ARCHITECTURAL PORTFOLIO ACADEMIC WORKS 2017-2019 NISHIT GANDHI
WORKSHOP
EDUCATION B.Arch : (2017- Present) HSCE : (2015-2017)
B.S. Patel School, Bilimora.
SSCE : (2014-2015)
B.S. Patel School, Bilimora.
SKILLS Nishit Gandhi December 6, 1999 “GEETA”, Bangiya Faliya, Opp: Kalika mata temple, Bilimora(w) Dist: Navsari
nishithoceky@gmail.com nishit.17.idea@barch. indusuni.ac.in +919898251365 IDEA, Indus University, Ahmedabad
IDEA- Indus University, Ahmedabad.
1. Autocad 2. Archicad 3. Sketchup 4. Adobe Photoshop 5. Adobe Indesign 6. Microsoft Office 6. Model Making 7. Sketching 8. Drafting 9. Rendering
1. Documentation of Vernacular Architecture, Dharamashala. 2. Documentation of Havelis Bundi, Rajasthan. 3. Card board Workshop: Design And Built With Cardboard, Ahmedabad 4. Documention of Aranya Housing, Indore, Madhya Pradesh . 5. Studying: Materials, Construction Techniques Auroville, Pondicherry.
CONTENT STUDIO: I & II : Contextual Studio
Techincal Drawings
Mapping Ahemdabad & Ambli Intervention in Ambli Institution
Toilet Drawings Staircase Drawings Door Window Drawings Pol House Documentation & Bundi Documentation
STUDIO: V : Housing Studio Contextual Study of Uvarsad Design Project
STUDIO: IV : Material Studio Design Project (Material Exploration)
STUDIO: III : People And Place Studio Design Project (Thangka Painting Institution)
STUDIO: VI : Working Drawings Studio Design Project (Archive in Auroville)
Material Exploration Bamboo Workshop Principals Of Tension & Compression Arches
Paper Workshop Design And Built With Cardboard, Ahmedabad Documentation Aranya Housing Dharamshala streets & Vernecular Houseforms
Skills
MAPPING Ambli And Ahmedabad Semester I (Group Work)
The exercise intended to create the maps of Ambli village and Ahmedabad city respectively. Ambli village was divided into the gride of 4x3 and each groups were allotted with the place respectively. Mapping was done with the navigational memories and the observation that each had, and was a play of different line types and hatches.
Ahmedabad city was divided among all the students, and the exercise was to map the way from each students house to Indus University connecting the roads to form a whole map. Important landmarks were marked to denote places. The intend of the exercise was to train our mind to recall the memories, as the exercise was also known and ‘Memory Mapping’.
C O NTEX T U A L S T UDIO
First Floor Plan
Institution
Polo Forest, Gujarat Semester II ( Studio Project) Studio started with creating a collage, with the sketches of Polo forest. Imaginary sites were created through collage, with reference to Polo forest. Understanding contours and designing accordingly. The program was a small scale institution with healer’s space and students space, working space and learning jointly in the forest.
Ground Floor Plan
C O NTEX T U A L S T UDIO Section
Light And Shadow
Intervention In Ambli
Ambli village, Ahmedabad
Sleeping Space
Semester I ( Studio Project) Ambli a village in Ahmedabad, with very rich culture of their own. The studio intended to understand the village, adopting the life of Ambli, following their culture and traditions, and intervening the one of the build form of Ambli. Documenting village and understanding scale of village to cluster to build form was also the part of the studio.
Sleeping Space
Light And Shadow
One and half brick thick flemish bond
Living Room
Toilet
Kitchen
First Floor Plan
Contextual Study
Uvarsad Village, Gandhinagar Semester V (Documentation) (Group Work) Uvarsad, a village near Gandhinagar is not like a typical village. The village has now incorporated modern architecture and modern lifestyle. Studying the life of humans between typical and modern makes this village interesting.
H O US ING S T U D IO
The intend of the exercise was to study and observe the streets of the villages. Studying built forms as an individual unit with its characteristics, to how two build form creates space, to a group of built form creating a small cluster, group small clusters creating bigger cluster and group of bigger clusters connected with streets and forming one whole village. Also how important landmarks .i.e, schools, ‘Arogya’ centres, shops, temples are placed.
Design Project
Uvarsad Village, Gandhinagar Semester V The program focuses on horizontal and compact housing design as per Gandhinagar climatic response. 32 housing units were required to design on a tight compact site with 2BHK and 3BHK units. Also controlling 60%-40% ration of built and unbuilt area.
H O US ING S T U D IO Section CC’
The design intend to give the same street experiences to the users which are found in villages. A well designed street with small pockets opening to the streets creating gathering spaces, play of plinth levels and sizes allowing different activities, a junction of two streets with hight plinth and a tree creating a gathering space where children can play and aged people and talk.
2BHK Floor Plan
Ground Floor Plan
3BHK ground Floor Plan
Design Project
Riverfront, Ahmedabad Semester IV The studio was based on understanding of the essence of the material and climate. The brief was to design recreational spaces such as coffee house, exhibition space and performance space. The site was situated on Riverfront(East) Ahmedabad. Ahmedabad located in hot and dry climate requires mutual shading. The material explored in the studio was Bamboo, and Rammed Earth walls(wall maximum of 15m).The main function decided was performence space and supporting spaces were coffee house and exhibtion space.
