Technical Memorandum #7 Existing Plus Committed Projects
February 7, 2015
Path Forward 2040 Long Range Transportation Plan
COMPLETED AND COMMITTED CONSTRUCTION
T O ESTABLISH A BASELINE FOR DETERMINING FUTURE NEEDS , PROJECTS THAT WERE COMPLETED SINCE THE LAST LRTP AND PROJECTS WITH COMMITMENTS FOR CONSTRUCTION WITHIN THE NEXT FIVE YEARS WERE IDENTIFIED . An analysis of the progress made in completing the Envision 2035 LRTP was performed to establish the baseline for this Cost Feasible Plan. Major projects completed since the adoption of the 2035 LRTP are shown on Figure 1 and summarized in Table 1.
The projects identified with commitments for construction or capital improvements are part of the Cost Feasible Plan to provide the flexibility to implement projects commensurate with future funding availability. Projects in Baker and Putnam Counties are shown in the list of committed projects based on the regional development of this plan and their inclusion in the travel demand forecasting model for North Florida.
The major projects with commitments for construction are summarized in Table 2 and Table 3. The commitments were obtained from the following planning documents and through coordination with our partner agencies.
All values in this plan for revenues and costs are reported in year of expenditure dollars.
North Florida TPO’s Transportation Improvement Program for the Fiscal Years 2015-2019 as Amended 10/27/14. FDOT’s 2015-2019- Adopted with Amended dated October 30, 2014. Local government Capital Improvement Programs. Jacksonville Transportation Authority’s Transit Development Plan.
Technical Memorandum #7 – Existing Plus Committed Projects is included in the attachments to this report.
1
¿ ¾ ¿ ¾ ¿ ¾
¾¿ ¾¿ ¾¿ ¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
2
¿ ¾ ¾
¾¿
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
301
¿ ¾ ¿ ¾ ¾
300 1
67 3011
í ì ë é Wè " Ò )
§ ¦ ¨ 10
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
50
51
¿ ¾ ¾
¿ ¾
¿ ¾
¿ ¾ ¿ ¾ ¾
¿ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
13A
¬ «
214
51
" )
3003
305
£ ¤ 17
§ ¦ ¨ 95
¬ «
206
¬ «
504
" ) 204
20
54
422
21
A1A
100
¬ « ¬ «
" )
5
¬ «
" ) 310
19
¬ «
" ) 309
" ) 308
502
200
25
200A
200
326 326
13
A1A
207
301
441
3002 4
34
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
3006
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¾
¿ ¾ ¿ ¾
5
¾¿
17
¿ ¾
53
Date: 3/13/2015
126
¿ ¾
" )
200A
" ) £ " ) ¤ Conservation Lands « " £ ¤¬ Six ) Counties Boundaries £ ¤ ¬ «" " ) " ) ) ¬ « ¬ ) « " ) " ¬ «" ) ¬ « 326
" ) 209
¬ «
" )
55
320 FEC Project X Ã" ) 75
16
208
214
New 3 Lane Road
£ ¤
¬ « " ) " " ) ) " )
17
315
Roadway System
61
1
£ ¤
" )
Express Lanes
" Ò ) Ê
21
95
315
New 6 Lane Road
¬ «
§ ¦ ¨
" )
422
A1A
16
New 2 Lane Road
225A
" Ò ) Ê
" )
New 4 Lane Road
46 30
¬ «
Context Sensitive Solutions¬ 26 «
25A
220
315
Reconstruct 6 Lanes
316
" )
16
Widen to 5 Lanes
318
¬ «
¬ «
Widen to 4 Lanes
329
13
¬ «
Widen to 3 Lanes
500
¿ ¾ ¾
¿ ¾ ¾
1027
Reconstruct 2 Lanes
§ ¦ ¨ Water Bodies
3
21
