Victoria Myrick - Work Experience Portfolio 2021

Page 1

VI C TOR IA MYR ICK


1215 Elm St, 2013 (AutoCAD/Photoshop)

N YA S H A -V I C T O R I A M Y R I C K

N VM

PROFESSIONAL PROFILE

CONTACT

3 years of architectural related experience and strong technical proficiency.

EmAil:

NVICTORIAWMYRICK@GMAIL.COM

An additional 2 years of professional experience in administrative support and customer

PhonE:

513 652 1750

service. Experienced in variety of typologies including educational, commercial and public space. Diligently pursues the creation of spaces where “form follows function”

ADDrESS: 9563 UNION PARK West Chester, OH 45069

and the finer details articulate well-rounded design.

EXPERIENCE INTERN ARCHITECT

in

ArChitECturE, inC., rESton, vA / JunE 2017 – July 2019 •

linkedin.com/in/nvmyrick/

issuu.com/nyasha-victoriamyrick

Collaborated on Schematic Design through Construction Administration phases of Commercial Amenities, Workspaces, Educational Facilities, and Pro-Bono Public

SKILLS

Art projects.

Revit 2015-20

Documented conditions of existing sites and buildings and built accurate detailed

AutoCAD

3D models in Revit from field notes and photographs.

Sketchup

Performed building code analysis for new and existing constructions. Outlined and

Documentation

revised applicable code deficiencies to provide cost saving remedies.

Detailing

Prepared Bid and Permit Documents satisfactory for approval on first submission

Schematic Design

INTERN ARCHITECT (CO-OP)

Adobe InDesign

ArChitECturE, inC., rESton, vA / fAll 2015, SummEr 2016

Adobe Illustrator

Communicated design through Architectural Drawings and Renderings produced

Adobe Photoshop

in Revit, Sketchup and Adobe CC

Strong Work Ethic

Autonomously progressed construction and design documents

Team Player

Efficiently and Intuitively fulfilled company documentation standards

Critical Thinking

Cheerfully accomplished tasks as assigned

Attention to Detail

INTERN (CO-OP)

Project Coordination

Designed residential and commercial luxury tile installations

MEMBERSHIPS

Produced renderings communicating client design specifications with Adobe

AmEriCAn inStitutE of ArChitECtS

Illustrator

Associate Member

rookwooD PottEry Co., CinCinnAti, oh / JAnuAry – AuguSt 2015

Designed tile feature board and developed shop drawings for installation in Rookwood Pottery Company’s Retail location at Liberty Center.

ADMINISTRATIVE INTERN

fAmiliESforwArD, CinCinnAti, oh / AuguSt 2012– AuguSt 2013 •

Processed applications, background checks, payroll and supply orders

Managed file room, internal data and internal records improving organization and

ArChitECturAl ExPEriEnCE ProgrAm (nCArb) Completed

EDUCATION

Provided front desk, administrative and technical support

univErSity of CinCinnAti, CinCinnAti, oh / 2017

Created graphics and layouts for marketing materials and student resources

B.S. ARCHITECTURE

efficiency


Tetris House, 2012 (AutoCAD/Photoshop)

CO N T EN T S VALO PAR K. . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 JOH N C ME YER S. . . . . . . . . . . . . . . . . . . 1 7 PR OF E S SIONAL . . . . . . . . . . . . . . . . . . . 24 B . S . AR CH 20 1 7.. . . . . . . . . . . . . . . . . . . 28 CR E ATI V E OU T LE T S . . . . . . . . . . . . 3 4

Site Geometry @ iit, 2011(Gathered Natural Materials)

BUOYAN T F OR CE . . . . . . . . . . . . . . . . . . 12


VAT ING OR

EX ELE IST

DIS

TO IT

EX IR

STA '=

'H '-

291 7"

EX

ING

IST

ICE

RV

SE

R IDO

RR CO

L

NA

GO

DIA

DIS CE

TAN =

012

99' -

32"

7"

ON

MM

CO

CR

PE

X

IT

EX

N

-10 " RA TIO

30'

OF

L

AVE

TR = 24'10"

013

X

011 DW

32"

013 001

CR

X

PE

F.

RE

ING

IST

EX

ICE

RV

SE

R

IDO

RR

CO

X

009

PA

SE

H

PAT

012

CE

TAN

VAT ING OR

EX ELE IST

010

L

AVE

TR

32"

VAT ING OR

EX ELE IST

002

001 003 CE TO EXI T IR

STA 'J' =

004 TAN

185

004

'10"

005 DIS

005

008

L

ON

= PAT 39'H 11" OF

CO TR MM AVE

007

FIT NE SS ER

ING

NT

.

.I.C

IST

CE

EX

N

006

TRA VEL

003

009

008 A

E

R

A F

O W O R K

P-1 RB CP -1 T-1

GN ALI

PLTYP 1

MW

SS PL- -1 TYP 2

-2

SS

RBP-1 LVT -1 -1

1 DWBT-

SS PL- -1 TYP 2

F

RE

P-1 RB LVT -1 -1

GN

ALI

SS PL- -1 TYP 2

P-1 RB CP -1 T-1

P-1 RB LVT -1 -1

P-1 RB CP -1 T-1

1

PL-

PLTYP 1

RBP-1 LVT -1 -1

P-1 RB LVT -1 -1

SS PL- -1 TYP 2

P-1 RB LVT -1 -1

ALI GN

SS PL- -1 TYP 2

RBP-1 LVT -1 -1

ALI GN

P-1 RB CP -1 T-1

PL1

P-1 RB CP -1 T-1

PLTYP 1

SS PL- -1 2

A.

A

012

4

013

A

DW

4

001

B.

F.

RE

5

1

5

1

2

003

D2

1

1

1

D1

009

1

004

C

005

2

3

008

2

007 B

3

3

3

3

3

4

CR

J

MW

DW

J

J

CR

F

RE

DW

F.

RE

C

C

C

G6

G1

G4

C

C

G6

G6

G1

G5

C

G4

G6

C

K

G6

C

G1

G4

C

G5

G6

E C

K

G1

G3

C

C

G1

G4

G6

K

G6 G6

C

G3

G1

G2

G1

(ET R)

H1

G4

G6

H1

G6

K

C

H1

K

G2

E

G1

H1

G1

K

G3

H1

H1

C

K

H1

(ET R)

H1

C

G1

C

E

H1

G2

G1

C

C

H1

H1

G6

C

C

G6

H1

C

C

G1

B

G2

C

H1

A

C

H1

C

C

G6

B

C

C

C

C

C

C

C

B

G7

E

C

A

A

C

A

B

A

A

F

A

A

B

C

C

A

C

C

B

C

C

C

C

A

C

A

C

A

C

C

VALO PAR K

GR OU ND F LOOR TE CH SU I TE

A unique project beginning with the demolition of two Ground Floor suites with no natural light, one containing an office, the other contained both a bank and a barber shop.

We worked directly with the building owner to design a spec suite suitable for a tech related tenant while retaining the two entries doors to the main Ground Floor corridor.

The suite is divided by a portal into individual spaces and an open concept space.

007

The individual spaces include a reception area, hoteling space, flex work area, conference room and one executive office. Beyond the portal is the copy area, kitchenette and open office space. ABOVE : Concept illustration of view from main entrance. LEFT: stacked life safety, finish, floor, power, furniture, and reflected ceiling plans


valo park

F R OM R ENDER TO R E ALI T Y

LEFT: 3d revit model showing new phase construction layout, lighting, finishes, and potential furnishings TOP (LEFT/RIGHT): view from main entrance view of hoteling space and reception area

BOTTOM: open office space to kitchennette and copy area

Lighting design was a driving factor in space planning creating datums both in plan and elevation. Finishes were chosen to accent the high ceilings while creating a intimate grounding feel.


valo park

All reproduction + intellectual property rights reserved by Architecture Incorporated © 2018

VALO PAR K : PER MI T DR AWING S

DEMOLITION L D#

EXISTING CENTRAL PLANT

EXISTING ENGINEER BREAK ROOM

AREA OF WORK

N.I.C.

D3

EXISTING SERVICE CORRIDOR

EXISTING CONFERENCE ROOM

D1

D2

D1

EXISTING HAIR WASH SINKS

EXISTING OFFICE D2

D13

D3

D3

D8

D3

D3

D7

EXISTING OFFICE

EXISTING OFFICE D1

D2

D1

D2

D3

EXISTING WORKROOM

EXISTING STORAGE

D1

D5

D2

EXISTING OPEN OFFICE

D3

EXISTING OPEN OFFICE D1

D2

EXISTING PANTRY

EXISTING RECEPTION D1

D10

D1

REF.

D14

EXISTING SERVICE CORRIDOR

D2

D4

EXISTING STORAGE

P

D1

D5

D2

D14 D3

D14

P

D9

D1 D14

D9

D15

M.W.

EXISTING PUMP ROOM

D2

D14

D11

D14

D1

D2

D5

D3

D2

EXISTING LAN/ELEC CLOSET

D9

D11

P

EXISTING STORAGE

EXISTING WATER FEATURE

P

EXISTING OFFICE

P P

D1

D2

D10

EXISTING WATER FEATURE

ec Suite_CD's_ARCHIVE_2018_Permit Rev 1_victoriam-AI.rvt

EXISTING ELEVATOR

N.I.C.

EXISTING TERRACE LEVEL CORRIDOR

PLAN 1 DEMOLITION 1/4" = 1'-0"

KEYED DEMO NOTES:

GENERAL DEMOLITION NOTES: 1

2

3

PATCH AND REPAIR PARTITIONS, FLOORS OR CEILINGS WHERE EXISTING FINISHES HAVE BEEN DISTURBED OR INTERRUPTED DUE TO REMOVAL OF EXISTING CONTIGUOUS PARTITIONS. DOORS, WINDOWS, CASEWORK OR MECHANICAL, ELECTRICAL OR PLUMBING FIXTURES OR DEVICES, TO PROVIDE A SMOOTH MONOLITHIC FINISH TO MATCH ADJACENT SURFACE. COORDINATE WITH ELECTRICAL, PLUMBING AND MECHANICAL DRAWINGS.

13

GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES BETWEEN THE ARCHITECTURAL AND ENGINEERING DOCUMENTS. WHERE DISCREPANCIES EXIST BETWEEN THE DOCUMENTS THE MORE STRINGENT, TIME CONSUMING, OR INCLUSIVE OPTION SHALL BE ASSUMED FOR PRICING.

VICTORIA MYRICK |

ALL EXISTING CONSTRUCTION TO REMAIN SHALL BE PROTECTED FROM DAMAGE FOR DURATION OF CONSTRUCTION. GENERAL CONTRACTOR SHALL REPAIR/REPLACE EXISTING CONSTRUCTION WHICH IS DAMAGED DURING CONSTRUCTION, AS COMPONENT OF BASE CONTRACT.

"READY TO RECEIVE NEW FINISHES" SHALL REFER TO SURFACES WHICH ARE FREE OF DEFECTS; SMOOTH, FLAT SURFACES. CONTRACTOR TO SCRAPE, GRIND, AND/OR LEVEL/FILL SLABS WITH SELF

14

D2

D14

D5

D15

EXISTING ELEVATOR

D1

EXISTING VESTIBULE

D3

P

EXISTING STORAGE

D3

D1

REMOVE EXISTING CARPET IN ITS ENTIRETY. SCRAPE MASTIC AND MAKE SURFACES READY TO RECEIVE NEW FINISHES.

D2

REMOVE EXISTING BASE IN ITS ENTIRETY. SCRAPE MASTIC OFF EXISTING TO REMAIN AREAS AND MAKE SURFACES READY TO RECEIVE NEW FINISHES.

LINKEDIN.COM/IN/NVMYRICK

PRIOR TO CEILING CLOSE-IN, THE GENERAL CONTRACTOR SHALL NOTIFY THE CHIEF BUILDING ENGINEER FOR INSPECTION AND ACCEPTANCE OF WORK. SHOULD ANY ITEMS BE DISCOVERED BY THE CHIEF BUILDING ENGINEER THAT ARE DEEMED STILL REQUIRING REMOVAL I.E. ABANDONED WIRE, HANGERS, CLIPS, ETC... THE COST TO REMOVE/CORRECT THESE ITEMS WILL COVERED BY THE THE GENERAL CONTRACTOR.

D3

REMOVE EXISTING CASEWORK/MILLWORK IN ITS ENTIRETY.

D4

REMOVE EXISTING APPLIANCES IN THEIR ENTIRETY. OWNER HAS FIRST RIGHT OF REFUSAL. COORDINATE WITH PLUMBING SHEET INFORMATION FOR RE-USE OF EXISTING WATER/SANITARY LINES & DRAINAGE WITHIN SCOPE OF NEW WORK.

(E) A.P.

N.I.C. EXISTING FITNESS CENTER

D6

D.W.

P

D2

EXISTING RECPETION

EXISTING ATM ACCESS ROOM

D3

D3

EXISTING ELEVATOR

(E) A.P. D3

D2

D12

D5

P

D9

D14

EXISTING LOBBY

N.I.C.

D3

EXISTING HAIR STYLING STATIONS

N.I.C.

REFER TO A0.1 FOR ADDITIONAL GE


All reproduction + intellectual property rights reserved by Architecture Incorporated © 2018

valo park

REFLECTED DE EXISTING CENTRAL PLANT

D#

EXISTING ENGINEER BREAK ROOM

D

AREA OF WORK

R

E

E

R

N.I.C. E

EXISTING SERVICE CORRIDOR

EXISTING CONFERENCE ROOM CD1

E

EXISTING HAIR WASH SINKS

CD2

EXISTING OFFICE CD1

CD1

R

CD2

CD2

R IT EXISTING OFFICE

EXISTING OFFICE

CD1 CD5

CD1

EXISTING STORAGE

CD5

CD1

EXISTING WORKROOM

CD5

CD1

R C

CD5

(E) A.P. EXISTING OPEN OFFICE EXISTING LOBBY CD1

N.I.C.

CD1

R

EXISTING HAIR STYLING STATIONS

CD2

CD2

(E) A.P.

CD1

R

CD2

N.I.C.

EXISTING SERVICE CORRIDOR

R

EXISTING FITNESS CENTER CD7

EXISTING ATM ACCESS ROOM

EXISTING STORAGE

EXISTING OPEN OFFICE

EXISTING ELEVATOR

CD1

EXISTING RECEPTION

CD5

CD2

EXISTING PANTRY

EXISTING RECPETION CD1

CD7

E CD1

CD2

CD1

CD3

EXISTING STORAGE

CD7

N.I.C.

