Passive House Plus (Sustainable building) issue 39 IRL

Page 1

INSULATION | AIRTIGHTNESS | BUILDING SCIENCE | VENTILATION | GREEN MATERIALS

S U S TA I N A B L E B U I L D I N G

ONWARDS & UPWARDS Deep retrofit & extension inspired by Dartry’s Victorian villas

TIMBER IN BUILDING

Zero out

New homes falling short on NZEB & ventilation

Heart of oak

Passive B&B with oak frame core

Decarbonising heating Why fabric efficiency is essential

Issue 39 €6.95 IRISH EDITION

Balancing ecology and construction



ADVERTORIAL

OKNOPLAST

Discover Alu-clad windows in a new form In the window industry, aluminium is known as probably the best material to use as an external finish. With almost no maintenance required, it is excellent for standing up to even the most adverse weather conditions while maintaining its exceptional appearance for many years. But when the subject of Alu-clad windows comes up, most people’s automatic assumption is to think of timber Alu-clad. There is, however, another – and perhaps more suitable – option available.

The Look With its straight lines and sharp edges, smooth finish and overall modern design, nothing is a match for the unique look of aluminium window frames. Add to it the choice of several hundred colours (more than the full RAL colour chart) and none of the drawbacks of aluminium as a material and you’ve got a clear winner. Durability This fantastic look and the colour of your choice should give a lasting wow-effect. While time and the climate can have a huge impact on your windows over the years, the external layer of aluminium ensures the longest possible life for any window. Meanwhile, PVC is another low-maintenance and durable material that works perfectly with its outer aluminium cladding (Alu-clad).

Winergetic Alu with hidden drainage & invisible corners

W

hen it comes to materials used for the manufacturing of window frames, all of the main three (aluminium, PVC & timber) have their own strengths and weaknesses. For durability, aluminium and PVC lead the way. For thermal efficiency, PVC and timber offer the best insulation parameters. Aluminium and timber would be considered the most aesthetic and premium looking. It could therefore be argued that perhaps combining the different materials may bring about a perfect result. The relatively new technology of uPVC Alu-clad windows is aiming to achieve exactly that. Between them, aluminium and uPVC cover every important aspect of an ideal window – the premium look, extreme durability and countless colour options of aluminium coupled with the cost-effectiveness and naturally good thermal properties of uPVC. It is very much the best of both worlds, at a price lower than its timber Alu-clad counterpart and only marginally higher than the cost of high-end PVC.

U-values With the premium, modern look and extreme durability of the aluminium cladding, the thermal performance of the window is provided by the uPVC profile behind it. nZEB and Passive House projects can rely on uPVC Alu-clad windows to deliver U-values below 0.8 W/m²K with minimum fuss, while giving designers the creative freedom they need. Oknoplast uPVC Alu-clad All this and more is on offer with the aluminium clad Oknoplast uPVC systems. Thanks to the highly engineered and steel-reinforced uPVC profiles, shapes and sizes are rarely a problem. Their structural capabilities are often higher than any timber (or timber Alu-clad) products, being a close second to aluminium. On the aesthetic aspect, various innovative solutions ensure that every little detail is looked after. Hidden drainage caters to the functional needs of the window to remove water without having an effect on the beautiful Alu-clad finish. Invisible corners further improve the external appearance of the window by eliminating any joint lines from the frames. There are different projects and different tastes, but with all of their benefits and practically no downsides, uPVC Aluclad windows are certainly a remarkable solution worth considering.

ph+ | oknoplast advertorial | 3


EDITOR’S LETTER

PASSIVE HOUSE+

Publishers Temple Media Ltd PO Box 9688, Blackrock, Co. Dublin, Ireland t +353 (0)1 210 7513 | t +353 (0)1 210 7512 e info@passivehouseplus.ie www.passivehouseplus.ie

Editor

Jeff Colley jeff@passivehouseplus.ie

Deputy Editor

Lenny Antonelli lenny@passivehouseplus.ie

Reporter

John Hearne john@passivehouseplus.ie

Reporter

Kate de Selincourt kate@passivehouseplus.ie

Reporter

John Cradden cradden@passivehouseplus.ie

Reader Response / IT

Dudley Colley dudley@passivehouseplus.ie

Accounts

Oisin Hart oisin@passivehouseplus.ie

Art Director

Lauren Colley lauren@passivehouseplus.ie

Design

Aoife O’Hara aoife@evekudesign.com | evekudesign.com

Contributors

Pat Barry Irish Green Building Council Toby Cambray Greengauge Building Energy Consultants Shane Colclough Passive House Association of Ireland Steve Murphy Hines Peter Nickels architect Marc Ó Riain doctor of architecture Mel Reynolds architect Peter Rickaby energy & sustainability consultant Andy Simmonds AECB David W Smith journalist Jason Walsh journalist

editor’s letter ISSUE 39

W

ith COP26 looming large, a thought about climate change occurred to me recently: this is an issue that is never going to go away. Climate change has already moved from the margins to become a permanent feature of the news media, and the sad truth is that, as the climate emergency continues to worsen, it is bound to become an increasingly prominent aspect in all of our lives, whether we like it or not, for the rest of our lives, for the rest of our children’s lives, and on and on. The prospect is exhausting, but if we accept this truth, it can spark an epiphany in us. We will never escape this issue, but if we face it head on, and with urgency, we still have a chance to determine the extent to which it dominates our future. Delaying and accepting compromises that achieve some progress at a rate that balances inconvenience against ambition is frankly not good enough. There is a need for urgent, radical action, from government policy to the business world, right down to the decisions we take as individuals. I understand and accept the arguments that the vast majority of emissions are caused by a small number of extraordinarily polluting companies, and that the attempt to focus on individual responsibility has been a clever yet extremely cynical distraction tactic. But our actions as individuals can force the change we need – be it in terms of demanding our politicians regulate pollution far more seriously and punitively than has been the case up until now, or in terms of making profound changes in how we make a living, and how we live our lives. Ultimately, this will also mean taking

decisions which go against all conventional wisdom, in that they will cause declines in economic activity. Curiously, this seemingly intractable problem may not present itself in the short term. This is because we must invest heavily – albeit wisely, and in a way that minimise upfront emissions – in measures that will realign our civilisation on the lowest carbon trajectory possible. A perfect example is building a passive house, if we have first identified that we must build, rather than retrofit, and ensured that we build it to the size we need, in the right location, and using the lowest carbon materials possible. In so doing, we are investing in creating a climate action asset that will, with any luck, prevent emissions from occurring for multiple generations. This is infinitely preferable to approaches which rely on the decarbonisation of heat, for the simple reason that even decarbonised heat has to be paid for, and that earning money to pay for this heat will likely involve emitting carbon too. The deeply ingrained habits, dependencies, conventions and behaviour patterns that we have historically been unwilling or unable to detach from need to stop. The issue is never going to go away. Face up to the problem fully now, and we avoid consigning ourselves to a future plagued by constant reminders that we did not do enough, or that we did not set examples for others to follow. The future of the planet may not be clear, but our conscience can be. Regards, The editor

Print

GPS Colour Graphics www.gpscolour.co.uk | +44 (0) 28 9070 2020

Cover

The Willows Photo by Andrew Campion

Publisher’s circulation statement: 7,000 copies of Passive House Plus (Irish edition) are printed and distributed to the leading figures involved in sustainable building in Ireland including architects; consulting; m&e and building services engineers; developers; builders; energy auditors; renewable energy companies; environmental consultants; county, city and town councillors; key local authority personnel; and to newsagents nationwide via Easons. Disclaimer: The opinions expressed in Passive House Plus are those of the authors and do not necessarily reflect the views of the publishers.