Bus Rapid Transit
225
¿ ¾ ¾
¿ ¾ ¾
36
" )
33
Types of Projects
27
¿ ¾ ¾
¿ ¾
3047
218
è Intersection Projects í ì ë é " Ò ) Ê Interchange Projects
5
32
¿ ¾
301
£ ¤
Legend
¿ ¾ ¿ ¾ ¿ ¾ ¿ ¾ ¿ ¾ ¿ ¾
36
973
711
¿ ¾
¿ ¾ ¾
130
45
¾¿
5 50
" )
¬ «
18
" )
105
« ¬ «
¿ ¾
228
A
A1A 21
¿ ¾
£ ¤
95
¿ ¾
90
¯§ ¨ ¦
¿ ¾ ¾
124
¿ ¾ ¿ ¾ ¿ ¾ ¿ ¾ ¿¾ ¿¾ ¿ ¾ ¿ ¿¾ ¾ ¿ ¾
" )
23
3004
3009
¯ " Ò ) Ê
¬ « ¬ « ¬
116 " Ò ) Ê 11 27 3012 30 3052 3045 33043 10 051 3012 4 « 3005 44 1 " Ò í ) ì ë é è " Ò ) Ê ¬ Ê 16 " Ò ) Ê 3010 W " Ò 3008 105 ) í ì ë é è " Ò ) Ê 62 90 " Ò ) £ Ê65 ¤ " Ò 3007 3016 966 ) 3015 Ê W3021 71 " Ò ) 1 34 ¬ " Ò í ì ë é " Ò « è " Ò ) ) " Ò Ê Ê ) Ê Ê ) 3017 228 X Ã ¬ « 23 ¬ « í 3014 ì ë é è 970 295 í ì ë é è § ¦ ¨ 961 3020 66 " Ò ) Ê 1 53 £ ¤ " Ò ) Ê 0 05
" ) 221
¬ «
59
7
¿ ¾
" Ò ) Ê " Ò ) Ê
125
¬ «
§ ¦ ¨
§ ¦)"ÒÊ ¨ 295
1020
¿ ¾
¿ ¾ ¾
250
60
295
¿ ¿ ¾ ¿ ¾ ¾
" ) 119
" )
A1A
961
50 30
33
34
" Ò ) Ê " Ò ) Ê
¿ ¾ ¿ ¿¾ ¾
" )
3020
" )
0 304 64 13
£ ¤ 122
A1A
A1A
218
43
2
¬ « ¬ «
6
127
¿ ¾ ¾
" )
¿ ¾ ¾
42
¿ ¾ ¾
" ) 13 39
¿ ¾
17
£ ¤
" ) " )
¿ ¾
95
108
" Ò Ê ¬ «)
¿ ¾ ¾
38 37
§ ¦ ¨
1
£ ¤
105
¬ « ¬ «
107
40
2
¿ ¾ ¾
108
" )
64
" Ò ) Ê
" )
115
" Ò ) Ê 1
£ ¤ ¿ ¾ ¾
3040
" Ò ) Ê
5
¿ ¾
¾¿
¿ ¾
¿ ¾ ¾
6
¿ ¾ ¾
295
¿ ¾
3018
23 3014 í ì ë é è 66
" )
" ) " )
£ ¤§ ¨ ¦ 301
¿ ¾
¯
3019
228
¬ «
¬ « ¬ «
í ì ë é è
¾¿
326
Figure 1 Committed Plus Completed Projects 2
¯
0
10,560 Feet
0
4
8 Miles
Path Forward 2040 Long Range Transportation Plan
Table 1. Major Projects Under Construction or Completed Since the 2035 Plan Was Adopted Facility Alt. US 1 Martin Luther King Jr. Parkway Chaffee Road Clark Road Extension Collins Road Concourse Loop Road CR 210
ID 7 3047 1020 3048 711 21
From at 21st Street/ Talleyrand Avenue rd SR 134 103 Street Clark Road Old Middleburg Road Gene Lassere Boulevard US 1
To
Improvement
Phase
New Interchange
Complete
Chaffee Road Broward Road Shinder Drive Nassau Center Court FEC Railroad
New 2 Lane New 2 Lane New 2 Lane New 2 Lane
Committed Project Committed Project Locally Funded Locally Funded
New 2 Lane New Interchange and New 2 Lane Road Add 2 Lane
Complete Complete Complete Under Construction Under construction Complete Under construction Complete Under construction Under construction Under construction Complete
Operations Improvement Committed Project
CR 210 Extension Davis Parkway
3046 961
Valley Ridge Boulevard at 9B Extension
Nocatee Parkway
I-10
3051
Halsema Road
Lane Avenue
I-10
3052
I-295
SR 111 Cassat Avenue
I-10 I-295
3043 3042 62
I-295
3010
I-295
11
at Hammond Boulevard (Marietta) at SR 208 Wilson Boulevard at SR 228 Normandy Boulevard I-10
I-295
3009
I-295
Overpass
Add Auxiliary Lanes New Interchange and Remove Existing Interchange Modification Interchange Modification
Interchange Modification
60
at Commonwealth Avenue at Pritchard Road
I-295
67
at SR 104 Dunn Avenue
Interchange Modification
Under construction Under construction Under construction Complete
I-295
1022
SR 13 (Buckman Bridge)
Add 4 Express Lanes
Under
1
Commonwealth Avenue
Add Auxiliary Lanes
Interchange Modification
I-95