EXISTING VESTIBULE

CD6

CD2

EXISTING ELEVATOR

EXISTING PUMP ROOM

CD4

EXISTING STORAGE

EXISTING OFFICE

CD5

CD1 CD5

CD1

(E) A.P.

CD6

EXISTING LAN/ELEC CLOSET

CD2

EXISTING ELEVATOR

ec Suite_CD's_ARCHIVE_2018_Permit Rev 1_victoriam-AI.rvt

N.I.C.

EXISTING TERRACE LEVEL CORRIDOR

CEILING PLAN 1 DEMOLITION 1/4" = 1'-0" GENERAL CEILING DEMO NOTES 1.

KEYED DEMO NOTES:

GENERAL CONTRACTOR TO SURVEY AREA OF WORK PRIOR TO DEMOLITION ACTIVITY AND PERFORM CORRECTIVE MEASURES AS NECESSARY TO ENSURE INTEGRITY OF FIRE PROTECTION SYSTEMS AFFECTED BY WORK.

2.

PATCH, REPAIR AND/OR REPLACE ANY DAMAGED EXISTING CEILING TILE AND GRID TO REMAIN (EVEN IF NOT SPECIFICALLY NOTED ON THIS PLAN).

3.

SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION NOTATIONS.

4.

GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES BETWEEN THE ARCHITECTURAL AND ENGINEERING DOCUMENTS. WHERE DISCREPANCIES EXIST BETWEEN THE DOCUMENTS THE MORE STRINGENT, TIME CONSUMING, OR INCLUSIVE OPTION SHALL BE ASSUMED FOR PRICING.

CD1

REMOVE EXISTING ACOUSTIC CEILING TILE AND GRID IN ITS ENTIRETY.

CD2

REMOVE EXISTING LIGHTING FIXTURES, DEVICES, EXIT SIGNS, ETC... IN THEIR ENTIRETY. COORDINATE WITH M.E.P. SHEETS FOR ADDITIONAL INFORMATION.

VICTORIA MYRICK |

LINKEDIN.COM/IN/NVMYRICK

CD3

REMOVE EXISTING GYPSUM CEILING IN ITS ENTIRETY.

CD4

EXISTING TO REMAIN GWB CEILING.

CD5

REMOVE EXISTING COMBINATION LIGHT FIXTURE / MECHANICAL DEVICE IN THEIR ENTIRETY. COORDINATE WITH M.E.P. SHEETS FOR ADDITIONAL INFORMATION.

A

CD3

CD6

E

R

CD2

SEE A0.1 FOR ADDITIONAL GENERAL N CD1

CD2


All reproduction + intellectual property rights reserved by Architecture Incorporated © 2018

valo park

NEW WORK LE EXISTING CENTRAL PLANT

EXISTING ENGINEER BREAK ROOM 4

ALIGN

EXECUTIVE OFFICE 10 A8.1

A7.1

COPY / WORK

NE

3 3

B

3 N1

HOTELING 009

D1

D2

5

006

001

N1

A7.1

A7.2

2' - 9"

4

4

5' - 0" CLEAR

MW

ALIGN

2' - 2 1/2" VIF

1

013

013

4

N7

2' - 4"

DIM

13' - 5 1/2"

LAN / I.T.

004

003

ALIGN 2

10' - 2"

001

(E)A.P.

EXISTING WATER FEATURE

A

A

ark Lower Level Spec Suite_CD's_ARCHIVE_2018_Permit Rev 1_victoriam-AI.rvt

EXISTING WATER FEATURE

N1

N.I.C.

EXISTING TERRACE LEVEL CORRIDOR

WORK PLAN 1 NEW 1/4" = 1'-0"

KEYED WORK NOTES:

2

RESTORE FINISHES OF PATCHED AREAS AND EXTEND RESTORATION INTO ADJACENT CONSTRUCTION IN A MANNER THAT ELIMINATES EVIDENCE OF PATCHING AND REFINISHING

3

FILL AND PATCH EXISTING WALLS, CEILINGS, OR COLUMNS DAMAGED AS A RESULT OF DEMOLITION, NEW CONSTRUCTION, REMOVAL OF EQUIPMENT, FINISHES, WALL ANCHORS, ETC....

4

ALIGN ALL NEW FINISHES WITH EXISTING ADJACENT FINISHES.

5

EXTEND DRYWALL AT EXISTING PARTITIONS TO REMAIN AND EXISTING COLUMN SURROUNDS WHERE APPLICABLE TO ACHEIVE CEILING HEIGHTS AS NOTED. EXTEND DRYWALL COLUMN SURROUNDS TIGHT TO DECK AT AREAS TO HAVE EXPOSED CEILINGS UNLESS NOTED OTHERWISE.

6

ANY AND ALL ACCESS PANELS SHALL BE PAINTED TO MATCH SURROUNDING FINISHES.

7

GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES BETWEEN THE ARCHITECTURAL AND ENGINEERING DOCUMENTS. WHERE DISCREPANCIES EXIST BETWEEN THE DOCUMENTS THE MORE STRINGENT, TIME CONSUMING, OR INCLUSIVE OPTION SHALL BE ASSUMED FOR PRICING.

N1

DASHED LINE IDICATES GYPSUM BULKHEAD ABOVE FOR REFERENCE. COORDINATE WITH RCP INFORMATION.

N2

PROVIDE NEW MILLWORK AND COUNTERTOP. COORDINATE WITH FINISH PLAN AND CASEWORK DETAILS.

N3

PROVIDE NEW COUNTERTOP AND METAL SUPPORT BRACKETING. COORDINATE WITH FINISH PLAN AND CASEWORK DETAILS.

N4

PROVIDE IN-WALL ABOVE COUNTER WATERLINE FOR FUTURE TF/TI COFFEE MAKER. COORDINATE FINAL LOCATION IN FIELD WITH ARCHITECT.

N5

PROVIDE IN WALL FRT PLYWD BLOCKING ABOVE COUNTER HEIGHT FOR FUTURE TFTI MONITOR/TV

N6

PROVIDE IN WALL FRT 4' PLYWD BLOCKING ALONG EXTENT OF WALL CENTERED AT 4'-0" AFF FOR FUTURE TFTI SIGNAGE

N7

PROVIDE 8'-0" TALL FRT PLYWOOD BACKER BOARD PAINTED TO MATCH ADJACENT WALL. START PLYWOOD 6" ABOVE FINISHED FLOOR. PAINT PLYWOOD TO MATCH SURROUNDING PARTITIONS.

VICTORIA MYRICK |

REFER TO A0.1 FOR ADDITIONAL GENE REFER TO A1.3 FOR FINISH INFORMATI

005

1' - 0"

012

AR

STORAGE

1

003

EXISTING PUMP ROOM

N.I.C.

1

N4 N1

ED

2

N6

N2

N1

A7.2

2

ALIGN

N2

EXISTING FITNESS CENTER

002 5' - 0"

11' - 2 1/2"

2

A7.1 DW

3

10' - 7"

N2

011

10' - 0"

GALLEY / BREAK-OUT

A7.1 4

2

RECEPTION

3

N5

EXISTING ELEVATOR

3' - 0"

REF.

A7.2

ENTRY

EXI

N.I.C.

N4

1

3' - 3"

NE

BREAK-OUT AREA

005

012

NE CO DO

3

009

A7.1

NE

1' - 5"

007

5"

7' - 0 1/2"

OPEN OFFICE

NE

5' - 8"

5 1

N2

007

11' - 6 1/2"

6' - 6"

4"

7 9' - 6"

A7.1

C

4"

N1

EXISTING SERVICE CORRIDOR

3

008

11"

1

N3

N.I.C.

6

1' - 5"

N2

BRING DIMENSIONAL DISCREPANCIES TO THE ATTENTION OF ARCHITECT AFTER PARTITION LAYOUT AND BEFORE PARTITION CONSTRUCTION

GLA

5

010

1

A

CONFERENCE

3

008

1 N1

N1

GENERAL WORK NOTES

KEY

ALIGN A7.1

EXISTING SERVICE CORRIDOR

EXISTING ELEVATOR

PAR

EXI

N.I.C.

EXISTING ELEVATOR

AREA OF WORK

#

N#

LINKEDIN.COM/IN/NVMYRICK

ELECTRICAL CLST. 004


valo park

All reproduction + intellectual property rights reserved by Architecture Incorporated © 2018

REFLECTED PLA C# EXISTING CENTRAL PLANT

EXISTING ENGINEER BREAK ROOM

X E

AREA OF WORK

A 2' - 0"

N.I.C.

EXISTING SERVICE CORRIDOR

C

EXECUTIVE OFFICE EQ

EQ

1' - 6"

+/- 2' - 10"

6' - 11"

009 EXS P-2

P-1

B

G6

3' - 4"

6' - 0"

G4

012 EXS P-2

EQ

1' - 6"

6"

G1 C

8' - 0" C

G6

9' - 9"

3' - 4"

G4

G5

C G6

STORAGE

C

P-1 9' - 9"

A

A

A

A

005 8' - 0" ACT-1 1' - 8"

C

3' - 3"

C

1' - 2" LAN / I.T. 003

C

G3

D

8' - 0" P-1 C

2' - 4"

2' - 2"

N.I.C. EXISTING FITNESS CENTER

C

3' - 10" 7' - 10"

1' - 0"

H1

8' - 0" ACT-1 A

H2

8' - 0" ACT-1

ALIGN

J

A

9"

K

C 4' - 9" X

C X

4' - 11"

+/- 1' - 10"

G6

C1

GALLEY / BREAK-OUT

1 A1.2A

ELECTRICAL CLST. 004

011

C4 2' - 6"

1' - 0" +/- 10"

5' - 6 1/2"

G4

C P-1

10"

1' - 0"

3' - 3"

G6

C

6"

EXISTING PUMP ROOM 013

1' - 2"

G1

G4

P-1

EQ

1' - 7"

J 4"

G6

C

C2

2' - 0" C

002

B ALIGN

1' - 10"

G6 G6

MW

J

2' - 6"

5' - 11 1/2" 5' - 6 1/2"

G1 G5

4' - 1 1/2"

5' - 6 1/2"

G5

ALIGN

G1 3' - 0"

G6

001

006

B

RECEPTION C

ENTRY

3' - 3"

G4

G2

BREAK-OUT AREA

EXS P-2

3' - 0"

44' - 4" 5' - 6 1/2"

G4

G1

C

C

C2

B

AXIS 'ST ORDER

C7A

7"

G1

F

C

C

F

X

G3

G1

B C2

EQ

HOTELING

11".

X

C

8' - 0" P-1

1' - 7"

C2

. EQ

EQ

1' - 4"

3' - 0"

G7

6' - 0"

EQ

B

2' - 9"

8' - 0"

C

C

G3

J

C2

C3

7' - 6"

EQ

4' - 0"

G6 G6

2' - 6"

3' - 6"

A

P-1

7' - 0"

C7B

1' - 3"

5' - 5"

C

C 2' - 6"

C2

REF.

5' - 6 1/2"

G1

1' - 0"

EQ EQ

9' - 0"

1' - 0"

A

TYPE 'G' LIGHT FIXTURES:

OPEN OFFICE

C

EXISTING ELEVATOR

C

2' - 0"

ALIGN

5' - 1"

G6

C

E

+/- 1' - 10"

G1

C7C

A

C

8' - 0" P-1

D C

3' - 7"

3' - 0"

EQ

G1

G2

C

A C3

ALIGN 8' - 0" P-1

C

9' - 0" ACT-1

8' - 0"

A C3

ALIGN

G6

C

1' - 0"

C

C2

COPY / WORK

G2

J

EXISTING ELEVATOR

G6

010

G2

2' - 0"

P-1

+/- 1' - 3"

1' - 0" +/- 10"

5' - 6 1/2" 5' - 6 1/2"

G2

C

C

G1

P-1 8' - 0"

G3

EXISTING ELEVATOR

G1

A

2' - 0"

11"

C

+/- 1' - 7"

5' - 6 1/2"

EXISTING SERVICE CORRIDOR

G1

G6

P-1

5' - 11 1/2"

C

N.I.C.

C

C4

C

1' - 0"

C

8' - 0"

1' - 0"

C

6"

C

C

CONFERENCE 007

9' - 0" ACT-1 C

C3

008

2' - 0"

EQ

B

4' - 0"

EQ

4' - 0"

EQ

2' - 0"

35' - 6" EQ

2' - 0"

6"

2' - 0"

E

D

C C

NEW 2 EQ

ark Lower Level Spec Suite_CD's_ARCHIVE_2018_Permit Rev 1_victoriam-AI.rvt

6"

EQ

EQ

21' - 6"

N.I.C.

EXISTING TERRACE LEVEL CORRIDOR

EXIST

CEILING PLAN 1 REFLECTED 1/4" = 1'-0"

NEW G

KEYED CEILING NOTES:

GENERAL RCP NOTES 1.

CONTRACTOR TO COORDINATE MOUNTING FLANGES OF ALL FIXTURES WITH CEILING TYPE TO RECEIVE FIXTURES.

2.

CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL MPE AND SPRINKLER WORK WITH HEIGHT AND TYPE OF CEILING FINISHES.

3.

PROPOSED CEILING HEIGHT. CONTRACTOR TO BEAR RESPONSIBILITY TO ADJUST SPRINKLER HEAD HEIGHTS AND LOCATIONS TO ACCOMODATE PROPOSED CEILING HEIGHTS AND PLAN LOCATIONS WHICH DIFFER FROM EXISTING CONDITIONS. SUBMIT CONTRACTOR PREPARED SHOP DRAWINGS TO AUTHORITY HAVING JURISDITION FOR APPROVAL PRIOR TO PERFORMING WORK.

C1

EXISTING CEILING TO REMAIN

C2

TYPICAL BULKHEAD TYPE 'A', SEE 11/A8.1

C3

TYPICAL BULKHEAD DETAIL 'B', SEE 12/A8.1

C4

TYPICAL LIGHT COVE DETAIL, 13/A8.1

C5

PORTAL DETAIL, SEE 14/A8.1

C6

N.I.C.

INDICATED MECHANICAL DEVICE FINISH TO P-1. REF FINISH SCHEDULE

4.

