Portfolio aleksander nowak 2016

Page 1

Aleksander Nowak +47 45463244 (Norway) +48603063611 (Poland) nowak.aleksander3@gmail.com



SkyLense is the winning pavilion created for CHART Art Fair Architecture Competition, 2016. SkyLense is conceived as a machine for cooking whose mechanics are so simply perceived as to be apprehended in a single glance. The pavilion demonstrates the concept that sustainability is not just about being “less bad�, but instead may be used as a creative stimulator for life-activities that positively affect the environment. From sunbaking, to art performance, to cooking, each act is sponsored by two elements: water and sunlight. An experiment in optics and illusion, the design focussed on the elements that would intrigue those who interacted with it. In their assessment, the Judges noted the effectiveness of the illusion created by the water and mirrored surface, whereby Jury member Bjarke Ingles admitted that he did not realise there was a bar counter until he physically touched it. The pavilion’s elemental tectonic evokes two circular planes containing water separated by slender columns. Water suspended by a clear film hangs overhead, forming a lenticular object that acts to focus and distort light. The lense works in two directions - it concentrates light beams one way and simultaneously distorts the surroundings for the ones looking through it.







Milestones

Milestones- European Warsaw


man urban e adaptibility

Urban concept is considering various scales of influence and adaptibility.

most of the sculptures exhibited on square were taken), where it is proposed to rebuild and expose the old staricase.

From city scale which activates perpendicural and circural connections to the boulevard, throught plot scale where influences of CNK and BUW were considered in pragmatic (time frame schedule) and mental (`adaptable experimental pavilion`) ways. Up to `little global` influences of wind, sun and noise within the park and outside proposed design location.

The proposed concept establishes additional axis: Dowborczykow monument; to be visible from Wilostrada street and open new view axis to power station as `undescribed tribute` to Kazimierz Cubryna. It is also prominent spot visible from the opposite coast, which allows for various artistic and cultural interventions.

Cubryna square is strictly related with strong axis connection to Kazimierzowski Palace (from which

Location and urban possibilities :

POWISLE green belt (see city diagram)

ve de w ne ntre ce

city centre

city centre

CNK

CNK

W BU ntre ce

BUW

BUW POWISLE green belt north-west

POWISLE green belt south

Vis tu

BUW gardens and POWISLE green belt

Vis tu

la

la

co

Vis tu

la

co

as t

as t

demountable shallow bumps for slowing down car speed

co

as t northern pedestrian / bike access from vistula boulevards

Vis tu

la

co

as t

Present urban connection

Activating perpendicural and other conenctions to the river bank

Daily Schedule :

Possible new urban connections activating park in a `hub like` zone

tourists flow from centre all access paths along green belt

It was considered to activate the space 24/7 in relation to neighbouring program and location. Various activities and events might occur in the open space zone, `stone market` or in the boulevard auditorium depending on the requirements and specific for various time zones audiences.

Connecting all parks to green belt as additional attractor path to riverbank and park light and water system treatment to push visitors towards the river (see description)

tourists flow from centre

tourists flow from CNK

students

students

leasure

leasure

exhibition program protected or open mode (see sections)

leasure

leasure

yoga / excersizes coffe inside the temporary pavilion

POWISLE green belt (see city diagram)

Sustainable approach ,as a part of social knowledge, was considered on a level of various analysis (please find booklet attached). Those environmental factors together with local influences e.g. noise were a driving factor for the shaping of the milestones park concept.

leasure

leasure leasure

events

exhibition program protected or open mode (see sections)

all access paths along Vistula coast

Morning activities

Activities and influences :

leasure

concerts

events

exhibition in closed mode (see section)

Sculptures :

nts

me

lop

Present trend of opening towards the river can only be successful, if promotes fully accessible and `hub like` solutions for further developement and constitutes a vibrant place within the city and riverscape fabric . Design propose to activate perpendicular connections in relation to the Wisla river to attract new events to the area. It also creates a connector of POWISLE green belt which allows for circular connection dispersion from the site.

Afternoon activities involving and activating BUW and CNK visitors

protection of whole existing trees allow for shaded space during the summer

leasure

exhibition program open or open guided mode (see sections)

exhibition program in closed mode (see section)

Evening activities activating park event s after BUW and CNK opening hours

open scape on topand strong coast winds allow for familly activities like kiting

Night activities pushing people towards the river bank with quiet zone close to residential zone hardscapes and trees create natural sounds barrier from street noise

high traffic within CNK opening hours

protection of whole existing trees creates west wind protection

Vi

st

various hard/soft scapes with mild slope and orientation towards the water and sun allow for relax leasure

a co

as t

big square after temporary pavilion for winter events exhibition program in closed mode (see section)

Summer activities

Excaveted treasures are grouped by categories inside each of the `stones` (see section). Kazimierzowski Palace staircase is considered to be rebuild in original location and exposed in the viewv axis.