4 | passivehouseplus.ie | issue 39

About Passive House Plus is an official partner magazine of the International Passive House Association. Passive House Plus (Irish edition) is an official magazine of the Passive House Association of Ireland.


PASSIVE HOUSE+

EDITOR’S LETTER

ph+ | editor’s letter | 5


CONTENTS

PASSIVE HOUSE+

CONTENTS COVER STORY

10

33

34

08

10

16

30

6 | passivehouseplus.ie | issue 39

COLUMN Housing for all: a plan in need of a story Under its new housing plan, the government wants the state to acquire more land for housebuilding. But why has it failed to use the vast land banks it already owns? Mel Reynolds runs the rule over the figures.

INTERNATIONAL This issue features a passive house hostel situated in the town of Zegama, on the route of the Camino de Santiago.

NEWS One in four new homes failing to meet NZEB standards, Passive House Plus to launch Building Performance Annual, and a new study confirms “systematic inequalities” in indoor air pollution.

COMMENT In his latest column, Dr Marc Ó Riain looks back at the Saskatchewan House, which established the principle of prioritising energy demand reduction over active systems; and Dr Peter Rickaby investigates what options are available to decarbonise heating.


PASSIVE HOUSE+

48

34

60

60

70

CASE STUDIES Onwards and upwards

This Enerphit project in the suburbs of South Dublin has dramatically transformed and extended a dated 1970s dwelling by adding an extra storey, radically reducing its energy consumption and creating a smartly-designed, light filled family home and office.

48

CONTENTS

70

A striking new oak-framed passive house in an area of outstanding natural beauty in the English countryside has just opened its doors to the public, and already there has been a flood of guests seeking to experience life in a passive house.

Hampshire house hits 70% energy saving via Enerphit The deep retrofit of this 1930s dwelling on the Hampshire coast provides a pitch perfect example of how to transform old dwellings while preserving their original structure and minimising embodied carbon, utterly transforming the living space without the need for an extension, and creating a cosy home that uses two-thirds less energy than before.

Seeing the wood for the trees:

Placing ecology at the heart of construction In recent years, as energy efficiency targets for new buildings have tightened, attention has turned to cutting the embodied carbon of buildings. But if we are serious about solving the ecological emergency as well as stabilising the climate, we must look even further than embodied carbon, and think more deeply about the core values we apply to materials and buildings.

Heart of oak

Witness the phitness

INSIGHT

78

86

MARKETPLACE Keep up with the latest developments from some of the leading companies in sustainable building, including new product innovations, project updates and more. How do breather membranes work? How do underlays manage to let water vapour through while keeping the rain out? Toby Cambray delves into the physics…

ph+ || contents contents || 77 ph+


MEL REYNOLDS

COLUMN

Housing for all: a plan in need of a story Under its new housing plan, the government wants the state to acquire more land for housebuilding. But why has it failed to use the vast land banks it already owns? Mel Reynolds runs the rule over the figures.

S

eptember saw the launch of a new housing plan for Ireland, with ambitious targets for social, private and subsidized private housing. The new plan has a raft of measures, some aimed at increasing land available for state building. Most of the initiatives are aimed at the private sector which, as we know, is subject to the winds of market forces and may not behave in the way predicted. The one component of the plan which is in complete state control is social housing, and in particular local authority building. The annual target for social homes in the new housing plan is 9,500 per year. So, let’s run the rule on the performance of the state’s previous plan, Rebuilding Ireland, and see how effective it has been at building on land it already owns. State funding & land capacity Two things are fundamental to building: money and land. The state has an abundance of finance, as demonstrated by the €20 billion committed to the Housing for All plan. In 2018, an audit confirmed that local authorities owned 1,317 hectares of zoned residential land with the capacity for 48,724 dwellings. These figures exclude the considerable land banks owned by other semi-state bodies such as CIE, ESB, Coillte, Dublin Port and the IDA. The audit found that the four Dublin local authorities owned enough zoned residential land for 29,377 dwellings. So, has the state been so active with house building that it has exhausted older land banks and now needs even more, as this new housing plan suggests? Local authority turnkey purchases The Department of Housing has a track record of re-defining inputs to meet targets. In order to inflate ‘build’ figures, the department classifies ‘turnkey’ homes, meaning new homes purchased from the private sector, as ‘builds’. This gives the impression of increased local authority activity. The headline ‘build’ figure quoted by ministers and officials for the four-and-a-half years

8 | passivehouseplus.ie | issue 39

from the middle of 2016 up until the end of 2020 is 15,962 dwellings in total. Impressive, but somewhat exaggerated as two out of every three, a total of 10,234 new dwellings, were in fact purchased new homes built by developers on private land. Local authorities bought three out of every ten of these purchased dwellings, and approved housing bodies (AHBs) bought the rest. Stripping out this ‘grade inflation’ will give a more representative view of actual state building activity on state-owned land.

The state is doing very little with a lot of land it already owns.

Local authority builds In this same four-and-a-half-year period local authorities built 4,326 homes (an average of 961 per year), and out of this 1,492 local authority homes were completed in County Dublin (an average of 332 per year), where demand is highest. AHBs were also active — in the same period they completed 1,402 social builds nationwide (an average of 312 per year), and of these 607 were in County Dublin (an average of 135 per year). These figures suggest that after almost five years of Rebuilding Ireland, only 12 per cent of local authority land capacity had been utilised nationwide. In County Dublin, local authorities and AHBs utilised just 7 per cent of available land capacity in the same period. It would appear that the state doesn’t need any more land, it needs to use the vast land capacity it already has rather than accumulating larger land banks. The new Housing for All plan aims to increase the annual average social housing build output more than sevenfold, from 1,273 homes to 9,500 per year. This may

be unrealistic as it can take a minimum of 18 months (and sometimes quite a bit longer) for local authorities and AHBs to get through the department’s four stage approval process. It is likely that the only way the state can meet ambitious targets is to expand the ‘turnkey’ new home purchase programme, an expensive way, particularly in Dublin, to inflate ‘build’ output on paper. Current budgetary constraints on new borrowing until 2023 suggest that leasing of private homes by local authorities may well expand, particularly in Dublin, contrary to the new plan’s stated intentions. There is an established narrative that private equity firms are muscling-out first-time buyers by purchasing and leasing entire developments in advance of completion. But the same argument can be made towards the government which appears to be doing precisely this, at a much larger scale, while hoarding vast land banks. These figures throw up more questions than answers. The state is doing very little with a lot of land it already owns. Does it need more from other semi-state bodies? Why is the state about to go on a spending spree purchasing land from the private sector? Moving existing state land assets from one balance sheet to another and continuing reliance on the private sector for delivery may eventually lead to complex public private partnerships — like at O’Devaney Gardens in Dublin 7 — which if not structured properly, may result in significant wealth transfers from the state to the development sector. n A fully referenced version of this article is online at www.passivehouseplus.ie Mel Reynolds is a registered architect with more than 25 years of experience in project management, conservation, urban design and developer-led housing. He is also a certified passive house designer.


ADVIE06_PH_v1

© GettyI mages

END OF THE BALANCING ACT

THE FIRST NSAI CERTIFIED DEMAND CONTROLLED VENTILATION SYSTEM Ventilation doesn’t have to be a balancing act. Aereco has achieved Ireland’s first Agrément certification for Demand Controlled Ventilation. A system that self balances and automatically adjusts to the needs of a home, securing indoor air quality and energy savings. The National Standards Authority of Ireland (NSAI) Agrément provides a pathway that has significantly simplified the commissioning and validation process of Aereco systems. Aereco is committed to constantly innovating and improving the performance of their systems. Along with the recent release of their control indicator as part of the updated regulations for Part F, Aereco is reaffirming this commitment.

