POC Plant Operation Center Plant overview and optimisation
Management system for economic success Our offer:
POC Plant Operation Center For Oerlikon Schlafhorst machines: L Zinser roving frames of the 668, 670 series L Zinser ring spinning machines of the 350, 351, 450, 451 series L Autoconer machines of the X5, 5, 338 (from 01/2000) series L Autocoro 8
L POC management system for Oerlikon Schlafhorst machines L Comprehensive online communication channel for your spinning mill L Data access via web browser from any PC throughout the world L Variable connection options for individual machines, plants and combinations L Efficient machine/plant overview Your advantage: L Well-founded basis for decisions L Targeted and rapid increase in quality and production Collecting data, speeding up information flow, using staff and machines better – with the POC information system, Oerlikon Schlafhorst‘s Plant Operation Center, you systematically increase the quality and economic efficiency of your spinning mill.
L Documented product quality L Targeted labour utilisation L Information transparency at all times via firewall-protected data access L Configurable, user-friendly reports L Bidirectional connection to your IT system
Making reliable decisions based on facts Every piece of your Oerlikon Schlafhorst machine‘s production and quality data is collected centrally online and is available as a shift or production report at the click of the mouse – for rotor spinning and winding machines to the individual spinning position/winding unit, for ring spinning machines and roving frames up to the machine level. With overviews of production and the quality resulting from it prepared graphically and in detail, you optimise your operational application flows and increase the economic success of your company. Data access at any time and from any PC – worldwide You access the data from any of your operating sites’ machines networked anywhere in the world – easily via a web browser and without additional software. Then send your reports directly to a selected e-mail address, attach them as a PDF file or print them out with a system or network printer.
Oerlikon Schlafhorst Zweigniederlassung der Oerlikon Textile GmbH & Co. KG Carlstr. 60 . 52531 Übach-Palenberg . Germany Telefon +49 2451 905 1000 . Telefax +49 2451 905 1001 www.schlafhorst.oerlikontextile.com . info.schlafhorst@oerlikon.com
POC Shift Report
POC Production Report
POC
View:
ProductionReport
Timespan:
04/20/2011 07:45:00 - 04/21/2011 07:45:00
Product ID / Job:
Baumwolle BW 0815 /
Generated:
04/21/2011 07:45:10
Filter:
All machines
POC Plant Operation Center Plant overview and optimisation Details
Tried and tested user interface POC is extremely easy to operate. Logic and structure are set up along the lines of the Oerlikon Schlafhorst machine control systems – for rapid data access and short training periods. High-performing functions L POC User Management
Here you allocate and manage the internal user permissions for all the machines in your production plant networked with the system. POC User Management
L POC Shift Management:
Manage your operational shift calendar and the associated shift working times. L POC Reports & Statistics:
POC Shift Report The shift report indicates the per-shift running behaviour of the machines connected, e.g. the machines‘ efficiency or the number of stoppages. POC Production Report The production report makes for fast and optimal evaluation of the production data and provides information about: production quantities, assignment of products to machines. POC Shift Management
Professional reporting system Two standard reports are pre-configured. Additional templates for shift, daily, weekly or monthly reports can be custom designed for your operational application flows. All machine-generated data are available to be configured into reports via the configuration dialog. Shift supervisors, operation managers, sales directors and company management receive your reports targeted to the objective required of the given situation.
POC Shift Report View:
ShiftReport(MC)
Shift End:
04/21/11 05:45:00
Generated:
04/21/2011 07:46:59
Filter:
All machines 5
1
Machine
6171.2 kg
Products
ACO 8 - 1
kg 1
ACO 8 - 2
1
ACO 8 - 3
2229
nYB 389
1411.6 kg
544
1300.4 kg
199.7 /TRh
491
265.1 /TRh nSC
160.5 /TRh 151.1 /TRh
85.3 %
26 min
%Ma
306.1 /TRh
tRL 97.1 %
138.5 /TRh
89.9 %
19 min
698 min 647 min
95.1 %
17 min
684 min
ACO 8 - 4
1
606.8 kg
134
236.3 /TRh
177.1 /TRh
55.8 %
81 min
401 min
1
1726.5 kg
671
209.3 /TRh
261.9 /TRh
88.5 %
8 min
634 min
Apr 21, 2011 7:47 AM
397.8 /TRh
613 min tRun
4 min
ACO 8 - 5
Printed:
1
186.7 /TRh
nDP
1125.9 kg
1 / 1
(c) Oerlikon Textile Software Solutions
POC Shift Report
POC Production Report View:
ProductionReport
Timespan:
04/20/2011 07:45:00 - 04/21/2011 07:45:00
Product ID / Job:
Baumwolle BW 0815 /
Generated:
04/21/2011 07:45:10
Filter:
All machines
5
13
Machine
Group
1440 No. of. pos.
159.4 m/min Speed
14.9 NeB YCe
2996.8 100km 100km
12790.6 kg kg
188.1 /TRh nYB
254.8 /TRh nSC
10.2 /TRh nL
62.3 % %PR
ACO 8 - 1
2
288
155.8 m/min
16.4 NeB
613.0 100km
2206.7 kg
175.0 /TRh
301.6 /TRh
0.6 /TRh
72.3 %
ACO 8 - 2
3
120
157.7 m/min
14.1 NeB
248.6 100km
1044.2 kg
171.9 /TRh
150.6 /TRh
1.9 /TRh
55.0 %
88.3 % %Ma 96.5 % 91.3 %
ACO 8 - 2
5
109
157.7 m/min
14.1 NeB
227.5 100km
955.3 kg
172.5 /TRh
161.7 /TRh
2.9 /TRh
68.7 %
92.2 %
ACO 8 - 2
6
59
197.4 m/min
9.8 NeB
139.6 100km
837.4 kg
333.2 /TRh
117.6 /TRh
4.2 /TRh
30.5 %
83.6 %
ACO 8 - 3
3
288
157.7 m/min
14.1 NeB
618.4 100km
2597.4 kg
152.7 /TRh
400.3 /TRh
6.4 /TRh
70.6 %
95.1 %
ACO 8 - 4 ACO 8 - 4
1
44
155.8 m/min
119.6 /TRh
4.9 /TRh
54.1 %
62.1 %
179.0 /TRh
255.1 /TRh
9.3 /TRh
61.8 %
78.9 %
14.1 NeB
194.4 100km
816.4 kg
161.5 /TRh
361.5 /TRh
19.0 /TRh
53.7 %
72.6 %
227.5 /TRh
362.3 kg
157.8 m/min
0.5 /TRh
70.8 %
674.7 kg
100.6 100km
94
70.7 /TRh
0.0 /TRh
187.4 100km
16.4 NeB
60
286.1 /TRh
246.7 /TRh
16.4 NeB
155.8 m/min
1
463.2 kg
259.8 /TRh
141.6 m/min
57
2
185.3 100km
257.2 kg
187
ACO 8 - 5
23.6 NeB
71.5 100km
187
3 4
ACO 8 - 5
169.6 m/min
16.4 NeB
2
ACO 8 - 4 ACO 8 - 4
68.3 %
92.1 %
91.2 %
157.7 m/min
14.1 NeB
116.5 100km
489.4 kg
187.3 /TRh
151.6 /TRh
48.6 /TRh
58.7 %
85.9 %
ACO 8 - 5
5
50
180.4 m/min
11.8 NeB
112.8 100km
563.9 kg
188.0 /TRh
461.4 /TRh
48.9 /TRh
71.5 %
87.1 %
ACO 8 - 5
6
84
177.9 m/min
7.0 NeB
181.2 100km
1522.4 kg
175.1 /TRh
83.1 /TRh
48.9 /TRh
41.5 %
84.6 %
Custom Configuration of the Reports Printed:
Apr 21, 2011 7:45 AM
OSC/09-11/POC1/EN
POC Production Report
Oerlikon Schlafhorst Zweigniederlassung der Oerlikon Textile GmbH & Co. KG Carlstr. 60 . 52531 Übach-Palenberg . Germany Telefon +49 2451 905 1000 . Telefax +49 2451 905 1001 www.schlafhorst.oerlikontextile.com . info.schlafhorst@oerlikon.com
1 / 1
(c) Oerlikon Textile Software Solutions