wave landscape protect visitors from strong and cold coast wind

leasure

Vi

st

ul

a co

noise from wislostrada high traffic road

as t

exhibition program in closed mode (see section)

wave landscape protect visitors from strong coast wind

special light and watering system allow for noise control during night (see section)

concerts and events

shallow and uneven slopes allow for safe sledging

ul

residential district beeing noise protected by natural hard and softscape

wave landscape protect visitors from strong coast wind from the north

Winter activities

designed hardscape create natural sound barrier from street noise

Wind protection and possibilities

Noise protection

40 cannonballs

dolphin’s sculpture parts of greater arcade building

bases with eagle and coat of arms of vasa

two arcade elements

12 parts of comice

marble base part of the balustrade

architectural element with engraved surnames

small marble elements marble floor

Putto sculpture volute keystones with motive of sequins

2

three lintels

fountain stem

portrait frames

1

parts of garden fountain

bench bases

vase with coat of arms of Vasa

spherical decorative vase with motive of festoon

decorative vases with human masks

3

eleven marble arcs

parts of arc

4

5

1

10

4

5

2

bench in marble

6

2


adaptibility

Our concept treats water as a tool for and BUWmental garden physical border between the visitors and the exhibited treasures, activating and controlling the pedestrian Agaton garden flow within the site. It creates an unique opportunity BUW to play and experiment with the temporary structures raised on the Cybruna Square.

periodically changing, adaptable, temporary structure, Cubrynaan park oppurtunity to artists, designers, engineers giving and architects to curate a temporary pavilion for a specific period time. Scienceof Centre Science Centre Roof Garden

Perfect location allows for tighening collaboration Swietokrzyski Bridge between city cuncil, Discoverers park Sience Centre and University New developments

Kazimierzowski park

Kahla Square

CALLOUT

New Metro Station

< City centre

A

Boulevards squares

A

K. Beyera Park Entertainment events

Section AA

Section line diagram

E.R.Smilgy Park National Museum

Small scale city interventions allowing for `green belt` connection along whole POWISLE district for local habitants and between most attractive points (scale from gray to black) Open mode exhibition with access control by water level

Close mode exhibition with climarized space (i.e. winter conditions) or night time.

Open guided mode exhibition with access control by water level

View from entrance to BUW gardens

< North Warsaw > Old town and Castle

CALLOUT > Krakowskie przedmiescie

< South Warsaw

Water create natural protection against direct access or vandalism in a same time create none-border accesible feeling. It is also a part of `experimantal space` where flooding the square might be a part of art installation or have purely functional purpous by pushing people towards the river bank i.e. in case of high noise behave.

Location and influence of Science Centre (rational) and library (mental) create perfect conditions for experimental pavilions curated by famous polish architects or artists.

Temporary pavilion (like Serpentine Gallery in London) might adapt not only dedicated space for pavilion but work with whole square and become attractor itself.

View from north side of boulevard

> CNK visitors > POWISLE

pavilion

< Boulevards

> Metro Station > City Centre and University

New possible non colission `event hub` connections from University, `Krakowskie Przedmiescie`, Castle and Mariensztat through parks up to river front.

Vistula Boulevards

Green connector to BUW

Exhibition stones market

Boulevards Stage Zone Temporary Experimental Pavilion Zone Auditorium and Exhibition space Open Space events zone

Pavilion program

Pavilion program

Warsaw / Milestones


GUGGENHEIM HELSINKI

2014, SNØHETTA, PLANS, CONCEPT, DIAGRAMS, VISUALISATION


THE DECK

in Tähtitorninvuoren puisto forms the starting point for the flyover towards the Guggenheim Museum and is subtly integrated in the existing network of pathways and small squares.

THE FLYOVER

STRUCTURE

The roof as the main building element above the public `Third Space` consists of a large scale spaceframe structure made of steel. These spaceframes are clad in reflective recycled aluminum, forming cas settes of 5x5m. The roof rests on the concrete structure of the larger exhibition halls, the auditorium, as well as an integrated structure in the glazed atria connecting the `Third Space` with the museum level below.

To realize the roof cantilever towards the North-East of the building a free-standing column is introduced.

creates a new urban link from the park over Laivasillankatu towards the Guggenheim Museum. On the roof the ramp is continued in a gangway parallel to the waters edge.

+12,1m

THE ROOF +11,0m

shelters the public `Third Space` and offers views of the bay and the horizon. The moveable roof flaps for solar harvesting can be adjusted for ideal positioning towards the sun.

THE RAMP

continues the public pedestrian flow from the park and the roof down to the public `Third Space from where pedestrians can continue in the Museum or towards the seaside promenade.

+6,1m

THE THIRD SPACE

SUSTAINABILITY

The Sustainabilty approach is based on the principles of simplifica tion, area efficiency and (re-)use of cradle-to-cradle materials.

is a new sheltered public space for outdoor exhibitions and various urban activities. From here passers-by can have glimpses into the exhibitions through glazed atria.

The roof of the building serves the dual function of daylight control and energy production. Large sensor controlled flaps with solar panels are oriented in optimal angles towards the sun during the lighter months of the year.