M ATERIA L S T UDIO
Detail 1
Ground Floor Plan
Detail 2
The design process started with the idea of having pause points and having circulation, i.e. a path as services and the spaces as served spaced. Also considering river an advantage to the design, creating a visual connection to it. Bamboo being slender and strong material, the entire structure is built with bamboo with Rammed earth wall support.
First Floor Plan
Section AA’
Section BB’
Design Project
Dharamshala, Himachal Pradesh Semester III (Thangka Painting Institution) The studio was based on studying the lifestyle of the people living at a particular place. Dharamshala located in Himachal Pradesh on the edge of the Himalayas surrounded by cedar forest in Kangra district. The place is famous for Tibetian culture and Tibetian paintings, i.e., Thangka Paintings.Studying the lifecycle of the people understanding their mental and physical aspects, Thangka Paintings Institution was to be designed. Studying thangka painters works, their anthropometry, their needs around them, their comfort, light quality in space positing of painters one after the other, hours of daily work, were essential aspects to be studied and apply into the program.
P E OPLE & P L ACES
Mass and void, an important concept followed to design on hilly regions. Observing the chaotic condition surrounded by the high rise building of the site, the design built needed to be submerged into the nature. Mass are the closed space .ie., workshops, shops, living room, kitchen, bedrooms. Whereas voids are the inbetween spaces or the open space which help to create mass. The strong representation of the concept is being reflected in the elevation and plans.
Design Project
Auroville, Chennai Semester VI (Archive) Auroville, an experimental township thought and created by Mother and Shree Aurobindo on the idea of human unity, sustainable living and spirituality, where the life revolves around the Matrimandir. The place attracts many tourists from different corners of the world throughout the year, and especially architects and artists for its planning and architecture. People also come to Auroville as a volunteer in organic farms around, and as a researcher. The site is located near the crown road, opposite to Pre- Cherche, on the way to Deepanam school. Site area in 1250 sq. m and built up area is 250 sq.m
W OR KING DR AWIN G S
Archives is a place where primary source documents that have accumulated over the course of an individual or organization’s lifetime, and are kept to show the function of that person or organization. The project proposed is an encyclopedia of the Auroville, catering majorly to the Architects, artists and planners. Auroville being an experimental township could have a built of record for all their studies, research and experiments. The built is the experiment in itself between two contradicting material in properties. Poured earth being a bold, rigid and massive structure and steel simple strong and visually light material. Controlling the character of both the material overpowering is a main challenge.
6mm THICK TETRAPACK CORUGATED SHEET (1000x3000) 40mm THICK GLASSWOOL INSULATION 20mm THICK FALSE CEILING BOARD 2mm THICK NET 15mm DIAMETER STEEL ROD 2mm THICK STEEL HOLLOW BOX SECTION (80x80) 240x300mm THICK RCC TIE BEAM (1:1.5:3)
LVL +4,210 ROOF
240mm THICK POURED EARTH WALL 20mm THICK OXIDE FLOOR FINISH 200mm THICK PCC (1:4:8)
LVL +3,600 TOP OF TIE BEAM
2mm THICK DECKING SHEET(750x3000)
LVL +3,300
10mm DIAMETER DRIP EDGE
BOTTOM OF TIE BEAM
50x50 ALUMINIUM FRAME
LVL +1,200 TOP OF PLINTH BEAM
20mm THICK FALSE CEILING BOARD 240x300mm RCC TIE BEAM
18x30mm ALUMINIUM SLIDING SHUTTER 8mm THICK TOUGHENED GLASS 20mm THICK OXIDE FLOOR FINISH 100mm THICK PCC (1:4:8) 30mm THICK CUDDAPAH STONE SILL
LVL +750
15mm THICK TADELAKT FINISH
BOTTOM OF PLINTH BEAM
240mm THICK POURED EARTH WALL
LVL +00 GROUND LEVEL
240x300 RCC PLINTH BEAM(1:1.5:3) 100mm THICK PCC (1:4:8) 100mm THICK PCC (1:4:8) STONE STEP FOUNDATION
LVL -1,135 FOUNDATION BASE
50mm THICK PCC COMPACTED EARTH(1:4:8)
UNEXCAVATED EARTH
03
04
05
06
07
08
09
10
11
12
13
14
A
AD-301
A
02
AD-202
01
2. Any ambiguity is found shall brought to the notice of Architect/Engineer. 3. All dimensions to be read and not to be measured. 4. Before setting the layout to get it approved with the site Engineer, check all the diagonals. 5. Before execution check all the dimensions on site. 6. Before setting the layout, check all dimenesions on the site. 7. All levels are unfinished level. 8. Details and specification of all R.C.C. and Poured Earth work shall be considerd as per structural drawings. 9. Column reduction as per structural drawings.
26,520
2,040
2,040
2,040
2,040
2,040
2,040
2,040
2,040
2,040
2,040
2,040
2,040
18,810
2,040
8,160
A
AD601
18,480
Hatch Legend
8,160 12,804
LVL +4,715
Roof
210 600
Poured Earth AR-05 R.C.C. Brick Stone PCC Wood Insulation Stone Foundation
A
240
900
9,300
6, 44 2
5,853
1,900
LVL +750
LVL -1,135
Foundation base
1,900
LVL +1,220
Finish Floor
LINTEL
SIZE.
