6
Rate
Unit
Amount
198.6
m3
317.76
2900
m3
9715
Say Per Rm
Check Dam Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size 1.5X1.5M a) Excavation
1.6 b) Gabion Structure
c) Apron
1
1
1
1
1
1
1
1.5
0.5
0.75
1
1
2
0.5
1
1
1
2
0.3
0.6 3.35
Total
Comprehensive CAT Plan of Satluj River Basin
10032.76
10033
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
269
Volume: XII Chapter: 5 Page No:
270
CHECK DAM ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
2.5
0.5
1.25
1
1
3.5
0.3
1.05
Rate
Unit
Amount
198.6
m3
456.78
2900
m3
16820
Say Per Rm
Check Dam Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size -2X2.5M a) Excavation
2.3 b) Gabion Structure
c) Apron
1
1
1
1
1
1
1
1.5
1
1.5
1
1
2
0.5
1
1
1
2.5
0.5
1.25
1
1
3.5
0.3
1.05 5.8
Total
Comprehensive CAT Plan of Satluj River Basin
17276.78
17277
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
271
Volume: XII Chapter: 5 Page No:
272
CHECK DAM ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
2.5
0.5
1.25
1
1
3.5
0.3
1.05
Rate
Unit
Amount
198.6
m3
456.78
2900
m3
19720
Say Per Rm
Check Dam Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size - 2.5X3M a) Excavation
2.3 b) Gabion Structure
c) Apron
1
1
1
1
1
1
1
1.5
1
1.5
1
1
2
1
2
1
1
2.5
0.5
1.25
1
1
3.5
0.3
1.05 6.8
Total
Comprehensive CAT Plan of Satluj River Basin
20176.78
20177
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
273
Volume: XII Chapter: 5 Page No:
274
CHECK DAM ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
3
0.5
1.5
1
1
4.5
0.3
1.35
Rate
Unit
Amount
198.6
m3
566.01
2900
m3
Say Per Rm
Check Dam Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition.Gabions of Size 3X4M a) Excavation
2.85 b) Gabion Structure
c) Apron
1
1
1
1
1
1
1
1.5
1
1.5
1
2
2
1
2
1
1
2.5
1
2.5
1
1
3
0.5
1.5
1
1
4.5
0.3
1.35 9.85
Total
Comprehensive CAT Plan of Satluj River Basin
28565 29131.01
29131
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
275
Volume: XII Chapter: 5 Page No:
276
RETAINING WALL ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
2
0.5
1
1
1
2
0.3
0.6
Rate
Unit
Amount
198.6
m3
317.76
2900
m3
9715
Say Per Rm
Check Wall/ Retaining Wall in Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size - 1.5X1.5M a) Excavation
1.6 b) Gabion Structure
c) Apron
1
1
1
1
1
1
1
1.5
0.5
0.75
1
1
2
0.5
1
1
1
2
0.3
0.6 3.35
Total
Comprehensive CAT Plan of Satluj River Basin
10032.76
10033
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
277
Volume: XII Chapter: 5 Page No:
278
RETAINING WALL ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
2.5
0.5
1.25
1
1
3.5
0.3
1.05
Rate
Unit
Amount
198.6
m3
456.78
2900
m3
16820
Say Per Rm
Check Wall/ Retaining Wall in Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size -2X2.5M a) Excavation
2.3 b) Gabion Structure
c) Apron
1
1
1
1
1
1
1
1.5
1
1.5
1
1
2
0.5
1
1
1
2.5
0.5
1.25
1
1
3.5
0.3
1.05 5.8
Total
Comprehensive CAT Plan of Satluj River Basin
17276.78
17277
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
