Arthaus - Architecture Design 05 Port Folio + Technical Report

Page 1



CONTENT

PROJECT 01 DESIGN BY RESEARCHING

PROJECT 02 URBAN STRATEGY BUILDING STRATEGY

PROJECT 03 NEW NORMAL

TECHNICAL REPORT



DESIGN BY RESEARCHING

01-1 SITE INVESTIGATION

01-2 PRE – POST PANDEMIC

01-3 NEW INTERVENTION

** SCAN ME FOR PROJECT 01 SLIDES – PROJECT 01-1

PROJECT 01


PROJECT 01-2 PRE – POST PANDEMIC


Pre-COVID The life that we used to has been taken for granted, by us. Performing where the spotlights are on us. Taking pieces by pieces, producers join hands with performers stitches out the staging with unimaginable elements, bringing out their best for us, the audience. The ever-changing stage has never failed to surprise us as audience. Do you anyhow miss that experience?

Post-COVID

The pandemic strikes in, all activities come into halt. Physical contact is then prohibited. Performer falls into despair. All shows shall not be going on. Uncertainties of the future has made the creatives drown into anxiety, and depressed.

One moment later, adapting to the virtual becomes a trend. The creatives is now slowly getting back on their feet and start anew – ‘the dawn of virtual show’. Online platform has opened many doors of opportunities, yet it limits us recreating the atmosphere experience that can only be portray through live performance.


Speculation

A reimagination of how performance art would be in near future, where we maintain social distancing and allow human interaction to certain extend, physical contact plays a big part of performing art.



PROJECT 01-3 NEW INTERVENTION

REIMAGINE The reimagination combines and adapts the -- of park rides, whereby it brings the audience to experience shows while journeying through the space..


Audience patiently wait at the waiting area, in order to get into the transportation pods

Stage 01 upper half of the performance The audience sit in individual pods. As the show begins, the car pods will be lead to the first stage.

Outdoor landscape Intermission

During the intermission, audience are being lead to an outdoor and back to the performing stage to enjoy the other half of the show.


Stage 2 Lower half of performance During the intermission, audience are being lead to an outdoor and back to the performing stage to enjoy the other half of the show.

When the curtain calls, the audience are being sent to a platform and they bid goodbye to the show the performers put on together




PROJECT 02 URBAN STRATEGY + BUILDING STRATEGY

02-1 URBAN STRATEGY

02-2 BUILDING STRATEGY


PROJECT 02-1 URBAN STRATEGY

RECONCILIATION The reconciliation bonds again the relationship of the Sentul Park and the surrounding contexts – multiculturalism, multigenerational, educational, religious and history


SHARING BACKYARDS EDUCATION + RELIGIOUS

RECREATION PARK + COMMUNITY AREA + URBAN FARMING

ART VILLAGE

LOCAL DELICACIES HUB

HOLIDAY GETAWAY


MAIN PROGRAMMES

BIKING

RAILBIKING TRACK

GREEN LUNGS

PERFORMING ART

AFTERSCHOOL ACTIVITIES

RELIGIOUS EVENTS

EXERCISING

FOOD HUNT


PROGRAMME CIRCULATION

ALA-CARTE

COMBO SET A

COMBO SET B

FULL COMBO SET


SITE STRENGTH + WEAKNESS

+ GREENS / NATURAL ELEMENTS

+ CENTRE OF SENTUL

+ MULTICULTURALISM

INTERACTION BETWEEN OUTSIDE AND INSIDE

BARRIER TO UNITY

PRIVACY


SITE CONTEXT DIAGRAMS


SKETCHES DEVELOPMENT

GATHERING SPOT -

surrounded by multi-cultures separated between cultures open for the locals become the gathering spot

EDUCATION + RELIGIOUS CENTRE - surrounded by education centre + religious centre - education centre: 35 (within 1.5km radius) - religious centre: 25 (within 1.5km radius) - become a centre for education and religious - providing bigger space for performing art - space for exchanging knowledge

NOISE - residential areas are mostly located at the left side, hence the noise pollution is lower - low noise performing art located at the quiet zone - recreation park will locate at the left sides


SKETCHES DEVELOPMENT

CAR PARK + BUS HUB

ACCESS

ZONING

- empty land, abandoned structure & abandoned buildings are used to propose as a parking area & shuttle bus to bring the people to the site - to reduce the spaces used for carpark in the site - to remain the amount of greens in the site.