THE MUSEUM LEVEL +3,1m

+1,1m

is accessed from the north via a large, slightly inclined surface. All exhibitions as well as the performance hall are grouped arround the central foyer/multi-purpose-zone.

Daylight optimization

Local energy production solar thermal

THE PUBLIC ART SQUARE +1,1m

is an outdoor exhibition space that connects the public realm with the `Third Space` of the Guggenheim Museum. Area efficiency

Super insulated building envelope

A++

Super Efficient appliances

Cradle to cradle Materials

Local energy production ground source heat pump

Sensor activated lighting

Local energy production combined heat and power

Monitoring of building energy performance

sqm Very low infiltration

THE PLINTH

protects the museum and its content with its double-layer watertight structure.

Low energy lighting

LED

DAYLIGHT

Besides the aspect of energy production through the solar panels the roof flaps, if desired, also enable curators and artists to work with daylight in the exhibition halls. In addition horizontal blinds un der the roof allow for adjusting the levels of natural light or blocking out daylight completely.

DIAGRAM OF ARCHITECTURAL ELEMENTS

ALEKSANDER NOWAK

-


8. recharging

relaxing

ni par les besoins éjà que nous erts, propices jet prévoit break area auditorium etoutdoor privées, exhibition

complementlounge area library themed rooms

elaxing

working

max H=+37,0m SDP total: 22490m2

redaction

private office

superdesk

open office

travailler working

superdesk

mezzanine: +28,0m, SDP: 610m2

working

bureau privateprivatif office

open office

office bureau open en open-space

work lounge

redaction superdesk niv. 6: +24,5m, SDP: 1290m2 20m2

unformal meeting space

study both /cubicle

La proposition architecturale a été élaborée en prenant en compte les fortes contraintes techniques liées à la construction du bâtiment sur la dalle existante, en particulier la position des points porteurs et leur capacité respective à reprendre les charges verticales et horizontales.

redaction

superdesk

ng space

commercial

superdesk

working

unformal meeting space

Afin d’assurer la faisabilité du bâtiment et en particulier de l’ouvrage de franchissement, la collaboration avec les ingénieurs de l’équipe de conception a orienté les choix

niv. 5: +21,0m, SDP: 3765m2 meeting room

private office

work “salon delounge travail”

open office

study both /cubicle commercial

workgrouping

unformal meeting space

study both /cubicle commercial

recharging être inspiré

study both / cubicle

relaxing

complement

hub

superdesk

working

redaction

superdesk

private office

workgrouping

niv. 4: +17,0m, SDP: 4075m2

kiosque espaces demeeting réunion unformal meeting study both unformal meeting unformal study study both both niv. 3: individuel space /cubicle space /cubicle space /cubicle informels +13,0m, SDP: 4060m2

commercial

espaces de pause outdoor breakextérieurs area auditorium exhibition auditorium

niv. 2: du projet,+9,0m, SDP: 3755m2 75m2 té. Ainsi le ateurs une niv. 1: d’usage et+5,0m, deSDP: 2810m2 60m2 commercial commercial commercial

relaxing se détendre

recharging

archive/storage print/copy circulation break zone mini kitchen sanitary

lounge area library complement themed rooms

hub

meeting room open office

work lounge

niv. 0: +0,0m, SDP: 2130m2

workgrouping

niv. 3: +13,0m, SDP: 4060m2

10m2

max H=+37,0m SDP total: 22490m2

outdoor break area

recharging

auditorium salle d’exposition exhibition salon de repos lounge area bibliothèque library espaces thématiques themed rooms

archive/storage print/copy circulation break zone mini kitchen sanitary mezzanine: complement+28,0m, SDP: 610m2

espaces supports

relaxing

workgrouping

outdoor break area

m 0m2 private office

open office

work lounge

niv. 2: hub superdesk +9,0m, SDP: 3755m2

niv. 6: +24,5m, SDP: 1290m2

niv. 5: +21,0m, SDP: 3765m2 mezzanine: +28,0m, SDP: 610m2

niv. 6: +24,5m, SDP: 1290m2

niv. 5: +21,0m, SDP: 3765m2

niv. 4: +17,0m, SDP: 4075m2

open office

work lounge

working workgrouping

meeting room private office

niv. 3: +13,0m, SDP: 4060m2

niv. 2: +9,0m, SDP: 3755m2

niv. 1: +5,0m, SDP: 2810m2

ALEKSANDER NOWAK

work lounge

unformal meeting space

niv. 0: +0,0m, SDP: 2130m2

commercial

niv. 2: +9,0m, SDP: 3755m2

niv. 1: +5,0m, SDP: 2810m2

study both /cubicle

study both commercial /cubicle

study both /cubicle

3

recherche de légèreté

compensation des efforts horizontaux

prise en compte de l’hétérogénéité des points porteurs

max H=+37,0m SDP total: 22490m2

niv. 0: +0,0m, SDP: 2130m2

5

Afin de limiter le poids de l’ouvrage de franchissement, le bâtiment s’affine dans la zone centrale en plan et en élévation. L’objectif de légèreté a également orienté le choix du système constructif envisagé pour les planchers (cf. description ci-contre). La structure des extrémités du bâtiment (entre les files 3 et 4 et entre les files 10 et 12) est basée sur un système conventionnel poteaux-poutres. Leur stabilité latérale est assurée par un système de cadres rigides sur toute la hauteur du bâtiment dans les directions transversales et longitudinales. La structure de la partie centrale est basée sur le principe de l’arc à poussée