For more information: www.aereco.ie


IN BRIEF Building: 95 m2 hostel Location: Zegama, Basque Country Building method: CLT with wood fibre insulation Standard: Passive House Classic

INTERNATIONAL PASSI VE & ECO BUIL D S F R O M A R O U N D TH E WO R LD

10


I N T E R N AT I O N A L

BASQUE COUNTRY

Photos by Jorge Allende

PILGRIM’S HOUSE, BASQUE COUNTRY

B

uilt on the route of the Camino de Santiago in the interior of the Basque Country, this simple and elegant hostel in the town of Zegama was built to accommodate 12 pilgrims. It was commissioned by the local town council, which had two key stipulations: that the finished building had to meet the passive house standard, and that because it was going to sit beside the town’s timber museum, it had to be constructed from wood. The town of Zegama sits among the forested hills of the Basque Country, and the hostel itself sits right at the entrance to Aizkorri-Aratz Natural Park, which is known for its endless beech woods. Designed by architects Natxo Ibarretxe and Iñaki del Prim, the finished hostel is a lesson in spare-but-smart design. The careful orientation of the building, the modestly sized glazing, and the deep-set windows meant no additional shading was needed externally on the south-west façade. The size of the north-east elevation, meanwhile, was minimised to prevent heat loss to cold winds in the autumn

and winter. Inside, the internal layer of OSB board was left exposed, creating a simple-yet-warm detail that eliminated the need for extra wall finishes. The finished hostel features two communal bedrooms, with six bunks each, plus a simple living and dining space, an adjoining kitchen, and two bathrooms. It was primarily constructed with a cross-laminated timber system that was sourced and manufactured locally, while wood fibre was used as the main insulation material, and the hostel is externally clad with timber too. Meanwhile, the building’s heat pump and underfloor pipework can provide active cooling, should it be needed in summer when the building is fully occupied (the building’s peak cooling load of 10 W/m2 is almost equal to its heating load of 11 W/m2). All-in-all the simple palette of materials, beautiful detailing and guarantee of passive house comfort at the Casa Del Peregrino makes us want to visit almost as much as the forests and hills outside do.

ph+ | basque country international | 11


BASQUE COUNTRY

I N T E R N AT I O N A L

WANT TO KNOW MORE? The digital version of this magazine includes access to exclusive galleries of architectural drawings. The digital magazine is available to subscribers on www.passive.ie

12 | passivehouseplus.ie | issue 39


Join us on the road to sustainability 0 Book your CPD today. Email info@ecocem.ie

|

+353 1 678 1800 |

ecocem.ie


14 | passivehouseplus.ie | issue 39


Stop building in the past. Embrace the FUTURE

INSULATED FOUNDATION

Ireland’s Only NSAI Certified Insulated Foundation System • Guaranteed thermal performance that lasts a lifetime • Sustainable, recyclable and EPD verified • Designed to exceed nZEB & Part L 2019 • Fully engineered for each project

KORE Insulated Foundation System CERT No. 20/0424

• NSAI Certified

Learn more by visiting www.kore-system.com Join the KORE Resource Centre for product design guides, technical data and BIM object files. Consult with KORE for project evaluations and technical calculations at no cost.

HIGH PERFORMANCE

EPS


NEWS

PASSIVE HOUSE+

NEWS One in four homes failing to meet NZEB A

lmost a quarter of new nearly zero energy building (NZEB) cent of cases, though Passive House Plus understands the informahomes may be non-compliant with Part L of the regulations, tion was included in the publication of the BERs. However, in new analysis by Passive House Plus has revealed. In total, 23.5 per 1.9 per cent of cases, an airtightness test was not done, and in 0.6 cent of new homes built to date under the NZEB regulations have per cent of cases a non-compliant value of above 5 m3/hr/m2 at 50 Pascals was used. failed to meet one or more targets to demonstrate compliance. By the end of September, 7,522 new homes feature BERs for While the compliance picture looks strong among targets such as the energy performance coefficient (EPC), carbon performance homes assessed against 2019 TGD L. The average primary energy coefficient (CPC) and renewable energy ratio (RER), evidence of score is 41.3 kWh/m2/yr, a mid A2 rating. Space heating is provided non-compliance becomes more prevalent in some building fabric by heat pumps in 82 per cent of cases, with gas boilers at 11 per cent, targets including airtightness test results and U-values – in particular combined heat and power (CHP) at 5.8 per cent, direct electric at 1 per cent and oil boilers at 0.2 per cent. Mechanical extract ventilafor walls and external doors. One factor in the lack of compliance may be the fact that some tion is the dominant ventilation method at 50.8 per cent, followed homes appear to have been voluntarily built to the new standard, by heat recovery ventilation at 20.4 per cent, natural ventilation at including homes where the year of construction was before 2020. 17.7 per cent, ventilation via exhaust air heat pumps in 9.9 per cent The NZEB regulations (Part L 2019) came into force for new homes of cases, and positive input ventilation at 1.2 per cent. Almost one where a planning application was submitted from November 2019 quarter (24.5 per cent) of naturally ventilated homes had airtightonwards, while homes with earlier planning approval were permitted ness results of below 3 m3/hr/m2 at 50 pa, indicating non-complito be built to 2011 standards if they were substantially complete by ance with Part F of the building regulations. The average airtightness test result is 2.58 m3/hr/m2 at 50 Pa. November 2020. The non-compliance drops to 20.3 per cent if only homes where the year of construction was 2020 or later are counted. Average U-values are 0.17 (walls), 0.12 (for both roofs and floors), Up until recently, SEAI’s National BER Research Tool did not 1.17 (windows) and 1.15 (external doors). As previously reported, self-build homes are underreported in the include the EPC, CPC or RER scores for buildings, but the tool was updated to include these elements in response to a request BER data, with Passive House Plus estimating that between two from Passive House Plus. The targets under TGD L 2019 include thirds and three quarters of self-builders fail to comply with the legal a maximum permitted EPC of 0.30 and CPC of 0.35 – targets obligation to obtain a BER prior to occupancy. • which respectively represent 30 per cent and 35 per cent of the energy consumption and carbon emissions totals a given dwelling would have achieved if built to the 2002 building regulations, with a SPACE HEATING SYSTEM TYPE IN NZEB HOMES standard efficiency gas boiler. Just over four per cent of BERs to date Space heating system type in NZEB homes for homes built to 2019 Technical Guidance Document (TGD) L 90% 82.0% failed to meet the 0.30 EPC target, with an average EPC score of 80% 0.34. Meanwhile, 10.5 per cent of homes failed to meet the backstop 70% U-value for external walls, with 1.7 per cent failing to meet backstop 60% CHP floor U-values. Almost 97 per cent of homes met the sloping roof heating system type50%in NZEB homes U-value of 0.16, with a further 3.1 perSpace cent meeting or exceeding Direct electric the flat roof target of 0.20, although the BER research tool doesn’t 40% 90% Heat pump identify roof type, meaning compliance cannot be 82.0% definitively 30% 80% Heating Oil identified in these cases. In total, 1.9 per cent of windows and 7.9 20% 70%failed per cent of external doors to meet the backstoptype U-value 1.4. homes Space heating system in ofNZEB 11.0% Mains Gas 5.8% 10% Data issues mean it’s not yet possible to definitively say what 60% 1.0% CHP 0.2% 90% 82.0%of 0.2 (which means that percentage of homes meet the RER target 0% 50% Direct electric 20 80% per cent or more of the energy needs counted within the BER are TGD L 2019 40% met70% from renewable sources). This is because 18.8 per cent of BERs Heat pump include no data in this 30% field, in spite of the fact that almost all feature 60% Heating Oil CHP heat pumps. Only 0.01 per cent of homes with RER values fail to 20% 50% 11.0% Mains Gas meet the 0.2 target. Direct electric 5.8% Similarly, data issues10% acknowledged by SEAI1.0% mean that airtight40% 0.2% Heat pump ness30% test results were not0%transferred into the research tool in 9.9 per TGD L 2019 11.0%

20% 10%

5.8%

1.0%

0% 16 | passivehouseplus.ie | issue 39

TGD L 2019

0.2%

Heating Oil Mains Gas


PASSIVE HOUSE+

NEWS

(above) A selection of the 14 winners from this year's Passive House Awards. For the full list see www.passivehouse-international.org.