450
NO.
E
LVL +750
1,140 1,800 2,040
D1
1800x2800
D2
980x 2,100
Bottom of plinth beam
5,790
Glass Wooden
1,135
A
2,040
5,880
5,220
7,020
6,360
6,360
2,160
240
900
AD602
3,840
H
AD-301
1,510
7,778
5,220
9,960
2,040
9,300
2,040
2,040
18x30
50x50
18x30
B
C
D
2,040
2,040
2,040
2,040
600x1,960
425x1,960
A
+3,900
+4,500 Sliding
50x50
+3,900
+4,325 Sliding
50x50
18x30
+4,035 Sliding
50x50
18x30
+3,275 Fixed
45x50
-
+2,690 Sliding
50x50
18x30
W7
435x1,960
W8
900x1,800
+1,475
W9
500x1,500
+1,690
+3,600
B
18x30
C
D
A
2,040
10
11
12
13
14
2,040
2,040
2,040
2,040
2,040
2,040
2,040
2,040
1,800
1,800
1,800
1,800
A
AD601
Hatch Legend 960
A 1,140
900
900
900
W1
450
W1 2,400
W1
1,140
2,400
2,400
A 1,140
1,140
3,840
900
1,140
900
D1
450
900
1,140
1,800
690
2,040
16,680 2,040
2,040
04
1,850
140
2,040
5,982
2,040
140
2,040
2,040
1,850
2,040
2,040
240
2,040
1,800
240
05
06
07
09
635
Reading Sapce
LVL +3,522
Finish floor
D1
W2
LVL +3,000
Bottom of tie beam
W2
W2
Reading space Reading Sapce W3
W3
D1
W3 W3
D1 W4
Exhibition space
D1 1,980
1,215
W4
Reading Sapce
D1
3,570
300 2,040
2,040
1,215
D1
1,980
Finish floor
2,040
2,040
120
2,040
600
3,568 26,520
2,040
300
600
2,040
300
600
2,040
W4 2,040
LVL +320
Finish Floor
W3
LVL +00
Ground Level
LVL +800
Top of sill LVL -1,135
Foundation base
2,040 900
240 7,920
2,040
2,040
06 600
08 3,568
06
07
2,040
2,040
2,040
08
2,040
09
600
900
10 240
120 600
05
06
07
1,860
09
2,040
11
10
12
11
2,040
13 7,920
12
2,040
14
13
2,040
240 500
14
2,040
2,040
08
09
10
11
12
13
14
2,040
240
2,040
240
10
11
12
W6
820
820
W6
SIZE. 2,400
3,000
6,820
W4
2,040
FRAME W4
+3,590 Hingh
25x75
50x50
+1,830
+3,590 Sliding
50x50
18x30
+320
+3000 Sliding
50x50
18x30
+800
+3,000 Sliding
50x50
18x30
2,700
W9
600x1,960
+3,900
+4,500 Sliding
50x50
18x30
425x1,960
+3,900
+4,325 Sliding
50x50
18x30
435x1,960
+3,600
+4,035 Sliding
50x50
18x30
900x1,800
+1,475
+3,275 Fixed
45x50 W4
+1,690
+2,690 Sliding
50x50
500x1,500
W4
W6
SHUTTER
+1,690
1,800x2,200
W7
I
LINTEL TYPE
SILL
900x1,900 900x1,800 1,800x2,680
W4 W5
LVL +00 Ground Level
W6
W6
W6
D1
-
W1
W1
W1
W1
W1 D1
18x30
Project Name- Archive
2,040
13
Glass Wooden
W3
W8
1,800
MATERIAL
Hinge
6,860
14
1,800
2,040
2,040
10,440
2,040
2,040
2,040
1,800
2,040
Student Name-
2,040
2,040
4,820
2,040
2,040
1,420
2,040
2,040
26,520
Nishit Gandhi A
A
IU1743000015 Sem - 6 Indus University, Rancharda, Ahmedabad
AD-201
B AD-202
North Elevation
Ground Floor Plan Scale 1:100
13
12
Drawning No AD 101,
Scale - 1:100
Stamp -
11
10
09
08
LVL +00
Ground Level
LVL -1,135
900
07
600
2,040
500
Foundation base
26,520
120
LVL +320
Finish Floor
240
1,860
2,040
LVL +3,000
Bottom of tie beam
LVL +00 Ground Level LVL +800
8,900
W4
300 2,040
2,040
900
600
LVL +3,522
AR-04
W2
26,520
TYPE
LVL +5,700
Bottom of tie beam
3,487
150
820
Top of tie beam
LVL +3,400 First Floor
Top of sill
2,040
Pivot door
150
LVL +6,000
LVL +5,700
Bottom of tie beam
W2
W2 Exhibition space
D1
05
2,040
W6
Opp:Pre-Chreche Crown Road 2,040 Auroville, Pondicherry 08
AD-301
Ground Floor Plan
Reading Sapce
Computer space
Roof
Top of tie beam
AR-04
05
04
5,700
14
Ground Floor Plan Scale 1:100
W2
Exhibition space W2
1,860
W2
300
2,040
H
W3
1,800
3,590
Drawning name Ground Floor Plan 3
AD-101
W6
W4
500
240
980x 2,100
W6 1,800
1,800
W3
240
240
725 377
W3
240 1,800
1800x2800
D2
3,000
1,190
240 500 2,040
9
03
W2
1,860
04
LINTEL
SIZE.