La géométrie envisagée pour le système d’arcs résulte de la prise en compte des capacités hétérogènes des points porteurs disponibles. En effet, les points porteurs à l’Ouest de l’ouvrage (à droites sur les figures ci-contre) ont une résistance jusqu’à deux fois supérieure aux points porteurs situés à l’Est. Les arcs sont liés entre eux par des poutres parallèles qui assurent la transmission des efforts verticaux des étages supérieurs ainsi que la stabilité latérale des arcs.

P/2

6

P/2

7

arc comprimé

8

F 9 E

10

faux plancher

absorbant acoustique

D

poutrelle type IPE

11 C

NE

P/4

P/4

P/4

P/4

arch compression tirant tendu string

EI

S

12

dalle béton mince tuyaux d’activation thermique

max H=+37,0m SDP total: 22490m2

Choix constructifs pour les planchers

niv. 3: +13,0m, SDP: 4060m2

niv. 0: +0,0m, SDP: 2130m2

GARREE GA

La solution structurelle retenue pour les planchers consiste

niv. 2: +9,0m, SDP: 3755m2 max H=+37,0m SDP total: 22490m2

faux plancher

niv. 1: +5,0m, SDP: 2810m2

niv. 0: +0,0m, SDP: 2130m2

P P

4

repris par des tirants positionnés entre le niveau brut de la dalle et son niveau fini. Ainsi, les seuls efforts horizontaux transmis aux points porteurs sont ceux liés à l’action du vent.

commercial commerces niv. 4: +17,0m, SDP: 4075m2

open office

niv. 4: +17,0m, SDP: 4075m2

niv. 3: +13,0m, SDP: 4060m2

unformal meeting space

commercial redaction niv. 1:superdesk +5,0m, SDP: 2810m2

archives /stockage auditorium archive/storage exhibition print/copy impression/photocopies niv. 5: lounge area circulation +21,0m, SDP: 3765m2 circulations mezzanine: library break zone SDP: 610m2 cuisine meeting room+28,0m, unformal meeting study both themed rooms mini kitchen sanitaires space /cubicle sanitary

ue

private office

superdesk

niv. 6: +24,5m, SDP: 1290m2

working

30m2

redaction

unformal meeting space

working

superdesk

meeting room

55m2

STAT

Carrying points analysis

workgrouping

meeting room

niv. 4: +17,0m, SDP: 4075m2

90m2

study both /cubicle

niv. 6: +24,5m, SDP: 1290m2 private office

niv. 5: +21,0m, SDP: 3765m2

: 10m2

ping g ping groupe

unformal meeting space

work lounge

15m2

30m2

hub

superdesk

ION

Stratégie générale work lounge

workgrouping

meeting room redaction superdesk

STR UCT UR E

Programme distribution per level

workgrouping

meeting room archive/storage print/copy circulation hub break zone mini kitchen sanitary

work lounge 10% 20%

archive/storage hub print/copy circulation break zone 14 stk mini kitchen 85m2 sanitary mezzanine: +28,0m, SDP: 610m2

ve/storage nt/copy culation eak zone i kitchen anitary

65m2

superdesk super-desk

hub

“Salon de travail”

orium mplement hibition nge area ibrary ed rooms

union m oom oom

complement

absorbant acoustique

13

max H=+37,0m SDP total: 22490m2

poutrelle type IPE dalle béton mince

Plafond

béton préfabriqué et réseau d’activation

Structure

Poutres alvéolaires pour les installations techniques

tuyaux d’activation thermique

Plancher

béton ou autre

19

se composent de poutres en acier de type IPE portant transversalement des dalles minces en béton installées entre Capacités porteuses des points d’appuis sur leurs semelles inférieures. Ces les poutres métalliques dalles minces préfabriquées sont coulées autour des poutres Capacités porteuses des points d’appuis la protection au feu de l’acier et la en atelier. Elles assurent transmission des efforts horizontaux.