Passive house celebrates 30th birthday at international conference

T

he Passive House Institute celebrated the low energy standard’s 30th birthday at the 25th International Passive House Conference in September. Around seven hundred participants registered for the conference, which mostly took place online due to Covid. Addressing the conference, Diana Ürge-Vorsatz of the UN's Intergovernmental Panel on Climate Change (IPCC) warned that more frequent extreme weather events could be expected as a result of climate change, and that CO2 emissions must be reduced to net zero. She also called for the transformation of every building, using solar PV systems, into a mini power plant. "We cannot wait any longer. The next two decades will be decisive for seeing how the climate affects humans in the next two hundred years," she said. Meanwhile in his speech, the director of Germany’s Federal Environmental Agency, Dirk Messner, emphasised the social benefits of building to the passive house standard — namely, that energy efficient construction and renovation offers a high level of living comfort for building occupants. "Let us build houses and districts which are good for the people," he said.

Uwe Schneidewind, lord mayor of the German city Wuppertal, told the conference that the city wished to become “climate neutral” by 2035, and that the passive house standard represented a critical way of achieving this goal. During the four days of the conference, more than one hundred speakers presented diverse ways in which energy efficient construction and refurbishment have been applied to buildings across the globe. Ecological building materials, social housing, summer comfort and ventilation concepts were also discussed in detail in separate lecture sessions. During the conference, the Passive House Institute also launched the German language version of PHPP 10, and announced that the English version will be released next spring. New features to the software include a stress test for summer comfort, and the ability to compare calculated energy use with measured consumption data. Award winners revealed Two projects that have featured in Passive House Plus were among the winners at this year’s global Passive House Awards, which were presented at the conference. Lark Rise passive house in Buckingham-

shire, designed by bere:architects, won in the single-family home category. The house was previously featured in issue 36 of this magazine. It is certified to the passive house plus standard, and is designed to have extremely low energy consumption and to meet the majority of its own energy needs via a large solar photovoltaic array and battery. Meanwhile the retrofit of two semi-detached Victorian dwellings in Manchester to the Enerphit Plus standard, by passive house consultancy Ecospheric, won in the special “living comfort” category. The project was featured in issue 28 of Passive House Plus. Twelve other award winners were announced at the event (see photo panel), and the full list of recipients is available at www.passivehouse-international.org. "Buildings constructed to the passive house standard require much less energy and significantly lower emissions are produced over their life-cycle,” said Jan Steiger of the Passive House Institute on presenting the awards. “All winners are a perfect example of how an extremely sustainable building standard can be implemented with a high architectural quality and in completely diverse ways.” •

ph+ | news | 17


NEWS

PASSIVE HOUSE+

EPA launches new green procurement guides T he government has launched new guidelines from the Environmental Protection Agency aimed at greening public procurement. However, the guidance contained in the document ‘Green Public Procurement: Guidance for the Public Sector’ is voluntary rather than mandatory, and with regards to buildings, it provides guidance for offices but no other building types. With regards to office buildings, the guidance offers advice in areas such as building energy performance, lighting controls and building energy management, renewable energy systems, thermal comfort, daylight and glare, ventilation and air quality, and building life cycle assessment. The overall guidance also includes advice in other areas such as ICT products and services (including data centres), food and catering, cleaning products and services, indoor and

outdoor lighting, paper products and printing, heating equipment, energy-related products, and textile products and services. “Each year the state spends billions of euro on goods and services to support the delivery of vital services to the public,” said Ossian Smyth, minister of state for public procurement. “Our Climate Action Plan sets out an ambition to ensure that this significant expenditure is managed in an environmentally responsible way. “This new guidance from the EPA will be of assistance to all public servants who find themselves procuring goods and services by providing practical support on how to include realistic and measurable green targets in their contracts with suppliers.” The guidance will also be of interest to the private sector when responding to tenders or applying green criteria in their own procure-

(above) EPA director general Laura Burke.

ment. “With a purchasing power of approximately €20 billion annually, the public sector has significant opportunity to stimulate the provision of more resource-efficient, less polluting goods, services and works within the marketplace by implementing green public procurement,” said EPA director general Laura Burke. The guidance forms a part of a suite of EPA supports aimed at greening public procurement. These include developing and delivering training and monitoring, and reporting on green public procurement implementation by government departments. •

Passive House Plus to launch Building Performance Annual

P

assive House Plus is set to launch a new publication, the Building Performance Annual, by the end of 2021. The new title will revisit ten of the most significant buildings from past issues of Passive House Plus, with updated case studies including detailed technical panels on material build ups. Buildings that have been occupied for at least five years have been selected, and the focus will be on how the buildings have actually performed, in terms of monitored energy use and, where available, temperature and indoor air quality data. The updated case studies will also feature brief synopses from occupants, where possible, on their experience of living or working in these buildings. Passive House Plus has partnered with the Usable Buildings Trust and ARUP for the annual to use the tried-and-tested Building Use Studies (BUS)

18 | passivehouseplus.ie | issue 39

methodology to assess feedback from building users. ARUP, who own the methodology, have granted permission for its use for the annual. The annual will also include updated versions of the Passive House Plus guides to airtightness, thermal bridging and heat recovery ventilation; and additional articles focused on the real-world performance of buildings. According to Passive House Plus editor Jeff Colley, the annual’s genesis has its roots in reader feedback: “In our December 2019 reader survey we learned that readers rarely if ever tend to dispose of the magazine – with just 3 per cent and 6 per cent of Irish and UK edition readers respectively binning or recycling the mag after they finish with it, and the vast majority filing their copies away for reference. That got us thinking. What would be the most useful publication we could produce to build

on our readers’ inclination to refer back to our articles repeatedly, over months and years? The answer we came up with was The Building Performance Annual.” Over the last decade, Passive House Plus has published detailed case studies on hundreds of exemplary sustainable new build and deep retrofit projects, often shortly after the buildings were completed. “Many of the buildings we feature are a year old or less, in which cases any post occupancy data we do have may include periods where the building was drying out, or where the occupants are learning how to operate the building,” said Colley. “This may count against their energy use, but on the other hand it’s also possible users may be more motivated to run the building more diligently at first. We really want to understand how the buildings we write about actually perform over time. Cold, hard statistics on energy use, temperatures and indoor air quality measurements are one element — but what about the occupants’ impressions of their buildings? “The Building Performance Annual will answer these questions, in a beautifully produced perfect-bound publication designed to adorn any desk or coffee table, before being filed away for reference for years to come.” The annual will be available to buy as part of an annual subscription to Passive House Plus, including four seasonal issues of the magazine, for €30. To subscribe visit www.passivehouseplus.ie/subscribe. Advertising space is also available in the annual. Email info@passivehouseplus.ie for more information. •


