JUST FOR
KICKS Technical / Concept & Process
3
JUST FOR
KICKS Technical / Concept & Process
Table of Contents
Esquese Exercise
4
Inspiration Images
8
Plan Beautiful 12 Schematic Review 16 Plan Progression 22 Midterm Review 26 Progress Work 34 Winter Final Design
40
Appendix 46
2
3
Esquese Exercise
4
5
Esquese Exercise
Second Floor Plan
First Floor Plan
6
Just For Kicks is a state of the art indoor soccer facility that is located in West Chester,
Ohio right off of Interstate 75. Located in a great location with a variety of food and shopping nearby, this facility is easy to reach and in the heart of a family area in one of Cincinnati’s best suburbs. The facility will provide people of all ages with a space to enjoy the atmosphere of soccer that is so dearly loved around the world. Teams from all over the Cincinnati area and the tri-state will flock here to get a piece of the action. Using motifs derived from all things soccer the building has a unique personality that will keep you excited and energized from the moment you hit the parking lot. Just for Kicks is the place to be for all soccer enthusiasts.
Parti
Section
First Floor Plan
7
Inspiration Images
8
9
Inspiration Images
10
11
Plan Beautiful
12
13
Plan Beautiful
14
15
Schematic Review
16
17
Schematic Review
Second Floor Plan
First Floor Plan
18
Spatial Breakdowns
Ideation Sketches
19
Entrance View
Players Tunnel
20
Training Fields
Training Ramp and Training Fields
21
Plan Progression
22
23
Plan Progression
24
25
Winter Midterm
26
27
Winter Midterm
Office
Training Below
Spectator Seating
Office
Cafe Area
Second Floor Plan
Storage
Drop off Zone/ Back Lobby
Shooting Cages
Ramp
Men’s Locker Championship Field The Tunnel
Spectator Seating Women’s Locker
Workout B
First Floor Plan
28
Physical Therapy
Workout A
Front Desk/ Lobby
Axonometric
Sections
29
Entry
Players Tunnel
30
Tunnel Ideation
Sections
31
Entry
Players Tunnel
32
Tunnel Ideation
Sections
33
Process Work
34
35
Process Work
36
37
38
39
Winter Final Design
40
41
Winter Final Design
Glass Dome
Space Frame
Ceiling
1 Front Desk
Joist Grid
2 Concessions 3 Cafe/Lounge 4 Suspended Track 5 Interactive Spectator Zones
Column Structure
6 Catwalk 7 Spectator Seating Media / Scouts
3 2 1
4
7 6
1 Entry Pro Shop 2 Elevators The Board Main Stair
5
Second Floor
3 Women’s Locker 7
6
4 Men’s Locker
11
4
5 Team Pods 3
8
6 Office
5
7 Back Entry
2 1 9 10
8 Technical Training 9 Workout Rooms Physical Therapy 10 Training Ramp
First Floor
42
11 Championship Pitch Spectator Seating
Building Facade from Parking lot
Building Facade from Interstate
Section
Section
Open Grid
Passing and 1v1
Agility Ladder
Corever Training
43
Interactive Video Wall
Players Tunnel with Seating above
Art Installation Lighting Above Threshold Lighting
44
Logo/Graphic Wall with Signage Main Information Desk
Stadium Seating
Suspended Track
Space Frame with Hexagon Paned Glass
45
Appendix
46
47
Appendix
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
NICOLE MYSINGER DESIGN
DRAWING INDEX
SITE CONTEXT
JUST FOR
DRAWING NAME GENERAL - TITLE SHEET
G002
GENERAL - PROJECT NOTES
A001
FIRST FLOOR DEMO PLAN
A002 A100
5727 MUHLHAUSER ROAD WEST CHESTER, OH
SYMBOL LEGEND
JUST FOR
KICKS
SECOND FLOOR DEMO PLAN SITE PLAN
A101
ARCHITECTURAL PLANS
A200
BUILDING FACADE ELEVATIONS
A201
BUILDING SECTIONS
A601
DETAILS
E101
REFLECTED CEILING PLANS
PROJECT LOCATION
PROFESSIONAL IN CHARGE
PROJECT MANAGER
DRAWN BY TRUE NORTH
PROFESSIONAL SEAL
SITE NORTH
CODE INFORMATION
PROJECT NAME
LIFE SAFETY PLANS REVISIONS
CLASSIFICATION A-4 Assembly
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
KICKS
SHEET G001
CONSTRUCTION TYPE Noncombustible 1 Hour / Sprinkled FIRE PROTECTION RATING ASSEMBLY
RATING IN HOURS
Floor Construction Columns and Load Bearing Walls Roof Construction Tenant Space Separation Other NOnn-Bearing partitions Exit Access Corridors Enclosures of Exits, Exit Hallways, Stairwells Shaft Enclosures
1 hour 1 hour 1 hour 1 hour Noncombustible 1 hour 2 hours 2 hours
EGRESS SYSTEM REQUIREMENTS Maximum Travel Distance to nearest exit Minimum Clear corridor width Minimum stair width Largest Room that may contain only one door
250'-0" 44" 44" 49 occupants
RESTROOM FIXTURE REQUIREMENTS Water Closets Lavatories Service Sink Drinking Fountains
DS
TO BE ADDED
PROJECT NUMBER
GENERAL TITLE PAGE
1 per 150 1 per 200 1 required 1 required, more may be added due to the nature of the facility
G001 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
GENERAL NOTES
EM PLAN, NOTES, ELECTRICAL NOTES, MECHANICAL AND FIRE PROTECTION NOTES
