E1
500.000 + 0.20
Staff And Trucks Entry
E3
+ 0.00
Green Area For Future Expansion And Pre-Cooling For Air
+ 0.10
Glass Raw Materials Handling Yard
+ 0.20 + 10.00
Adminstration Parking
+ 10.00
+ 0.10
S1
6
+ 15.00
0 .50 7 4
S1
+ 15.00
+ 0.20
+ 0.20
Green Area For Future Expansion And Pre-Cooling For Air
+ 13.00 + 10.00
Lo
+ 10.00
+ 11.00
+ 0.20
a
n di
g
Ba
y
+ 0.10
00 0.0 30
ng di l o sH k uc Tr
+ 0.10
4 .42 43
g kin r a sP r o sit Vi
+ 15.00
g kin r Pa
6
7 .16 5 1
t Lo 5 .40 9 5
7 .27 3 1
m 40
+ 0.20
St
20
m
re St
et
0 .00 0 40
re et + 10.00
E2
Green Area
+ 09.00 47 6.5 9 1
+ 0.20
Filling Hall Glass Bottles Manufacturing plant Administration Aluminum Cans Manufacturing Plant P.E.T Bottles Manufacturing Plant Warehouse E4
General Zoning
_Site Plan
_1:750
Obai Hasab Elrasoul Fifth Year Soft Drinks Factory _ Stage 5 _ 23/12/2012
1
E4
E1
+ 0.20
Staff And Trucks Entry
+ 0.00
Green Area For Future Expansion And Pre-Cooling For Air
+ 0.10 + 0.20
Electrical & A/C Room
Adminstration Parking
g in ur t ac uf n a M l s l e ttl Ha o sB as l G
Bottles Filling Hall
+ 0.10
+ 0.20
Warehouse
g kin r Pa rs o sit Vi
Syrup Prepn aratio
Green Area For Future Expansion And Pre-Cooling For Air
Lo
+ 0.20
+ 0.10
m 40 St re et
. P.E
um in um s ing Al Can tur ac uf all n a H M
g rin u ct fa u an M s ll tle Ha t o TB
a
di
ng
Ba
y
+ 0.10
ng di l o sH k uc Tr
+ 0.20
g kin r Pa
t Lo
m 20
re St
et E2
Green Area
+ 0.20
E3
_Ground Floor Plan
_1:750
Obai Hasab Elrasoul Fifth Year Soft Drinks Factory _ Stage 5 _ 23/12/2012
2
organizer
Conveyer Buffer Area
Preparation: Shower, rinsing and Drying
Filling Hall Finished Cans, Glass and P.E.T Bottles Storage
Ov er
Pallets Lift
he
Traffic Control Units
n Co ts lle Pa tem ad Sys
Glass Bottles Manufacturing and Recycling
Automated Pallet System
ve
Palletizers
ye
Helical Conveyers
Packaging
r
Aluminum Cans Filling And Capping
Buffer Area before Palletizing
Glass Bottles Filling And Capping
P.E.T Bottles Filling And Capping
Depalletizer
+ 0.20
Syrup Preparation
Fridge
+ 0.20
Quality Control
+ 0.10
Ware House Neutral Temperature Storage
Fork Lifts Maneuvering Area
+ 0.20
Hydraulic levelers Loading Dock Dock For Side Loading Distribution Trucks
+ 0.10
Ready Product + 0.20
Automated Pallet System + 0.10
+ 0.20
Palletizer and Depalletizer
Arrived Pallets Temporary Holding area Pallet Feeding Necking and Packaging Depalletizer
+ 0.20
Loading
Aluminum Cans
P.E.T Bottles
Painting Press Shop
Organizer Tubes and Finished Bottles Palletizers Tube Molder
buffer Area
Pre-palletizing Helical Conveyer Packaging
_Ground Floor Plan
_1:750
Obai Hasab Elrasoul Fifth Year Soft Drinks Factory _ Stage 5 _ 23/12/2012
3
+ 20.00 + 15.00
+ 10.00 + 00.00
Elevation E1 _ 1:750
+ 20.00 + 15.00
+ 10.00 + 00.00
Elevation E2 _ 1:750
_Elevations
_1:750
Obai Hasab Elrasoul Fifth Year Soft Drinks Factory _ Stage 5 _ 23/12/2012
4
+ 20.00 + 15.00
+ 10.00 + 00.00
Elevation E3 _ 1:750
+ 20.00 + 15.00
+ 10.00 + 00.00
Elevation E4 _ 1:750
_Elevations
_1:750
Obai Hasab Elrasoul Fifth Year Soft Drinks Factory _ Stage 5 _ 23/12/2012
5
D1
+ 20.00 + 15.00
+ 10.00 + 00.00
2.515
0 00 2.