2035 Cost Feasible 1 Plan Status Committed Project
2035 Cost Feasible Plan #19 Private Privately Funded Committed Project
Operations Improvement Operations Improvement 2035 Cost Feasible Plan #6 Operations Improvement 2035 Cost Feasible Plan #7 Operations Improvement 2035 Cost Feasible
Projects identified in the list of committed projects in the Envision 2035 Cost Feasible Plan are show as “Committed Project�. Projects identified as Operations Improvement were not part of the 2035 Cost Feasible Plan. 3
Path Forward 2040 Long Range Transportation Plan Table 1. Major Projects Under Construction or Completed Since the 2035 Plan Was Adopted Facility ID From To Improvement
Phase
I-295
431
construction Complete
I-295
59
I-95
65
I-95
71
I-95
3041
I-95
13
SR 21 Blanding Boulevard at SR 105 Heckscher Drive at Bowden Road
Collins Road
Interchange Modification Interchange Modification Interchange Modification
at SR 202 J.T. Butler Boulevard Emerson Street (Overland Bridge) at I-295 North
Interchange Modification Fuller Warren Bridge Phase 1
Bridge Replacement Interchange Modifications
Max Leggett Parkway Max Leggett Parkway
35 3040
I-95 Owens Road
Owens Road SR 5 US 1
Widen to 4 Lanes New 4 Lane
SR 104 Dunn Avenue
3011
Garden Boulevard
Walgreens
Intersection Improvement
I-95
CR 107
Widen to 6 Lanes
SR 200 SR 202 J. T. Butler Boulevard SR 21 Blanding Boulevard
37 3007
Hodges Boulevard
33
SR 23 Branan Field Road Old Jennings Road Old Jennings Road
SR 21 Blanding Boulevard SR 23 First Coast Expressway
3050 3006
SR 23 First Coast Expressway
36
SR 9B
4
SR 9B
126
US 17 Park Avenue
3020
SR 21 Blanding Boulevard I-95 US 1 SR 5 Philips Highway Wells Road
Under construction Complete Under construction Under construction Complete Complete Under Construction Complete
2035 Cost Feasible 1 Plan Status Plan #5 Committed Project Committed Project Operations Improvement 2035 Cost Feasible Plan #22 Operations Improvement 2035 Cost Feasible Plan #21 Privately Funded Privately Funded
Intersection Improvement
Under Construction Complete
Old Jennings Road
Widen to 4 Lanes
Complete
Operations Improvement 2035 Cost Feasible Plan #9 Operations Improvement Locally Funded
Knight Boxx Road Oakleaf Plantation Parkway I-10
Widen to 6 Lanes Build Frontage Roads
Complete Complete
Locally Funded Committed Project
New Limited Access Toll Road New Limited Access Roadway New Limited Access Roadway Add Lanes and Reconstruct
Under construction Under construction Complete
Committed Project
Complete
Operations Improvement
US 1 SR 5 Philips Highway I-295 I-295
4
2035 Cost Feasible Plan #11 Committed Project
Path Forward 2040 Long Range Transportation Plan Table 1. Major Projects Under Construction or Completed Since the 2035 Plan Was Adopted Facility ID From To Improvement US 301 SR 200
23
US 301 SR 200
301
Baldwin Bypass South of Baldwin North of Baldwin
Baldwin Bypass North of Baldwin Callahan
New 4 Lane Road Widen to 4 Lanes
Note: All Cost Feasible Plan project number references are as shown in the plan summary brochure.