- the shortest routes are proposed from the carparks to the site - there are entrances are proposed from all the sides according to the routes.

a: carparks b: gathering spot c: performing stage d: homestay + recreation park e: recreation park


MODEL DEVELOPMENT

DEVELOPMENT 01

DEVELOPMENT 02

DEVELOPMENT 03

bringing in all the religious and education centre as well as the locals

sharing backyards are created for the people to use it. All the spaces are connected by the rail-biking track.

Sharing backyards are connected to each other to create a bigger space. Community area, recreation park and urban farming area are combined together


FINAL URBAN PLAN 1. shuttle bus hub 2. walking + riding bridge 3. moving train stage 4. event space 5. rail-biking station 6. kitchen + dining area 7. sentul depot 8. mini stage 9. chong hwa backyard stage 10. homestay 11. urban farming area 12. new intervention block - klpac (propose) 13. community area 14. sport facilities 15. indoor cinema 16. car theatre 17. ktm station 18. carparks


CIRCULATION + ACTIVITIES

WEEKDAYS

WEEKEND

PUBLIC HOLIDAY



URBAN ACTIVITIES – SITE MODEL COLLAGE

ZOOM IN – PART A this render shows the connection of the overhead bridge from the indian temple to the sentul park. the overhead bridge is directly connected to the event space and carpark provided as well as the sharing backyard



URBAN ACTIVITIES – SITE MODEL COLLAGE

ZOOM IN – PART B

this render shows the combination community area, recreation park and urban farming area.



URBAN ACTIVITIES – SITE MODEL COLLAGE

ZOOM IN – PART C this render shows the biggest event area and the moving performance train stage. an overhead bridge is connected from the park to the malay area at the back of the site. mini stages and chong hwa sharing backyard are located along the rail-biking track.



URBAN ACTIVITIES – SITE MODEL COLLAGE

ZOOM IN – PART D this render shows the location of the homestay that surrounded by the greens. homestay are located along the pond. mini stages are also provided at the sharing backyard areas.



PROJECT 02-1 BUILDING STRATEGY


FORMAL PERFORMANCE

INFORMAL PERFORMANCE

OTHERS

ARENA THEATRE

IN-OUTDOOR PERFORMING AREAS

ACADEMIC – AFTERSCHOOL MUSIC HUB

EVENT SPACE

FINE DINE – LOCAL DELICACIES

MOVING PERFORMANCE STORY TELLING SERIES


SKETCHES DEVELOPMENT

DEVELOPMENT 01

DEVELOPMENT 02

this diagram is showing the space arrangement by following the programme flow which is dining before performance.

this diagram is showing the location of the new performing areas which are one at the top and one at the bottom. it also shows a bridge proposed to connect the sentul depot to klpac.


DEVELOPMENT 03

DEVELOPMENT 04

the buildings are tilted to the right that parallel with the axis of the ktm railway train track.

the function of the each spaces are planned. the detailed circulation of the spaces are planned from the main entrance to each performing areas


DEVELOPMENT 05 + DEVELOPMENT 06 the diagrams above are showing the proposed location for the seating areas in both performing stage area


DEVELOPMENT 07 + DEVELOPMENT 08 the diagrams above is showing the development of the shape for the performing stage areas from square to round shape. it is because the round shape can suit with the architectural language of the new proposed urban park.


DEVELOPMENT 09

DEVELOPMENT 10

the axis is added in to the performing stage area to allow the further form development.

the organic form design are development from the axis cut on the performing stage area.