1.974
Section A-A _ 1:750
1.974
HOT WATER TANK:
1.974
CONDENSOR: Cools the hot Ammonia and turns it into liquid to be ready for evaporation.
SOLAR COLLECTORS:
Ambient Light 0 00 2.
Unique Fresnel Type Solar Thermal Collectors to Concentrate Sun Radiation In The Thermal Oil In the Evacuated Tube 30% less Expensive than the Parabolic Type.
Sun Rays Concentrated on the Mirror on the other Side Which Then Reflects them to the Tube To heat the Oil
Located above the hot oil tank to allow hot water to be continuously heated by convection without pumps.
Air outlet
CHIMNEY:
EVAPORATOR:
Integrated into the mesh surrounding the stairwell to not attract attention, it helps extract hot air by having its outlet high above the ground.
Expand extracted ammonia to achieve the cooling effect
ABSORBER: Contains water that absorbs the Ammonia and transfers it to the generator
AMMONIA GENERATOR:
Skylight:
Heats the water/ammonia solution to evaporate the ammonia
2.515
allways shaded by the concentrator's lens and only admits ambient light.
Light Duct
HEATED OIL TANK: An insulated cistern containing oil as a heat transfer and storage fluid. Copper tubes circulate inside it for exchanging heat between it and the compartments that require heat.
ROOM SPACE:
Mirrors Acrylic Diffuser 1.974
Filling Hall Space Now Illuminated all day
Minimum insolation is achieved by having two insulated concrete walls on the sides facing the sun and from above by the roof garden.
SOLAR HEAT COLLECTOR:
HEAT EXCHANGER: Fresnel Lens
3D Partial View of the Concentrator
Mirror
Shows the configuration of the sun tracking fresnel thermal collector and how it acts as shading device for the light duct
To provide proper air renewal, air is extracted still cold, so it's passed through this heat exchanger with the incoming air to pre-cool it before entering the chilled coils, which lightens the load for refregeration which increases the efficiency of the whole system.
COMPOST COMPARTMENT: Transforms human excreta into usable amendment for soil outside air inlet covered with an electro-static air filter
CHILLED COILS: Air coming from the heat recovery passes through it to complete the air cooling action.
EARTH:
Curved Glass Panel located in the area
Used for pre-cooling the air before entering the system, the effect is maximized because it's a damp soil because of being near the river, also because the segment needed for cooling is shaded by the units suspended above
which is shaded
with the lens for the whole day, curved to
allow for the movement of the device throughout the day Mirrors tunnel the ambient light from the sky until it reaches the diffuser (yellow) to be distributed all over the hall, thus full natural lighting without the heat.
UNDERGROUND HEAT EXCHANGER Air coming from the heat recovery passes through it to complete the air cooling action.
Detail 01 : Fresnel Solar Thermal Collectors _ 1:100
_Sections
Copper channels cover with vacuum glass tube for maximum heat gain and insulation to achieve least heat loss.
_1:750
Air Refrigeration Diagram - Zero Energy Cooling and Ventilation Obai Hasab Elrasoul Fifth Year Soft Drinks Factory _ Stage 5 _ 23/12/2012
6
Perspective _ Bird Eye View
Fresnel Solar Thermal Collectors On The Roof Of The Filling Hall
_Views
Obai Hasab Elrasoul Fifth Year Soft Drinks Factory _ Stage 5 _ 23/12/2012
7