OSC_FS_POC_110908_EN_A.pdf

Page 1

POC Plant Operation Center Plant overview and optimisation

Management system for economic success Our offer:

POC Plant Operation Center For Oerlikon Schlafhorst machines: L Zinser roving frames of the 668, 670 series L Zinser ring spinning machines of the 350, 351, 450, 451 series L Autoconer machines of the X5, 5, 338 (from 01/2000) series L Autocoro 8

L POC management system for Oerlikon Schlafhorst machines L Comprehensive online communication channel for your spinning mill L Data access via web browser from any PC throughout the world L Variable connection options for individual machines, plants and combinations L Efficient machine/plant overview Your advantage: L Well-founded basis for decisions L Targeted and rapid increase in quality and production Collecting data, speeding up information flow, using staff and machines better – with the POC information system, Oerlikon Schlafhorst‘s Plant Operation Center, you systematically increase the quality and economic efficiency of your spinning mill.

L Documented product quality L Targeted labour utilisation L Information transparency at all times via firewall-protected data access L Configurable, user-friendly reports L Bidirectional connection to your IT system

Making reliable decisions based on facts Every piece of your Oerlikon Schlafhorst machine‘s production and quality data is collected centrally online and is available as a shift or production report at the click of the mouse – for rotor spinning and winding machines to the individual spinning position/winding unit, for ring spinning machines and roving frames up to the machine level. With overviews of production and the quality resulting from it prepared graphically and in detail, you optimise your operational application flows and increase the economic success of your company. Data access at any time and from any PC – worldwide You access the data from any of your operating sites’ machines networked anywhere in the world – easily via a web browser and without additional software. Then send your reports directly to a selected e-mail address, attach them as a PDF file or print them out with a system or network printer.

Oerlikon Schlafhorst Zweigniederlassung der Oerlikon Textile GmbH & Co. KG Carlstr. 60 . 52531 Übach-Palenberg . Germany Telefon +49 2451 905 1000 . Telefax +49 2451 905 1001 www.schlafhorst.oerlikontextile.com . info.schlafhorst@oerlikon.com

POC Shift Report

POC Production Report

POC

View:

ProductionReport

Timespan:

04/20/2011 07:45:00 - 04/21/2011 07:45:00

Product ID / Job:

Baumwolle BW 0815 /

Generated:

04/21/2011 07:45:10

Filter:

All machines


POC Plant Operation Center Plant overview and optimisation Details

Tried and tested user interface POC is extremely easy to operate. Logic and structure are set up along the lines of the Oerlikon Schlafhorst machine control systems – for rapid data access and short training periods. High-performing functions L POC User Management

Here you allocate and manage the internal user permissions for all the machines in your production plant networked with the system. POC User Management

L POC Shift Management:

Manage your operational shift calendar and the associated shift working times. L POC Reports & Statistics:

POC Shift Report The shift report indicates the per-shift running behaviour of the machines connected, e.g. the machines‘ efficiency or the number of stoppages. POC Production Report The production report makes for fast and optimal evaluation of the production data and provides information about: production quantities, assignment of products to machines. POC Shift Management

Professional reporting system Two standard reports are pre-configured. Additional templates for shift, daily, weekly or monthly reports can be custom designed for your operational application flows. All machine-generated data are available to be configured into reports via the configuration dialog. Shift supervisors, operation managers, sales directors and company management receive your reports targeted to the objective required of the given situation.

POC Shift Report View:

ShiftReport(MC)

Shift End:

04/21/11 05:45:00

Generated:

04/21/2011 07:46:59

Filter:

All machines 5

1

Machine

6171.2 kg

Products

ACO 8 - 1

kg 1

ACO 8 - 2

1

ACO 8 - 3

2229

nYB 389

1411.6 kg

544

1300.4 kg

199.7 /TRh

491

265.1 /TRh nSC

160.5 /TRh 151.1 /TRh

85.3 %

26 min

%Ma

306.1 /TRh

tRL 97.1 %

138.5 /TRh

89.9 %

19 min

698 min 647 min

95.1 %

17 min

684 min

ACO 8 - 4

1

606.8 kg

134

236.3 /TRh

177.1 /TRh

55.8 %

81 min

401 min

1

1726.5 kg

671

209.3 /TRh

261.9 /TRh

88.5 %

8 min

634 min

Apr 21, 2011 7:47 AM

397.8 /TRh

613 min tRun

4 min

ACO 8 - 5

Printed:

1

186.7 /TRh

nDP

1125.9 kg

1 / 1

(c) Oerlikon Textile Software Solutions

POC Shift Report

POC Production Report View:

ProductionReport

Timespan:

04/20/2011 07:45:00 - 04/21/2011 07:45:00

Product ID / Job:

Baumwolle BW 0815 /

Generated:

04/21/2011 07:45:10

Filter:

All machines

5

13

Machine

Group

1440 No. of. pos.

159.4 m/min Speed

14.9 NeB YCe

2996.8 100km 100km

12790.6 kg kg

188.1 /TRh nYB

254.8 /TRh nSC

10.2 /TRh nL

62.3 % %PR

ACO 8 - 1

2

288

155.8 m/min

16.4 NeB

613.0 100km

2206.7 kg

175.0 /TRh

301.6 /TRh

0.6 /TRh

72.3 %

ACO 8 - 2

3

120

157.7 m/min

14.1 NeB

248.6 100km

1044.2 kg

171.9 /TRh

150.6 /TRh

1.9 /TRh

55.0 %

88.3 % %Ma 96.5 % 91.3 %

ACO 8 - 2

5

109

157.7 m/min

14.1 NeB

227.5 100km

955.3 kg

172.5 /TRh

161.7 /TRh

2.9 /TRh

68.7 %

92.2 %

ACO 8 - 2

6

59

197.4 m/min

9.8 NeB

139.6 100km

837.4 kg

333.2 /TRh

117.6 /TRh

4.2 /TRh

30.5 %

83.6 %

ACO 8 - 3

3

288

157.7 m/min

14.1 NeB

618.4 100km

2597.4 kg

152.7 /TRh

400.3 /TRh

6.4 /TRh

70.6 %

95.1 %

ACO 8 - 4 ACO 8 - 4

1

44

155.8 m/min

119.6 /TRh

4.9 /TRh

54.1 %

62.1 %

179.0 /TRh

255.1 /TRh

9.3 /TRh

61.8 %

78.9 %

14.1 NeB

194.4 100km

816.4 kg

161.5 /TRh

361.5 /TRh

19.0 /TRh

53.7 %

72.6 %

227.5 /TRh

362.3 kg

157.8 m/min

0.5 /TRh

70.8 %

674.7 kg

100.6 100km

94

70.7 /TRh

0.0 /TRh

187.4 100km

16.4 NeB

60

286.1 /TRh

246.7 /TRh

16.4 NeB

155.8 m/min

1

463.2 kg

259.8 /TRh

141.6 m/min

57

2

185.3 100km

257.2 kg

187

ACO 8 - 5

23.6 NeB

71.5 100km

187

3 4

ACO 8 - 5

169.6 m/min

16.4 NeB

2

ACO 8 - 4 ACO 8 - 4

68.3 %

92.1 %

91.2 %

157.7 m/min

14.1 NeB

116.5 100km

489.4 kg

187.3 /TRh

151.6 /TRh

48.6 /TRh

58.7 %

85.9 %

ACO 8 - 5

5

50

180.4 m/min

11.8 NeB

112.8 100km

563.9 kg

188.0 /TRh

461.4 /TRh

48.9 /TRh

71.5 %

87.1 %

ACO 8 - 5

6

84

177.9 m/min

7.0 NeB

181.2 100km

1522.4 kg

175.1 /TRh

83.1 /TRh

48.9 /TRh

41.5 %

84.6 %

Custom Configuration of the Reports Printed:

Apr 21, 2011 7:45 AM

OSC/09-11/POC1/EN

POC Production Report

Oerlikon Schlafhorst Zweigniederlassung der Oerlikon Textile GmbH & Co. KG Carlstr. 60 . 52531 Übach-Palenberg . Germany Telefon +49 2451 905 1000 . Telefax +49 2451 905 1001 www.schlafhorst.oerlikontextile.com . info.schlafhorst@oerlikon.com

1 / 1

(c) Oerlikon Textile Software Solutions


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.