Sheet List Sheet Number
Sheet Name
A100 A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112 A113 A114 A115 A116 A117 A118 A119 A120 A121 A122 A123 A124 A125 A126 A127 A128
Sheet Issue Date
SHEET LIST D&W LEGEND COLOUR LEGEND Unnamed SITE PLAN GROUND FLOOR PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN THIRD FLOOR PLAN ROOF PLAN GROUND FLOOR CEILING PLAN FIRST FLOOR CEILING PLAN SECOND FLOOR CEILING PLAN SECTION A-A SECTION B-B FRONT ELEVATION REAR ELEVATION RIGHT ELEVATION LEFT ELEVATION EXT PERSPECTIVE 1 EXT PERSPECTIVE 2 EXT PERSPECTIVE 3 INT PERSPECTIVE 1 INTERIOR PERSPECTIVE 2 INT PERSPECTIVE 3 EXT 3D VIEW 1 EXT 3D VIEW 2 INT 3D VIEW 1 INT 3D VIEW 2
NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT Checked By SHEET LIST
DWG. NAME:
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE:
02/10/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20 05/03/20
02/10/20
SEMESTER: 4
SCALE:
UEBA3443
Mr. Foo Chek Kim
SHEET NO.:
A100
1067
2415
1800
1350
1350
1800
915
1830
2108
2425
2710
1850
Doors & Windows Legend 1 : 50
NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
D&W LEGEND
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
SCALE: 1 : 50
UEBA3443
Mr. Foo Chek Kim
SHEET NO.:
A101
A
B 4000
C 6400
D E 2500
1380
F 2570
G 1650
H 2080
I 2080
J 1650
K 1650
L
N M
1650
3150
1600
Room Legend
O
BATH 1
4800
BATH 2
1 3000
BEDROOM 1 BEDROOM 2
2 4200
BEDROOM 1
WARDROBE BATH 1
25 m²
10 m²
BATH 1 WARDROBE
15 m²
15 m²
BEDROOM 1
10 m²
CORRIDOR
25 m²
DINING ENTRANCE
MAIN HALL
18 m²
62 m²
3000
3
WET KITCHEN
4 LIVING
8 m²
34 m² 5600
DRY KITCHEN 14 m²
STUDY AREA
5
14 m²
17 m²
17 m²
2200 2100 2100
CORRIDOR
CORRIDOR
BEDROOM 2
LAUNDRY
DINING
6
STORE
BATH 2
4 m²
10 m²
LAUNDRY
4 m² LAUNDRY
5 m²
LIVING
STUDY AREA 33 m²
MAIN HALL
13 m²
STORE
25 m²
ENTRANCE
8 m² DRY KITCHEN
34 m²
7
53 m²
WET KITCHEN
DINING
13 m²
DRY KITCHEN
LIVING
5 m²
STORE
BATH 2 10 m²
STUDY AREA
BEDROOM 2 25 m²
WARDROBE
8 3000
WET KITCHEN
9
NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
COLOUR LEGEND
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A102
Room Schedule Num ber 9 8 26 6 18 22 20 23 30 15 11 25 31 21 10
Name
Area
STORE LAUNDRY WET KITCHEN BATH 2 WARDROB E CORRIDO R DRY KITCHEN BATH 1 DINING ENTRANC E BEDROOM 2 BEDROOM 1 STUDY AREA LIVING MAIN HALL
Floor Finish
Wall Finish
Ceiling Finish
Perimeter
4 m² 5 m² 8 m²
Ceramic Tiles Ceramic Tiles Parquet Tiles
Paint Paint Wallpaper
Plaster Ceiling Plaster Ceiling Plaster Ceiling
8150 9350 14521
10 m² 10 m²
Mossaic Tiles Parquet Tiles
Plaster Wallpaper
Plaster Ceiling Plaster Ceiling
12800 13050
13 m²
Parquet Tiles
Wallpaper
Plaster Ceiling
16850
14 m²
Parquet Tiles
Plaster
Plaster Ceiling
15271
15 m² 17 m² 18 m²
Mossaic Tiles Ceramic Tiles Ceramic Tiles
Plaster Wallpaper Wallpaper
Plaster Ceiling Plaster Ceiling Plaster Ceiling
15850 17079 18600
25 m²
Parquet Tiles
Plaster
Plaster Ceiling
20600
25 m²
Parquet Tiles
Paint
Plaster Ceiling
20800
33 m²
Ceramic Tiles
Plaster
Plaster Ceiling
23050
53 m² 62 m²
Ceramic Tiles Ceramic Tiles
Plaster Plaster
Plaster Ceiling Plaster Ceiling
37015 34570
Furniture Schedule Type Mark 1 2 2 3 4 4 5 1 2 2 3 4 4 5 3 6 7
Family and Type
Count
M_Bed-Box: 1346 x 1880mm - Double Furniture-Generic-Bedside_Table: Furniture-Generic-Bedside_Table Furniture-Generic-Bedside_Table: Furniture-Generic-Bedside_Table Modern_TV_wood_and_Glass_door_TV_Stand_17253: Modern_TV_wood_and_Glass_door_TV_Stand_17253 M_Chair-Corbu: Chair M_Chair-Corbu: Chair M_Chair-Executive: M_Chair-Executive M_Bed-Box: 1346 x 1880mm - Double Furniture-Generic-Bedside_Table: Furniture-Generic-Bedside_Table Furniture-Generic-Bedside_Table: Furniture-Generic-Bedside_Table Modern_TV_wood_and_Glass_door_TV_Stand_17253: Modern_TV_wood_and_Glass_door_TV_Stand_17253 M_Chair-Corbu: Chair M_Chair-Corbu: Chair M_Chair-Executive: M_Chair-Executive Modern_TV_wood_and_Glass_door_TV_Stand_17253: Modern_TV_wood_and_Glass_door_TV_Stand_17253 M_Entertainment center: 1830 x 1830 x 0610mm M_Credenza: 1830 x 0610mm
NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
R&F SCHEDULE
FACULTY OF ENGINEERING AND SCIENCE
Comme nts
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
SCALE:
UEBA3443
Mr. Foo Chek Kim
SHEET NO.:
A103
A
B
C DE FG H I J K L NM
O
37160 3925
4200 5600
3000
5 6 7 8 9
1
4800
3000 210021002200
25200
3 4
250013802570165020802080165016501650 3150 1600
3000
1 2
6475
SITE PLAN 1 : 350 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
SITE PLAN
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 350 SHEET NO.:
A104
A
B
C
D E
F
G
H
I
J
K
L
N M
O
1 A113
37160 4000
2500
1380
2570
1650
2080
2080
1650
1650
1650
3150
1600
4800
3000
1
6400
4200
2 BEDROOM 1
BATH 1
OUTDOOR DECK
3000
3
A114
5600
1
25200
4
ENTRANCE
MAIN HALL
DINING WET KITCHEN
LIVING
1 A114
DRY KITCHEN
STUDY AREA
7
BATH 2
2100
6
2100
2200
5
BEDROOM 2
STORE LAUNDRY
8
MAIN ENTRANCE
3000
1 A113
9
1
GROUND FLOOR PLAN 1 : 150 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
GROUND FLOOR PLAN
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A105
A
B
C
D E
F
G
H
I
J
K
L
N M
O
37160
4000
6400
2500
1380
2570
1650
2080
2080
1650
1650
1650
3150
1600
4800
3000
1 OUTDOOR DECK
4200
2 BEDROOM 1
BATH 1
3000
3 KITCHEN LIVING
POOL
5600
25200
4
DINING
ENTRANCE
CORRIDOR
STUDY AREA 2200
5 2100
6 STORE
7 2100
BEDROOM 2
BATH 2 LAUNDRY
3000
8 OUTDOOR DECK
9
1
FIRST FLOOR PLAN 1 : 150 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
FIRST FLOOR PLAN
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A106
A
B
C
D E
F
G
H
I
J
K
L
N M
O
37160
4000
6400
2500
1380
2570
1650
2080
2080
1650
1650
1650
3150
1600
4800
3000
1 OOUTDOOR DECK
4200
2 BEDROOM 1
BATH 1
3000
3 KITCHEN
4
LIVING 25200
POOL
7800
DINING
ENTRANCE
CORRIDOR
STUDY AREA
2100
6 STORE
7 2100
BEDROOM 2
BATH 2 LAUNDRY
3000
8 OUTDOOR DECK
9
1
SECOND FLOOR PLAN 1 : 150 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
SECOND FLOOR PLAN
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A107
A
B
C
D E
F
G
H
I
J
K
L
N M
O
37160
4000
6400
2500
1380
2570
1650
2080
2080
1650
1650
1650
3150
1600
4800
3000
1
4200
2
7800
25200
ROOF GARDEN
4
ROOF GARDEN
3000
3
INDOOR PLAYGROUND
INDOOR FOOTBALL FIELD CORRIDOR
2100
6 2100
7
3000
8 9
1
THIRD FLOOR PLAN 1 : 150 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
THIRD FLOOR PLAN
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A108
A
B
C
D E
F
G
H
I
J
K
L
N M
O
37160
4000
6400
2500
1380
2570
1650
2080
2080
1650
1650
1650
3150
1600
4800
3000
1
4200
2
3000
3
7800
25200
4
2100
6 2100
7
3000
8 9
1
ROOF PLAN 1 : 150 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
ROOF PLAN
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A109
A
B
C
D E
F
G
H
I
J
K
L
N M
O
37160
4000
6400
2500
1380
2570
1650
2080
2080
1650
1650
1650
3150
1600
4800
3000
1
4200
2
3000
3
25200
5600
4
2200
5 2100
6 2100
7
3000
8 9
1
GF CEILING PLAN 1 : 150 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
GROUND FLOOR CEILING PLAN
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A110
A
B
C
D E
F
G
H
I
J
K
L
N M
O
37160 4000
6400
2500
1380
2570
1650
2080
2080
1650
1650
1650
3150
1600
4800
3000
1
4200
2
3000
3
5600
25200
4
2200
5 2100
6 2100
7
3000
8 9
1
FIRST FLOOR PLAN 1 : 150 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
FIRST FLOOR CEILING PLAN
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A111
A
B
C
D E
F
G
H
I
J
K
L
N M
O
37160
4000
6400
2500
1380
2570
1650
2080
2080
1650
1650
1650
3150
1600
4800
3000
1
4200
2
3000
3
7800
25200
4
2100
6 2100
7
3000
8 9
1
SECOND FLOOR PLAN 1 : 150 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
SECOND FLOOR CEILING PLAN