D1
W1
LVL +3,400 First Floor
7 -300
2,960
15
02
W6
Computer space
300 2,040
G
26,520
01
W6
WINDOW SCHEDULE
AD-302
240
1,800
A AD602
6 DOWN
8
11
14
13
2,040
W6
W6
D1
Steel 2,040 Aluminium 900 Gypsum
2,040
04
W6
A
AR-03
12
2,040
W4
300
5
450
3,880
10
W OR KING DR AWIN G S
2,040
03
NO.
700
I 240
W6
4,320
Revision Table
NO.
F
240 1,800
5,400
495
2,040
900
900
1,800
W2 900
W3
1,800
W6
LVL +6820
LVL +6,000
DOOR SCHEDULE
W3
Water body
500 240
W6
120 2,038
Poured Earth 2,040 R.C.C. 900 Brick Stone 02 03 4,320 PCC 02 03 Wood 2,040 Insulation Stone Foundation
LVL +6,820 Roof
690
725
A AD602
1,800
4,720
GSPublisherVersion 0.4.100.100
4
1,140
02
+300
6,360
240
5,220
5,982
Slope
3
3,840
W3
Reading Space
2
900
2,040
E
1,850
1
W2 450
2,040
01
240 240
1,800
DN
1,000
UP 1,800
15R x 170 14G x 304
2,490
Admin +1200
Water body
Reading space D2
D
240
AD-302
1,800
Section Scale 1:100 6,120
4,560
B
D1
6,075
5,475
5,475
6,075
Slope
1,850
2,040
W4
+750
6,860
5,880
6,860
2,040
+450
W2
H
1,800
UP
+150
Sitting
AD-302
G
AD-302
GSPublisherVersion 0.4.100.100
600 600
+00
Slope
A
2,270
W4
3,890
2,530
2,490
2,970
600
600
600
900
1,000 600
600
2,190
Central Courtyard
4,770
300
4,080
300
+750
480
Computer space
W4
Section BB’
A Elevation Section AD-201 Scale 1:100 Scale 1:100
B
240
1,806
5,880
2,630
600 600 +750
1,000
6,120
6,361
W8
UP
+00
4,080
D1
470
1,680
900
DN
UP
2,040
2,490
2,630
1,800
1,800
2,040 16,680
600
240
430
1,800
480
240
1,800 240
F
1,788
+750
DN
900
480
Entrance
01
C
Sitting
Slope
480
W7
W4 W6
Roof
6,262
4,320
E
240
1,800
10,440
2,630
2,190
+600
1,800
1,800
2,040
300
1,800
1,800
3,890 4,080
+300
1,541
300 300
UP
1,440
W2
5,300
D3
W2
2,040
4,319
900
2,540
900
5,880 1,140
1,850
900
1,800
900
3,840
240
690
W2
900
+750
Slope
1,800
Toilet
+900
1,920
B
150
2,040
300 300 1,440
2,279
1,000
1,800
1,800
pe
2,040
Slo
2,040
450
UP
D1
Slope
Slope
UP
1,800
Sitting
W9
1,000
Slope
2,040
900
2,038
1,800
+1200
8,160 +900
D3 1,800
960
8,160
240
Exhibition Space
1,800
+500
01
+00
960 4,200
2,400
1,140
9,960
AD601
240
W1
240
1,800
Water body
D
900
Slope
2,400
8,040
B
1,140
960
2,040
2,400
900
2,900
450
W1
C
W7
LVL +6820
8,160
A Ramp
W7
900
1,800
8,040
W7
W5
W5
7,843
09
240 8,040
LVL +6,820 Roof
W7
W5
W5
300
Drawning name Notes: LineoutGeneral Plan 1. All dimensions are in m.m. Drawning No -ambiguity is found shall 2. Any brought to the W7 W7 W6 AD 101, notice of Architect/Engineer. W7 W7 3. All dimensions to be read -and not to be Stamp Scale - 1:100 measured. Toilet 4. Before setting the layout to get it approved with the W2 W2 site Engineer, check all the diagonals. Admin Toilet Admin 5. Before execution check all the dimensions on D1 site. W8 6.Toilet Before setting the layout, check all dimenesions Admin on the site. D1 7. All levels are unfinished W8level. 8. Details and specification of all R.C.C. and 3,460 Poured Earth work shall be considerd4,820 as per structural drawings. 9. Column reduction as per900structural drawings. 2,040 2,040 2,040 2,040
A
2,040
W7
W5
W5
3,300
08
W5
W5
1,135
07 AD-301
2,040
W7
Student NameIU1743000015 Sem - 6 Indus University, Rancharda, Ahmedabad
635
W7
14
315
13
2,383
12
300
11
2,200
10
26,520
2,040
I
Nishit Gandhi
GSPublisherVersion 0.4.100.100
2,040
H
300 500
06
G
1,135
05
F
820
09 A AD-201
AD-202
04
E
300
08
A
03
I
2,040
Opp:Pre-Chreche Crown Road Auroville, Pondicherry
07 AD-301
02
H
2,040
Project Name- Archive
2,040
Lineout Plan Scale 1:100
01
G
2,040
7,020
2,040
Line Out Plan AD-101
F
2,040
16,680
W7
2
E
2,040
315
06
18x30
50x50
2,300
05
50x502,400
50x50
+3000 Sliding +3,000 Sliding
3,000
04
A
25x75
+3,590 Sliding
+320 +800
3,450
3,487
03
2,040
5,475
6,360
2,040
2,040
+3,590 Hingh
+1,830
600
6,820
2,040
+1,690
600
2,383 100 300
2,040
900x1,900
1,860
2,700
02
2,040
3,000 7,843
2,040
4,679
900x1,800
W5
Section IScale 1:100
26,520
01
3,450 2,040
2,200
2,040
5,475 2,040
3,300
4,980
2,040
600 2,040
300
10 ,74 2
4,320 17,36 0
600
2,040
120
SHUTTER
1,800x2,200
W6
A AD-301
FRAME
1,800x2,680
Section AA’
H
2,040
5,880
1,800
1,140
2,040
1,840
I
LINTEL TYPE
W3 W4
Section Scale 1:100
3,180
A
SILL
W2
W1
2,040
1,800
2,040
2,040
2,040
A
2,160
3,550 1,880
SIZE.