PASSIVE HOUSE+

NEWS

Evidence emerges of endemic ventilation regs breaches E

vidence is emerging of endemic non-compliance with ventilation requirements for new homes under Part F of the building regulations – including widespread failure to meet minimum flow rates and vent sizes, and low compliance with the requirement for independent validation of ventilation systems – with validators reporting lack of awareness about the validation requirement, and even claiming to have lost work as a result of promoting validation. Data gathered by Passive House Plus indicates that only 12 per cent of homes built to the nearly zero energy building (NZEB) standard to date have been subject to independent ventilation validation – with validators reporting poor awareness among clients and assigned certifiers. Meanwhile, only 9 per cent of homes assessed by independent ventilation validators as part of their registration audit met compliance with Part F. Under changes to Technical Guidance Document (TGD) F introduced in 2019, all ventilation systems in new homes are required to be designed, installed and commissioned by competent people, and independently validated by certified ventilation validators. The National Standards Authority of Ireland (NSAI) has established a ventilation validation registration scheme, which currently includes 23 people certified as competent independent third parties to validate that a ventilation system has been installed, balanced and commissioned to meet the minimum requirements of TGD F. Twenty two dwellings with mechanical ventilation systems – including both mechanical extract ventilation and heat recovery ventilation systems – were used to audit newly trained validators prior to registration, with one house being used for audits on two of the 23 validators. Naturally ventilated homes were not selected for audit, on the basis that validators should have no problem measuring the area of wall vents. In 20 of the 22 houses, the installed ventilation failed to meet the minimum requirements of TGD F [Ed. – it’s important to avoid the false conclusion that natural ventilation systems would fare better, given widespread acknowledgement in the industry that natural ventilation systems have tended to be grossly undersized to meet building regulations, not to mention the real world performance of natural ventilation in low energy buildings]. According to Gary O’Sullivan, who manages the NSAI scheme, all of the validators passed the audit, in that they accurately calculated the actual flow rates and measurements. It’s not known whether the systems in any cases were designed, installed or commissioned by people who had sat competency courses or not. The 2019 version of TGD F was introduced concurrently with TGD L 2019, reflecting a recognition that that the nearly zero energy building standard would require increased care to ensure buildings are adequately ventilated. Approximately 900 of the 7,522 new homes built to the NZEB standard up until the end of September had independent ventilation validations completed by the the same date, based on information Passive House Plus obtained from every ventilation validator registered with the National Standards Authority of Ireland and the Irish National Accreditation Board. The 7,522 homes are homes with final BERs, where 2019 TGD L was listed as the relevant version of building regulations in the DEAP calculations. It’s important to note that some of these homes would have been voluntarily assessed against 2019 TGD L, and would not have been required to meet 2019 TGD F. Nonetheless, the fact remains that there is a very large gap between the

number of validations completed, and the number of homes which would have been subject to 2019 TGD F. One validator who is also registered as an airtightness tester told Passive House Plus that he had recently been asked to bid for a large housing scheme with a builder he had worked with frequently in the past. The validator claims that he lost the job as a consequence of including ventilation validation in his quote, as the builder had been incorrectly informed that ventilation validation wasn’t required. DEAP input solution – and more accurate BERs A number of validators proposed a solution that Gary O’Sullivan of the NSAI has been promoting: requiring a validation number to be added into the DEAP calculations to generate a building energy rating. “It would serve as a driver to compel people to ensure that ventilation is being installed correctly,” said O’Sullivan. “If there was some kind of a check box somewhere – a compulsion to input some entry into DEAP as to the general ventilation rate for a dwelling this would serve as a better control measure.” O’Sullivan added that it would make sense to add the measured ventilation air change rate into DEAP, as opposed to the current default rate of 0.5 air changes per hour – enabling a more accurate calculation of ventilation heat losses, and potentially reducing the cost of compliance. O’Sullivan provided an example to Passive House Plus, where the TGD F compliant ventilation rate was 18 per cent lower than the assumption in DEAP. •

ph+ | news | 19


NEWS

PASSIVE HOUSE+

Window-opening unreliable for ventilation, study finds By Kate De Selincourt

A

comparison between two pairs of households in Switzerland suggests that people do not reliably compensate for lack of mechanical ventilation with more window opening. The study was carried out by MVHR manufacturer Zehnder and presented at the 2021 International Passive House Conference by Bart Cremers. The four flats formed the ground and first floor of a single block, so weather, outdoor pollution, noise etc were identical for all. The ground floor flats had whole-house MVHR installed, while the upper floor relied on window opening for ventilation. Monitoring of window opening behaviour showed that over the course of a year, windows were open around the same amount of time during winter in all flats, and slightly more upstairs than downstairs in summer. However, while air quality in the flats with MVHR was consistently good (only one per cent of the time above 1,000 ppm CO2) the upstairs flats had much poorer air quality. Between 30 and 60 per cent of the time, CO2 levels were over 1,000 ppm. •

Draft development plan guidelines a “retrograde step”

Advertise with us.

94% say the adverts in Passive House Plus are relevant to them*

Contact us for more information on how your brand can feature in our next issue. To enquire about advertising, contact Jeff Colley on +353 (0)1 2107513 or email jeff@passivehouseplus.ie

www.passivehouseplus.ie *source, Passive House Plus Irish edition 2019 reader survey

20 | passivehouseplus.ie | issue 39

T

he Department of Housing has come under criticism for draft guidelines which would prevent local authorities from setting sustainable building targets for buildings as a planning condition, with the passive house standard and low carbon cement directly referenced. The draft document, Development Plans Guidelines for Planning Authorities, states that objectives dealing with specific issues governed by the Building Regulations or the Building Control Acts should not be included in development plans. “This includes objectives that refer, for example, to specific building standards or methods, such as NZEB, Passive House or Low Carbon Cement,” the document states. Over the past two decades, progressive local authorities have put sustainable building requirements into development plans to bypass building regulations. This began in 2005, when Fingal County Council introduced requirements in local area plans for 60 per cent reductions in energy use and CO2 emissions for new buildings along with 30 per cent renewable energy contribution. The predecessor to Passive House Plus magazine, Construct Ireland, was heavily involved in this initiative, and assisted Green Party councillors in other local authorities to introduce similar requirements, with successful impacts on the Dún Laoghaire-Rathdown County Development Plan and Dublin City Development Plan in 2006, and local area plans in Wicklow. These initiatives then led to unprecedented improvements to Part L of the building regulations when the Green Party entered government in 2007, including 40 per cent energy and CO2 reductions for new homes compared to 2002 levels and 10 kWh/ m2/yr of renewable energy in 2007, rising to

60 per cent energy and CO2 reductions in 2011. Passive House Plus editor Jeff Colley had first-hand involvement in this process, chairing a Green Party committee on buildings during the Green Party’s first tenure in government, and working with David Healy, a Green councillor in Fingal who worked on the policy from its inception, and who served as special policy advisor to the minister for the environment from 2007 to 2011. Commenting on the proposed text in the draft development plan guidelines, Healy said: “This proposal would be a retrograde step. I think it’s mistaken about what the legislation is for. The legislation is very wide. There isn’t anything in the planning legislation which says if something can be dealt with in the building regulations then you can’t do it via development plans. That just isn’t there.” According to Healy, the precedents with energy performance requirements in 2005 and 2006 bear testament to the value of this policy approach. “We know in practice that using the planning system to require more sustainable building has worked very successfully in the past. And in fact it has served as a model for improvements to the building regs. It would be a big mistake if we were to cut off that source of innovation at this stage.” Healy said that, because compliance with building regulations doesn’t have any regard to design decisions taken at the planning stage, it may cause overheating risks due to excessive passive solar gains, or conversely, significant increases in energy use arising from sub optimal orientation and inefficient building form. “The way that the building regulations are at the moment, they’re not covering all of the issues, because they’re not covering building form, they’re not covering solar gain,” he added. •