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A112
9
8
7
6
5
4
3
2
1
25200 3000
2100
2100
7800
3000
4200
3000
ROOF PLAN 18000
THIRD FLOOR PLAN 12000
SECOND FLOOR PLAN 8000
FIRST FLOOR PLAN 4000
GROUND FLOOR PLAN
1
Section A-A
0
1 : 100 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
SECTION A-A
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 100 SHEET NO.:
A113
A
B
C
D E
F
G
H
I
J
K
L
N M
O
37160
4000
6400
2500
1380
2570
1650
2080
2080
1650
1650
1650
3150
1600
4800
ROOF PLAN 18000
THIRD FLOOR PLAN 12000
SECOND FLOOR PLAN 8000
FIRST FLOOR PLAN 4000
GROUND FLOOR PLAN 0
1
Section B-B 1 : 150 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
SECTION B-B
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A114
A
B
C
D E
F
G
H
I
J
K
L
N M
O
37160 4000
6400
2500
1380
2570
1650
2080
2080
1650
1650
1650
3150
1600
4800
ROOF PLAN 18000
THIRD FLOOR PLAN 12000
SECOND FLOOR PLAN 8000
FIRST FLOOR PLAN 4000
GROUND FLOOR PLAN 0
1
FRONT ELEVATION 1 : 150 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
FRONT ELEVATION
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A115
O
M N
L
K
J
I
H
G
F
E D
C
B
A
37160 4800
1600
3150
1650
1650
1650
2080
2080
1650
2570
1380
2500
6400
4000
ROOF PLAN 18000
THIRD FLOOR PLAN 12000
SECOND FLOOR PLAN 8000
FIRST FLOOR PLAN 4000
GROUND FLOOR PLAN 0
1
REAR ELEVATION 1 : 150 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
REAR ELEVATION
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 150 SHEET NO.:
A116
9
8 3000
7 2100
6 2100
5 2200
25200
5600
4
3 3000
2 4200
1 3000
ROOF PLAN 18000
THIRD FLOOR PLAN 12000
SECOND FLOOR PLAN 8000
FIRST FLOOR PLAN 4000
GROUND FLOOR PLAN 0
NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
RIGHT ELEVATION
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 100 SHEET NO.:
A117
1
2
3
4
5
6
7
8
9
25200 3000
4200
3000
5600
2200
2100
2100
3000
ROOF PLAN 18000
THIRD FLOOR PLAN 12000
SECOND FLOOR PLAN 8000
FIRST FLOOR PLAN 4000
1
GROUND FLOOR PLAN
LEFT ELEVATION
0
1 : 100 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
LEFT ELEVATION
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 100 SHEET NO.:
A118
1
EXT PERSPECTIVE 1 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
EXT PERSPECTIVE 1
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 1 SHEET NO.:
A119
1
EXT PERSPECTTIVE 2 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
EXT PERSPECTIVE 2
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 1 SHEET NO.:
A120
1
EXT PERSPECTIVE 3 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
EXT PERSPECTIVE 3
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 1 SHEET NO.:
A121
1
INT PERSPECTIVE 1 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
INT PERSPECTIVE 1
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 1 SHEET NO.:
A122
1
INT PERSPECTIVE 2 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
INTERIOR PERSPECTIVE 2
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 1 SHEET NO.:
A123
1
INT PERSPECTIVE 3 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
INT PERSPECTIVE 3
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 1 SHEET NO.:
A124
1
EXT 3D VIEW 1 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
EXT 3D VIEW 1
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 1 SHEET NO.:
A125
1
EXT 3D VIEW 2 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
EXT 3D VIEW 2
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 1 SHEET NO.:
A126
1
INT 3D VIEW 1 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
INT 3D VIEW 1
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 1 SHEET NO.:
A127
1
INT 3D VIEW 2 NAME:
NG TZE WAY
ID NO.
1803893
ASSIGNMENT:
FINAL ASSIGNMENT
DWG. NAME:
INT 3D VIEW 2
FACULTY OF ENGINEERING AND SCIENCE
ISSUE DATE: 4/19/2020 SEMESTER: 4
Checked By
UEBA3443
Mr. Foo Chek Kim
SCALE: 1 : 1 SHEET NO.:
A128