EXTEND GYPSUM BOARD UP EXISTING WALLS WHERE NEW CEILING HEIGHT IS GREATER THAN EXISTING CEILING HEIGHTS.

5.

REFER TO FINISH PLANS FOR CEILING FINISH DESIGNATIONS.

6.

COORDINATE WITH MECHANICAL AND ELECTRICAL DRAWINGS FOR SPECIFIC ACCESS PANEL LOCATIONS. NOT ALL ARE SHOWN ON R.C.P.

C7B

WALL MOUNTED MECHANICAL LOUVER. LOCATE CENTERED ABOVE OPENING AND WITH BOTTOM @ 11'-0" AFF

7.

AREAS WITH NO CEILING INDICATION ARE PAINTED 5/8" GYPSUM CEILINGS, SEE FINISH SCHEDULE.

C7C

WALL MOUNTED MECHANICAL LOUVER. LOCATE WITH BOTTOM @ 11'-0" AFF

8.

GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES BETWEEN THE

C7A

EXIST

WALL MOUNTED MECHANICAL LOUVER. LOCATE CENTERED ON WALL AND WITH BOTTOM @ 11'-0" AFF

VICTORIA MYRICK |

LINKEDIN.COM/IN/NVMYRICK

AREA

XX'-X"

CEILIN

ACT-1

ACOU

P-1

PAINT

EXS P-2

PAINT

SEE A0.1 FOR ADDITIONAL G SEE A1.3 FOR FINISH SCHED


All reproduction + intellectual property rights reserved by Architecture Incorporated © 2018

valo park

FINISH LEGEND F#

AREA OF WORK SS-1 PL-2 TYP

N.I.C.

PL-1 TYP

EXISTING SERVICE CORRIDOR

EXECUTIVE OFFICE

CONFERENCE 007

008

P-1 RB-1 CPT-1

P-1 RB-1 CPT-1 PL-1 TYP

ACOUSTICAL CE

CPT

CARPET

P

PAINT

PL

PLASTIC LAMINA

LVT

LUXURY VINYL T

RB

RUBBER BASE

SS

SOLID SURFACE

BT

BACKSPLASH TIL

TRANSITION STR

DIRECTION OF F

010 P-1 RB-1 CPT-1

N.I.C.

SS-1 PL-2 TYP

ALIGN

PL-1

AREA

ALIGN

HOTELING

SEE A0.1 FOR ADDITIONAL GENERAL NOTE

009 P-1 RB-1 CPT-1

ALIGN

BREAK-OUT AREA

N.I.C.

P-1 RB-1 LVT-1

006

EXISTING SERVICE CORRIDOR

N.I.C.

SS-1 PL-2 TYP

EXISTING FITNESS CENTER

PL-1

RECEPTION

1

SS-2

012

GALLEY / BREAK-OUT 011 P-1 RB-1 LVT-1

P-1 RB-1 CPT-1

002 P-1 RB-1 LVT-1

ENTRY

STORAGE

001 P-1 RB-1 LVT-1

BT-1

OPEN OFFICE

EXISTING ELEVATOR

ACT

SS-1 PL-2 TYP

COPY / WORK

F1

KEYED FINISH NO

TYPICAL MATERIAL ABBREVIATIONS

005 P-1 RB-1 LVT-1

F4

SS-1 PL-2 TYP

SS-1 PL-2 TYP PL-1 TYP

EXISTING PUMP ROOM

ALIGN

EXISTING ELEVATOR

LAN / I.T.

003

P-1 RB-1 LVT-1

P-1 RB-1 LVT-1

ELECTRICAL CLST.

004

013 F2

EXISTING WATER FEATURE

F3 F3

F2

F2

EXISTING WATER FEATURE

Park Lower Level Spec Suite_CD's_ARCHIVE_2018_Permit Rev 1_victoriam-AI.rvt

EXISTING ELEVATOR

N.I.C.

TO 2 RESILIENT 6" = 1'-0"

EXISTING TERRACE LEVEL CORRIDOR

KEYED FINISH NOT

PLAN 1 FINISH 1/4" = 1'-0"

SCHEDULES - FINISH MATERIALS SCHEDULE DESIGNATION

DESCRIPTION

MANUFACTURER

SERIES/FINISH/STYLE

COLOR

NOTES

CONTACT

ACOUSTICAL CEILING TILE ACT-1

ACOUSTICAL CEILING TILE

ARMSTRONG

ULTIMA / 2X2 BEVELED TEGULAR

WHITE

SUPRAFINE XL 9/16" GRID

ARMSTRONG REP: KEVIN SHULZ, 571-389-5864

BACKSPLASH TILE BT-1

BACKSPLASH TILE

CREATIVE MATERIALS COPORATION

4X8" COSMOPOLITAN

BRIGHT WHITE

GROUT: LITOKOL - STARLIKE GALAXY: VERDE SALVIA C.540. PROVIDE CONTINUOUS CLEAR SEALANT ALONG EDGE AT COUNTER.

-

CARPET CPT-1

CARPET TILE

MILLIKEN

COLOR FIELD PATINA

ASH SLATE; PATT 119-13

RUNNING BOND INSTALLATION

MILLIKEN REP; MARY CEPKO; 202-841-8732

COUNTER SURFACE SS-1 SS-2

SOLID SURFACE ENGINEERED STONE

CORIAN SILESTONE

-

DEEP CAVIAR CARBONO

AT HORIZONTAL SURFACES AS NOTED AS NOTED

CORIAN REP: RYOCE BROWN; 202-339-1213 -

LAMINATE SURFACE PL-1 PL-2

PLASTIC LAMINATE PLASTIC LAMINATE

WILSONART LAMINART

SOLICOR GLOSS FINISH GLOSS FINISH

DESIGNER WHITE D354-01 FRENCH CAMBRIC 5325-G

AT UPPER CABINETS AND AS NOTED AT LOWER CABINETS

WILSONART REP: MIKE MILLNER; 410-443-1664 WILSONART REP: MIKE MILLNER; 410-443-1664

PAINT P-1

PAINT

BENJAMIN MOORE

FLAT

CHANTILLY LACE; OC-65

GENERAL WALL PAINT. GYPSUM BULKHEAD PAINT.

BENJAMIN MOORE REP: LAUREN PRELLER, Lauryn.Preller@Benjaminemoore.com

VICTORIA MYRICK |

LINKEDIN.COM/IN/NVMYRICK

F1

PROVIDE 2 COATS MATTE SEALANT TO COL COLUMN.

F2

PATCH, REPAIR, INFILL AND EXTEND FINISH MATCH EXISTING FINISHES IN ALL RESPEC CONTRUCTION IN SUCH A MANNER AS TO E

F3

PATCH/REPAIR/REPLACE ANY AND ALL POR ASSEMBLY DAMAGED AS A RESULT OF DOO

F4

REFER TO RECEPTION DESK ELEVATION IN INFORMATION.


Allreproduction reproduction++intellectual intellectualproperty propertyrights rightsreserved reservedbybyArchitecture ArchitectureIncorporated Incorporated©©2018 2018 All

valo park

10' - 0"

MECH DEVICE

MECH DEVICE P-2

H1

MECH DEVICE P-2

H1

H2 TYP

H1

TYP

8

A9.1

EQ

1" SCRIBE

1" SCRIBE

TYP

PL-1 TYP

2' - 6"

PL-1 TYP

EQ

EQ

3

RB-1 TYP

EQ

N5 PROVIDE IN WALL FRT PLYWD BLOCKING ABOVE COUNTER HEIGHT FOR FUTURE TFTI MONITOR/TV N5

P-1

B

8' - 0"

F

5' - 0"

PL-2

1902 campus commons 1902 campus commons drive drive suite 101 suite 101 reston,reston, virginiavirginia 20191 20191 Tel: 703.476.3900 Tel: 703.476.3900 Fax: 703.264.0733 Fax: 703.264.0733 www.archinc.com www.archinc.com

SS-1

8' - 0"

PL-2 TYP

8' - 0"

1' - 7"

2' - 6"

4

APPROXIMATE LOCATION OF WATERLINE FOR COFFEE MAKER

8'2'--0" 10"

10' - 0"

EQ

BT-1 SS-1

10' - 0"

OPEN TO BEYOND

PL-2 TYP

2' - 10"

EQ

B

5' - 0"

SS-1

8' - 0"

EQ

J

1' - 0"

7' - 6"

2' - 6"

8' - 0"

EQ

EQ

1" SCRIBE

PL-2

10" 8' -2'0- 1/2"

1' - 0"

G1-G4

J

+/- 10' - 0" V.I.F.

TYP

1 A9.1

8' - 8"

PL-2

11' - 0"

2' - 8"

TYP ACCOUSTICAL BAFFELS, TYP

6 A9.1

+/- 3' - 5" COORD W/ REF. DIMS

EXPOSED DECK VIF

EQ

8' - 0"

EQ

10' - 0"

EQ

1' - 0"

EQ

+/- 2' - 2" VIF

EQ

3' - 7"

9 A9.1

EQ

1' - 8"

+/- 12' - 5 1/2" V.I.F. 1" SCRIBE

PL-2

2' - 10"

P-1 TYP

RB-1 1" SCRIBE

1' - 6"

EQ

EQ

EQ

1" OVERHANG

1' - 6"

7' - 4 1/2"

2" PANEL

5' - 0" CLEAR

3' - 6"

2' - 0" CLEAR

1" SCRIBE

+/- 1' - 7"

1' - 6"

2' - 6"

1" SCRIBE

1" SCRIBE

EQ

EQ

EQ

EQ

4

4

A9.1

TYP

2

A9.1

TYP

5

A9.1

TYP

TYP

4

A9.1

& PANTRY ELEVATION LIGHTING HEIGHT DIAGRAM 11 COPY/WORK 3/8" == 1'-0" 1'-0" 1/2"

EQ

EQ

1" SCRIBE

+/- 8' - 5" V.I.F.

33' - 6 1/2"

TYP

EQ

A9.1

TYP

2

2

A9.1

8

TYP

TYP

4

A9.1

2 ENTRY 1/2" = 1'-0"

NOTE: COORDINATE ALL MECHANICAL DEVICES WITH MECHANICAL DRAWINGS

A9.1

TYP

P-1

4"

RB-1 2' - 6"

PL-2

2X WOOD FRAMING, TYP

PL-2

PL-2

2X WOOD BLOCKING, TYP

7' - 7"

1' - 8" EQ

EQ

EQ

TYP

EQ

EQ

2

A9.1

6" 6"

8' - 0"

3/4" PARTICLE BOARD WITH PLASTIC LAMINATE FINISH, TYP

PL-2

2X BASE FRAME

EQ 3' - 5"

WHITE MELAMINE INTERIOR

SS-1

EDGE OF WATERFALL COUNTER BEYOND

1" SCRIBE

4

- SIDE 3 RECEPTION 1/2" = 1'-0"

9

A7.2

SS-2

RB-1 1' - 8"

6"

9' - 9 1/2"

RECEPTION - FRONT MILLWORK 32 GALLEY 1/2" = 1'-0" 1/2" = 1'-0"

A7.2

DRAWER WITH FULL EXTENSION SOFT-CLOSE DRAWER SLIDE, TYP

1" SCRIBE

EQ

4

TYP

2' - 10"

PL-2

3' - 0"

4' - 8"

A7.2 PL-1

SS-1

2' - 6"

3' - 6"

PL-1

RB-2

EQ

EQ

TYP

RB-1 EDGE OF WATERFALL COUNTER BEYOND 1" SCRIBE PLASTIC LAMINATE BASE

3"

A9.1

WHITE MELAMINE ON 1/4" HARD BOARD

A9.1

- BACK 44 RECEPTION BREAK-OUT AREA 1/2" = 1'-0" 1/2" = 1'-0"

Project: 18294-01 Project: 18294-01 Issue Issue

- BASE CABINET 5 5 RECEPTION EXECUTIVE OFFICE 1 1/2" = 1'-0"

03/28/2019 03/28/2019

BID-PERMIT SET BID-PERMIT SET

1/2" = 1'-0"

Revisions Revisions PLASTIC LAMINATE ON 3/4" PARTICLE BOARD, TYP

3' - 0"

1" SCRIBE

PLASTIC LAMINATE ON 3/4" PARTICLE BOARD 6"

1/2" PLYWOOD ON 3/4" PLYWOOD

6"

SOLID SURFACE WORKTOP 2' - 6"

3/4" PLYWOOD ON 1/2" PLYWOOD

EDGE OF WATERFALL COUNTER BEYOND

RB-1 1" SCRIBE

EQ

10"

EQ

1" SCRIBE

4

A9.1

TYP

- KNEE SPACE 6 RECEPTION 1 1/2" = 1'-0" 6 CONFERENCE 1/2" = 1'-0"

2' - 10"

TYP

RB-1 EQ

INTERIOR INTERIOR ELEVATIONS ELEVATIONS AND DETAILS

WHITE MELAMINE INTERIOR

A7.2

PLASTIC LAMINATE ON 3/4" PARTICLE BOARD WHITE MELAMINE ON 1/4" HARD BOARD

PL-1

1' - 6"

FINISHED SIDE OF BASE CABINET BEYOND

3' - 6"

PL-2

8"

2' - 10"

3' - 6"

2X WOOD BLOCKING, TYP

9

2' - 6"

A7.2

PLASTIC LAMINATE ON 3/4" PARTICLE BOARD

2X WOOD FRAMING, TYP

RUN POWER AND DATA IN MILLWORK

3' - 6"

1/2" PLYWOOD STUD FRAMING, TYP

TYP

WOOD BLOCKING, TYP 1/2" PLYWOOD STUD FRAMING, TYP

8"

2' - 0"

8' - 0"

A7.2

SS-1

9

2' - 6"

TYP

DRAWER WITH FULL EXTENSION SOFT-CLOSE DRAWER SLIDE, TYP

8' - 0"

9

2' - 10"

RUN POWER AND DATA IN MILLWORK

P-1

P-1

1' - 8" POWER AND DATA OUTLET

PL-1 3/4" PARTICLE BOARD

2X WOOD BLOCKING, TYP

2' - 10"

3' - 2"

PLASTIC LAMINATE ON 3/4" PARTICLE BOARD

2X BASE FRAME

PLASTIC LAMINATE ON 3/4" PARTICLE BOARD PLASTIC LAMINATE ON 3/4" PARTICLE BOARD

10"

PLASTIC LAMINATE BASE

8

TYP

A7.2

5

TYP

A7.2

PLASTIC LAMINATE ON 3/4" PARTICLE BOARD

EQ +/- 5' - 10" V.I.F.