Dans la hauteur structurelle du plancher, tous les équipements techniques peuvent être installés. La sous face des dalles minces en béton préfabriqué est laissé nue du fait de leur haute qualité de finition, ce qui permet de s’affranchir d’un faux plafond supplémentaire. Le système permet par ailleurs de bonne performances d’isolation acoustique, un montage F de la structure sur chantier très rapide et un apport d’inertie 9 thermique. F

E E

10 D D

11 C

12

11

10

9

7 8 8

7

E IN SE NE I SE


ALEKSANDER NOWAK


LĂ˜KKEVEIEN 99 LIGHTHOUSE HLA, APRIL 2014, WINNING PROPOSAL, COMPETITION, STAVANGER, NORWAY

The winning proposal for an office building in Stavanger. The flexible proposal consists of 10630 up to 20000 m2 of office and commercial space. The form of the new building was designed in a way to respect and celebrate the historical building on the site. We did achieve a high flexibility in terms of use of the units, together with unifying the new and the old. High emphasis on sustainability issues was a priority. Double glazed facade with automatic curtains

was planned to achieve the highest daylight control. The facade, the shape and interior natural raw materials are in a strong relation to the context of the site. The designed architectural object and the space around it are meant to attract people and constitute a landmark in the city landscape.


SANDNES ULF STADIUM

HLA, AUGUST- NOVEMBER 2013

The proposal includes a school and sportshal adding up to a total of 15-20.000 m². We've been working with a light frame on top of a multifunctional base with school, fitnesscenter, sportsarenas, rehabilitation center, cafÊs and much more. The heavy base makes the light frame hover and is suposed to be lit acording to the

WIND

ongoing events ranging from soccergames, concerts, ishockeymatches, horseshows etc. We've had great help from sustainability department in Copenhagen to come up with inputs such as WDR (wind driven rain) - strategies to shape the roof, watermanagement, windbarriers. (HLA)

SANDNES ULF STADION

ADGANG TIL STADION


GANDAL HOUSING GANDAL HOUSING Proposal for 182 housing units /9220 m² in a modular, flexible concept. The apartments gather GANDAL HOUSING around a nice lifted garden space and the units can vary from 55, 75, 85 to 100 m². Proposal for 182 housing units /9220 m² in a modular, flexible concept. The apartments gather GANDAL HOUSING around a nice lifted gardenunits space and m² thein units can varyflexible from 55, 75, 85The to 100 m². Proposal for 182 housing /9220 a modular, concept. apartments gather HLA, SEPTEMBER 2013

HLA, SEPTEMBER 2013

HLA, SEPTEMBER 2013

HLA, SEPTEMBER 2013

around a nice lifted garden space and the units can vary from 55, 75, 85 to 100 m². Proposal for 182 housing units /9220 m² in a modular, flexible concept. The apartments gather around a nice lifted garden space and the units can vary from 55, 75, 85 to 100 m². buss

snitt B

eien

GANDAL BOLIGER GANDAL BOLIGER GANDAL BOLIGER GANDAL BOLIGER

Fedaveien Fedaveien Fedaveien

Fedaveien

terrasse/ vinterhage rom

stue

kjøkken

terrasse/ vinterhage terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage stue rom rom

stue

kjøkken kjøkken kjøkken

bod stue

stue

bod

kjøkken kjøkkenkjøkken

bod bod bod

terrasse/ terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage vinterhage rom rom rom rom

stue

stue

kjøkken

bod

kjøkken

vaskerom

stue stue stue

vaskerom

altangang bod bod

rom stue rom stue

rom

stue

vaskerom

terrasse/ vinterhage rom

kjøkken

stue

vaskerom

bod entré altan rom

rom

bod

rom

bod

altan

rom stue

entré

altangang altan

entré

rom stue

bod

entré

entré

rom stue

bod

entré

entré

stue

altangang altangang

entré

entré

stue

altan altan

entré

entré

terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage rom rom rom rom

bod

kjøkken kjøkken kjøkken

stue

vaskerom

bod bod

vaskerom

kjøkken kjøkken kjøkken

vaskerom

terrasse/ terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage vinterhage rom rom rom rom

vaskerom

stue stue

terrasse/ terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage vinterhage rom rom rom rom

