nelson lai soon chuen
architecture design 05 unit A
project 01 | design by researching
project 02 | urban + building strategy
project 03 | newnormal
project 01 | design by researching
performing art : pre - post
project 01 | design by researching
new intervention: moving stage
project 01 | design by researching
new intervention: moving stage
project 02 | urban + building strategy
reconciliation
sharing backyards – education and religious centre
recreation centre + community area + urban farming
reconciliation?
art village
delicacies hub
holiday getaway
urban strategy | main programme + programme circulation
biking
railway track
green lungs
ala-carte
performing art
combo set A
education centre
combo set B
religious centre
full combo set
exercise
delicacies
urban strategy | strength + weakness
+ greens / natural elements
+ centre of sentul
+ multiculturalism
- interaction between outside and inside
- barrier to the unity
- privacy
urban strategy | site context diagram
urban strategy | sketches development
1. gathering spot - surrounded by multi-cultures - separated between cultures - open for the locals - become the gathering spot
2. education + religious centre - surrounded by education centre + religious centre - education centre: 35 (within 1.5km radius) - religious centre: 25 (within 1.5km radius) - become a centre for education and religious - providing bigger space for performing art - space for exchanging knowledge
3. noise - residential areas are mostly located at the left side, hence the noise pollution is lower - low noise performing art located at the quiet zone - recreation park will locate at the left sides
urban strategy | sketches development
4. car park + bus hub - empty land, abandoned structure & abandoned buildings are used to propose as a parking area & shuttle bus to bring the people to the site - to reduce the spaces used for carpark in the site - to remain the amount of greens in the site.
5. access - the shortest routes are proposed from the carparks to the site - there are entrances are proposed from all the sides according to the routes.
6. zoning a: carparks b: gathering spot c: performing stage d: homestay + recreation park e: recreation park
urban strategy | model development
development 1 bringing in all the religious and education centre as well as the locals
development 2 sharing backyards are created for the people to use it. All the spaces are connected by the rail-biking track.
development 3 Sharing backyards are connected to each other to create a bigger space. Community area, recreation park and urban farming area are combined together
urban strategy | final urban plan
1. shuttle bus hub 2. walking + riding bridge 3. moving train stage 4. event space 5. rail-biking station 6. kitchen + dining area 7. sentul depot 8. mini stage 9. chong hwa backyard stage 10. homestay 11. urban farming area 12. new intervention block - klpac (propose) 13. community area 14. sport facilities 15. indoor cinema 16. car theatre 17. ktm station 18. carparks
urban strategy | circulation + activities
sketch
collage
holiday
weekend
weekdays
urban strategy | activities – times – age groups
urban strategy | urban activities – site model
zoom in – part A this render shows the connection of the overhead bridge from the indian temple to the sentul park. the overhead bridge is directly connected to the event space and carpark provided as well as the sharing backyard
urban strategy | urban activities – site model
zoom in – part B this render shows the combination community area, recreation park and urban farming area.
urban strategy | urban activities – site model
zoom in – part C this render shows the biggest event area and the moving performance train stage. an overhead bridge is connected from the park to the malay area at the back of the site. mini stages and chong hwa sharing backyard are located along the rail-biking track.
urban strategy | urban activities – site model
zoom in – part D this render shows the location of the homestay that surrounded by the greens. homestay are located along the pond. mini stages are also provided at the sharing backyard areas.
building strategy | programmes
formal performance arena theatre
informal performance in-outdoor performing areas event space moving performance story telling series
others academic – afterschool music hub fine dine – local delicacies
building strategy | form development
this diagram is showing the space arrangement by following the programme flow which is dining before performance.
this diagram is showing the location of the new performing areas which are one at the top and one at the bottom. it also shows a bridge proposed to connect the sentul depot to klpac.
building strategy | form development
the buildings are tilted to the right that parallel with the axis of the ktm railway train track.
the function of the each spaces are planned. the detailed circulation of the spaces are planned from the main entrance to each performing areas
building strategy | form development
the diagrams above are showing the proposed location for the seating areas in both performing stage area
building strategy | form development
the diagrams above is showing the development of the shape for the performing stage areas from square to round shape. it is because the round shape can suit with the architectural language of the new proposed urban park.
building strategy | form development
the axis is added in to the performing stage area to allow the further form development.
the organic form design are development from the axis cut on the performing stage area.
building strategy | form development
the diagram above is the first developed massing plan that showing the new extension building from the Sentul depot.
the diagram above is the second developed extension building from the Sentul depot.
building strategy | form development
the diagram above is the third developed new extension building from sentul depot. the hand-drawn perspective is showing the new form of the new extension buildings.
building strategy | form development – arena theatre
project 03 | newnormal
arthaus
large space - 1m social distancing
newnormal? pandemic?
screening and scanning temperature
outdoor > indoor
project 03 | material + texture
concrete + brick pieces
hard + soft – concrete + silk
concrete + rusty steel pieces
organic shape
rusty steel pieces – brick pattern
project 03 | development
project 03 | development
section – hand drawn
project 03 | development model
project 03 | arthaus
project 03 | arthaus
project 03 | arthaus
1. drop off area 2. main entrance 3. lift core 4. event space 5. locker room 6. multipurpose hall | dance studio | indoor seating area 7. sound engineering room 8. recording room 9. public toilet 10. private toilet 11. dressing room 12. preparation zone 13. discussion area 14. music studio 15. informal performance area 16. seating area 17. side drop off area 18. storage room 19. producer’s room 20. plant room 21. orchestra pit 22. main stage 23. side stage 24. green room 25. railbiking rental house 26. railbiking main station
project 03 | arthaus
1. main entrance 2. meeting point 3. to ground floor 4. to railbiking rental house 5. to ktm station 6. seating area 7. to informal performance area 8. lobby 9. reception counter 10. lift core 11. management office 12. meeting room 13. waiting area 14. customer service counter 15. kitchen 16. dining area 17. drinking bar 18. public toilet 19. private toilet 20. green room 21. restroom 22. toilet 23. pantry 24. outdoor area 25. self-check in area 26. ticket selling area 27. to urban park 28. theatre entrance 29. control room 30. main stage 31. emergency exit 32. walkway to klpac
project 03 | arthaus
project 03 | arthaus
part a (1:200)
section a-a (1:350)
part b (1:200)
project 03 | arthaus
section b-b (1:350)
project 03 | arthaus
front elevation (1:400)
left elevation (1:400)
project 03 | arthaus
rear elevation (1:400)
right elevation (1:400)
project 03 | arthaus
project 03 | arthaus
formal performance – arena theatre
informal performance – arena theatre
project 03 | arthaus
informal performance – outdoor performing area
informal performance – event space
project 03 | arthaus
informal performance – semi-outdoor performing area
informal performance – outdoor performing area
project 03 | arthaus
main lobby
project 03 | arthaus
Sectional model (1:50) – staircase of the outdoor stage area
Thank you! prepared by nelson lai soon chuen