TYP

- KNEE SPACE 7 RECEPTION / PHONE 1/2" = 1'-0" 7 1HOTELING 1/2" = 1'-0" 11

A9.1

VICTORIA MYRICK |

SOLID SURFACE WORKTOP, TYP 3/4" PLYWOOD

CABINET LOCK

PLASTIC LAMINATE ON 3/4" PARTICLE BOARD

EDGE OF WATERFALL COUNTER BEYOND

EPCO DP41-SS-6 EDGE PULL, TYP

2' - 6"

1/2" PLYWOOD ON 3/4" PLYWOOD

WOOD BLOCKING AND FRAMING, TYP

1/2" PLYWOOD ON 3/4" PLYWOOD

- BASE CABINET 8 RECEPTION 1 1/2" = 1'-0"

DESK PLAN DETAIL 9 RECPETION 1 1/2" = 1'-0"

LINKEDIN.COM/IN/NVMYRICK

Scale As indicated :DrawnScaleVWM 1/2" = 1'-0" :Drawn :Checked VJD VWM :Checked VJD : :

A7.2 A7.1

BID-PERMIT SET BID-PERMIT SET

1" SCRIBE

SOLID SURFACE WORKTOP

3' - 6"

2 1/2"

4"

3/4" PARTICLE BOARD, BEYOND

SOLID SURFACE WORKTOP

A9.1 +/-2'2'--6" 11 1/2" V.I.F. EQ EQ

1/2" PLYWOOD STUD

PLASTIC LAMINATE ON 3/4" PARTICLE BOARD, TYP

6"

1 1/2"

8

TYP

3/4" PARTICLE BOARD, TYP

3' - 0" 6"

1 1/2"

1' - 0"

2' - 6"

9/14/2019 9:07:29 PMPM 9/14/2019 9:10:39 C:\Users\nVictoria\Documents\_work\Revit Projects\18294-01_Valo Park Lower Level Spec Suite_CD's_ARCHIVE_2018_Permit C:\Users\nVictoria\Documents\_work\Revit Projects\18294-01_Valo Park Lower Level Spec Suite_CD's_ARCHIVE_2018_PermitRev Rev1_victoriam-AI.rvt 1_victoriam-AI.rvt

A7.2

PL-1

SS-2 PL-2

A7.2

TYP

11"

7' - 0" SS-2

2 1/2"

PL-1

SS-2

APPROXIMATE LOCATION OF WATERLINE FOR COFFEE MAKER

3/4" PARTICLE BOARD

2' - 6"

Sim

5

P-1

5' - 0"

7

A9.1

6

TYP P-1

8' - 0"

A7.2

7

TYP

2' - 0"

A7.2

TYP

3' - 6"

TYP

A7.2

3' - 6"

6

8

1' - 0" 8' - 0"

TYP

5 A7.2

TYP

EPCO DP41-SS-6 EDGE PULL, TYP CABINET LOCK

4' - 7"

2' - 10"

P-1

8

1/2" PLYWOOD ON 3/4" PLYWOOD

1/2"

PLASTIC LAMINATE ON 3/4" PARTICLE BOARD

P-1 3' - 0"

8"

N6

10' - 0"

8' - 0"

7

K

TYP

3' - 6"

TYP

PL-1

8' - 0"

Signage

SOLID SURFACE WORKTOP

EQ

4"

3' - 6"

N6 PROVIDE IN WALL FRT 4' PLYWD BLOCKING ALONG K EXTENT OF WALL CENTEREDK AT 4'-0" AFF FOR FUTURE TFTI SIGNAGE

+/- 7' - 0" V.I.F. EQ 2' - 6"

1" SCRIBE

TYSONS, VA 22102 7950 JONES BRANCH DRIVE TYSONS, VA 22102

1" SCRIBE B

Construction Documents for:

H1 H2, TYP

4"

H1

EQ

3' - 2"

H1

EQ

2' - 10"

H1

2' - 6"

H1

+/- 7' - 10" V.I.F. EQ

EQ

Construction VALODocuments PARKfor: VALO PARK TERRACE LEVEL TERRACE LEVEL SPEC SUITE 7950 JONES BRANCH DRIVE SPEC SUITE

A9.1

EQ


BUOYAN T F O R CE “Buoyant Force is a 50-foot steel sculpture by Sue Wrbican inspired by the paintings of American Surrealist Kay Sage (b. 1898, Albany, New York; d. 1963, Woodbury, Connecticut). Sage is recognized for her paintings of scaffolded structures and furled fabric in desolate landscapes. Tephra ICA organized the first comprehensive exhibition of Wrbican’s work, entitled Well Past the Echo, in Fall 2017. ... Based on the success of the exhibition, Tephra ICA commissioned Wrbican to realize one of her structures at full-size in Reston Town Square Park.” (Tephra ICA)


buoyant force

We worked closely with Artist Sue Wrbican to translate the maquette to a build-able reality. 3/2/2018

GRACE WRBICAN SCULPTURE

Keeping the human scale in mind, the proportion of the tower entices the viewer to look upward. Blue columns pierce the sky, supporting large “wind-filled” parametric sails attached seemingly by just enormous clothes pins. Panels of varying colors and textures interrupt the view, encouraging a closer inspection. Horizontal rungs appear to encourage an upward venture. Without allowing or encouraging physical climbing, Buoyant Force draws its viewers to let their minds venture upward towards the sky while engaging from the ground plane. Two sister sculptures and coordinating fencing were envisioned but omitted.

3/2

GR WR SCUL


buoyant force

All reproduction + intellectual property rights reserved by Architecture Incorporated © 2015

PER MI T DOCUMEN T S 3

2 1' - 9"

1 4' - 5"

PRIMARY SCULPTURE APEX 47' - 9"

MARKET ST

PRIMARY STRUCTURE TOP 39' - 1" A1.2 3

PANEL-4 A1.2

MESH-4

2

A

4

A1.2

     

6 A1.1

B

1

1

MESH-3 PRIMARY SCULPTURE SECONDARY SUPPORTS 22' - 5"

SCULPTURE ONE

(E) 8" STORM LINE

6" PERF HDPE U/G DRAINAGE, TYP, VIF SCULPTURE TWO

7' - 6"

A1.2 3

7' - 6"

PANEL 2

4' - 5"

(E) BENCH

(E) BENCH

4

A1.2

CONCRETE FOOTER, TYP

5' - 6"

6 A1.1

4' - 0"

5' - 7"

A

6" COMPACTED GRAVEL

TOWN SQUARE ST

B

RELOCATE (E) 6" PERF DRAIN SYSTEM, SLOPE TO DRAIN. VIF 1' - 0"

2

5' - 2"

A1.2

10' - 4"

5"

1' - 9"

5" DIA SPIN RAIL AINTI-CLIMBING DEVICE ON BALL BEARING AXLE ASSEMBLY, TYP

GRADE 0' - 0"

2' - 0"

MESH 2

1

3

2

1 VERIVY MIN 2500 PSF SOIL BEARING

@ TOP OF SECONDARY SUPPORTS 2 PLAN 1/4" = 1'-0"

6 SECTION 1/4" = 1'-0"

1' - 3" 2' - 8"

6' - 0"

(E) 6" PERF HDPE U/G DRAINAGE, TYP, VIF 9' 3' -

PANEL 1.1 1"

SCULPTURE TWO, MESH-3

7' -

A1.2

3' -

5" + SLA /B

10' - 8" FOOTER

5' - 3"

B

6' -

4" + SLA /B

1' - 9"

PANEL 1.2

4' - 5" 1

2

 4" CONC SLAB ON 4" COMPACTED GRAVEL. ATTACH SCULPTURE TO SLAB MIN, 4 LOCATIONS

12" DEEP WOOD CHIPS TO EXTEND MIN 5' BEYOND EDGE OF SCULPTURE 9" DEEP WOOD CHIPS FROM 5' TO 6' BEYOND SCULPTURE

DIMS MAY VARY BASED ON ACTUAL SIZE OF SCULPTURE

1 A1.2

@ GRADE 1 PLAN 1/4" = 1'-0"

PLANS AND SECTION

(E) 8" STORM LINE 2' - 2"

4

3

/-

/-

(E) 6" PERF HPDE, TYP, SEE 4/A1.1 FOR ADDITIONAL NOTES

3 10' - 8" FOOTER

6

9" +

5" +

8' - 0"

2' - 4"

A

A1.1

5"

2' -

A1.2

2

04/03/2018 REVISIONS

MESH 1

2' - 1"

A1.2

 Issued PERMIT

CONCRETE FOOTER, BELOW GRADE, TYP

5' - 2" 4"

PLAN 4 SITE 1/16" = 1'-0"

4' - 0"

4' - 0"

C:\Users\VictoriaM\Documents\18051-01_GRACE-Wrbican_CENTRAL_2017_victoriam6WHA5.rvt

4/3/2018 11:56:04 AM

A1.2

TOWN SQUARE & ST FRANCIS ST RESTON, VA 20190

19' - 0" 5 A1.1

WRBICAN SCULPTURE

HAND DIG EXCAVATIONS - DO NOT DAMAGE (E) UNDERGROUND WATER LINES AND (E) 6" PERF HPDE LINES RE-ROUTE (E) PERF HPDE DRAINAGE LINES AS NEEDED

Construction Documents For:

@ TOP OF SCULPTURE 3 PLAN 1/4" = 1'-0"

GreaterRestonArtsCenter

A1.2

23' - 0"

2

ST FRANCIS ST

3

TWO PLAN 5 SCULPTURE 1/4" = 1'-0"

VICTORIA MYRICK |

LINKEDIN.COM/IN/NVMYRICK







  





  VWM   GL

A1.1




6

6

A1.1

A1.1

PANEL 4

PANEL 4

WIND-DRIVEN ROTATING ELEMENT, MESH-4

PRIMARY SCULPTURE APEX 47' - 9"

WIND-DRIVEN ROTATING ELEMENT, MESH 4

3' - 6" 2' - 0"

PANEL 3.1

PRIMARY STRUCTURE TOP 39' - 1" PANEL 3.3

PANEL 3.1 MESH 3

16' - 0"

PANEL 3.1, BEYOND

MESH 3

10' - 6" 3' - 9"

PANEL 2

5' - 0"

PRIMARY SCULPTURE SECONDARY SUPPORTS 22' - 5"

2' - 1" 1' - 8" 1' - 8"

5' - 1"

5" DIA SPIN RAIL ANTI-CLIMB ASSEMBLY PANEL 1.2

2' - 6"

1' - 11"

10' - 4"

11' - 10"

10' - 4"

12' - 11"

11' - 10"

MESH 1

5"

2' - 0" 1' - 0"

ocuments\18051-01_GRACE-Wrbican_CENTRAL_2017_victoriam6WHA5.rvt

5"

10' - 4"

PANEL 1.1

PANEL 1.2

5" DIAM SPIN RAIL, ANTI-CLIMB DEVICE. AXLE AND BALL BEARING ASSEMBLY, TYP

12' - 3"

16' - 8"

6"

PANEL 2, BEYOND

16' - 8"

6" 6"

1' - 8" 10' - 4"

12' - 0"

PANEL 1.2

5' - 1"

2' - 3" 2' - 1" 1' - 8" 1' - 8"

7' - 6"

7" 9" 9"

2' - 9" 7"

MESH 2

MESH 2

Construction Documents For:

10" 3' - 2"

5" 10"

PANEL 2

10"

47' - 9"

15' - 9"

PTL STL PIPE COLUMN, TYP

5" DIA SPIN RAIL ANTI-CLIM DEVICE ON BALL BEARING AXLE ASSEMBLY, TYP

     

PANEL 3.4 3' - 3"

5' - 10"

MESH 3

2' - 1"

28' - 9"

PANEL 3.4

PANEL 3.2

8"

12' - 10"

19' - 0"

1' - 7" 1' - 7" 1' - 7" 1' - 7"

PANEL 3.3

PTD MTL PIPE, VAR DIA

13' - 0"

MESH 4

AXLE AND BALL BEARING ASSEMBLY

GreaterRestonArtsCenter

5' - 0"

All reproduction + intellectual property rights reserved by Architecture Incorporated © 2015

buoyant force

1' - 11" 1' - 9"

4' - 5"

2' - 7"

3' - 4"

4' - 0"



GRADE 0' - 0"

3' - 4"

Issued PERMIT

REVIS

10' - 8" 10' - 8"

SOUTH ELEVATION SQUARE ST 1 TOWN 1/4" = 1'-0"

NORTH

WEST ELEVATION FRANCIS ST 2 ST 1/4" = 1'-0"

NORTH ELEVATION ST 3 MARKET 1/4" = 1'-0"

EAST ELEVATION ST 4 EXPLORER 1/4" = 1'-0"

PERSPECTIVE FROM 5 SOUTHWEST CORNER

ELEVATI AND PERSPE

VICTORIA MYRICK |

LINKEDIN.COM/IN/NVMYRICK



 

VWM   GL


SEE MORE AT LANTZ CONSTRUCTION CO.


John c meyers

JO H N C M E YER S

3D Color Study Revit

3D Detail Model Revit

3D Section Model Revit

Front Elevation 3D Revit

ELEMEN TAR Y SCHOOL A public elementary school renovation project including a total project area of 83,115,09 SF. Extensive interior work, two small additions, and some exterior upgrades results in a building better adapted for teachers’ needs and meeting current building and sanitary codes. While most areas receive reconfiguration of classroom dividing walls, some areas are complete revitalizations. Three Kindergarten classrooms fill the space left by the two Industrial Arts Shops. Two Special Education classrooms take the space of the former Auxiliary Gym. Additional Special Education classrooms are created in spaces that were once dank and dreary locker rooms. A corridor addition, connects the Special Education suite to the existing breezeway and memorial courtyard while providing an additional learning space. The final additions improve efficiency of the cafeteria kitchen, which also underwent renovation.