kjøkken

stue

vaskerom

bod

vaskerom

kjøkkenkjøkken kjøkken

bod

vaskerom

vaskerom stue

entré

entré

entré

rom stue

bod

altan

altan

rom

rom

bod

rom

bod

altan

altan

eksisterende villa

rom

stue

kjøkken kjøkken kjøkken

bod

stue

entré

stue

entré

entré altan

eksisterende villa

terrasse/ terrasse/ vinterhage vinterhage rom rom terrasse/ vinterhage stue rom

stue

stue terrasse/ rom vinterhage

kjøkken

bod

entré entré

stue

altan

rom

bod

eksisterende villa

relativ kt. +0.0 m relativ kt. -1.4 m

stue

bod bod bod rom

altangang

entré

entré

rom

bod

stue

eksisterende villa

relativ kt. +0.0 m relativ kt. -1.4 m

stue

bod

entré

altangang altangang

altan

rom

bod

+4.8mm relativ kt. -1.4

stue terrasse/ terrasse/ vinterhage vinterhage

bod

entré altan

bod rom

entré

bod rom

rom altan

altangang

rom

stue

relativ kt. +8.0 m

stue

bod

kjøkken

bod rom bod rom

rom altan altan

terrasse/ vinterhage

romstue

relativ kt. -2.9 m

+4.8mm relativ kt. -1.4

terrasse/ vinterhage

bod

rom rom altan altan

rom

rom

bod

stue

relativ kt. +11.2 m relativ kt. +4.8 m

relativ kt. +0.0 m

Fedaveien

kjøkken

rom

rom rom altan altan

stue

stue

Fedaveien

P-kjeller boliger

bod

rom

stue romstue

terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage rom rom

rom

altan

relativ kt. +8.0 m

Fedaveien

kjøkken

rom

altan altan

stue stue

relativ kt. +0.0 m

relativ kt. +11.2 m

relativ kt. +0.0 m

terrasse

bod

rom altan

stue stue

rom

altan

bolig

relativ kt. -2.9 m

Kvernelandsveien

altan

Fedaveien

relativ kt. -2.9 m

Kvernelandsveien

relativ kt. +11.2 m relativ kt. +4.8 m relativ kt. +14.4 m relativ kt. +8.0 m

terrasse

relativ kt. +4.8 m relativ kt. +0.0 m

kjøkken

hage

terrasse/ terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage vinterhage rom rom rom rom

stue

rom

altan

entré

Kvernelandsveien

relativ kt. +14.4 m relativ kt. +8.0 m

terrasse altan

kjøkken

stue stue

relativ kt. +0.0 m

relativ kt. +11.2 m

terrasse altan

altan

stue

stue

relativ kt. +8.0 m

kjøkken

entré

bod

P-kjeller boliger bolig bolig P-kjeller boliger

relativ kt. +4.8 m

relativ kt. -2.9 m

altan

P-kjeller boliger

bolig bolig bolig

relativ kt. +11.2 m relativ kt. +4.8 m

rom

altan

kjøkken

entré

entré

hevet hage oppfylling

bod

hage terrasse/ svalegang

terrasse/ terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage vinterhage rom rom rom rom

stue

entré

entré

bolig

hevet hage

bod

relativ kt. +11.2 m

relativ kt. +11.2 m relativ kt. +4.8 m relativ kt. +14.4 m relativ kt. +8.0 m

kjøkken

hevet hage oppfylling terrasse/ svalegang oppfylling

terrasse/ svalegang hage

bolig bolig bolig bolig

rom

stue

kjøkken stue

entré

entré

oppfylling terrasse/ svalegang

terrasse/ hage terrasse/ svalegang svalegang

terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage bod rom rom

bod

bod

rom

kjøkken

entré

hevet hage

rom

bod

terrasse

terrasse/ terrasse/ svalegang svalegang

relativ kt. +14.4 m relativ kt. +8.0 m

Kvernelandsveien

relativ kt. +14.4 m

bolig bolig bolig

terrasse/ vinterhage bod

entré

bolig

baneterreng

kjøkken

bod

terrasse/ terrasse/ svalegang svalegang

bod

entré

kjøkkenkjøkken kjøkken

bod bod

bolig

vaskerom

entré entré

terrasse/ terrasse/ svalegang svalegang

relativ kt. +11.2 m relativ kt. +14.4 m

relativ kt. +8.0 m

rom

bolig bolig bolig

vaskerom

kjøkkenkjøkkenkjøkken kjøkken vaskerom vaskerom

bodrom

entré

rom

kjøkken

stue rom

rom

altan

terrasse

vaskerom

bod

entré

altan

kjøkken

rom

altan

bolig bolig

rom

kjøkken

kjøkkenkjøkken vaskerom

entré

bod bodrom rom

rom

kjøkken

stue rom

romstue

kjøkken

terrasse terrasse

baneterreng

bolig bolig bolig

baneterreng

baneterreng

bolig bolig

stue

bod

stue

romstue

altan

entré

entré

terrasse terrasse

vaskerom

kjøkken vaskerom kjøkken

bod rom

rom

kjøkken

stue kjøkken

altangang

kjøkken

altan

entré

entré

entré

terrasse/ svalegang

terrasse/ svalegang

bod

bod bod

stue

kjøkken

altangang altangang entré

altangang

stue

rom entré

bod entré

rom

bolig

relativ kt. +14.4 m

relativ kt. +0.0 m

byggelinje

terrasse

stue

rom

altangang

kjøkken

rom

P-kjeller matbutikk

rom

kjøkken

stue

kjøkken kjøkken

altan

bod rom

bod

rom

terrasse/ vinterhage

stue

rom

P-kjeller matbutikk

altan

relativ kt. +14.4 m

P-kjeller boliger

terrasse/ svalegang

terrasse/ svalegang

bolig

stue

stue

kjøkken

bod

altangang altangang

bod

rom

kjøkken

bolig P-kjeller matbutikk

altan

byggelinje

terrasse

stue

stue kjøkken

rom

bod

bolig

stue

matbutikk

altan

bolig

bolig bolig matbutikk P-kjeller

kjøkken

rom

hage

bolig

stue

hevet hage

altangang

rom

hage

kjøkken

bod

bod

terrasse/ terrasse/ vinterhage vinterhage rom rom

bod rom bod

stue

bolig terrasse/ hage svalegangbolig

P-kjeller boliger

byggelinje

kjøkken

matbutikk P-kjeller boliger

altan

bod stue

terrasse/ vinterhage rom terrasse/ vinterhage

rom kjøkken

altan

stue

bod

matbutikk byggelinje

bod rom

bod stue rom kjøkken

kjøkken

altan

stue

P-kjeller boliger snitt A

bolig

bolig

terrasse/ hage svalegangbolig bolig

snitt A

hevet hage

rom

rom stue stue

rom terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage rom rom

kjøkken

altan

stue

snitt bod A

matbutikk

altan

stue stue

kjøkken

bod

snitt A

terrasse/ svalegang

snitt A

rom

stue stue

terrasse/ terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage vinterhage rom rom rom rom