NO.
G AD602
3,880 3,180
3,960
2,040
WINDOW SCHEDULE
AD-302
1,830
A
5,760
3,840
3,630
185 200
Foundation base
1,830
2,040
2,400
LVL -1,135
Water Body
120 1,860
200
13,142
12,480
5,685 5,603
8,160
5,483
5,385
5,483
5,385
5,685
5,603
F
AR-01
4,679
300 500
AD-302
G
MATERIAL
Hinge
LVL +00
Ground Level
16,680 6,690
6,120
5,220
5,880
1,800
240
8,160
900 1,140
2,040
A
TYPE
Pivot door
5,700
1,140
F
W2
3,590
500
2,610 2,280
2,040
2,040
7,262
7,920
3,180
3,840
3,180 3,840
3,841
3,181
3,570
1,140 1,800 1,800
Water Body
750
16,680
16,680
3,390
E
LVL +1,690
Top of sill
Reading Sapce
W1
5,853
DOOR SCHEDULE
Exhibition Space
30 460
1,135
185 200
2,040
3,990
500
3,182
4,560
4,232
3,810
1,800
1,140
3,840
3,840
900
240 2,040
1,860
3,900
2,040 2,040
1,140 1,800
LVL +3,590
Computer Room
W6 AR-01
Bottom of tie beam
LVL +00
Ground Level
D
W5
AR-05
LVL +3,905
Top of beam
750
Bottom of plinth beam
2,040
5,880 2,040
3,180 12,000
Reading Sapce W2
210 600
450
Finish Floor
315
Revision Table
5,220 2,040
6,360
Exhibition Space W1
Roof
100
LVL +1,220
200
C
3,840
D
Computer Room
W6
LVL +4,715
30 460
LVL +1,690
Top of sill
100
2,040
2,040
8,489
200
2,400 4,440
5,220
7,020 2,040
B
2,040
2,040
2,040
2,040
1,990
2,040
1,710 3,180
3,840
5,880
4,080 4,080
3,180
3,840
4,080
3,180
2,040
2,040
900 2,040
1,800
A
AD601
1,140
3,840
LVL +3,590
Bottom of tie beam
4,438
9,1 91
2,040
3,180
C
1,500
2,160
1,500
2,160
1,480
2,160
2,400
6,120
B
786 13,
2,040
6,120
Steel Aluminium Gypsum
315
Top of beam 9,960
8,040
W5
LVL +3,905
7,710
200
A
1,135
3,4 46
2,941
31 2,7
4,2 33
1,135
3,423
07
06
05
04
03
02
01
General Notes: 1. All dimensions are in m.m. 2. Any ambiguity is found shall brought to the notice of Architect/Engineer. 3. All dimensions to be read and not to be measured. 4. Before setting the layout to get it approved with the site Engineer, check all the diagonals. 5. Before execution check all the dimensions on site. 6. Before setting the layout, check all dimenesions on the site. 7. All levels are unfinished level. Details and specification of all R.C.C. and General8.Notes: Poured Earth work shall be considerd as per 1. All dimensions aredrawings. in m.m. structural 2. Any ambiguity is found shall brought to the 9. Column reduction as per structural drawings.
20mm thick cuddapah stone skirting(100x200) 20mm thick ochre yellow oxide finish
24omm thick Poured earth wall (1:3:3:3:4)
01 AR01
2mm thick decking sheet (750x3000)
100mm thick PCC (1:4:8)
120x240 steel I-section beam 6mm dimeter Rivet bolt (IS: 2155-1982)
Detail-01 Scale: 1:10
200mm thick brick bat
Poured Earth R.C.C. Brick Stone PCC DOOR SCHEDULE Wood SIZE. NO. Insulation Stone Foundation D1 1800x2800 D2
Flooring and Skirting Detail
SIZE.