All reproduction + intellectual property rights reserved by Architecture Incorporated © 2018

BUILDING 2 GROSS AREA 12821.94 SF EXISTING BUILDING GROSS AREA 52796.49 SF

J ohn c meyers BUILDING 1 GROSS AREA 14550.48 SF

PER MI T DOCUMEN T S

BUILDING 3 GROSS AREA 2884.28 SF

     

110

GROSS AREA DIAGRAM 2 BUILDING 1" = 60'-0" EX 2 HR FIRE WALL

33"

EX 2 HR FIRE WALL

KITCHEN JAN O40H

BUILDING 3 - EX 1975

KITCHEN LOCKER

12321 SF

O40G

O40D

BUILDING 1 - EX 1965

O58B 96 SF

224

STEM G6 638 SF EDUCATIONAL 25 (30)

67"

3

33"

JAN STORAGE

K1

O58C 101 SF ACCESSORY 1 (1)

O56 1022 SF EDUCATIONAL 25 (30)

O58 368 SF ACCESSORY 1 (1)

TEACHER'S WORKROOM / LOUNGE

K2 O52 1025 SF EDUCATIONAL 25 (30)

JAN STORAGE TLT K-1

TLT K-2

O56A

O52A

MECHANICAL 1

K4

K5

O50 1167 SF EDUCATIONAL 25 (30)

O44 1195 SF EDUCATIONAL 25 (30)

G10 304 SF BUSINESS 3 (3)

BREAK / WORK ROOM

CAFETERIA O40 2842 SF ASSEMBLY 191 (191)

O42 1532 SF ACCESSORY 5 (5)

G5E 150 SF BUSINESS 2 (2)

O44A

TLT 1-3

O62A

O60A

DN

234

67"

SERVER O59 127 SF BUSINESS 1 (1)

DN

O54A

UNISEX 1

SPEECH

AUTISM

Y66A

O55 148 SF EDUCATIONAL 5 (7)

O53 171 SF EDUCATIONAL 7 (7)

CORRIDOR YELLOW

ID Y63 326 SF EDUCATIONAL 15 (15)

TEACHER WORK ROOM Y66 363 SF BUSINESS 6 (6)

BOOKS 2 Y68 166 SF ACCESSORY 1 (1)

CORRIDOR YELLOW

RESOURCE Y70 226 SF EDUCATIONAL 10 (10)

Y65A

O54 995 SF EDUCATIONAL 25 (30)

BOOKS 1 O48 184 SF ACCESSORY 1 (1)

1ST GRADE 4

TLT 1-4

TLT 1-5

O51A

O49A

O51 1028 SF EDUCATIONAL 25 (30)

TDT O47 243 SF EDUCATIONAL 5 (12)

LD O45 399 SF EDUCATIONAL 15 (15)

FEC

PRE-K1

COURTYARD

TLT SPED-1 ECH

NODE YELLOW

DATA SPED 1 (ECH)

EWC

Y72A

R78 268 SF ACCESSORY 1 (1)

R80A

BOYS 2

TLT PK-1

TLT SPED-3 SPED SUPPLY 2

R80 1036 SF EDUCATIONAL 25 (53)

Y67

R78A 94 SF ACCESSORY 1 (1)

R69A

B34 634 SF EDUCATIONAL 25 (30)

NODE RED

R71 126 SF EDUCATIONAL 5 (6)

PE OFFICE G16B 173 SF BUSINESS 2 (2)

PORTABLE LIFT STORED IN GYM / LIFT SUPPLY

G11B

G5H 196 SF BUSINESS 2 (2)

442' 1011'

PLATFORM B30 865 SF STAGE 58 (58)

14,500 SF + 2610 SF = 17,110. BUILDING 2 COMPLIES AT 16,482 SF



B26

FEC CORRIDOR BLUE EAST

JAN 3

5TH GRADE 3

5TH GRADE 4

B24 636 SF EDUCATIONAL 25 (30)

B22 633 SF EDUCATIONAL 25 (30)

5TH GRADE 5

4TH GRADE 4

B20 634 SF EDUCATIONAL 25 (30)

B18 632 SF EDUCATIONAL 25 (30)

EX IT S) 3RD GRADE 3

3RD GRADE 4

B27 635 SF EDUCATIONAL 25 (31)

B25 635 SF EDUCATIONAL 25 (30)

B23 636 SF EDUCATIONAL 25 (30)

Room name

B26A

99"

33"

### AREA Occupancy ACTUAL (CODE)

295

ROOM TAG ROOM NUMBER ROOM AREA FUNCTION TYPE ACTUAL OCCUPANCY LOAD ( CODE OCCUPANCY LOAD) EXIT SIGN WITH LIGHTS AND CHEVRONS

POST OCCUPANCY LOAD SIGN MEDIA CENTER

TLC 2 B19 236 SF EDUCATIONAL 5 (12)

B21 3451 SF ASSEMBLY 217 (217)

4TH GRADE 1

4TH GRADE 2

4TH GRADE 3

B17 635 SF EDUCATIONAL 25 (30)

B15 635 SF EDUCATIONAL 25 (30)

B13 636 SF EDUCATIONAL 25 (30)

EGRESS PATH WITH TRAVEL DISTANCE

170

XIT

'79

B21A 123 SF BUSINESS 1 (1)

LIFE SAFETY PLANS/ CODE ANALYSIS

34"EXIT DOOR LOAD AND WIDTH EGRESS UNITS PROVIDED FE

MEDIA WORK RM

FE

110 INSTRUMENTS B41A 352 SF ACCESSORY 1 (1)

EE N

3RD GRADE 2

B29 636 SF EDUCATIONAL 25 (30)

BE TW

3RD GRADE 1

E

B31 645 SF EDUCATIONAL 25 (30)

IS TA NC

2ND GRADE 5

B33 641 SF EDUCATIONAL 25 (30)

(D

2ND GRADE 4

LIFE SAFETY LEGEND:

TRAVEL DISTANCE 186'

105B

B35 634 SF EDUCATIONAL 10 (31)

10/25/18



BOYS 3

B28

STAGE LEFT

BREEZEWAY

RESOURCE 2

OPEN PERIMETER BUILDING 2 GREATER THAN 20': TOTAL PERIMETER BUILDING 2:

442/1011 - 0.25 = 0.18 0.18 X 14,500 = 2610 SF ALLOWABLE AREA INCREASE

442

GIRLS 3

STAGE RIGHT

FO 3" AL -H NE "(O 11

B37 337 SF EDUCATIONAL 15 (17)

OFFICE PRINCIPAL

G5G 178 SF BUSINESS 2 (2)

RESOURCE STOR 1 G11A G11 364 SF EDUCATIONAL 5 (12)

ELEC CL

67" RESOURCE (ELL)

OFFICE ASST PRINCIPAL

G5B 156 SF BUSINESS 1 (1)

G9 636 SF EDUCATIONAL 25 (30)

RESOURCE 3 B32 675 SF EDUCATIONAL 10 (33)

BOOKS 3 R73 122 SF ACCESSORY 1 (1)

249

MUSIC B41 1334 SF EDUCATIONAL 25 (27)

TLC 3 B39 282 SF EDUCATIONAL 5 (14)

OPEN PERIMETER

OFFICE BOOK KEEPING

G7 634 SF EDUCATIONAL 25 (30)

CORRIDOR BLUE EAST

TRAVEL DISTANCE 134'

80' - 0"

5TH GRADE 2

CORRIDOR BLUE WEST

99"

142' - 8"

AREA - CODE 3 BUILDING 1" = 60'-0"

READING G1 646 SF EDUCATIONAL 10 (32)

OFFICE GUIDANCE

5TH GRADE 1

40 '-

T " NO 11 E, NC TA DIS

FEC

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

EWC ELECTRIC WATER COOLER (EWC)

K RIN SP

 As indicated  KBel4  CRS

(E) 1 HOUR RATED PARTITION (VCC - TABLE 720.1(2) 3-1.4)

R LE

(E) 2 HOUR RATED PARTITION (VCC - TABLE 720.1(2) 3-1.4)

ED )

C:\Users\JayN\Documents\17065-01_John C Myers ES_CENTRAL_2017_JayN.rvt

2ND GRADE 3

B36 641 SF EDUCATIONAL 25 (31)

G5K 326 SF ASSEMBLY 23 (23)

100G

'39

10/24/2018 11:29:50 AM

2ND GRADE 2

B38 643 SF EDUCATIONAL 25 (31)

VESTIBULE ADDITION 492 SF

Issued

TITLE 1

2ND GRADE 1

EX MULTIPURPOSE 2590 SF

VESTIBULE GREEN

132"

POST HEARING ASSISTANCE AVAILABLE SIGN

SPED 3 R69 841 SF EDUCATIONAL 25 (40)

GYM CHAIR / LIFT SUPPLY

CORRIDOR YELLOW

G5 409 SF BUSINESS 4 (4)

NEW 2 HR FIRE WALL

EX 1975 12118 SF EX CORRIDOR 1231 SF

GYM G16 4950 SF ASSEMBLY 330 (330)

G16A 509 SF ACCESSORY 2 (2)

PRE-K2

224

CD SUBMITTAL - 90%

Y74A

241

O43 823 SF EDUCATIONAL 25 (40)

PE SUPPLY G16C 326 SF ACCESSORY 1 (1)

TLT PK-2

Y74 972 SF EDUCATIONAL 25 (30)

GENERAL ADMIN / WAITING

POST OCCUPANCY LOAD SIGN

SPED 2 O43A

SPED 4 (MD) R76 1041 SF TLT SPED-4 MD EDUCATIONAL 25 (43) R76A

Y65

67"

GIRLS 1

EWC

TLT SPED-2

1ST GRADE 5

51622 SF

BUILDING 2 16431 SF

CONFERENCE RM

G3 418 SF BUSINESS 4 (4)

G14

O49 1030 SF EDUCATIONAL 25 (30)

GIRLS 2

DN

G5J 51 SF ACCESSORY 0 (0)

TELE / DATA G5A 68 SF BUSINESS 1 (1)

POSTED OCCUPANCY LOAD SIGN

O42A

CORRIDOR ORANGE EAST

JAN 2

Y72 929 SF EDUCATIONAL 25 (30)

UNISEX 4

TLC 1 O46 263 SF EDUCATIONAL 5 (13)

TRAVEL DISTANCE 200'

CORRIDOR ORANGE WEST

EWC

SUPPLY O61 112 SF SUPPLY ACCESSORY O61 0 (0)

TLT K-3

STORAGE RECORDS

G12

HALLWAY 2 ORANGE

K3

O60 910 SF EDUCATIONAL 25 (30)

CORRIDOR GREEN

1ST GRADE 3 TLT 1-2

(E)AED FEC

O62 930 SF EDUCATIONAL 25 (30)

G2 639 SF EDUCATIONAL 25 (32)

TRAVEL DISTANCE HALLWAY GREEN 98'

G12A

EWC

1ST GRADE 2

O64 915 SF EDUCATIONAL 25 (30)

RED

1ST GRADE 1

TRAVEL DISTANCE 200' CORRIDOR

O64A

G5L

G5F 207 SF BUSINESS 2 (2)

JAN 1 BOYS 1

TLT 1-1

UNISEX 3

STORAGE SUPPLIES

G5D

TLT K-5

O50A

FEC

TRAVEL DISTANCE 154'

CORRIDOR GREEN NORTH

CLINIC G5C 258 SF BUSINESS 3 (3)

CLINIC T

TLT K-4

STEM SUPPLY

27' - 8"

G6A 63 SF ACCESSORY 0 (0)

20 (21)

DN

ART G4 1071 SF EDUCATIONAL 25 (19)

ART SUPPLY G4A 130 SF ACCESSORY 0 (0)

290 RAIDER RD BROADWAY, VA 22815

JAN LOCKER

CHALLENGE G8 682 SF EDUCATIONAL 25 (34)

O40A 334 SF ASSEMBLY 16 (16)

COMPUTER LAB

RENOVATION AND ADDITION

(E) FREEZER

EX 2 HR FIRE WALL

CAFETERIA TEACHER DINING

Construction Documents for:

O40B 330 SF KITCHEN 2 (2)

ROCKINGHAM CO PUBLIC SCHOOLS JOHN C. MYERS ES

DISH WASH O40C 215 SF KITCHEN 1 (1)

KITCHEN SERVING

28' - 1"

(E)FE

(E) COOLER

JAN OFFICE O58A 110 SF BUSINESS 1 (1)

KITCHEN DRY STORAGE

KITCHEN O40E 975 SF KITCHEN 5 (5)

150' - 3 3/8"

O40F 66 SF BUSINESS 1 (1)

13' - 6"

KITCHEN OFFICE

LS1.1 1 - LIFE SAFETY PLAN 1 LEVEL 1/16" = 1'-0"

VICTORIA MYRICK |

LINKEDIN.COM/IN/NVMYRICK


John c meyers RTU BEYOND

GRAVEL STOP AND GUTTER

RAH-GYM

GRAVEL STOP, REFER TO ROOF PLAN

 EJ

ROOF LADDER

LIGHT, TYP

G2

G2

G2

G2



G2

2 G2

A1.8

3 G2

 EJ



RAH-CAF

A1.7

BEYOND

RAH-4

LIBRARY - T.O.M. 111' - 7 5/8"

A1.6

E20A

E20A♦ C

B1

B1

GYM - T.O.M. 119' - 8"

GRAVEL STOP, REFER TO ROOF PLAN

3

RAH-3 RAH-2



C

T.O.M. 108' - 6 1/4"

E20A♦

 LEVEL 1 97' - 0"

STAINING OF BRICK

12 A3.2

STAINING OF BRICK- REFER TO, DETAIL 12/A3.A SIM



STAINING OF BRICKREFER TO, DETAIL 12/A3.A SIM





STAINING OF BRICKREFER TO, DETAIL 12/A3.A SIM

      MATCHLINE SEE 6/ A3.1

ELEVATION 1 WEST 3/32" = 1'-0"

MATCHLINE SEE 3/ A3.1

All reproduction + intellectual property rights reserved by Architecture Incorporated © 2018

1 A4.1

GUTTER, TYP GYM - T.O.M. 119' - 8"

5 EJ 

RTU, TYP GRAVEL STOP, TYP

A4.2

LIGHT, TYP

RAH-3



9



4

GUTTER, TYP.

A4.2



GRAVEL STOP, TYP. GYM - T.O.M. 119' - 8"

GRAVEL STOP, TYP

RAH-5

LIBRARY - T.O.M. 111' - 7 5/8" T.O.M. 108' - 6 1/4"

A4.1

RTU, TYP.

