![](https://assets.isu.pub/document-structure/230526091354-a8f6a8726179ba8e05a59d1896f305c7/v1/c7c8c6ec1a2cf2d2aa8091c13b43d6f7.jpeg?width=720&quality=85%2C50)
1 minute read
Barking Station
from Component 1
by Nicole Eke
The new station was opened as part of the London Tilbury & Southend Railway's new line which left the Eastern Counties Railway's main line at a new junction at Forest Gate. Two separate LT&SR trains from London departed from Fenchurch Street and Shoreditch and were combined at Stratford for the Tilbury journey (and split at Stratford in the opposite direction).Barking was a small village at the time and the original railway station was a two-platform affair which opened on 13th April 1854. Congestion in Stratford and a deterioration in the relationship between the lessees operating LT & SR and the Eastern County Railroad created a new route between Barking and the Gas Factory Junction, which joined the London & Blackwall Extension Railroad in 1858.
Site:
Advertisement
The area that I've chosen is a site near barking station as well as near local schools and shopping districts.
![](https://assets.isu.pub/document-structure/230526091354-a8f6a8726179ba8e05a59d1896f305c7/v1/4db622846e1a7170e1be45ef83e7d058.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230526091354-a8f6a8726179ba8e05a59d1896f305c7/v1/46e7045ba0e46526fb15bab9f157f0e9.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230526091354-a8f6a8726179ba8e05a59d1896f305c7/v1/dd71ae6cac53bb30ce68a60f3bbf5bbe.jpeg?width=720&quality=85%2C50)
1889 rebuilding:
§ An additional through platform on the underside of the station.
• Two existing platforms have been extended to accommodate longer trains.
• New station building
• New cattle dock
1902-1908 Developments:
In 1902, the LT&SR made some adjustments to the signaling system that had a positive impact. These changes were a precursor to more significant changes that would take place in the area in the future. A new bridge over the River Roding was opened in 1900 and the old bridge was replaced in 1903.The new scheme saw the Great Eastern/T&FGR trains running on the northern lines and the LT&SR trains on the southern lines.