1. All construction shall comply with the current edition of the local building codes and regulations and all other applicable codes, ordinances and statues. 2. All written dimensions shall have precedence over drawing scale. all dimensions shall be verified in the field before proceeding with work. The designer shall be notified of any errors or dimensions requiring correction. All dimensions are to grid line, face of masonry or face of wall finish unless noted otherwise. 3. Dimensions are indicated for critical locations pertaining to interior design related items only, not for construction. 4. The general contractor shall provide all necessary blocking, backing, framing, hangers, or other support for fixtures, equipment, cabinetry, furnishing and all items requireing the same. 5. These documents are for design intent only. They are not for construction. It is not the intent of these documents to be architectural or engineering drawings. 6. All fixtures, fittings, and equipments, locations, dimensions and tolerances must meet local, state and national code requirements for the location of the project. It is the responsibility of the Contractor to insure code compliance, including handicapped, and to advise Nicole Mysinger Design Consultant and architect of any discrepancies between their documents and the required codes. 7. In addition to these documents of work, materials, finishes, and furniture must comply with Nicole Mysinger Design Consultant's PREAMBLE AND GENERAL CONDITIONS and Project Manual. This document will be provided. 8. General Contractor will coordinate with the Architect, Engineers, Lighting Designer and Interior Designer for all details for the construction process. 9. Fabricator and./or Contractor must provide shop drawings, prototypes, finishes, samples, etc. as required by these documents; Interior Designer's Specifications; and Nicole Mysinger Design Consultant's PREAMBLE AND GENERAL CONDITIONS. This documentation shall be provided. 10. The following documents may be issued seperately and are included in this document by reference: Primary Plumbing Fixture Selections and Decorative Hardware Selections.
1. Only those electrical.mechanical devices required to support interior designer's specified items are shown. 2. See RC Plan and notes for additional information. 3. Refer to elevation drawings, All devices mounted in walls must be located such that they do not conflict with interior design related items. 4. Provide power, telephone and equipment requirements as required by Owner, Convenience outlet locations will be reviewed by the Owner, Operator, Engineer and the Interior Designer. 5. Unless otherwise indicated, all wall mounted electrical outlets are to be mounted at 18" to center above finished floor. Mount outlets vertically. 6. All switches and dimmers will be mounted at 48" above finished floor. Unless otherwise noted. 7. Cover plates for switches, outlets and other devices shall be metal in paint finish - white, unless otherwise noted. Review specification locations with designer prior to installation. 8. All recessed clock outlets shall be mounted at 60" above finished floor unless otherwise noted. 9. Refer to elevations for mounting height of sconces. Verify with designer before installation. 10. All floor outlets will be recessed waterproof outlets with stainless steel cover plates (removable screw type, not hinged). 11. Television and audio/visual and microphone outlets will be located as required by Owner/Operator and Adio/Visual Consultant. 12. Thermostats for Public Areas shall be remote sensor type. All operating control and mechanisms to be located in the back of house areas in locations directed by the Owner. 13. The plumbing fixture selections provided by the interior designer are for design intent only and do not include all required accessories and components such as traps, drains, trims, etc. Al plumbing fixtures to be provided and installed by the General Contractor. 14. All hardware light fixtures are to be dimensioned by lighting consultant to verify proper performance and design intent. 15. Lighting consultant is responsible for drawing and dimensioning lighting within all light details, including light pockets, drapery pockets, light coffers, cable lighting and any specially lighting that is integral in the design of the project. 16. All fire alarm strobes and indicators to be white if allowed by local codes. 17. All exit signs shall be clear, edge lit with green lettering. 18. Coordinate locations of emergency lighting with designer. 19. Fixtures shall be approved by Nicole Mysinger Design Consultant and Lighting Consultant. 20. The General Contractor shall coordinate with th ekitchen consultant for location and/or special requirements for all equipment in kitchen areas, services areas, bars, buffets, and display cooking areas.All kitchen equipment required by others.