PASSIVE HOUSE+

NEWS

#BuildingLife: “Regulation of whole life carbon is key”, says Steve Murphy of Hines I

n the #BuildingLife ambassador spotlight series, Passive House Plus is profiling leaders who have endorsed the Irish Green Building Council’s call to address the environmental impacts of buildings across their life-cycle. In our third interview, Steve Murphy, managing director of Conceptual Construction, Hines, tell us more about the campaign and why he is supporting it. Why did you choose to become a #BuildingLife ambassador? Steve Murphy: The decarbonisation of the built environment is critical for a list of stakeholders that essentially includes everyone. From present day investors, developers, manufacturers and occupiers to future generations, we all have a stake in this evolving priority. As a member of Hines Conceptual Construction group, I have the unique privilege to help steer early design decisions related to our projects in support of sustainable materials, future operational efficiency, waste reduction and Hines’s global ESG [environmental, social and governance] vision. Since relocating to Ireland in 2017, I have been working with the Irish Green Building Council (IGBC) on several initiatives, including incorporating their Home Performance Index certification into our developments in Ireland. We agree with the IGBC that embodied carbon emissions represent a real challenge facing our industry. These are the emissions associated with materials and construction processes throughout the whole lifecycle of a building. At Hines, we recognise the importance in reducing our carbon footprint, but no one stakeholder can do this alone. Success demands collaboration across the private and public sectors and that is why I was delighted to become a #BuildingLife campaign ambassador. What are you hoping to achieve with the #BuildingLife campaign? SM: The campaign is a great opportunity to drive change in the industry. I’m hoping it will help galvanise our entire sector into action to reach carbon

neutrality by 2050. In particular, regulation of whole life carbon is key to support this transition. Development is inherently risky. Investors, developers and design teams are attracted to a transparent set of ‘rules of play’ to compete effectively in any given market. It is challenging for organisations to take actions above and beyond the rules of play, as they typically add cost and could price them out of a deal. Likewise for refurbishing existing stock. These are typically more difficult to execute, carry more uncertainty and have less desirable characteristics such as low floor to ceiling heights, small shafts, stairwells, etc. As such they are often less attractive versus tearing down and building new, which is carbon intensive. How to make refurbishment and reuse of existing stock a more attractive investment opportunity is key as these can be significantly more carbon friendly.

(above) Steve Murphy, managing director of Conceptual Construction at Hines.

Can you explain a few ways in which Hines is working towards a sustainable built environment? SM: Hines has a deep-rooted history in designing and delivering sustainable buildings. We want to create spaces that are healthy and sustainable for everyone to work, live, play and stay. Across our properties, we are also big advocates of truly improving indoor air quality, optimising energy performance, optimising HVAC design, greening spaces and reducing noise and light pollution. In Ireland, a good example of this is our Cherrywood development where, for GRESB 2020 [a global sustainability benchmark for physical assets], we achieved the #1 GRESB ranking for mixed use developments in Europe. To reduce embodied carbon, we are looking at ways of developing buildings using less concrete and steel. A great example of this is our work in Munich with the Aer building. The wood-hybrid construction method we are using is expected to have a positive impact on the carbon footprint of the building and the wellbeing of its occupants. Moving forward, we will continue to leverage wood and timber frame construction

“Embodied carbon emissions represent a real challenge facing our industry” where appropriate. In Ireland, we have joined and fully support the IGBC’s EPD campaign. By requesting environmental product declarations, we are hoping more manufacturers will produce and continue to improve material transparency. #BuildingLife is a project led in Ireland by the Irish Green Building Council. The initiative aims to achieve the mix of private sector action and public policy necessary to tackle the whole-life impact of buildings. Learn more at www.igbc.ie. •

ph+ | news | 21


NEWS

PASSIVE HOUSE+

Oil heating sector pivots to biofuels, but green groups raise concern By Lenny Antonelli

T

he UK and Ireland’s oil heating industry says it has taken a “major step forward” in the use of biofuels in domestic oil boilers, with early tests concluding that hydrotreated vegetable oil (HVO) works in virtually all existing oil boilers. A statement from industry bodies OFTEC and UKIFDA said a switch from kerosene to HVO could reduce carbon emissions from oil boilers by almost 90 per cent, but green groups raised concern about the true carbon footprint of common HVO fuels. “Nineteen sites… are now running hydrotreated vegetable oil (HVO) in a range of heating and cooking appliances in both domestic and commercial settings,” read the statement from OFTEC & UKIFDA. “Each HVO installation is monitored regularly, and, to date, the systems have performed well with no significant issues reported.” OFTEC CEO Paul Rose said that the “initial trial results are highly encouraging and add further evidence to our belief that HVO offers oil heated households an attractive, low cost, low disruption solution to decarbonisation.” The group said that oil boilers can be converted to run HVO for a cost of around £500. HVO is a liquid biofuel that can be produced from a variety of bio-based feedstocks, so the sustainability and carbon footprint of each must be assessed individually. Crown Oil, which supplied the HVO for the boiler trialsi, said the fuel it imports is “100 per cent used cooking oil based”. It is also certified by the International Sustainability & Carbon Certification. OFTEC told Passive House Plus that its carbon savings figure was produced by the BRE, which calculated a carbon emissions factor of 36 g of CO2 equivalent per kilowatt hour for waste-derived HVO, compared to 298 g for kerosene. Globally, HVO feedstocks can include virgin vegetable oils such as palm, soy, and rapeseed oil, but proponents say that a move to “advanced” waste feedstocks now make the fuel more sustainable. Virgin oils have been heavily linked with deforestation in the tropics, and rising food prices. “Waste and residue” feedstocks can include used cooking oil, by-products of vegetable oil processing, and fatty wastes from animal industries, but environmental NGOs question whether there is enough supply of genuine waste feedstocks to meet demand. “The challenge with advanced feedstocks is that either there are not enough of them, or they are not genuinely advanced. The aviation,

22 | passivehouseplus.ie | issue 39

road transport and chemical sectors are all competing for advanced feedstocks, of which there are a limited and potentially decreasing supply,” said Andrew Murphy of the Brusselsbased NGO Transport & Environment (T&E). Advanced or not? The Finnish oil refining company Neste, the world’s largest producer of HVO, says its fuel is based on 92 per cent “waste and residues”, and that it is aiming for 100 per cent by 2025 (the French company Total Oil, another major manufacturer of HVO, says it typically achieves 30 to 40 per cent waste and residues at its La Mède biorefinery in France, with the rest coming from vegetable oils like sunflower, palm and rapeseed). Neste also says that in the “medium to longer term” it is aiming to develop advanced feedstocks from plastic waste, forestry and farm residues, municipal solid waste, and from the cultivation of algae. But environmental NGOs question whether some of the key waste feedstocks typically used for HVO warrant that definition. One such feedstock is palm fatty acid distillate (PFAD), a by-product of palm oil refining. While proponents say it is a legitimate waste product, critics say that demand for PFAD can also drive deforestation. A 2017 studyii funded by the International Council for Clean Transportation concluded that, “PFAD based biofuels are likely to have a higher net climate impact than the fossil diesel they would replace”, due to indirect land use change — that is, demand for PFAD diverting the material from other sectors and stimulating demand for virgin palm oil, leading to deforestation. Meanwhile, recent research commissioned by T&E concluded that demand for used cooking oil (UCO) across the EU could double within a decade to meet renewable energy targets. It warned this would increase UCO imports from palm-producing countries like Indonesia and Malaysia. “Countries that would use UCO for animal feed and other products may end up exporting theirs while using cheap oil, like palm, at home,” said Cristina Mestre, biofuels manager at T&E. It also warned that this increase in demand could incentivise fraud (the mixing of virgin oils into used cooking oils). The European Waste-to-Advanced Biofuels Association says that used cooking oil is “one of the most highly regulated commodities in the