279
Volume: XII Chapter: 5 Page No:
280
RETAINING WALL ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
2.5
0.5
1.25
1
1
3.5
0.3
1.05
Rate
Unit
Amount
198.6
m3
456.78
2900
m3
19720
Say Per Rm
Check Wall/ Retaining Wall in Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size - 2.5X3M a) Excavation
2.3 b) Gabion Structure
c) Apron
1
1
1
1
1
1
1
1.5
1
1.5
1
1
2
1
2
1
1
2.5
0.5
1.25
1
1
3.5
0.3
1.05 6.8
Total
Comprehensive CAT Plan of Satluj River Basin
20176.78
20177
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
281
Volume: XII Chapter: 5 Page No:
282
RETAINING WALL ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
3
0.5
1.5
1
1
4.5
0.3
1.35
Rate
Unit
Amount
198.6
m3
566.01
2900
m3
28565
Say Per Rm
Check Wall/ Retaining Wall in Gabion Providing & laying steel Gabions or equivalent type of required section including boxes made of mechanically woven, double Twisted , hexagonal shaped steel wire mesh Gabions as per En standards mesh type 10 x 12 as per EN 10223 , edges are to be mechanically selvedge made of heavily ( Zn+PVC) coated G.I. wire as per B.S. 443 mesh wire 3 mm die & edge wire dia 3.9mm dia of maccaferri type or equivalent type & filled with 20 to 50 kg weight trap Stones ,including conveying with all leads & lifts and required placing at required places in required line , level, slope, section as directed. etc complete under tidal condition. Gabions of Size - 3X4M a) Excavation
2.85 b) Gabion Structure
c) Apron
1
1
1
1
1
1
1
1.5
1
1.5
1
1
2
1
2
1
1
2.5
1
2.5
1
1
3
0.5
1.5
1
1
4.5
0.3
1.35 9.85
Total
Comprehensive CAT Plan of Satluj River Basin
29131.01
29131
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
283
Volume: XII Chapter: 5 Page No:
284
SPUR ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
2
1
2
1
1
3
0.3
0.9
Rate
Unit
Amount
198.6
m3
575.94
2900
m3
15660
Say Per Rm
Deflecting Spur Gabions of Size – 1.5X2M a) Excavation
2.9 b) Gabion Structure
c) Apron
1
1
1
1
1
1
1
1.5
1
1.5
1
1
2
1
2
1
1
3
0.3
0.9 5.4
Total
Comprehensive CAT Plan of Satluj River Basin
16235.94
16236
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
285
Volume: XII Chapter: 5 Page No:
286
SPUR ESTIMATE
Item No
No
Length
Breadth
Depth
Quantity
1
1
3
1
3
1
1
4
0.3
1.2
Rate
Unit
Amount
198.6
m3
834.12
2900
m3
28855
Say Per Rm
Gabions of Size – 2X3.5M a) Excavation
4.2 b) Gabion Structure
c) Apron
1
1
1
1
1
1
1
1.5
1
1.5
1
1
2
1
2
1
1
2.5
0.5
1.25
1
1
3
1
3
1
1
4
0.3
1.2 9.95
Total
Comprehensive CAT Plan of Satluj River Basin
29689.12
29689
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
287
Volume: XII Chapter: 5 Page No:
288
SPUR ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
Deflecting Spur Gabions of Size – 2X3M
1
1
2.5
1
2.5
a) Excavation
1
1
4
0.3
1.2 3.7
b) Gabion Structure
c) Apron
1
1
1
1
1
1
1
1.5
1
1.5
1
1
2
1
2
1
1
2.5
1
2.5
1
1
4
0.3
1.2 8.2
Rate
Unit
198.6
m3
734.82
2900
m3
23780
Total
Comprehensive CAT Plan of Satluj River Basin
