PS0 Relieft Joint @ Wall w Temporary Stressing Strip

Page 1

SECOND POUR

FIRST POUR

#X HOOK BAR OR FORM-SAVER (BY OTHERS) INSERTED INTO PS=Ø COUPLER @ XX" O.C. BEFORE SECOND POUR (SEE STRUCTURAL)

t

SLAB

EQ

EQ

BULKHEAD

CONCRETE SLAB (SEE STRUCTURAL) #X x X'-X" THREADED BAR PS=Ø SLOTTED COUPLER (MID-DEPTH) @ XX" O.C. CONCRETE WALL (SEE STRUCTURAL)

NOTES: 1. APPLY BOND-BREAKER BETWEEN SECOND POUR & WALL POUR PER MANUFACTURES REQUIREMENTS. 2. SECOND POUR CAN BE PLACED AFTER STRESSING. 3. THE PS=Ø RELIEF JOINT TO REMAIN OPEN FOR XX DAYS. 4. AFTER THE TIME PERIOD SPECIFIED ABOVE, THE PS=Ø COUPLERS AND JOINT TO BE GROUTED PER MANUFACTURES REQUIREMENTS. 5. SEE PS=Ø MANUFACTURE DATA FOR MORE INFORMATION. 6. NO BACKSHORING REQUIRED.

PS=Ø RELIEF JOINT @ WALL w/TEMPORARY STRESSING STRIP