15mm thick Tadelakt finish 240mm thick Poured earth
5mm thick steel 50x50 Aluminium section C-channel frame
Compacted Earth 5mm MS plate
02 AR02
8mm diameter steel Detail-02 anchor bolt Scale: 1:10 10mm diameter Detail-04 04 drip edge AR04
Scale: 1:10
1,800x2,200
+800
600x1,960
980x 2,100
AR05
erVersion 0.4.100.100
+320
FRAME
+3,590 Hingh
25x75
50x50
50x50
18x30
+3,590 Sliding
50x50
+3,000 Sliding
50x50
+3,900
+4,500 Sliding
50x50
425x1,960
+3,900
+4,325 Sliding
50x50
W7
435x1,960
+3,600
W9
500x1,500
SIZE.
NO.
SILL
Hinge
50x50
+3,275 Fixed
45x50
+1,690
+2,690 Sliding
50x50
LINTEL TYPE
FRAME
200mm thick brick bat
MS L-section 5mm5mm thickthick C-channel 240x300 RCC tie beam (1:1.5:3) 15mm diameter steel rod
2mm thick steel hollow box section (80x80) 240mm thick Poured earth 240x300 RCC tie beam wall(1:3:3:3:4) (1:2:4)
120x240 steel I-section 10mm diameter drip edge 240X300 RCC tie beam (1:1.5:3) 25x35 Aluminium section shutter 8mm thick glass (170x220) 50X50 Aluminium section frame 30mm thick cudapah stone sill (26x1800)
Drawning No Revision Table Ar 03, Ar 04
50x50 wooden shutter
Stamp -
Scale - 1:10
15mm thick Tadelakt finish DOOR SCHEDULE
LVL +800 Top of stone sill
NO.
LINTEL
SIZE.
TYPE
1800x2800
3,590
Pivot door
Glass
D2
980x 2,100
5,700
Hinge
Wooden
LVL +320 Finish Floor
LINTEL TYPE
FRAME
900x1,900
+1,690
+3,590 Hingh
25x75
900x1,800
+1,830
+3,590 Sliding
LVL +00 Ground level
6mm thick translucent anti slip glass
W3
1,800x2,680
W4
300
SILL
SIZE.
50x50
+320
+3000 Sliding
1,800x2,200
+800
+3,000 Sliding
50x50
W5
600x1,960
+3,900
+4,500 Sliding
50x50
W6
425x1,960
+3,900
+4,325 Sliding
50x50
50x50
W7
435x1,960
+4,035 Sliding
50x50
W8
900x1,800
+1,475
+3,275 Fixed
45x50
W9
500x1,500
+1,690
+2,690 Sliding
50x50
+3,600
LVL -330 Finish Floor
6mm thick Silicon
1,135
3mm thick Aluminium section frame 3mm thick rubber holder
Project Name- Archive
12mm diameter nail
Opp:Pre-Chreche Crown Road Auroville, Pondicherry
12mm thick tile mortar 100mm thick PCC (1:4:8)
5mm thick steel C-channel
Poured earth casted desk (1:3:3:3:4)
20mm thick ochre yellowoxide finish
MATERIAL
D1
W2
IN
150mm thick PCC (1:4:8)
240mm thick Poured earth wall(1:3:3:3:4)
SHUTTER
OUT
50x50
240x500 RCC beam (1:1.5:3) 18x30 18x30 18x30 18x30
20mm thick ochre yellowoxide finish 18x30
-
18x30
200mm thick brick bat Stone foundation 50mm thick PCC (1:4:8)
Drawning name Roof and skylight detail
2 AD-602
240x300 RCC plinth beam (1:1.5:3) Compacted earth
18x30
150mm thick PCC (1:4:8)
Student NameLVL -1,135 Nishit Gandhi IU1743000015 Foundation base Rancharda, Ahmedabad Sem - 6 Indus University,
20mm thick gypsum board (false ceiling)
AR06
18x30
Insulation Drawning name Stone Foundation Slab and False ceiling detail
75x50 wooden frame
5mm thick rubber holder
Skylight Detail
-
Project Name- Archive
6mm thick toughened glass
Detail-06 Scale: 1:10
18x30 18x30
Auroville, Pondicherry Poured Earth Steel Drawning No R.C.C. Aluminium Student BrickNameGypsum Ar 01, Ar 02 Nishit Gandhi Stone Stamp Scale - 1:10 IU1743000015 PCC SemWood - 6 Indus University, Rancharda, Ahmedabad
W1
06
18x30
Drawning name Opp:Pre-Chreche
NO.