DEVELOPMENT 11

DEVELOPMENT 12

the diagram above is the first developed massing plan that showing the new extension building from the Sentul depot.

the diagram above is the second developed extension building from the Sentul depot.


DEVELOPMENT 13 the diagram above is the third developed new extension building from sentul depot. the hand-drawn perspective is showing the new form of the new extension buildings.



FORM DEVELOPMENT – ARENA THEATRE



PROJECT 03 NEW NORMAL

ARTHAUS A new performing art centre, Arthaus, a new adaptive architecture building to Sentul Depot. Arthaus are designed to provide functions at every corners of the buildings. There are few programmes happen in the building. The main programme is an arena theatre, a semi-indoor performing stage with a proper theatre design. Besides that, there are also some facilities provided for the informal performances such as the outdoor performing area, moving performance box and the event space. Furthermore, arthaus also serves academic purposes by providing music and dance studio as well as the facilities to the students from the nearby education centres.

NEW NORMAL? - Large space reserved for practicing social distancing - Screening and scanning - More outdoor spaces than indoor spaces



MATERIAL + TEXTURE

CONCRETE + BRICK PIECES.

CONCRETE + RUSTY STEEL PIECES


HARD + SOFT – CONCRETE + SILK

RUSTY STEEL PIECES – BRICK PATTERN

ORGANIC SHAPE


FINAL DEVELOPMENT


SECTION


MODEL DEVELOPMENT



GROUND FLOOR PLAN ARTHAUS


1. drop off area 2. main entrance 3. lift core 4. event space 5. locker room 6. multipurpose hall | dance studio | indoor seating area 7. sound engineering room 8. recording room 9. public toilet 10. private toilet 11. dressing room 12. preparation zone 13. discussion area 14. music studio 15. informal performance area 16. seating area 17. side drop off area 18. storage room 19. producer’s room 20. plant room 21. orchestra pit 22. main stage 23. side stage 24. green room 25. railbiking rental house 26. railbiking main station


FIRST FLOOR PLAN ARTHAUS


1. main entrance 2. meeting point 3. to ground floor 4. to railbiking rental house 5. to ktm station 6. seating area 7. to informal performance area 8. lobby 9. reception counter 10. lift core 11. management office 12. meeting room 13. waiting area 14. customer service counter 15. kitchen 16. dining area 17. drinking bar 18. public toilet 19. private toilet 20. green room 21. restroom 22. toilet 23. pantry 24. outdoor area 25. self-check in area 26. ticket selling area 27. to urban park 28. theatre entrance 29. control room 30. main stage 31. emergency exit 32. walkway to klpac


ROOF PLAN ARTHAUS



SECTION A-A ARTHAUS



SECTION B-B ARTHAUS



FRONT LEFT ELEVATION ARTHAUS


FRONT ELEVATION

LEFT ELEVATION


REAR RIGHT ELEVATION ARTHAUS


REAR ELEVATION

RIGHT ELEVATION


FORMAL INFORMAL PERFORMANCES OTHERS ARTHAUS


02 01

03

04 05

06


01 FORMAL PERFORMANCE ARENA THEATRE



02 INFORMAL PERFORMANCE ARENA THEATRE


03 INFORMAL PERFORMANCE OUTDOOR PERFORMANCE AREA


04 INFORMAL PERFORMANCE OUTDOOR PERFORMANCE AREA


05 INFORMAL PERFORMANCE EVENT SPACE


06 INFORMAL PERFORMANCE SEMI-OUTDOOR PERFORMANCE AREA


06 INFORMAL PERFORMANCE SEMI-OUTDOOR PERFORMANCE AREA

BIRD EYE VIEW


06 INFORMAL PERFORMANCE SEMI-OUTDOOR PERFORMANCE AREA

LOBBY 01


LOBBY 02


DINING AREA



SECTIONAL MODEL STAIRCASE



ARTHAUS DESIGNED BY: NELSON LAI SOON CHUEN UNIT A – PERFORMING ART CENTRE EMAIL: nelsonlai_98@hotmail.com