kjøkken

rom

snitt A

hevet gårdhage 1/2 etasje

altan

stue stue

kjøkken

stue

stue

altan bod

stue

bod

kjøkken stue

altan

rom

terrasse/ svalegang

snitt B snitt A

stue

stue

terrasse/ terrasse/ terrasse/ vinterhage vinterhage vinterhage rom rom rom rom

kjøkken

bod bod

hevet gårdhage 1/2 etasje nivåfri adgang hevet gårdhage 1/2 etasje

hevet hage

stue

kjøkken kjøkken kjøkken

kjøkken stue

romrom

snitt A innkjørsel gjesteparkering

nivåfri adgang

snitt B

hevet hage

terrasse/ vinterhage rom

stue

kjøkken kjøkken kjøkken

kjøkken

bod

altan

nivåfri adgang

nivåfri adgang ankomstplass

stue

kjøkken

kjøkken

bod

altan altan

nedkjørsel P-kjeller innkjørsel gjesteparkering

nivåfri adgang ankomstplass innkjørsel gjesteparkering

snitt B

kjøkken

romrom

nivåfri adgang nivåfri adgang ankomstplass

nivåfri adgang hevet gårdhage 1/2 etasje

bod

innkjørsel gjesteparkering

hevet gårdhage 1/2 etasje

snitt B

bod

rom rom

altan altan

ankomstplass

bod

nedkjørsel P-kjeller

nivåfri adgang hevet gårdhage 1/2 etasje

bod

altan altan

rom rom

nedkjørsel P-kjeller

bod bod

nivåfri adgang hevet gårdhage 1/2 etasje

rom

kjøkken

rom

nedkjørsel P-kjeller

nivåfri adgang hevet gårdhage 1/2 etasje

stue

kjøkken

SANDNES, NORWAY bod

altan altan

nivåfri adgang

bod

nivåfri adgang

altan

landsv eien nivåfri adgang

nivåfri adgang

rom rom

nivåfri adgang

nivåfri adgang

bod bod

Kverne

nivåfri adgang

SANDNES, NORWAY SANDNES, NORWAY

altan

snitt B nivåfri adgang

bod

rom

nivåfri adgang

buss

SANDNES, NORWAY

landsv eien nivåfri adgang Kverne landsv eien

rom

nivåfri adgang

Kverne

bod

snitt B nivåfri adgang

stue

buss

kjøkken

landsv

snitt B

bod

buss

rom

Kverne

nivåfri adgang


JÅTTÅVÅGEN HLA, AUGUST- OKTOBER 2013

The Jåttåvågen (Stavanger), which is now an old industrial area is going to be torn down and redeveloped to a completely new district. The whole city developement plan is going to be executed in long term phases. Municipality plan for the subsite of our concern encompasses housing and office buildings. We ended up with several possible scenarios of creating cosy space both for inhabitants and office workers. The unique approach towards investor by letting him beeing literally part of a design team

can be an advantage over other competition participants. The developed project included a coherent overall landscape plan for greenstructure / open-air. Landscape plan established a main grip and main use within greenstructure, terrain forming, altitudes of terrain and design of transition between existing city structure and new designed area, lighting , surface walkways , squares, ramps and outdoor furniture.

HENNING LARSEN ARCHITECTS OSLO, NORWAY, AUGUST 2013- ...still in the game

SUN

WIND

COMFORT



HOTEL INSOMNIA 3rd GRADE, COMMERCIAL BUILDING DESIGN

Hotel Insomnia is a project of a 3-star academic hotel. A main assumption of the concept was to create a green passage in a city centre space, which could serve both hotel guests and Poznan inhabitants. The space between the north facade of the building and existing backyards is a walking route connecting the Bernardynski square with Mostowa street. The space thanks to its cosiness and greenery is a perfect place to rest in a shade and eat a meal in the hotel restaurant. The building was pulled back to the maximum from the mentioned backyards to not overshadow them. Additionally, the facility contains fitness center with saunas and massage rooms. Two conference halls were designed; one large for business meet-

ings and the second for student talks, semilecutres and media library purposes. In the Insomnia hotel, there are several kinds of accomodation units. In the west part, units with higher standard were designed. Their furnishings include a special workplace. The building design provides a use of ecological materials. The building facade is a double glass facade with a shading sysem inside. It ensures thermal comfort throughout a year. What is more, the green ventilated green roof influences the percent of biologically active surface of the site.