120x240mm tsteel Isection beam
200mm thick PCC (1:4:8) 2mm thick decking sheet (750x3000)
18x30
5mm thick C-channel
Hatch Legend Crown Road Flooring and sitting detail
WINDOW SCHEDULE
8mm thick tile
Wooden
+4,035 Sliding
+1,475
18x30
20mm thick LVL +3000 Project Name- ArchiveGypsum board (False ceiling) Bottom of tie beam
Detail-05 Scale: 1:10
3mm thick Aluminium section
Glass
W6
5,700
16mm diameter steel rods
SHUTTER
MATERIAL
+3000 Sliding
Pivot door
2. Any ambiguity is found shall brought to the SHUTTER W1 +1,690 +3,590 Hingh 900x1,900 25x75 50x50 notice of Architect/Engineer. 900x1,800 +1,830 +3,590 Sliding 50x50 18x30 3. AllW2dimensions to be read and not to be 1,800x2,680 W3 +320 +3000 Sliding 50x50 18x30 measured. 1,800x2,200 W4 +800 50x50 with18x30 +3,000 4. Before setting the layout to getSliding it approved the 600x1,960 50x50 18x30 W5 Sliding site Engineer, check +3,900 all the +4,500 diagonals. Opp:Pre-Chreche 425x1,960 +3,900 all 5. Before execution check the Sliding dimensions +4,325 50x50 on 18x30 W6 Crown Road site.W7 50x50 18x30 435x1,960 +3,600 +4,035 Sliding Auroville,+1,475 Pondicherry 6. Before setting checkFixed all dimenesions +3,275 W8 45x50 900x1,800the layout, on the W9 site.500x1,500 50x50 +1,690 +2,690 Sliding 18x30 Student Name7. All levels are unfinished level. Gandhi 8. Details andNishit specification of all R.C.C. and Poured EarthIU1743000015 work shall be considerd as per structural drawings. Sem - 6 Indus University, Rancharda, Ahmedabad 9. Column reduction as per structural drawings.
Decking Slab Detail 05
LINTEL TYPE
TYPE
W4
D2
LVL +3522 First floor finish WINDOW SCHEDULE 1. All dimensions are in m.m. General Notes: W8 900x1,800
16mm diameter steel rod (250mm interval) 6mm thick tetrapack roofing sheet (1000x3000) 2mm thick decking sheet 20mm thick ochre yellow oxide finish (750x3000) 40mm thick glasswool insulation 120x240 steel I-section 100mm thick PCC beam embedded in rcc beam (1:4:8) 20mm thick Gypsum board 6mm thick anchor bolt (false ceiling)
+1,830
3,590
300
500
wall(1:3:3:3:4) Poured earth casted sitting
+1,690
1,800x2,680
1800x2800
2,200
bars
Glass Wooden
LINTEL
W3
D1
W5
200mm thick Brick Bat
240mm thick Poured earth wall(1:3:3:3:4)
MATERIAL
Hinge
SILL
900x1,900
SIZE.
NO.
725
12mm diameter reinforcement 20mm thick ochre yellow colour bars for oxide poured earth sitting finish
20mm thick Gypsum boardsection 25x25 Aluminium (False ceiling)shutter
TYPE Pivot door
5,700
20mm thick ochre yellow oxide finish
NO.
6mm diameter rivet8mm bolt glass 12mm diameter reinforcement (interval 100mm)
LINTEL
3,590
WINDOW SCHEDULE W1
Stirrups
240x300 RCC tie beam (1:4:8)
Steel Aluminium Gypsum
980x 2,100
DOOR SCHEDULE 900x1,800 W2
200mm thick PCC 240x450 RCC plinth beam (1:4:8) (1:1.5:3)
5mm thick MS plate
Revision Table
20mm thick ochre yellow Detail-03 03 oxide 1:10 finish AR03 Scale:
100mm thick PCC (1:4:8)
2mm thick steel hollow box section(80x80)
Revision Table Hatch Legend
5mm thick steel C-channel 20mm thick Gypsum board (false ceiling)
222
240mm thick Stone wall
100mm 240mm thick poured earth wall thick PCC (1:4:8) (1:3:3:3:4)
LVL +5700 Bottom of RCC tie beam
500
Compacted Earth
25mm thick Cement motar (1:6)
20mm thick ochre yellow oxide finish 200mm thick PCC (1:4:8)
15mm diameter steel rods
300
200mm thick Brick Bat 240x450 RCC plinth beam (1:1.5:3)
20mm thick Gypsum board (False ceiling)
notice of Architect/Engineer. 3. All dimensions to be read and not to be Hatch Legend measured. 4. Before setting the layoutEarth to get it approved with Steel the Poured site Engineer, check all the diagonals. R.C.C. Aluminium 5. Before execution check all the dimensions on Brick Gypsum site. Stone 6. Before setting the layout, check all dimenesions PCC on the site. Wood level. 7. All levels are unfinished 8. Details and specification Insulationof all R.C.C. and Poured Earth workStone shall be considerd as per Foundation structural drawings. 9. Column reduction as per structural drawings.
30mm thick cuddapah stone rough tile finish (600x900)
2,178
Stirrups 12mm diameter reinforcement bars
40mm thick glasswool Insulation
5mm thick C-channel
821
100mm thick PCC (1:4:8)
6mm thick tetrapack roofing sheet(1000x3000)
LVL +6820 Roof
Earth
Drawning No Ar 05, Ar 06
Wall section B Scale: Stamp Scale - 1:10 1:20
Wall Section B
General Notes:
1. All dimensions are in m.m.
Hatch Legend Poured Earth
Revision Table Steel
Project Name- Archive
LEGENDS
MI
MIRROR 580*4*1080
UL URINAL 400*375
P
PT
TP
PT
WC
TP
WC
PT
30 FWS
30 HWS (TYP)
PT
PRODUCED BY AN AUTODESK STUDENT VERSION
110 UPVC WASTE PIPE (SUSPENDED @ B1)
PT
WC
F
30 DWS
PIPE SLOPE 1:100 TYP.