AR PLAN NOTES AND GENERAL ARCHITECTURAL INFORMATION NOTES 1. Refer to architect's drawing for dimensioned partition plan. 2. Refer to elevations to determine style and finish of doors. Refer to Architect's drawings for detailed door and hardware schedule.
RC PLAN NOTES AND LIGHTING NOTES
ELEVATION NOTES
1. Refer to EM Notes for additional information. 2. RC Plans include only information pertaining to the interior design intent and application of finishes. Refer to architect's drawings for a fully coordinated ceiling plan for construction purposes. 3. Dimming is required in all public areas. Dimming curcuits will be coordinated by Architect, Lighting Consultant, and perator in conjunction with the Project Engineers. Dimming shall be automatic CPU driven and shall be remote, four scene (minimum) preset dimmers. See Electrical Plan for additional notes. Lighting on emergency circuits shall be dimmable with emergency relay override. Dimming per dimming schedule by lighting designer. 4. Provide power, wiring and all supports required for all decorative lighting. Verify requirements with Owner/Purchasing Agent prior to installation of supports and electrical service boxes. 5. Diffusers shall be conceals in coves where possible.Paint diffusers to match surface in which they occur unless diffusers are stainless steel. Black out boot and surrounding areas above ceiling to avoid light bleed. All visible diffusers shall be continuous slots. Where continuous slots are required, provide blank slot where air supply or return is not required. 6. All sprinklers will be concealed pop down with factory applied finish. 7. Sprinklers will be located by others to meet code requirements. Coordinate locations with lighting, mechanical devices and speakers. 8. Located other life-safety devices as required by code. Locations shall be coordinated with Nicole Mysinger Design Consultants and Architect in conjunction with other ceiling devices. 9. Speaker locations will be coordinated with Nicole Mysinger Design Consultants and Architect. speaker cover plates shall be factory finished to match the ceiling in which they occur. 10. Fluorescent lighting, including PL (compact fluorescent) is not allowed in any location in which it might be seen by hotel guests including vestibules, service stations, and offices which open into public areas or have exterior glazing which is visible to guests from the building exterior.
1. See EM notes for additional information. 2. All wall surfaces are not elevated. Any wall surface not specifically elevated is assumed to be finished to match the adjacent surfaces.
WF AND PLAN NOTES 1. See elevations for additional information. 2. Paint finish on painted trim shall be semi-gloss unless noted otherwise. 3. Paint finish on walls shall be eggshell unless noted otherwise. 4. Paint finish on ceilings shall be flat unless noted otherwise.
DETAIL NOTES 1. See elevations for finish and material selection information.
PROJECT NAME
JUST FOR
KICKS PROJECT LOCATION
PROFESSIONAL IN CHARGE
PROJECT MANAGER
DRAWN BY
PROFESSIONAL SEAL
FC PLAN NOTES 1. Provide transition/threshold between turf and aisle or other floor transitions. 2. Where floor transitions occur at swinging doors, transition shall align with centerline of door in closed position. 3. All grout lines are to be 1" wide maximum unless otherwise noted. 4. All wood flooring to receive a full filled finish unless noted otherwise.
