PS0 Relieft Joint @ Top of Wall w Slab on Grade

Page 1

t

SLAB

EQ

EQ

#X HOOK BAR OR FORM-SAVER BAR (BY OTHERS) INSERTED INTO PS=Ø COUPLER @ XX" O.C. BEFORE SLAB POUR (SEE STRUCTURAL)

CONCRETE SLAB (SEE STRUCTURAL) #X x X'-X" THREADED BAR PS=Ø SLOTTED COUPLER (MID-DEPTH) @ XX" O.C. VISQUEEN OR SIM. BOND BREAKER CONCRETE WALL (SEE STRUCTURAL)

NOTES: 1. APPLY BOND-BREAKER BETWEEN SLAB POUR & WALL POUR PER MANUFACTURES REQUIREMENTS. 2. THE PS=Ø RELIEF JOINT TO REMAIN OPEN FOR XX DAYS. 3. AFTER THE TIME PERIOD SPECIFIED ABOVE, THE PS=Ø COUPLERS AND JOINT TO BE GROUTED PER MANUFACTURES REQUIREMENTS. 4. SEE PS=Ø MANUFACTURE DATA FOR MORE INFORMATION. PS=Ø RELIEF JOINT @ TOP OF WALL w/SLAB ON GRADE