Physical Planning
Portfolio Parth MAkwana
“The 19th century was a century of empires, the 20th century, a century of nation. The 21st century will be a century of cities.” - Wellington Webb
Contents Transportation sector of Master Plan for Tirupati Mandal, 2041
Pg. 4-7
Affordable housing, Site Planning at Gandhinagar
Pg. 10- 17
Feasibility study last mile connectivity through metro subway.
Pg. 18 – 20
Master Plan for Tirupati Mandal, 2041
“
“ ”
”
• • Transport Sector Master Plan
Sheet No.
5
• • •
Project title
MASTER PLAN FOR TIRUPATI MANDAL, 2041
• –
Sheet title
Conceptualization & Context
Studio/ internship
3rd year, 6th sem. B.plan, spa d
• •
•
•
• • • • •
PCU ENTERING •
•
PCU EXITING •
•
•
•
Sheet No.
6
Project title
MASTER PLAN FOR TIRUPATI MANDAL, 2041
Sheet title
Sheet title
Functionality analysis and IPT survey
Studio/ internship 3rd year, 6th sem. B.plan, spa d
0 2 8 KM
• •
• •
Sheet No.
7
Project title
MASTER PLAN FOR TIRUPATI MANDAL, 2041
Sheet title
Sheet title
O D Survey and overall issues though analysis
Studio/ internship 3rd year, 6th sem. B.plan, spa d
OBJECTIVE
STRATEGIES
ISSUE DESIGN LEVEL Variation in row
Creating an efficient transport system that enhances traffic movement throughout the Tirupati Mandal.
Improvement of Public Transportation within the Mandal area.
Proper road hierarchy for Mandal
Improper Road Hierarchy Improper Road Pattern Improper Road Cross Sectional Installing of street Elements lights Poor Level Of Service Road widening Through Traffic Entering The City
Feeder Bus service
Proposed Bus terminal
Cross section redesign
Designated spaces for NMT
Parking Issue At Commercial Area No Designated Space For Ipt Stands Less Availability Of Ipt In Some Area
Cross section redesign Cross section redesign
Distance specified
IPT stands Proposed Bus terminal Change the function Proposed Bus of bus station terminal Divert traffic, Time Proposed Loading restrictions, Goods and Unloading Distribution through Terminal small vehicles.
Location Of Central Bus Station Goods Movement Through City Center Accidents Took Pace At Junctions Reduce accidents
Divert traffic Divert traffic
Pedestrian Paths At Commercial Areas.
Availability Of Public Transport
Reduce congestion in the central area
Policy level
Road widening
Availability Of Public Transport Distribution of all facilities and amenities in transport to all sections of society.
MANAGEMENT LEVEL
Behavioural And Management Issue
Junction redesign Fine on certain rules Appoint traffic police
•
• •
Sheet No.
8
Project title
Sheet title
MASTER PLAN FOR TIRUPATI MANDAL, 2041
Vision, objectives and strategies
Studio/ internship 3rd year, 6th sem. B.plan, spa d
SHIFTING INTER INTRA CITY FUNCTION
Sheet No.
9
Project title
Sheet title
Studio/ internship
MASTER PLAN FOR TIRUPATI MANDAL, 2041
Proposals and overall conclusion
3rd year, 6th sem. B.plan, spa d
Affordable housing, Site Planning at Gandhinagar
•
•
• • •
❖
❖ –
❖
• •
❖
• ❖
• • • •
❖
❖ ❖
Sheet No.
11
Project title
Sheet title
Studio/ internship
Affordable housing : Site planning Gandhinagar
Literature study
2nd year, 4th sem. B.plan, spa d
• • • •
• • • •
•
–
’ –
• • • •
• • • •
–
Sheet No.
12
•
–
Project title
Sheet title
Studio/ internship
Affordable housing : Site planning Gandhinagar
Approaches and context
2nd year, 4th sem. B.plan, spa d
• • •
•
Strengths Bounded within 3 Major Roads, providing connectivity to the site, simplifying the Transportation during the construction and better WorkHome Connectivity. • Lies in Proximity with Gandhi Nagar Administration Zone and GIFT City • The upcoming metro stations might • decrease the time travel for working population in our area. • The land is flat which makes it best for • developing an area. •
Sheet No.
13
•
•
•
Opportunity The Bridge connecting the site with GIFT Road, if widened can enhance the Work opportunities. The Metro Project coming within the site can be turned into Commercial Hubs or Multi-Utility zones and developed by the Private Companies RE II zone gives a whole lot of • permissible activity zones to make more job opportunity.
•
•
•
•
Project title
Sheet title
Studio/ internship
Affordable housing : Site planning Gandhinagar
Topography analysis , swoc
2nd year, 4th sem. B.plan, spa d
• • •
• •
8 Sheet No.
14
Project title
Sheet title
Studio/ internship
Affordable housing : Site planning Gandhinagar
Strategies and estimations
2nd year, 4th sem. B.plan, spa d
•
• •
• •
• Sheet No.
15
Project title
Sheet title
Studio/ internship
Affordable housing : Site planning Gandhinagar
Topography analysis , swoc
2nd year, 4th sem. B.plan, spa d
Plot-1
Plot-2
Plot-3 • •
• • • •
Sheet No.
16
Project title
Sheet title
Studio/ internship
Affordable housing : Site planning Gandhinagar
Pop. Calculations and facilities
2nd year, 4th sem. B.plan, spa d
Blocks ( EWS/ LIG/ MIG1/ MIG2/ HIG )
Roads Parking
Green spaces and facilities
• • •
Ancillary River Front Development Commercial Zone
• • • •
Overall scenario Gamtal Preseravtion Sheet No.
17
IPT Facilitation
Project title
Sheet title
Studio/ internship
Affordable housing : Site planning Gandhinagar
Plan composition
2nd year, 4th sem. B.plan, spa d
Feasibility study at Mumbai metro rail coop.
last mile connectivity through metro subway.
•
•
–
•
❑ • • • • ❑ • •
Mumbai Metro Rail Corporation Ltd Sheet No.
19
Project title
Feasibility study last mile connectivity through metro subway
Sheet title
project overview
Studio/ internship
Internship at MMRC
•
•
•
•
•
• “
”
Sheet No.
20
Project title
Feasibility study last mile connectivity through metro subway
Sheet title
project understanding
Studio/ internship
Internship at MMRC