5
Phase Under construction Under construction
2035 Cost Feasible 1 Plan Status 2035 Cost Feasible Plan #12 2035 Cost Feasible Plan #13
Path Forward 2040 Long Range Transportation Plan Table 2. Major Projects with Construction Funds Committed Facility Chester Road CR 216 CR 220 Doctors Inlet Road CR 739 Henley Road/ Russell Road Crawford Road Crawford Road Florida East Coast Railway Fort Gates Ferry Road Girvin Road Girvin Road Holloway Road I-10 at I-95 I-10 I-295 I-295 I-95 I-95 I-95 Kolas Ferry Road Lake Susan Road Old St Augustine Road Parramore Road Extension Pecan Park Road Radio Avenue SR 10 Atlantic Boulevard SR 10 US 90 Beaver Street SR 10 US 90 Beaver Street SR 109 University Boulevard SR 115 Southside Boulevard SR 134 103rd Street SR 152 Baymeadows Road SR 20 SR 200 SR A1A SR 200 SR A1A SR 202 J. T . Butler Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 21 Blanding Boulevard SR 212 Beach Boulevard SR 23 First Coast Expressway SR 23 First Coast Expressway SR 243 JIA North Access Road SR 9B SR 9B
ID 973 504 50 51 42 43 3021 502 44 45 3003 27 3045 5 3016 13 64 66 3018 55 53 970 3019 40 105 3004 3005 3012 3014 3015 3017 422 38 39 966 32 33 34 3008 18 17 6 126 3002
From
To
Improvement
County
Fund Source
Phase
SR 200 SR A1A SR 100 CR 209 Russell Road CR 218 CR 121 Old Alabama Trail RAILEX SR 19 SR 10 Atlantic Boulevard Ashley Melisse SR 100 US 17 Roosevelt Boulevard SR 23 First Coast Expressway SR 9B rd SR 134 103 Street at I-295/SR 9A North at SR 102 Airport Road at Old St. Augustine Road Murrhee Road Alachua County Line Greenland Road / Loretto Road Youngerman Circle SR 243 JIA North Access Road US 17 SR 115 Arlington Expressway CR 121 Brandy Branch Road CR 119 Otis Road Bartram Drive Deercreek Club Road at Firestone Road Freedom Commerce Parkway Alachua County Line Still Quarters Road Rubin Lane SR 115 Southside Boulevard CR 218 Branan Field Road CR 220 Long Bay Road F.O.P. Way Argyle Forest Boulevard Clay County Line SR 102 Airport Road US 1 Philips Highway CR 2209
Green Pine Road US 17 Knight Boxx Road CR 220 Doctors Inlet Road Old Alabama Trail US 301 SR 200
Add Lanes and Reconstruct Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes Road Reconstruction Road Reconstruction Rail Capacity Project Road Reconstruction Widen to 5 Lanes Widen to 3 Lanes New Road Construction Interchange Improvement Interchange Improvement Add 4 Express Lanes Interchange Improvement Interchange Ramp (New) Interchange Improvement Interchange Improvement Road Reconstruction Widen to 4 Lanes Widen to 6 Lanes New 2 Lane Road Widen to 4 Lanes New Road Construction Intersection Improvement Add Right Turn Lane(s) Add Right Turn Lane(s) Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Add Lanes and Reconstruct Add Lanes and Reconstruct Add Lanes and Reconstruct Interchange Improvement Add Lanes and Reconstruct Add Lanes and Reconstruct Add Lanes and Reconstruct Intersection Improvement New 4-Lane Road Construction Widen to 6 Lane Limited Access Toll Road New Road Construction New Road Construction New Road Construction
Nassau Putnam Clay Clay Nassau Nassau Duval Putnam Duval Duval Putnam Duval Duval Duval Duval Duval Duval Duval Nassau Putnam Duval Duval Duval Nassau Duval Duval Duval Duval Duval Duval Duval Putnam Nassau Nassau Duval Clay Clay Clay Duval Clay/Duval Clay/Duval Duval Duval St. Johns