REVISIONS
TENANT SAFETY NOTES 1. Construction will be confined to the area of work and will not create dust, dirt, or other such inconveniences to other tenants within the building at all times in the course of construction provision is made for adequate egress, as required by the code. Required egress may not be obstructed at any time. 2. Construction operation will not block hallways or means of egress to tenants of this building. 3. Construction operations will be confirmed to normal business hours of 8 AM to 5 PM Mondays through Fridays, except legal holidays. 4. All precautions to be observed in the building to maintain fire safety during construction. 5. The structural integrity of the building to be protected at all times and not to be disturbed. 6. Construction noise will be kept to a minimum and cease after normal working hours. 7. Building security to be maintained to prevent unauthorized persons, from entering the construction area. 8. Floors shall not be overloaded with construction material beyond that permitted. 9. There will be occupancy of apartments when possible during the course of construction work at the option of the respective tenants. 10. There will be no one occupying the area of work, to be renovated, during the course of the construction work. 11. Before sprinkler system is turned off the fire department is to be notified. 12. Fire System - all necessary laws and controls as well as any additional measures necessitated by the construction shall be strictly observed. 13. Plans - Plans submitted by the applicant shall show compliance with the above items during construction. Details such as temporary fired rated assemblies and opening protective shall be included.
PROJECT NUMBER
GENERAL PROJECT NOTES
G002 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
48
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
NICOLE MYSINGER DESIGN
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
NICOLE MYSINGER DESIGN
PROJECT NAME
PROJECT LOCATION
PROFESSIONAL IN CHARGE
DRAWN BY
PROFESSIONAL SEAL
REVISIONS
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PROJECT MANAGER
PROJECT NUMBER
FIRST FLOOR DEMO PLAN
A001 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
NICOLE MYSINGER DESIGN
PROJECT NAME
PROJECT LOCATION
PROFESSIONAL IN CHARGE
DRAWN BY
PROFESSIONAL SEAL
REVISIONS
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PROJECT MANAGER
PROJECT NUMBER
SECOND FLOOR DEMO PLAN
A002 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
49
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
NICOLE MYSINGER DESIGN
PROJECT NAME
PROJECT LOCATION
PROFESSIONAL IN CHARGE
DRAWN BY
PROFESSIONAL SEAL
REVISIONS
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PROJECT MANAGER
PROJECT NUMBER
SITE PROPOSAL PLAN
A100 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
NICOLE MYSINGER DESIGN
PROJECT NAME
JUST FOR
KICKS PROJECT LOCATION
PROFESSIONAL IN CHARGE
PROJECT MANAGER
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PROFESSIONAL SEAL
REVISIONS
PROJECT NUMBER
BUILDING FACADE OPTIONS
A002 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
50
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
DRAWN BY
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
NICOLE MYSINGER DESIGN
PROJECT NAME
PROJECT LOCATION
PROFESSIONAL IN CHARGE
DRAWN BY
PROFESSIONAL SEAL
REVISIONS
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PROJECT MANAGER
PROJECT NUMBER
ARCHITECTURAL PLANS
A101 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
NICOLE MYSINGER DESIGN
PROJECT NAME
PROJECT LOCATION
PROFESSIONAL IN CHARGE
DRAWN BY
PROFESSIONAL SEAL
REVISIONS
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PROJECT MANAGER
PROJECT NUMBER
BUILDING SECTIONS
A201 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
51
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
NICOLE MYSINGER DESIGN
PROJECT NAME
PROJECT LOCATION
PROFESSIONAL IN CHARGE
DRAWN BY
PROFESSIONAL SEAL
REVISIONS
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PROJECT MANAGER
PROJECT NUMBER
DETAILS
A601 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
NICOLE MYSINGER DESIGN
PROJECT NAME
PROJECT LOCATION
PROFESSIONAL IN CHARGE
DRAWN BY
PROFESSIONAL SEAL
REVISIONS
PROJECT NUMBER
REFLECTED CEILING PLANS
E101 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
52
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PROJECT MANAGER
53
On the Cover...
Arsene Wenger Birthdate: October 22, 1949 Origin: Strasbourg, France Position: Manager (Arsenal) Clubs: Mulhouse, ASPV Strasbourg, RC Strasbourg Arsene Wenger is the longest serving and most successful manager of English Premier League’s Arsenal. Le Professeur, as named by some of his players, is the only manager in the league to go an entire season with a loss, 49 straight wins.
54
“You build a player like you build a house. You start with the Foundations, the Fundementals.� - Arsene Wenger
Nicole Mysinger Interior Design 2012 mysingne@mail.uc.edu 419.944.7042