A-A

1

2

73,77 73, 77 m

126,48 6,48 m2

10

9

8

7

6

5

4

3

11

12

14

13

16

2

A

2 3

KOMUNIKACJA

RESTAURACJA

4

HOL+ KOM.

019 A: 24,86 m2

021 A: 218,10 m2

5 6

002 A: 97,08 m2

015 A: 9,77 m2

PRZEDSIONEK 001 A: 6,43 m2

014 A: 10,45 m2

C

2

1

B-B

26 x 17 = 450

POM OM.. SOC. OM

ADMIN. MARKETING

DEPOZYT 023 A: 6,67 m2

5

WC. MĘS.

013 A: 10,16 m2

4

KOM OMUNIKACJA

3

016 A: 9,38 m2

6

ODB. NACZYN

9

WYDAWANIE POS.

8

10 12

7

8 7 9 8 10 9 11

12 14

015 A: 48,77 m2

014 A: 29,40 m2

11

18 15 17 14 16 13 15

10

7 6

19 16

C

1

5

17 20

B-B

B

25 x 18 = 45 450

25 21 24 20 23 19 22 18 21

KOM. 022 A: 8,67 m2

12

B

A

15%

13

11 13

14 15 16

SZATNI ATNIA A

DEPOZYT

KOMUNIKACJA A

017 A: 17,35 m2

004 A: 3,43 m2

D

25

26

24

23

5

7 6 8 7 9

6 5

4

3

2

1

11 9

8 10

12 10

ADMIN. DOSTAWY ADM

007 A: 11,74 m2

15 12 14

16 13

14 17

20 16 19 15 18

21 17

25 20 24 19 23

18 22

26 21

DPST. DOJAZD

012 A: 21,38 m2

018 A: 98,60 m2

011 A: 20,72 m2

ADMIN. IN. SEKRT.

4

22

013 A: 79,95 m2

3

21

017 A: 4,47 m2

DOSTAWY.

KOMUNIKACJA 13 11

ADMIN. KIER.

ADMIN. KADRY

008 A: 18,30 m2

009 A: 14,17 m2

ADMIN. K./STRATEG. G. 010 A: 14,27 m2

6

5

A-A

E

E

2

20

PRZEDSIONEK 2

005 A: 19,32 m2

023 A: 11,28 m2

26 x 17 = 450

1

018 A: 17,68 m2

SZATNIA SZ

003 A: 12,77 m2

KOM OMUNIKACJA

19

022 A: 11,22 m2

18

17

RECEPCJA KOM OMUNIKACJA OM

SZATNI SZ ATNIA ATNI A

D

020 A: 17,94 m2

8

9

10

8

9

10

11

12

14

13

16

A-A

7

1

2

3

4

5

6

7

11

12

14

13

15

16

J.M 1.1

042 A: 42,67 m2

J.A. 1.2

A

A

043 A: 36,03 m2

J.M 2.2

041 A: 18,98 m2

KOMUNIKACJA

MAGAZYN MA

3

027 A: 4,95 m2

4

WC M

7

15

025 A: 9,64 m2

11

14

12

026 A: 9,51 m2

WC D

030 A: 17,08 m2

C

3

2

1

7

ODB. NACZYN ZYN

6

WYDAWANIE POS.

5

9

4

029 A: 15,36 m2

8

10

040 A: 23,52 m2

028 A: 4,95 m2

6

17 16

J.M 2.1

MAGAZYN MA GAZYN

9

C

2

5

19 18

B-B

1

8

22 21 20

039 A: 23,27 m2

10

25 x 17 = 430

25 24 23

PRZEDSIONEK 2

020 A: 18,69 m2

B-B

26 x 17 = 450

KOM OMUNIKACJA

J.M. 2

024 A: 44,82 m2

038 A: 24,89 m2

11

B

021 A: 236,43 m2

B

SALA KONFERENCYJNA A

12 13 13

14

J.M. 2.4

15

044 A: 22,72 m2

16

PRZEDSIONEK 2

POM. TECH.

032 A: 15,59 m2

PRZEDSIONEK 2

PRZEDSIONEK 2

034 A: 77,33 m2

12

7

3

9

8

6

5

2

1

4

11

10

031 A: 11,17 m2

D

D

17

19

18

26

25

24

23

22

21

20

022 A: 16,04 m2

WARSZTAT WA

26 x 17 = 430

036 A: 24,95 m2

13

POSCIEL BR POSC BRUD/CZ

J.A. 2

15

14

16

19

18

17

20

22

21

24

23

26

25

033 A: 5,85 m2

PION OBSLUGOWY

2

3

4

5

6

045 A: 29,96 m2

J. M. 1

037 A: 21,80 m2

A-A

E

E

1

warsztat

035 A: 19,87 m2

7

8

9

10

11

12

13

14

16



DRAWINGS & PAINTINGS UNIVERSITY & OWN




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.