Nate Moulds
Professional Work
Preliminary Designs
Sample City Presentation
Sketchup Design Models
Construction Documents
01
Preliminary Designs
Site Plan
P r e l i m i na r y D es i g ns
Project information sheet, Home2 Suites
P r e l i m i na r y D es i g ns
P r e l i m i na r y D es i g ns
02
Sample City Presentation
T W I N FA L L S – C A N YO N PA R K
1 1 - 1 8 - 2 0 1 9 P R E S E N TAT I O N
H2S TWIN FALLS 11-18-2019
|
|
VIEW (FROM BRIDGE) H2S TWIN FALLS | 11 -18-2019
VIEW OF ROUNDABOUT H2S TWIN FALLS | 11 -18-2019
VIEW OF TRAIL H2S TWIN FALLS | 11 -18-2019
SITE PLAN H2S TWIN FALLS | 11 -18-2019
SITE PLAN H2S TWIN FALLS | 11 -18-2019
FIRST FLOOR H2S TWIN FALLS | 11 -18-2019
T Y P. U P P E R F L O O R H2S TWIN FALLS | 11 -18-2019
BIRD’S EYE H2S TWIN FALLS
BIRD’S EYE H2S TWIN FALLS
03
Sketchup Models
S p r ing hi l l Sui tes
S p r ing hi l l Sui tes
S p r ing hi l l Sui tes
W a lser H Q
W a lser H Q
04
Construction Documents
A
B
C
AREA G CORRIDOR & STAIRS -NO NEW CONSTRUCTION
D
E
F
G
AREA A NEW GUEST ROOMS -NEW WALLS -NEW FIXTURES
H
J
K
N
Q
U
Y
AA
CC
DD
EE
2248 DEMING WAY, SUITE 120 MIDDLETON, WI 53562 608-829-1750 608-829-3056 (FAX)
AREA B MEETING ROOMS -NO NEW CONSTRUCTION
1
2 Date: 02/14/2020
3
4
AREA LEGEND AREA D BACK-OF-HOUSE -NEW PARTITION TO ENCLOSE DRYERS
FLOOR PLAN & RCP KEY NOTES
AREA H OUTDOOR PATIO -REPLACE FIREPLACE
10
MM
NN AREA F GUEST LAUNDRY -NO NEW CONSTRUCTION
11
12
PROJECT:
9
1468 KIMBROUGH RD., SUITE 103 GERMANTOWN, TN 38138
AREA G CORRIDOR & STAIRS -NO NEW CONSTRUCTION
8
McNEILL HOTEL COMPANY
7
15520 NW GATEWAY CT BEAVERTON, OR CLIENT:
6
HILTON GARDEN INN by HILTON - RENOVATION
5
2019 GBA. Any duplication, reproduction, or use by any other party is prohibited unless prior written authorization is received from GBA or Marriott International.
15
PROJECT:
201901
DRAWN BY: DATE:
NM 10.04.19
SCALE:
15.5
16
L
M
P
R
T
V
X
Z
BB
AREA G CORRIDOR & STAIRS -NO NEW CONSTRUCTION
FIRST FLOOR PLAN
A2.01
A
B
C
E
D
F
G
AREA A NEW GUEST ROOMS -PATCH AND REPAIR CEILINGS
AREA G CORRIDOR & STAIRS -NO NEW CEILING WORK
H
J
K
N
Q
U
Y
AA
AREA B MEETING ROOMS -NO NEW CEILING WORK
CC
DD
EE
2248 DEMING WAY, SUITE 120 MIDDLETON, WI 53562 608-829-1750 608-829-3056 (FAX)
AREA C FITNESS ROOM -NEW CEILINGS -NEW LIGHT FIXTURES -PAINT NON DEMO CEILINGS
1
2 PA-215
Date: 02/14/2020
9'-6"
3
9'-0"
9'-6" 8'-0"
4 TO REMAIN
P-08
9
AREA D BACK-OF-HOUSE -NO NEW CEILING WORK
AREA LEGEND
AREA D BACK-OF-HOUSE -NO NEW CEILING WORK
10 7'-0"
9'-0"
CEILING PLAN LEGEND
11
PA-220
9'-6"
NN AREA F GUEST LAUNDRY -NEW LIGHT SENSOR
8'-0"
8'-0"
MM
PA-215
8'-6" 9'-6"
AREA G CORRIDOR & STAIRS -PAINT CORRIDOR
9'-0"
NEW
TO REMAIN
FLOOR PLAN & RCP KEY NOTES 9'-0 PA-201
12
PROJECT:
1 PA-221
1468 KIMBROUGH RD., SUITE 103 GERMANTOWN, TN 38138
8
McNEILL HOTEL COMPANY
7
15520 NW GATEWAY CT BEAVERTON, OR CLIENT:
6
HILTON GARDEN INN by HILTON - RENOVATION
5
PA-220
2019 GBA. Any duplication, reproduction, or use by any other party is prohibited unless prior written authorization is received from GBA or Marriott International.
15
PROJECT:
201901
DRAWN BY: DATE:
2
NM 10.04.19
SCALE:
5.5
16
LIGHT FIXTURE LEGEND PA-201 PA-205 PA-221 PA-215
PA-220
L
M
P
R
T
V
X
Z
BB
AREA E LOBBY AREA -NEW CEILING -NEW LIGHT FIXTURES
AREA G CORRIDOR & STAIRS -NO NEW CEILING WORK
FIRST FLOOR REFLECTED CEILING PLAN
A3.01
2248 DEMING WAY, SUITE 120 MIDDLETON, WI 53562 608-829-1750 608-829-3056 (FAX)
Date: 02/14/2020
6
7
8
9
10
11
12
1468 KIMBROUGH RD., SUITE 103 GERMANTOWN, TN 38138
5
McNEILL HOTEL COMPANY
4
PROJECT:
3
15520 NW GATEWAY CT BEAVERTON, OR CLIENT:
2
HILTON GARDEN INN by HILTON - RENOVATION
1
2019 GBA. Any duplication, reproduction, or use by any other party is prohibited unless prior written authorization is received from GBA or Marriott International.
PROJECT:
201901
DRAWN BY: DATE: SCALE: 1 2
PUBLIC SPACE INTERIOR ELEVATIONS 12a
14
15
13
A4.21
Nate Moulds
Professional Work