ROOF LADDER



LIGHT, TYP

INDUST.A. - T.O.M. 113' - 5"



T.O.M. 108' - 6 1/4"

E20A

 E

E

E

C

B1

B1

B4

B1

B4

B2

B2

B2

B2

 LEVEL 1 97' - 0"

LEVEL 1 97' - 0"

(E) HB

 TYP





ELEVATION - WEST 2 NORTH 3/32" = 1'-0"

(E) HB

ELEVATION - EAST 5 SOUTH 3/32" = 1'-0" RTU GUTTER, TYP

ROOF LADDER

ROOF GUTTER, TYP RTU, TYP



GRAVEL STOP, TYP LIGHT, TYP

RAH-6

C

C



B2

B2

G1

B2

G1

INDUST.A. - T.O.M. 113' - 5" LIBRARY - T.O.M. 111' - 7 5/8" T.O.M. 108' - 6 1/4"



G1

GYM - T.O.M. 119' - 8"

MATCHLINE SEE 2/ A3.1

GRAVEL STOP, TYP

RAH-GYM

B1

E20A

B1

B1

B1



LEVEL 1 97' - 0"

 



 TYP

Construction Documents for:

ROOF LADDER GRAVEL STOP, TYP.







(E) HB





ELEVATION - EAST 3 NORTH 3/32" = 1'-0"

EXTERIOR ELEVATIONS NOTES: 1. ROOF LADDER GUTTER

2. 3. GYM - T.O.M. 119' - 8"

ROOF LADDER LIGHT, TYP

GRAVEL STOP

RAH-5

RAH-1

RAH-6

G2



4.

E20A

T.O.M. 108' - 6 1/4" A

E20A

C



C

5. 6.

INDUST.A. - T.O.M. 113' - 5"

 EJ

LIGHT, TYP

C

C

C

C

A

N1 N1A N1B

E20A

 TYP

N2 N3 N4A N4B N5 N6

 

N8

ELEVATION 4 EAST 3/32" = 1'-0"

N9

KEY PLAN 5 MATCHLINE SEE 5/ A3.1

ROOF LADDER

LIGHT, TYP

RAH-3

ROOF LADDER

ROOF LADDER

RAH-4



 

IMP-GY

B1

RAH-1



B1

B1

(E) HB

B1



B1



E20A





C

INDUST.A. - T.O.M. 113' - 5"

B

CAFE - T.O.M. 111' - 5"

1

4 T.O.M. 108' - 6 1/4"

IMP-GY E20A

B3

B3

B3

D

4 A4.2

LEVEL 1 97' - 0"



(E) HB

E

A

 3

ELEVATION - WEST 6 SOUTH 3/32" = 1'-0"

VICTORIA MYRICK |



EXTERIOR ELEVATIONS

6

EJ



10/25/18

CD SUBMITTAL - 90%

RAKE MORTAR JOINT AND REPOINT TO MATCH EXISTING ADJACENT, SIM 14/A3.2 ROOF DRAIN INSERT ROOF DRAIN INSERT REMOVE AND REPLACE CRACKED BRICK TO MATCH EXISTING ADJACENT, SIM 13/A3.2 DRAIN LINE HOLE - PATCH TO MATCH EXISING ADJACENT BRICK OR MORTAR CAST STONE SILL - CLEAN, TYPICAL FOR ALL ON THIS ELEVATION CAST STONE SILL - RESEAL BETWEEN SILL AND EXISTING BRICK EXPANSION JOINT – REMOVE EXISTING AND INSTALL BACKER ROD AND SEALANT CONTROL JOINT – REMOVE EXISTING AND INSTALL BACKER ROD AND SEALANT HOLE IN BRICK - PATCH AS REQUIRED - COORDINATE W/ DEMOLITION AND ELECTRICAL WORK EXISTING STEEL CANOPY SUPPORT TO REMAIN - REMOVE RUST, PRIME AND PAINT AS SCHEDULED

GUTTER

RAH-GYM

EJ

C:\Users\KimB\Documents\17065-01_John C Myers ES_CENTRAL_2017_kimbD79KU.rvt

10/24/2018 11:17:01 AM

WATER FOUNTAIN



Issued

KEYED ELEVATION NOTES:

A

LEVEL 1 97' - 0"

(E) HB

REFER TO ROOF PLAN A1.4 FOR ROOF EDGE CONDITIONS, DOWNSPOUT, GUTTER, SCUPPER, AND LADDER LOCATIONS - NOTE THESE ARE NOT SPECIFICALLY CALLED OUT ON THE ELEVATIONS REFER TO SHEET F1.1 FOR EXTERIOR FINISH MATERIALS ALL LIGHT FIXTURES ARE NEW AT EXISTING JBOX LOCATION - REFER TO ELECTRICAL DOCS, UNO PATCH ALL HOLES FROM ANY ELECTRICAL CONDUIT, LIGHT FIXTURES, BRACKETS AND OTHER EQUIPMENT THAT ARE REMOVED AS PART OF DEMOLITION IN FACE BRICK TO MATCH EXISTING ADJACENT. REFER TO A1.0 FOR ADDITIONAL KEYED WORK NOTES. REFER TO A1.1 FOR EQUIPMENT SCHEDULE.

LINKEDIN.COM/IN/NVMYRICK

2

 As indicated  KBel4  CRS

A3.1

CD SUBMITTAL - 90%



290 RAIDER RD BROADWAY, VA 22815



RENOVATION AND ADDITION



ROCKINGHAM CO PUBLIC SCHOOLS JOHN C. MYERS ES




JST BEARING 107' - 10 5/8"

4 A2.2 8

16 SIM A1.10

6 AS1.2

AS1.2

KITCHEN

8 A2.2

(E) WD BLOCKING TO REMAIN

O40E

96.98 96.79 96.79

LEVEL 1 97' - 0" 95.52

T.O.M. 108' - 6 1/4"

94.79

LOADING DOCK

     

94.79 JST BEARING 107' - 10 5/8"

(E) STEEL JOIST TO REMAIN (E) STEEL TO REMAIN

3 A1.8

(E) WD BLOCKING TO REMAIN

(E) PANEL - TO BE REMOVED (MAY CONTAIN HAZARDOUS MATERIALS)

DOCK SECTION 1 LOADING 1/4" = 1'-0" GYM - T.O.M. 119' - 8"

BREAK METAL CLOSURE

VENEER METAL PANEL IN ALUM EDGE FRAMING

SOFFIT - PAINT AS SCHEDULED - UNO, REFER TO REFLECTED CEILING PLAN

1' - 0"

A2.2 17 A1.10

Construction Documents for:

INDUST ARTS JST BEAR. 112' - 9 3/8"

ABOVE EXTERIOR DOOR 2 SOFFIT 1 1/2" = 1'-0" 8 A2.2

LIBRARY - JST BEARING 111' - 0"

SILL 111.08

3 A2.2 P-BL TYP, FOR ALL (E) BACKBOARD SUPPORTS

2 A4.2

2 A2.2

1' - 0"

T.O.M. 108' - 6 1/4"

JST BEARING 107' - 10 5/8"

JST BEARING 107' - 10 5/8"



107.00



3' - 9"

3' - 9"

INSULATED METAL PANEL

CD SUBMITTAL - 90%

5/8"

2 5/8"

ACOUSTIC TILE CEILING SYSTEM AS SCHEDULED REFER TO REFLECTED CEILING PLAN

BEYOND

10/25/18

Issued

106.00

E13

290 RAIDER RD BROADWAY, VA 22815

5' - 3" (EXISTING MO)

3 A1.8 5

RENOVATION AND ADDITION

2 A2.3

4 A2.2

ROCKINGHAM CO PUBLIC SCHOOLS JOHN C. MYERS ES

All reproduction + intellectual property rights reserved by Architecture Incorporated © 2018

J ohn c meyers

6 A2.2

5 10' - 9 5/8" VIF MO

12' - 0" VIF MO

INSULATED GLASS IN ALUM FRAME

A2.2

8' - 5 3/8" MO

SOLID SURFACE SILL AND SKIRT

8' - 4 3/4"

O52

2' - 6" HOPPER

G16

2' - 6" HOPPER

GYM

G16B

9 A2.2 9 A2.2

TYP INSULATED METAL PANEL

SECTIONS 2' - 10"

PARTITION TYPE 21L METAL STUD FRAMING

14 A2.3 12 A2.2

13 A2.2 LEVEL 1 97' - 0"

LEVEL 1 97' - 0"

LEVEL 1 97' - 0"

LEVEL 1 97' - 0"

PRECAST SILL

 As indicated  KBel4  CRS

A4.2 - CLEARSTORY 3 WNDW 3/4" = 1'-0"

- B3/B4 4 WNDW 3/4" = 1'-0"

- E1 5 WNDW 3/4" = 1'-0"

VICTORIA MYRICK |

2 6 DOOR 3/4" = 1'-0"

LINKEDIN.COM/IN/NVMYRICK

CD SUBMITTAL - 90%

2' - 10"

C:\Users\KimB\Documents\17065-01_John C Myers ES_CENTRAL_2017_kimbD79KU.rvt

10/24/2018 11:18:56 AM

K2 PE OFFICE


All reproduction + intellectual property rights reserved by Architecture Incorporated © 2018

John c meyers

INTERIOR ELEVATION N 1.

E3 TYP

3' - 0"

E8 TYP

2' - 11 1/2"

2' - 6"

1' - 3"

1' - 0"

2' - 9"

1' - 0"

3' - 0"

2' - 11"

3 - B26 2 BOYS 1/4" = 1'-0"

3 - B26 3 BOYS 1/4" = 1'-0"

5 BOYS 3 B26 293 SF

1' - 6" 1' - 6"

E4B E4B

TYP

1' - 0"

HB

3' - 4"

FEC

3' - 3"



4' - 0"

E23

6



23 COURSE WALL TILE

E21

A6.13

2' - 6"



4' - 0"

7

HB

E26A

FD

2' - 1"

4' - 3"

MS-1 E6

3' - 4"

13

23 COURSE WALL TILE

4' - 0"

3' - 0"

B28 229 SF

4

A6.13

2' - 3"

GIRLS 3

3 2

2' - 6"

(E)FD

1' - 0"

2' - 10 1/4" 2' - 11 1/2" 2' - 11 1/2" 2' - 11 1/2"

A6.13 10 11

12

3' - 0"

FD

9

A6.13

2' - 9"

1' - 0"

2' - 6"

1' - 3"

2' - 11 1/2"

HB 12' - 0"

HB

3' - 0"

5' - 8" CLEAR

1' - 4"

2' - 3"

1' - 8"

FD

33 SF

8

4' - 10"

G11A

4' - 10"

STOR

26 SF

13' - 0"

G11B 

1' - 4"

ELEC CL 

23 COURSE WALL TILE

1' - 2 1/4"

5' - 2" CLEAR



1' - 0"

1' - 0"

2' - 3"

5' - 0"

2. 3. 4.

E2

23 COURSE WALL TILE

ALIGN

7" 2' - 3"

2' - 3"

2' - 3"

OPEN BEYOND

2' - 3"

3 - B26 4 BOYS 1/4" = 1'-0"

3 - B26 5 BOYS 1/4" = 1'-0"

1' - 6" 1' - 6"

E4A TYP

E4B

1' - 6" 1' - 0"

FLOOR PLAN - AREA D GANG TOILET 1 ENLARGED 1/4" = 1'-0"

2' - 3"

E21

3 - B26 7 BOYS 1/4" = 1'-0"

1' - 3"

3' - 4"

3' - 0"

2' - 3"

1' - 0"

2' - 3"

2' - 3"

3 - B28 8 GIRLS 1/4" = 1'-0"

3 - B28 9 GIRLS 1/4" = 1'-0"

2' - 7"

3' - 1"

2' - 10"

3' - 3"

23 COURSE WALL TILE

23 COURSE WALL TILE

8"

3 - B28 11 GIRLS 1/4" = 1'-0"

VICTORIA MYRICK |



2' - 0"

1' - 8"

4' - 10"

23 COURSE WALL TILE

1' - 0"

4' - 4"

E8 E22

2' - 0"

1' - 3"

1' - 8"

E8 TYP

23 COURSE WALL TILE

1' - 0"

E2

1' - 0" 1' - 0"

4' - 10"

E22 TYP

_John C Myers ES_CENTRAL_2017_kimbD79KU.rvt

2' - 3"

1' - 4 1/2"

E2

3 - B28 10 GIRLS 1/4" = 1'-0"

HB

2' - 3"

OPEN BEYOND

3 - B26 6 BOYS 1/4" = 1'-0"

3' - 3" 2' - 6" 2' - 1"

4' - 10"

TYP

3' - 4"



23 COURSE WALL TILE

23 COURSE WALL TILE

23 COURSE WALL TILE

E23

OPEN BEYOND

3 - B28 12 GIRLS 1/4" = 1'-0"

3 - B28 13 GIRLS 1/4" = 1'-0"

LINKEDIN.COM/IN/NVMYRICK

SEE SHEET A6.1 FOR EQUIPMENT SCHEDULE AND K NOTES FOR THIS SHEET. REFER TO SHEET F0.1 FOR FINISH SCHEDULE AND REFER TO SHEET F2.2 FOR TILE PATTERNS REFER TO SHEET F3.1 FOR FINISH DETAILS


J ohn c meyers

COMMON SPACE F INISH SCHEME S

CAFETERIA FLOOR PATTERN COMBINES INTERLOCKING SQUARES OF CORRIDOR W/ SOLID BAND OF CLASSROOMS.

PERSPECTIVE OF VESTIBULE FROM MAIN DOOR LOOKING IN.

CAFETERIA PERSPECTIVE FROM CORRIDOR ENTRY

INTERSECTION @ GREEN AND ORANGE CORRIDORS

ENCLOSED SPACE BETWEEN RED CORRIDOR AND BREEZEWAY CREATES ADDITIONAL LEARNING ENVIRONMENT.