Amount
24514.82
Say Per Rm
24515
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
289
Volume: XII Chapter: 5 Page No:
290
DROP STRUCTURE ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
3
1
3
1
1
5
0.5
2.5
Rate
Unit
Amount
198.6
m3
1092.3
2900
m3
50750
Say Per Rm
Drop Structure Gabion Gabions of Size – 3X4M a) Excavation
5.5 b) Gabion Structure
5
1
3
1
15
d) Apron
1
1
5
0.5
2.5 17.5
Total
Comprehensive CAT Plan of Satluj River Basin
51842.3
51842
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
291
Volume: XII Chapter: 5 Page No:
292
DROP STRUCTURE ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
3
1
3
1
1
5
0.5
2.5
Rate
Unit
Amount
198.6
m3
1092.3
2900
m3
50750
Say Per Rm
Drop Structure Gabion Gabions of Size – 4X5M a) Excavation
5.5 b) Gabion Structure
5
1
3
1
15
d) Apron
1
1
5
0.5
2.5 17.5
Total
Comprehensive CAT Plan of Satluj River Basin
51842.3
51842
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
293
Volume: XII Chapter: 5 Page No:
294
SILT DETENTION DAMS ESTIMATE
Item No Silt Detention Dams in Gabion Gabions of Size - 2X3M a) Excavation
b) Gabion Structure
c) Apron
No
1 1 1 1 1 1 1
Length Breadth Depth Quantity
1 1 1 1 1 1 1
2.5 3.5 1 1.5 2 2.5 3.5
0.5 0.3 1 1 1 0.5 0.3
Rate
Unit
1.25 1.05 2.3 198.6 m3 1 1.5 2 1.25 1.05 6.8 2900 m3 Total
Comprehensive CAT Plan of Satluj River Basin
Amount
Say Per Rm
456.78
19720 20176.78
20177
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
295
Volume: XII Chapter: 5 Page No:
296
SILT DETENTION DAMS ESTIMATE
Item No Silt Detention Dams in Gabion Gabions of Size - 3X4M a) Excavation
b) Gabion Structure
c) Apron
No
1 1 1 1 1 1 1 1
Length
Breadth
1 1
3 4.5
1 1 1 1 1 1
1 1.5 2 2.5 3 4.5
Depth Quantity
0.5 0.3 1 1 1 1 0.5 0.3
Comprehensive CAT Plan of Satluj River Basin
Rate
Unit
1.5 1.35 2.85 198.6 m3 1 1.5 2 2.5 1.5 1.35 9.85 2900 m3 Total
Amount
Say Per Rm
566.01
28565 29131.01
29131
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
297
Volume: XII Chapter: 5 Page No:
298
WATER HARVESTING STRUCTURE ESTIMATE Item No Water Harvesting Structure Gabions of Size - 2X4M a) Excavation
b) Gabion Structure
c) Apron
No
Length
Breadth
Depth
Quantity
2 1
1 1
3 2
1 0.5
2 2 2 2 2 1
1 1 1 1 1 1
1 1.5 2 2.5 3 2
1 1 1 1 1 0.5
6 1 7 2 3 4 5 6 1 21
Comprehensive CAT Plan of Satluj River Basin
Rate
Unit
Amount
198.6
m3
1390.2
2900 Total
m3
60900 62290.2
Say Per Rm
62290
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
299
Volume: XII Chapter: 5 Page No:
300
WATER HARVESTING STRUCTURE ESTIMATE
Item No Water Harvesting Structure Gabions of Size 3X4M a) Excavation
b) Gabion Structure
c) Apron
No
Length
2 1 2 2 2 2 2 1
1 1 1 1 1 1 1 1
Breadth Depth Quantity
3 3 1 1.5 2 2.5 3 3
1 0.5 1 1 1 1 1 0.5
Comprehensive CAT Plan of Satluj River Basin
Rate
Unit
6 1.5 7.5 198.6 m3 2 3 4 5 6 1.5 21.5 2900 m3 Total
Amount
Say Per Rm
1489.5
62350 63839.5
63840
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