WB
30 DWS
110 UPVC SOIL PIPE (SUSPENDED@ B1 )
TP
110 Soil Pipe
F
30 FWS
WB
PIPE SLOPE 1:100 TYP.
TP
30 FWS
F
30 DWS
76 UPVC SOIL & WASTE PIPE (SUSPENDED @ B1 CEILING LVL.)
SPECIFICATIONS : 110 VERTICAL PIPES
WB
WB 30 DWS (TYP)
D
D
D
30 FWS
110 Soil Pipe
CO
50 FWS
Tile 600*600
UL
P1
P1 UL
P1
P1 UL
PT
UL
UL PT
NAHNI TRAP
GT
GULLY TRAP
V
VENTILATION
BC
BIB COCK
PC
PILLAR COCK
TP
TOILET PAPER
SD
SOAP DISPENSER
P1
PARTITION 4MM THICK GLASS
WC
WATER CLOSET
D
DOOR
WB
WASH BASIN 480*350*185
F
FLUSH
HF
HEALTH FAUCET
350*450*400
HF D1 (WOOD) - 1110*40*2380 D2 (PVC) - 600*45*2100
CO 76 DWS 76 HWS 76 FWS
P TRAP
NT
SD
SMOKE DETECTOR
SB
SWITCH BOARD
CL
CEILING LIGHTS
WL
WALL LIGHTS
SD
SMOKE DETECTOR FWS (FLUSH WATER SUPPLY) DWS(DOMESTIC WATER SUPPLY) SOLID WASTE PIPE WASTE WATER PIPE HWS(HOT WATER SUPPLY)
PLAN UNITS IN mm
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
T ECH N ICA L M ODULE
Toilet Details
Hotel Crown Plaza, Ahmedabad Semester VI
Staircase Details
Jain Merchant Society, 11, Paldi Semester IV
Building Plan
Staircase plan
Section AA’
Window Details Semester VI
Elevation
Plan
T ECH N ICA L M ODULE Detail 1
Detail 2
Detail 3
Detail 4
Bundi Documentation And Pol House Documentation
Hand Rail
Semester II
Documentation of traditional house in Bundi, Rajasthan and Pol Houses, Ahemdabad. Learning space making, quality of light in space, working with traditional materials, wooden and stone joineries and importance of each space and how they function. T- Section C- Section
Corrugated
Timber Frame
Ground Floor Plan Detail 1
Finish Floor
Filling (BrickBat) Timber Beam
Timber Frame Timber Bracket
First Floor Plan
First Floor Plan
Detail 2
Finish Floor Filling(BrickBat) Timber Beam
Second Floor Plan
PRODUCED BY AN AUTODESK STUDENT VERSION
Ground Floor Plan
Timber Lintel
Top Rail
Mid Rail
Bottom Rail
Section
Detail 3
Kota Stone
Section
Wall Section
Exploring bamboo joineries and lashing techniques. Exploring tension force in various shapes through soap bubble exercise and generating tensile forms from stocking material. Constructing frame structure out of ridge sticks and learning transfer of load through various member. Testing with the loads and figuring out the failure conditions in frame structures.
M AT ERIA L E X P LOR AT I ON
Understanding the principals of tension and compression forces in frame structures and shell structures. Construction of brick arches and understanding the importance of stringer beams, outercourse and innercourse, keystone and buttress.
Design And Buil With Cardboard, Ahmedabad Semester VI
Workshop main intentions were to explore paper as a structural material. Exercise like bridge construction, load testing, form making, joinery exploring helped more to know paper as a material. Main aim was to construct two 1:1 structures out of honeycomb sheet.
PA P ER E X P LOR AT I ON
Construction of two structure with two different joinery pattern was challenging. First structure has MDF joinery with two strip locking system in it, with shear sheets on the edge of the honeycomb sheet. Second structure was purely out of honeycomb sheet, where each element interlocks with each other to form joinery.
Related Study Programme
Documentation Of Aranya Housing, Indor Semester V (Group Work)
ARA N YA
The RSP intend to understand the planning of housing done on a bigger scale. Aranya housing designed by Ar. Balkrishna Doshi, planned Aranya in different aspects. Understanding part to whole theory i.e., designing one unit, repeating the same unit having a connection to the adjacent unit, repeating group of unit to form small clusters, and clusters repeated to form big chowks, and chowks to form Housing. Also observing the character of streets, built to open ration and most important how services work.
Related Study Programme
Documentation Of Dharamashala Streets And Vernecular Houseforms Semester III (Group Work)
Section across street
Street Plan
DHA RAM S HALA Shops Elevation
Section across street
The RSP intend to document the character of the street and the lifestyle of people on a busy market street. Below documentation is a street in Mcleodganj which is 6.2KM from Dharamshala. The street is near Dalai lama temple. A narrow street with thousands of walking tourists and cars moving with handicraft and food stalls on the edges makes the street busy. Documenting the vernacular house forms in the villages near Dharamshala taught many interesting joineries possible with stone and mud construction.
Elevation
Site Plan
Ground Floor Plan
Section
Details
Site Section
S K IL LS
Interest in manual skills which includes trying out different mediums of sketching i.e., watercolour, charcoal sketching, ink, soft pastels. Rendering the drawings with different mediums. A bit of interest in capturing monuments and structures.