world” and that it is covered by “[c]omplete traceability” through its value chainiii. Green groups, however, say existing biofuel auditing and verification mechanisms are not effective. “We are deeply concerned that HVO is being used and promoted in ever more sectors, from aviation fuels to cars and now as a heating fuel, too,” said Almuth Ernsting of the NGO Biofuelwatch. “While a limited amount of HVO can be made from genuine waste products such as used cooking oil, such waste products are in very short supply and come nowhere near meeting current HVO demand… EU and UK biofuel sustainability and greenhouse gas standards still permit biofuels from palm oil and soy to count towards renewable energy targets, and they are based on a flawed greenhouse gas methodology which ignores the greatest source of emissions – indirect land use change.” The EU is aiming to phase out the use of virgin palm oil by 2030, but this will not include palm by-products like PFAD. Easier than retrofit The oil heating industry sees HVO as a way of meeting decarbonisation targets faster, and without the complex logistical and financial challenge of deep retrofit. OFTEC is calling for the British and Irish governments to remove duty on HVO to stimulate uptake, to include HVO-fuelled heating systems in home energy grants, and to remove trade barriers to the import of these fuels if they meet sustainability requirements. “There is a clear and robust system of checks to ensure that all HVO imported into the UK is renewable and sustainable,” an OFTEC spokesperson wrote to Passive House Plus. He said that this was via a 'proof of sustainability' (POS) statement that is instigated at raw material collection point and which transfers through the supply chain. •

i Crown asked us to clarify that the fuel was supplied at a higher rate as Road Transport Fuel Certificates cannot be claimed for applications such as heat generation. ii 'Waste not want not: Understanding the greenhouse gas implications of diverting waste and residual materials to biofuel production', Dr Chris Malians, Cerulogy, 2017 iii Used Cooking Oil biodiesel: best in class to decarbonise road transport', Euractiv.com, 29 Oct 2019


PASSIVE HOUSE+

NEWS

NORDAN WINDOWS & DOORS Sustainable Design, Energy Efficient, and Virtually Zero Maintenance

With secured by design accreditation and weather performance far exceeding the standard, it’s clear that no one can like NorDan can. Visit our showrooms in Cork, Dublin or Galway to experience the NorDan difference first hand 38 North Point Business Park, New Mallow Rd, Cork City Bluebell Industrial estate, Bluebell, Dublin 56b Briarhill Business Park, Briarhill, Galway - Opening July 2021

www.nordan.ie

ph+ | news | 23


NEWS

PASSIVE HOUSE+

Study confirms “systematic inequalities” in indoor air pollution By Kate de Selincourt

A

new analysis of the exposure of London households to indoor pollutants highlights “systematic inequalities” in exposure, overwhelmingly driven by factors beyond the control of those people worst affected. The researchers from UCL in London, and Public Health England, investigated the socio-economic distribution of a wide range of factors that worsen the risk of poor air quality at home. Analysis of the available literature and datasets demonstrated that the great majority of these risk factors were worse for people in worse socioeconomic positions. In contrast to the suggestions that people need more information or education to address poor indoor air quality (IAQ), the study found the inequalities were “structural,” i.e., built into the geography of the neighbourhoods and the construction of the homes that people occupy. The low-income households worst affected are least likely to be able to make changes that would improve the situation, the study found. They usually cannot afford to move, often cannot afford to repair or replace appliances, and are more likely to be tenants and therefore dependent on landlord co-operation for remediation and repairs. The team explored five factors that are known to affect exposure to indoor pollution: location and ambient outdoor levels of pollution; housing characteristics, including ventilation properties and internal sources of pollution; occupant behaviours; time spent indoors; and underlying health conditions. The team focused on three pollutants known to have serious impacts on health and life expectancy: PM2.5, nitrogen oxides (NOx) and carbon monoxide (CO). Modelling was carried out to investigate the likely impact of combined factors such as airtightness, and indoor and outdoor air pollution. For almost all the variables examined, factors that would increase exposure to, or harm from, indoor pollution were more common or more severe for populations with lower socioeconomic status. While a few factors (such as combustion of solid fuels and gas within the home) trended the other way, overall, the gradients of risk overwhelmingly advantaged more privileged households and neighbourhoods over those with lower incomes. Thus, low-income households tend to have

24 | passivehouseplus.ie | issue 39

more people living in a smaller space. This is strongly linked to poorer indoor air quality, the researchers say. “Given an indoor source emitting air pollutants at a certain rate, a smaller volume will reach higher concentrations faster than the equivalent source for a larger volume,” the research says. This is compounded by the higher risk that the ventilation is broken. “The EHS indicates that action is required to repair extractor fans in the lowest... income group in 57.5 per cent of houses versus only 7.7 per cent in the highest,” the paper concludes. Low-income households typically occupy more airtight buildings, and homes with more adjoining dwellings. While this may reduce the amount of outdoor pollution entering, modelling by the team showed this is outweighed by the increased build-up of pollution from indoor activities such as cooking, laundry drying, etc. On top of that, in homes with more adjoining dwellings, there is much higher risk of ingress of pollution from neighbours, either directly through poorly sealed walls or floors/ceilings, from communal circulation, or from neighbouring windows. One of the commonest and most concerning “shared” pollutants is tobacco smoke. The more people you share a wall with, the higher the risk that at least one of them will be a smoker. And if you are in a low socioeconomic status neighbourhood, your neighbours are much more likely to smoke. “In 2018, 25.5 per cent of those in routine and manual occupations smoked compared with... 10.2 per cent of those in managerial and professional occupations,” the researchers found. This concern is backed by research by Dr Jenny Brierly at the University of Sheffield, who found neighbours’ smoke – including, often, cannabis smoke — is a concern for many social tenants. Even when ventilation is available, people may not always be comfortable using it. Fuel poverty, outdoor pollution (e.g., roads, or people smoking on the doorstep), security concerns and noise all make it less pleasant to open vents and windows. The researchers cite a study showing that window-opening behaviours between households of different socioeconomic status may drive inequalities in carbon monoxide poisoning. Outdoor air quality The study also added to the growing body

of research showing how severely unequal outdoor air quality is. Analysis combining data on socioeconomic status and air quality records showed that PM2.5 levels are higher in lower-income neighbourhoods. Even more striking is the gradient in proximity to HGV routes: diesel combustion is the largest source of oxides of nitrogen (NOx), which are known asthma triggers. The study also found that the lower your income, the less able you are to make changes that would improve air quality at home. Low-income households in the UK are more likely to be tenants, and thus depend on a landlord for repairs that would improve IAQ, for example to boilers or ventilation. They are also less likely to be able to afford to move to a quieter, safer neighbourhood farther from major roads and with fewer very close neighbours, as these will generally be financially out of reach (especially once travel costs are considered). To reduce IAQ-driven health inequalities, it is essential to cut outdoor air pollution and improve the outdoor environment, the authors say. But buildings must be improved too. “Policies aimed at ensuring all housing has sufficient ventilation, and that mechanical ventilation is maintained and operational, would significantly reduce indoor air pollution exposures. Increased compartmentalisation between flats would help to reduce air pollution entering from adjoining dwellings.” The government should put pressure on landlords to fix the problems the tenants have no control over, the authors say. “National housing policies that require the improvement of social and privately rented properties will benefit low-income individuals who are more likely to occupy these tenures.” •

“Ensuring sufficient ventilation, and that mechanical ventilation is maintained and operational, would significantly reduce indoor air pollution exposures.”