VESTIBULE GYM ENTRANCE @ GREEN CORRIDOR

FINISH SCHEME JOHN C. MYERS ES

CAFETERIA ENTRANCES OFF ORANGE CORRIDOR

RED NODE PERSPECTIVE FROM BREEZEWAY ENTRY

DD SUBMITTAL 08/28/18

VICTORIA MYRICK |

LINKEDIN.COM/IN/NVMYRICK


John c meyers

COR R IDOR F INISH SCHEME S

COLORED BULKHEADS AT CORRIDOR INTERSECTIONS EMPHASIZE THE CORRIDOR COLORS

CORRIDOR WAINSCOT

CORRIDOR COLOR ACCENT CASTLE PATTERN

12X12 BLOCK OF ACCENT COLOR @ EWC LOCATIONS, CENTERED ON EWC

HALO PENDANT LIGHTS AND ROUND ACT "CLOUDS CREATE AN INDOOR SKY @ THE BREEZEWAY. LARGE COLOR BLOCKS DENOTE INTERSECTIONS AND ENTRIES TO PRIMARY SPACES

FINISH SCHEME JOHN C. MYERS ES

GROUND OR SHOTBLASTED SLAB, STAINED AND POLISHED FOR A BREATHABLE FINISH

DD SUBMITTAL 08/21/18

VICTORIA MYRICK |

LINKEDIN.COM/IN/NVMYRICK


All reproduction + intellectual property rights reserved by Architecture Incorporated © 2019

PR OF E S SION AL

E X PER IENCE Internships with the luxury tile brand Rookwood Pottery Company and Architectural Incorporated provided opportunities to build a well-rounded and flexible skillset. These internships gave me a background in many project sizes, and software including AutoCAD, Revit, Illustrator, Photoshop, and InDesign. Additionally, I had the opportunity to learn project management from schematic through construction administration.

EXISTING SERVICE ENTRANCE

EXISTING CORRIDOR

EXISTING WAITING 200 SF

EXISTING TELE ROOM

1 P-1 RB-1 LVT-1

CT-1

EXISTING MAIN ELECTRICAL ROOM EAST

12

CT-1

11

SS-1

6 6 SS-2 PL-2

11

5

SS-2 PL-2

CHECK-IN / CHECK-OUT 203 SF

1

1 SS-2

P-1 RB-1 CPT-1

P-1 RB-1 CPT-1 PL-2

PL-2

7

10

P-1 RB-1 CPT-1

7

CONSUTATION 1

CONSULTATION 2

INTAKE

88 SF

95 SF

3

CO EXISTING PLUMBING AND MILLWORK TO REMIAN

76 SF

3

4 8

1

2

113 SF P-1 RB-1 LVT-1

8 1

PASSAGE P-1 RB-1 CPT-1

14

REF.

EXISTING PANTRY

PL-2 PL-1 PL-2

P-1 RB-1 CPT-1

PL-2 SS-2 PL-2 5

8

EXISTING STORAGE

2

1

20 SF P-1 RB-1 LVT-1

9 7

SHARED OFFICE 132 SF

PL-2 1

PL-2 PL-1 PL-2

P-1 RB-1 CPT-1

13

4

4

PL-2 PL-1 PL-2

PL-2 PL-1 PL-2

EXISTING OFFICE 5

EXISTING OFFICE 6

EXISTING OFFICE 7

115 SF

114 SF 1

123 SF

1 PL-2

P-1 RB-1 CPT-1

P-1 RB-1 CPT-1

4

1 P-1 RB-1 CPT-1

7

Many projects from my professional experience fall into three categories: Interiors and Workspace, Workspace Test Fits, or Educational.

FIT 2 TEST 1/4" = 1'-0"

FIT - FLOOR PLAN 1 TEST 1/4" = 1'-0"

GENERAL PRICING NOTES

KEYED PRICING NOTES

FINISH MATERIALS SCHEDULE

9 3:05:18 PM

The following pages list projects accompanied by a selection of visual examples of those typologies.

\VictoriaM\Documents\Revit Projects\19-0618_Tysons Concourse - 1593 - Suite 125_REV#2_VictoriaM-ai.rvt

DESIGNATION 1

EXISTING ACT CEILING SYSTEM TO REMAIN. PROTECT FOR DURATION OF CONSTRUCTION EFFORTS.

1

EXISTING ROOM TO REMAIN. PROTECT ALL WALL SURFACES AND FINISHES DURING CONSTRUCTION.

2

PATCH, REPAIR, PELACE ANY AND ALL FINISHSES DISTURBED AS A RESULT OF CONSTRUCTION EFFORTS.

2

DEDUCT ALTERNATE 1. EXISTING VCT FINISH FLOORING AND RESILIENT BASE TO REMAIN. PROTECT DURING CONSTRUCTION.

3

ALL FURNITURE IS TENANT FURNISHED / TENANT INSTALLED UNLESS OTHERWISE NOTED.

3

PROTECT ALL EXISTING WALL SURFACES AND FINISHES DURING CONSTRUCTION.

4

PROVIDE BASE AND UPPER CABINETS WITH PLAM FINISH AND PLAM COUNTER.

5

PROVIDE BASE CABINETS WITH KNEE SPACE AND UPPER CABINETS. BASE AND UPPER CABINETS TO HAVE PLAM FINISH. COUNTER TO BE SOLID SURFACE.

4

LOW VOLTAGE IS TENANT FURNISHED / TENANT INSTALLED UNLESS OTHERWISE NOTED.

5

BREAK OUT PRICING INTO DIVISIONS FOR THE REFERENCED TEST FIT.

6

7

8

9

FINISHES ARE NOTED ON THIS PLAN. FINISH SPECIFICATIONS AND LOCATIONS ARE INTENDED TO ILLUSTRATE OVERALL DESIGN INTENT AND FOR GENERAL BUDGETING PURPOSES. FINAL COORDINATION OF FINISH SPECIFICATIONS AND LOCATIONS TO BE CONFIRMED BY BUILDING OWNER AND TENANT DURING THE SCHEMATIC DESIGN PHASE OF THE CONSTRUCTION DOCUMENTS. THIS DOCUMENT IS NOT INTENDED TO BE INCLUSIVE OF ALL POWER LOCATIONS. POWER LOCATIONS INDICATED ARE FOR BUDGETING PURPOSES AND TO ILLUSTRATE SPECIFIC TENANT COMMUNICATED REQUIREMENTS. ALL FINAL POWER LOCATIONS, SPECIFICATIONS, AND CONFIGURATIONS ARE TO BE DETERMINED BY ELECTRICAL ENGINEER IN CONJUNCTION AND COMPLIANCE WITH THE MOST CURRENT ELECTRICAL CODES AND AUTHORITIES HAVING JURISDICTION DURING THE SCHEMATIC DESIGN PHASE OF CONSTRUCTION DOCUMENTS; FINAL ELECTRICAL DESIGN TO BE APPROVED BY THE BUILDING OWNER AND TENANT DURING THE SCHEMATIC DESIGN PHASE OF THE CONSTRUCTION DOCUMENTS. THIS DOCUMENT IS NOT INTENDED TO BE INCLUSIVE OF ALL MECHANICAL WORK / EQUIPMENT. MECHANICAL EQUIPMENT SHOWN IS FOR BUDGETTING PURPOSES AND TO ILLUSTRATE OVERALL DESIGN INTENT. ALL FINAL MECHANICAL WORK / EQUIPMENT SIZING/ LOCATIONS ARE TO BE DETERMINED BY A MECHANICAL ENGINEER IN CONJUNCTION AND COMPLIANCE WITH THE MOST CURRENT MECHANICAL / ELECTRICAL CODES AND AUTHORITIES HAVING JURIDICTION DURING THE SCHEMATIC DESIGN PHASE OF CONSTRUCTION DOCUMENTS; FINAL MECHANICAL DESIGN TO BE APPROVED BY THE BUILDING OWNER AND TENANT DURING THE SCHEMATIC DESIGN PHASE OF THE CONSTRUCTION DOCUMENTS.

6

BUILT-IN CHECK-IN / CHECK-OUT MILLWORK WITH BASE CABINETS AND KNEE SPACE. PROVIDE SOLID SURFACE TRANSATION LEDGE AT 34" AFF AND COUNTER AT 30" AFF.

7

PROVIDE UPPER CABINETS WITH PLAM FINISH.

11 COORDINATE EXTENTS OF DEMOLITION WITH NEW WORK AS SHOWN. CONTRACTOR TO VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS.

MANUF

RESILIENT BASE

ASSUME JOHNSON

CARPET CPT-1

CARPET TILE

ASSUME MILLIKEN

PAINT P-1 P-2 P-3

PAINT PAINT PAINT

ASSUME BENJAMIN ASSUME BENJAMIN ASSUME BENJAMIN

PLASTIC LAMINATE PL-1 PL-2

PLASTIC LAMINATE PLASTIC LAMINATE

ASSUME FORMICA ASSUME WILSONA

SOLID SURFACE SS-1 SS-2

SOLID SURFACE SOLID SURFACE

ASSUME CEASARS ASSUME CORIAN

8

NEW DOOR, FRAME AND HARDWARE TO MATCH EXISTING

9

NEW 3'-0" X 7'-0" CASED OPENING

10

RELOCATED DOOR, FRAME AND HARDWARE

TILE CT-1

CERAMIC TILE

ASSUME ARCHITEC

NEW 4'-0" X 3'-0" SLIDING GLASS TRANSACTION WINDOW W/ PLAM TRANSACTION LEDGE

VINYL TILE LVT-1

LUXARY VINYL TILE

ASSUME HAPPY FE

11

12

NEW FRAMELESS GLASS PARTITION AT 42" AFF TO 8'-0" AFF. PROVIDE SOLID SURFACE SILL.

13

SYSTEMS FURNITURE ROOM DIVIDER.

14

EXISTING ACT AND GRID TO REMAIN. PROTECT FOR DURATION OF CONSTRUCTION.

15

PROVIDE NEW EXIT LIGHT. SPEC TO MATCH BUILDING STANDARD.

16

RELOCATE EXISTING LIGHT FIXTURE AND ACOUSTIC CEILING TILES AS NEEDED TO ACHIEVE INDICATED CEILING LAYOUT.

17

PROVIDE NEW RECESSED CAN LIGHT FIXTURE. MATCH SPECIFICATIONS OF EXISTING TO REMAIN.

18

PROVIDE SUSPENDED GYPSUM BOARD CEILING @ 7'-6" AFF AND RECESSED LED LED LIGHT FIXTURES

MODIFY EXISTING MECHANICAL SYSTEM AS NECESSARY TO ACCOMODATE NEW LAYOUT.

10 MODIFY EXISTING FIRE ALARM SYSTEM AS NECESSARY TO ACCOMODATE NEW LAYOUT. PROVIDE A CODE COMPLIANT FIRE ALARM/ FIRE SUPRESSION SYSTEM. VERIFY SPRINKLER PIPING MATERIAL AND INCLUDE ANY NECESSARY MODIFICATIONS AS PART OF THE BASE BID.

DESCRIPTION

BASE RB-1

19

PROVIDE GYPSUM BOAR BULKHEAD @ 8'-0" AFF WITH PARTITION EXTENDING TIGHT TO DECK

20

NEW 2X2' MECHANICAL DEVICE

21

RELOCATE EXISTING MECHANICAL DIFFUSER, ASSOCIATED MECHANICAL CONNECTIONS, AND ACOUSTIC CEILING TILES AS NEEDED TO ACHIEVE INDICATED CEILING LAYOUT.


IN TER IOR S AND WOR K PL ACE • T-Mobile Switch Room Expansion Beltsville

• L2T @ Woodland Park Rd

• Valo Park 1st Floor Demo

• Urgent.ly

• New Age Protection

• 8159 Leesburg Pike Suite 900

• Valo Park Lower Level Spec Suite

• Suite 509

• Valo Park 2nd and 3rd Floor Corridors

• ...

Urgent.ly, 2019/20

professional

• ALPA Demising and Corridors • WMATA Station Restroom Renovation Drawings

All reproduction + intellectual property rights reserved by Architecture Incorporated © 2019

TEST FIT LEGEND NEW PARTITION EXISTING PARTITION

EXISTING DOOR TO REMAIN

NIC

WOR K PL ACE TE ST F I T

NEW DOOR AND FRAME

NIC

NEW GLASS PARTITION

NEW FRAMELESS GLASS DOOR NEW GLASS SIDELIGHT

BUILDING FLOOR - AREA NOT IN CONTRACT

NIC

TENANT SPACE - AREA NOT IN CONTRACT

EXISTING STAIR

EXISTING COMMON CORRIDOR

116 SF

ENTRY

NIC

EXISTING WOMEN'S RESTROOM MONITOR LOCATION

OFFICE 1

CONF 259 SF

EXISTING ELECTRICAL/ TELEPHONE

EXISTING TENANT SUITE

CEILING TRANSITION OFFICE 2 113 SF MW

EXISTING J.C.

DW

GALLEY/OPS 169 SF

    

• Dr. Nataraj Suite 100

• Quadium Renovation

• Suite 301

• Wildlife Habitat Council Test Fit

LAN/STOR

Design Documents for:

61 SF

PASSAGE OFFICE 3

EXISTING MEN'S RESTROOM

REF.

117 SF

CEILING TRANSITION

COPY / WORK

OFFICE 4 117 SF

8605 WESTWOOD CENTER DRIVE VIENNA, VA 22182

NIC

ATLANTIC REALTY AGEIS MOBILE - SUITE 409

EXISTING TENANT SUITE

EXISTING TENANT SUITE

LOGO/FEATURE WALL

RoboMQ Test Fit, 2019

• WMATA Loisdale Office Furniture Permit Plan

• UICGS 8th & 9th Floor

• Korn Ferry

• 8605 Suite 207/209 Test Fit

• RoboMQ Test Fit

• Aegis Mobile Test Fit

• Rehancement Group

• 8603 Westwood Suite 250

• GSA Test Fit



NIC

Issue

07.01.2019

TEST FIT

624 SF



OFFICE 5 159 SF

FLOOR TEST FIT 1 4TH 1/4" = 1'-0"

4TH FLOOR

 As indicated  VWM  STW 

AREA OF WORK

KEYPLAN N.T.S

SCH1.1

TEST FIT

C:\Users\VictoriaM\Documents\Revit Projects\19-0701_Aegis Mobile_8605 Westwood Suite 409_CENTRAL 2018_victoriam-AI.rvt

7/1/2019 4:42:24 PM

OPEN OFFICE

• Reston Corner Ameresco Test Fit

• Spec Suites 700a/700b/700c

• Danya Institute

• Valo Park Refreaction Point Test Fit

• Spec Suite 450 Test Fit

• ...