301
Volume: XII Chapter: 5 Page No:
302
WATER HARVESTING STRUCTURE ESTIMATE
Item No Water Harvesting Structure Gabions of Size 3X5M a) Excavation
b) Gabion Structure
c) Apron
No
Length
Breadth
Depth Quantity
2 1
1 1
3.5 3
1 0.5
2 2 2 2 2 2 1
1 1 1 1 1 1 1
1 1.5 2 2.5 3 3.5 3
1 1 1 1 1 1 0.5
Comprehensive CAT Plan of Satluj River Basin
Rate
Unit
7 1.5 8.5 198.6 m3 2 3 4 5 6 7 1.5 28.5 2900 m3 Total
Amount
Say Per Rm
1688.1
82650 84338.1
84338
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
303
Volume: XII Chapter: 5 Page No:
304
WATER HARVESTING STRUCTURE ESTIMATE
Item No Water Harvesting Structure Gabions of Size 4X5M a) Excavation
b) Gabion Structure
c) Apron
No
Length Breadth Depth Quantity
2 1
1 1
3.5 4
1 0.5
2 2 2 2 2 2 1
1 1 1 1 1 1 1
1 1.5 2 2.5 3 3.5 4
1 1 1 1 1 1 0.5
Comprehensive CAT Plan of Satluj River Basin
Rate
Unit
7 2 9 198.6 m3 2 3 4 5 6 7 2 29 2900 m3 Total
Amount
Say Per Rm
1787.4
84100 85887.4
85887
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
305
Volume: XII Chapter: 5 Page No:
306
WATER HARVESTING STRUCTURE ESTIMATE
Item No Water Harvesting Structure Gabions of Size 4X6M a) Excavation
b) Gabion Structure
c) Apron
No
Length
2 1 2 2 2 2 2 2 2 1
1 1 1 1 1 1 1 1 1 1
Breadth
4 4 1 1.5 2 2.5 3 3.5 4 4
Depth Quantity
1 0.5 1 1 1 1 1 1 1 0.5
Comprehensive CAT Plan of Satluj River Basin
Rate
Unit Amount
8 2 10 198.6 m3 2 3 4 5 6 7 8 2 37 2900 m3 Total
Say Per Rm
1986
107300 109286
109286
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
307
Volume: XII Chapter: 5 Page No:
308
DROP STRUCTURE ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
3
1
3
1
1
4
0.5
2
Rate
Unit
Amount
198.6
m3
993
2900
m3
40600
Say Per Rm
Drop Structure Gabion Gabions of Size – 3X3M a) Excavation
5 b) Gabion Structure
4
1
3
1
12
d) Apron
1
1
4
0.5
2 14
Total
Comprehensive CAT Plan of Satluj River Basin
41593
41593
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
309
Volume: XII Chapter: 5 Page No:
310
Spill Way in Gabion ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
2
1
2.5
1
5.00
1
1
5
0.5
2.50
Rate
Unit
Amount
198.6
m3
993
2900
m3
47850.00
Say Per Rm
Spill Way in Gabion Gabions of Size – 5X3M a) Excavation
7.50 b) Gabion Structure
d) Apron
2
1
1
1
2.00
2
1
1.5
1
3.00
2
1
2
1
4.00
2
1
2.5
1
5.00
1
1
5
0.5
2.50 16.50
Total
Comprehensive CAT Plan of Satluj River Basin
49339.50
49340
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
311
Volume: XII Chapter: 5 Page No:
312
Toe Wall Gabion ESTIMATE Item No
No
Length
Breadth
Depth
Quantity
1
1
4
1
4.00
1
1
5
0.3
1.50
Rate
Unit
Amount
Say Per Rm
Toe Wall Gabion Gabions of Size – 4X6M a) Excavation
5.50 b) Gabion Structure
d) Apron
1
1
1
1
1.00
1
1
1.5
1
1.50
1
1
2
1
2.00
1
1
2.5
1
2.50
1
1
3
1
3.00
1
1
4
1
4.00
1
1
5
0.3
1.50 15.50
198.6
m3
993
2900
m3
44950.00
Total
Comprehensive CAT Plan of Satluj River Basin
46042.30
46042.00
Volume: XII Chapter: 5 Page No:
Comprehensive CAT Plan of Satluj River Basin
313