City of Raleigh North Capital Boulevard Park Master Plan Study

Page 6

PROCESS ORIENTED DESIGN

Chapter 1

Process Oriented Design

1.0 - Site Overview This plan explores the opportuni es and design innova ons for the development of an urban park, known as North Capital Boulevard Park (NCBP). The approximately 20.2 acre site is parallel to Capital Blvd. (US 401) in the City of Raleigh. The boundary of the site is established as the median of Capital Blvd. between Atlan c Ave. and Crabtree Blvd. (Figure 1). The overall study area encompasses approximately 295 acres of transi onal, non-residen al land uses surrounding the future park site. This area is roughly bounded by the exis ng CSX Rail-line to the west, Hodges Rd. to the north and parcels of non-residen al land uses to the east and south (Figure 2).

View of Site from Capital Blvd. west bound. Image by Nick Kuhn

6

North Capital Boulevard Park Master Plan Study


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.