FDOT FDOT FDOT Clay FDOT FDOT FDOT FDOT Duval LOGT Duval LOGT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT Duval LOGT Duval LOGT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT FDOT
CST CST CST CST CST CST CAP CST CST CST CST DSB CST CST CST DSB CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST CST DSB DSB CST DSB CST
Mount Royal Ave Ashley Melisse Wonderwood Drive Tinsley Road San Marco Avenue US 90 SR 202 J.T. Butler Boulevard Firestone Road Phase 2
Kings Ferry Road CR 21 I-295 Collins Road I-95 Minor Road Monument Road
Cesery Boulevard
Country Day School Drive SW 56th Avenue Rubin Lane CR 107 Scott Road Black Creek Old Jennings Road Allie Murray Road Ryar Road I-10 Argyle Forest Boulevar Pecan Park Road I-95 Duval County Line 6
Fiscal Year 2018 2016 2015 2018 2015 2015 2015 2015 2018 2018 2015 2016 2018 2015 2017 2017 2018 2018 2017 2017 2018 2018 2016 2016 2017 2018 2018 2019 2017 2017 2018 2019 2016 2018 2018 2019 2017 2019 2018 2015 2015 2018 2015 2015
Amount $10.30 $0.78 $0.81 $0.00 $0.29 $3.38 $1.14 $2.25 $5.74 $7.36 $1.26 $118.77 $48.10 $103.35 $6.90 $165.02 $6.60 $0.90 $3.64 $1.91 $0.60 $5.00 $11.83 $0.24 $6.84 $0.40 $0.19 $3.77 $0.52 $2.20 $6.72 $54.35 $0.65 $32.54 $1.83 $9.23 $15.28 $19.77 $5.41 $12.61 $7.21 $17.20 $95.43 $111.37
Path Forward 2040 Long Range Transportation Plan Table 2. Major Projects with Construction Funds Committed Facility
ID
SR 9B US 17 SR 15 US 301 SR 200
126 54 23
From
To
Improvement
County
Fund Source
Phase
South of SR 9A Horse Landing Road South of Baldwin
I-95 Boundary Road in San Mateo North of Baldwin
New Road Construction Widen to 4 Lanes New 4 Lane Roadway - Baldwin Bypass
Duval Putnam Duval
FDOT FDOT FDOT
DSB CST CST
Table 3. Major Bicycle, Pedestrian and Transit Projects with Construction Funding Committed
Fiscal Year 2015 2015 2017
$0.05 $17.65 $37.18
County
Facility
From
To
Improvement
Phase Fund Source
Clay
CR 218 Pine Avenue FEC Railway North First Coast Flyer Sherry Drive 4 Southeast First Coast Flyer
Mimosa Avenue Old Flemming Grove Road RAILEX 3 Downtown Jacksonville (Duval County) Atlantic Beach Elementary Downtown Jacksonville (Duval County)
SR 21 Blanding Boulevard Raggedy Point Road
Avenues Mall
Bike Path Trail Sidewalk Rail Capacity Bus Rapid Transit Sidewalk Bus Rapid Transit
CST CST 2 CAP CAP CST CAP
FDOT FDOT FDOT Jacksonville Transportation Authority FDOT Jacksonville Transportation Authority
2015 2017 2015 2016 2019 2016
$0.74 $1.30 $1.14 $33.50 $0.45 $23.80
SR 10 Atlantic Boulevard SR 115 Arlington Expressway Timuquan Trail Bailey and Simmons Road Main Street St. Johns Avenue
Intracoastal Waterway Bridge Service Roads Kingsley Connector Sports Complex Junction Road Sports Complex
Fletcher Avenue End of Existing Trail SR 19
Sidewalk Sidewalk Bike Path Trail Sidewalk Bike Path Trail Bike Path Trail
CST CST CST CST CST CST
FDOT FDOT FDOT FDOT FDOT FDOT
2017 2017 2016 2018 2016 2019
$1.20 $0.30 $2.00 $1.30 $0.77 $0.75
Bike Path Trail Sidewalk Bike Path Trail Bike Path Trail
CST CST CST CST
FDOT FDOT FDOT FDOT
2019 2014 2015 2015
$0.95 $0.15 $0.32 $0.37 $69.04
Duval
Nassau Putnam St. Johns
River Sea Loop Trail SR 13 SR 207
Holley Berry Lane Armstrong Trail Heads Hastings Trail Heads
I-295
Roberts Road
Grand Total
2
CAP represents capital improvements. 2035 Cost Feasible Plan Project #B 4 2035 Cost Feasible Plan Project #D 3
7
First Year
Amount
Amount
Path Forward 2040 Long Range Transportation Plan This page is intentionally left blank.