• Spec Suite Test Fit


MV - GIRLS' RESTROOM

F102

8 A1.5

SEATING

PROMETHEAN BOARD SYSTEM

22' - 8 3/8"

12' - 1 5/8"

16' - 10"

24' - 8 3/8"

MV - CORR C111

MEDIA WORK & PRODUCTION

24' - 0"

BRIDING AS REQUIRED - REF TO STRUCT DOCS

PROMETHEAN BOARD SYSTEM

716 SF

4' - 1 1/8" 18 BC

MEDIA ASSIST. WORKSTATION, NIC

MV - BOOK STOR

SB - IEP CONF 377 SF

CIRCULATION DESK, NIC

SEATING

SB INSTRUCT AREA

MONITOR, NIC

MV - MEDIA STACKS 2325 SF

283 SF

CREDENZA, NIC

MECH

283 SF

LOCKED LAMINATOR CABINET

MAIN BUILDING ROOF 10' - 10 1/2"

124 SF

26' - 3 1/4"

PROMETHEAN BOARD SYSTEM

590 SF 12'MB-M

TEACHER WARDROBE

SEATING

32' - 2 1/2"

SB - CHAIR STOR

MV - LG INSTRUCT. AREA

1' - 4"

BLDG SVCS OFFICE

MEDIA CENTER COURTYARD

16'MB-M

CORR

64' - 2" 32' - 0"

BLDG SVCS

MV VESTIBULE

MV LOBBY

ELEV CONTROL RM

ELEV

MV GENERAL OFFICE

MV WORKROOM

ROOF LOW POINT 11' - 5"

MV - CORR

MV - CORR

D120

HEALTH OFFICE

MV SPECIAL PROG OFF

HEALTH ASSESSMENT

MEDIA MDF TELECOM

MV ASSISTANT PRINC OFF

186 SF 11' - 11 3/8"

13' - 0 5/8" 8

REST AREA

165 SF

414 SF

8' - 7 5/8"

WAITING AREA

MV SUPPLY CLOSET

D123

MV - STAFF TLT

REST AREA

SB GRADES 2-5 CLASSROOM

SB - ESOL STAFF OFFICE

SB SOCIAL WORKER OFFICE

SB DE-ESCALATION RM SB GRADES 2-5 CLASSROOM

6' - 9 3/8" MO

CEILING AS CHEDULED, REFER TO REFLECTED CEILING PLAN, TYP

B118

FIRE CONTROL ROOM SB TESTING CLOSET

OFFICE

Calvin Coolidge H.S. R41B

5 3/8" SILL

6315 5th St VW Washington, DC 20011

2' - 8"

2' - 8 3/4"

34829

x2 A4.3

DOW - TYPE F

2' - 2 5/8" 10 BC

7 A2.2

SB - EPS OFFICE

SB - STAFF TLT

SB SUPPLY CLOSET

SB RECORDS RM

SB STUDENT SUPPORT OFFICE

SB PRINCIPAL'S TLT

MEDIA CENTER

Sheet List Sheet Number ST000 ST001 ST101 ST102 ST103 ST201 ST301 ST302 ST401 ST501 ST502 ST503 ST601 ST701 ST801 ST901 ST303

Sheet Issue Date Drawn By

Sheet Name COVER PAGE NOTES & ABBREVIATIONS FOUNDATION PLAN FRAMING PLAN SEATING PLAN FRONT ELEVATION SECTIONS SECTIONS Unnamed STEEL DETAILS STEEL DETAILS ALUMINUM DETAILS Unnamed Unnamed Unnamed Unnamed SECTIONS

08/08/18 08/08/18

Author Author

08/08/18 08/08/18 08/08/18 08/08/18 08/08/18 08/08/18 08/08/18 08/08/18 08/08/18 08/08/18 08/08/18 08/08/18 08/08/18 08/08/18 08/16/18

Author Author Author Author Author Author Author Author Author Author Author Author Author Author Author

Current Revision

Current Revision Description

& COURTYARD WRAP TILE WAINSCOT INTO CONCEPT WINDOW OPENING FIRST FLOOR

R33  1/8" = 1'-0"  VWM  BSP

CAFETERIA 2 R33A

7 A2.2

CAFETERIA 1

PLAN

ASK1.1

TILE WAINSCOTT, SEE INTERIOR ELEVATIONS

2' - 8 7/8"

SB DE-ESCALATION RM

EDIA CENTER & COURTYARD

x2 A4.3

LEVEL 1 0' - 0"

10 A2.2

No.

TILE WAINSCOTT, SEE INTERIOR ELEVATIONS

LEVEL 1 0' - 0"

Description

Date

B S W S

N21

LEVEL 1 0' - 0"

- TYPE B4 10 WINDOW 3/4" = 1'-0"

WRAP TILE WAINSCOT INTO WINDOW OPENING

EXISITING MASONRY WALL TO REMAIN, TYP

1' - 4" 6 BC

Coolidge Senior HS Bleachers

SB - EPS OFFICE SB - PSYCH OFFICE

SB - CORR

SB DE-ESCALATION RM



MV - CONF

SB - CORR

SB - CORR

SB DE-ESCALATION RM

C

9' - 5" MO

SB GRADES 2-5 CLASSROOM

SB GRADES 2-5 CLASSROOM

John Wayland ES Finish Floorplan Option

SB - SM INSTRUCT SUPPORT RM

Is

CD PROGRESS

9

SB DE-ESCALATION RM

MECH

P

12.11.17

Issued

8

SB CLOSET MECH

Coolidge Senior HS

John Wayland ES Monumental Sign (Link)

D122

SB OBSERVATION RM

MECH

SB GRADES 2-5 CLASSROOM

MV RECORDS RM

SB - CORR

C100

SB OBSERVATION RM

SIM

3' - 0 3/8"

SB - CORR

C112

13' - 6 1/2" 61 BC

SB - CORR

MECH

3 A2.2



STOR

127 SF

SB - GIRLS' RESTROOM

MV - PRINC TLT

MV PRINCIPAL'S OFFICE

SB - CORR SB PARENT RESOURCE

SB - CORR

8' - 5"

MV - MEDIA SUP/STOR

MV - CORR

1 A2.2

16' - 4 3/8"

MEDIA ASSIST. WORKSTATION, NIC

MEDIA SUP/STOR

10' - 6 1/4"

MECH 113 SF

13' - 2 1/8"

16' - 6 3/8"

STUDENT WORKSTATIONS, NIC

975 SF 12' - 8 3/8"

170 SF

32' - 6 7/8"

OPERABLE WALL

SB - MEDIA STACKS

SB - COAT CLOSET

31' - 4 3/4"

SB - CONF

10 TREATMENT/MED AREA

HEALTH CORR

TEACHER WARDROBE

METAL SHELVES, TYP

16' - 5 1/2"

14' - 9 3/8"

LOCKED LAMINATOR CABINET

32' - 8 3/8"

19' - 4"

21' - 7"

14' - 8 3/8"

SB DE-ESCALATION RM

C110

MV CLOSET

SB - CORR

CAFETERIA & ADDITION ROOF 14' - 0"

5 3/8" SILL

MV - CORR

16'MB-M

BLDG SVCS LOCKERS

STAIR 2

STAFF TLT

(E) ROOF SYSTEM AND GRAVEL STOP TO REMAIN

CD PROGRESS

Maryvale/Sandburg Library Floorplan

BLDG SVCS SHOWER

MV - CAPP CLOSET

MV - CAPP CLOSET

.

BLDG SVCS

MECH

1000 1st STREET ROCKVILLE, MD 20850

MV - CAPP CLOSET

STAFF TLT

MV - TLT

MV - CAPP OBSERVATION / OFF

MECH

     

MECH

Construction Documents for:

professional

MV - PTA STOR

BLDG SVCS TLT

MV - GIRLS' RESTROOM

2' - 7" 7 BC @ INFILL ONLY

MV - CAPP CLASSROOM

MV - CAPP CLASSROOM

F139

MARYVALE ES - SANDBURG LC

MV - CAPP CLASSROOM

MV - CORR

MONTGOMERY COUNTY PUBLIC SCHOOLS

MV - BOYS' RESTROOM

MV - CAPP SENORY RM

Fulks Run ES Typical Window Detail

F108

5

0"

Maryvale/Sandburg Courtyard (Link)

MV - CORR

OSE

R RM OR

MV - TLT MV GRADE 1 CLASSROOM

OSE

G

- TYPE C1 - HEAD DETAIL 6 WINDOW 3/4" = 1'-0"

MV - BOYS' RESTROOM

MV - TLT

- TYPE C2 11 WINDOW 3/4" = 1'-0"

Sc Dr Ch


EDUCATIONAL

• • • • • • • • • • • • • •

Prince William County PS Lake Ridge Elementary School Renovation Prince William County PS Saunders Elementary School Renovation Fairfax County PS West Springfield High School Renovation Fairfax Christian School Rockingham County PS Dayton Learning Center Rockingham County PS John Wayland Elementary School Renovation Rockingham County PS Pleasant Valley Elementary School Renovation Montgomery County PS Maryvale Sandburg Learning Center Loudoun County PS Freedom HS Modular Classrooms Rockingham County PS Fulks Run Elementary School Renovation Rockingham County PS John C Myers Elementary School Renovation Loudoun County PS Transportation Department Training Room Renovation Loudoun County PS Dominion High School Office Renovation ... PR OBONO

RCPS Pleasant Valley Elementary School Outdoor Learning Garden GRACe: Sue Wrbican Buoyant Force Sculpture at Reston Town Center

RCPS Outdoor Learning Garden

Maryvale/Sandburg Facade Designs

John Wayland ES Gym (Link)

professional


“...composed of seven academic semesters and three cooperative (co-op) semesters within four years of undergraduate education. Students are educated in design, construction technologies, digital arts, the humanities, social sciences, and aesthetic expression. Architecture is the culturally responsible design and production of buildings that are useful, durable, meaningful, inspiring, and responsive to their physical and social contexts...” University Of Cincinnati BS- Architecture

Summer 2015

B . S . OF AR CHI TE CT U R E PR OJE CT INDE X

fall

2014

B . S . AR CH 20 1 7


Spring 2016

Fall 2016

Spring 2017

B . S . AR CH 20 1 7

R E GGIO EMILIA E AR LY LE AR NING CEN TER

SOU TH CUMMINSVILE ADAP TI VE R EUSE

MI X ED -USE APAR T MEN T BLOCK

B . S . Arch 20 1 7


R E GGIO EMILIA E AR LY LE AR NING CEN T ER

Exterior Renderings

Interior Renderings

The Reggio Emilia inspired Learning Center is approximately 22,000 SF including Classrooms and Secondary Learning Spaces VIEW FROM THE NORTHWEST CORNER for 120 students ages 1-5. All age groups benefit from access to Piazzas, Altilier and Music Room. Age group 1-2 are on the ground level as well as a Parent/Community Resource Center. Age group 3-5 are on the 2nd level, along with the commercial kitchen and Cucina - a hands on cooking learning space for adults and children.

A connection to nature is reinforced by the unobstructed views outside, fanciful tree-shaped structural columns, and materiality. The interior is supplemented by more than 10,000 SF of outdoor separate play zones for age 1, age 2, and age 3-5, garden learning space, green roof play area, and front plaza gathering space. B . S . Arch 20 1 7


SO U TH CUM M I NS V I LLE

ADAP TI VE R EUSE

Adaptive Reuse and Sustainable Strategies activate underutilized areas of the South Cumminsville and boost the local economy. Site strategies include permeable surfaces and rain gardens at ground and roof level. Building strategies address pedestrian access and facade improvements. 1769 Elmore St serves as an example. VIEW FROM THE NORTHEAST CORNER

AREAS OF FOCUS: • Sustainable Reuse • Water Runoff Reduction • Heat-Island Effect • Local Economy • Community Functions ROOFTOP GArDEN

WITH PErMEABLE SUrFACES

POTENTIAL COMMERcIAL FUNcTIONS

B . S . Arch 20 1 7

V

IEW OF EXISTING L B IGHTED BUILDING FROM NORTHEAST CORNER


Additionally, a 2 level below grade parking garage provides a much need parking solution for the area. The apartment main lobby has a generously sized seating area and leasing office. Just outside the seating area there is an outdoor patio. B . S . Arch 20 1 7

Plaza Level: Cafe, Office and public Plaza. 1st Floor: Retail Space, Apartment Main Lobby

fits on the plaza level.

and reception area easily

An open office space for 10

At the Plaza level,

a

bistro provides socialization hubs.

Cafe or

VIEW FROM THE NORTHEAST CORNER

connected by breezeways

The development provides 22 apartments, space for 1 retail business on the front facade, 2 commercial spaces on the plaza level, and pleasant walkable area encouraging a connection between the University of Cincinnati and the greater Clifton community. The facade’s material and proportions pay homage to nearby Architecturally Significant Buildings such as Corryville Catholic Elementary, Hughes High School and, Old St. George. The plaza level houses a cafe and office space, creating environments conducive to educational facilities.

Roof Plan: 2 Green roofs

MI X ED -USE APAR T MEN T BLOCK


3, 2, & 1 Bedroom ADA accessible apartment

Floor Plans. Right (top-Bottom): Breezeways connect apartments to circulation and

amenity spaces. Apartment interiors

A secure elevator leads up to the second floor with management office and fully equipped fitness center. Across a breezeway, the 2 -story south facing lounge has floor-to-ceiling windows, green walls and kitchenettes. Resident only outdoor green spaces are on the 3rd floor and roof. 2nd Floor: access to main lounges, fitness center, management office.

3rd Floor: access to covered terrace and 3 bedroom apartment.

additional lounges.

boast open floorplans and ample

natural light. All one bedroom apartments have full kitchens

and balconies.

4th-7th Floor: 1, 2, & 3 Bedroom Apartments

B . S . Arch 20 1 7


CR E AT I VE OU T LE T S Expressing feeling and human experience through color and artistic liberty. Humanity is not separate from nature. It is deeply rooted within it. Nature does not choose color for specific harmonies, rather it uses color to serve relational purposes. Using color in this manner invokes emotion and engages the mind. Drawings come from photographic references and are less replicas than they are examinations of the expressions. Abstract acrylic paintings are inspired by natural color pallets and emotions. My creative outlets are an investigation into humanity’s essence and consciousness relating to nature. Identity, existence, purpose, energy, nature... it is all intertwined.


creative outlets



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.