PASSIVE HOUSE+

NEWS

Architects call for urgent climate action ahead of COP 26 A

head of the Built Environment Summit (28-29 October) and COP26 (1-12 November), the Royal Institute of British Architects (RIBA) and Architects Declare have published a report demonstrating the critical role the sector must play in reducing greenhouse gas emissions. ‘Built for the Environment’ brings together research and evidence from industry experts to prompt the built environment sector to scale-up its capabilities, and sets out bold recommendations to governments ahead of COP26. These range from reporting emissions on a consumption basis to adapting building codes that support the decarbonisation of buildings. RIBA and Architects Declare are encouraging organisations from across the global built environment sector to endorse the report and its recommendations, which calls for:

where we require change, particularly within challenging political landscapes and inadequate policies. Industry and governments need to work together to accelerate the global decarbonisation of buildings. I encourage the entire sector to endorse and amplify the report’s recommendations – we must speak with one voice to deliver a clear and urgent message.” Maria Smith, director of sustainability at Buro Happold and editor of the report, said: “This report is a call for governments across the world to include built environment actions in their net zero plans. The built environment sector can be a transformative force in meeting the challenges of the climate and biodiversity emergency. The knowledge, tools, and skills exist, but support and infrastructure is needed to mainstream best practice and bring about the transition to a fair and sustainable built environment for all.” The report can be downloaded from www.architecture.com. •

• G overnments to ensure environmental targets are science-based and fair – this means reporting greenhouse gas emissions on a consumption-basis, and including built environment actions and all sources of emissions within net zero plans (including nationally determined contributions). • G overnments to shift focus onto reducing absolute emissions, as opposed to reductions per square metre of building area, or per person. Greenwashing or reliance on large offsets will not help us meet our collective goals. • G overnments must both mitigate and adapt to the climate and biodiversity emergencies. Nature-based solutions and traditional ecological knowledge, wisdom and technologies are central to both. • Th ose operating within the built environment to actively adapt practice. From breaking down silos between disciplines and competencies, to communicating and sharing information, to shifting cultural ideas of beauty and design, the entire sector must adapt. • I nformation to be openly and widely shared to enable collaboration and transparent decision-making. This includes information around land, buildings, ecosystems, and infrastructure, as well as knowledge and skills. • S ocial justice to remain at the heart of all action. This means involving those impacted by change in decision-making, and together designing social policies to facilitate a transition to a fair and sustainable built environment, taking steps to ensure unintended negative consequences are addressed quickly and fairly.

Built for the environment Addressing the climate and biodiversity emergency with a fair and sustainable built environment

The report comes ahead of Architects Declare and RIBA’s Built Environment Summit – a two-day virtual conference on 28 and 29 October – that will provide an opportunity for the sector to unite ahead of COP26. RIBA President, Simon Allford, said: “As we approach COP26 and the critical juncture to limit global warming to below 2 C, we must unite as a sector to drive change. “This timely report emphasises the critical role our professions can and must play to tackle the climate emergency, and clearly states

ph+ | news | 25


DR SHANE COLCLOUGH

P H A I U P D AT E

When is an A-rated home really A-rated? Does the energy rating of homes actually reflect their real-world performance? Dr Shane Colclough, vice chair of the Passive House Association of Ireland, outlines the growing importance of post-occupancy analysis. Not only that, but it has implications for occupants in that they may be paying significantly more for their heating than they should. However, perhaps the most significant financial implication could be in the form of the impact of underperforming dwelling stock on those responsible for constructing them.

NZEB101 The NZEB101 project is carrying out POE of over 100 NZEB compliant dwellings for a cross-section of types – social housing, owner occupied, nursing homes, student accommodation, individual homes and schemes of dwellings, both new build and retrofit (see NZEB101.ie). One of the key findings to date is that a significant number of the NZEB dwellings monitored are consuming more energy than their BER rating indicates. For example, while eight houses monitored in one scheme had BER ratings of A2 (seven homes) and A3 (one home), based on their recorded energy consumption their in-use BERs were equivalent to A3 (three homes) B3 (four homes) and C1 (one home). One of the main reasons for the higher than expected in-use BERs was due to interior temperatures being significantly higher, and for longer than the BER software assumed – indicating a strong correlation with user interaction. However, the in-use coefficient of performance of the heat pumps was also significantly poorer than the assumptions in the BER software. Not only that, but measurements from other low energy buildings indicates that the majority of measured wall U-values underperformed theoretical values. So, for a combination of reasons, all of the dwellings underperformed compared to prediction, and the majority were not actually performing as A-rated buildings. Further work needs to be done in NZEB101 to see the overall trend from all monitored dwellings. However, if these trends are borne out across the full sample size, the findings have significant implications for Ireland as a whole in meeting its energy reduction commitments.

EU Taxonomy The EU Taxonomy is set to be a foundational tool of the European Green Deal and companies need to be aware of how it will affect them. The Taxonomy is a list of economic activities with performance criteria to assess the activities’ contribution toward environmental objectives. It describes what can be considered "green" and what can’t. Investors will ask businesses how their activities align to the EU Taxonomy, with the net result of preventing greenwashing and accelerating finance to support the transition toward a low carbon, climate-resilient economy. As part of this, it is highly likely that A-rated homes will be expected to perform as A-rated homes. Building firms in a position to prove this (e.g., via POE) will have a clear competitive advantage. This could prove the most significant driver in ensuring our homes really are energy efficient. n

A significant number of the NZEB dwellings monitored consume more energy than their BER indicates.

26 | passivehouseplus.ie | issue 39

DEAP

{kWh}

Recorded 7,422

8,000 7,000

4,017

4,956

3,055

3,098

4,301 4,931

3,380

3,416 3,859

3,000 2,000

3,331 4,156

5,000 4,000

5,254

6,000

3,745 4,670

What is post occupancy evaluation? Many buildings do not perform as planned, impacting on running costs, occupant satisfaction, health, safety, comfort, and (increasingly important) carbon emissions and sustainability. POE is the process of analysing a building's performance in use. Objective data such as temperature, noise, light, air quality, ventilation and relative humidity is collected and analysed. Energy consumption can be measured and compared with the building energy rating. Infrared imaging and airtightness tests can identify failure points and co-heating tests can allow comparison of overall heat loss with the design intent. In addition, structured occupant satisfaction surveys (such as the Building Use Study) can be carried out to enable subjective opinion to be analysed in a statistically robust way against similar buildings in an existing database. This level of analysis is important as high expectations for the performance of A-rated buildings have led to consumers becoming more demanding, and questioning why their buildings are not as energy efficient as expected. POE is one of the few objective means of demonstrating the performance is as it should

be. Not only that, but for construction companies, learning from and correcting mistakes in design and commissioning can be extremely cost-effective by eliminating waste and rework, and can lead to a competitive advantage not only via increased efficiency, but also as a consequence of the EU Taxonomy (see below).

3,416

B

uilding professionals often prefer to move on to their next project (for which they will be paid), rather than spend time analysing the performance of their previous projects (potentially highlighting issues for which they are liable!). However, as buildings become more energy efficient, and tolerances are tighter, it is increasingly important to not only analyse and optimise how buildings are performing, but also to demonstrate their high levels of performance. Companies may go out of business if they don’t – in particular due to the EU Taxonomy (more of which below). I’m part of the team of researchers from University College Dublin carrying out post-occupancy evaluation (POE) of over 100 nearly zero energy (NZEB) dwellings in Ireland, and we’ve been surprised with some of the results.

1,000

nZEB22 nZEB23 nZEB24 nZEB25 nZEB26 nZEB27 nZEB30 nZEB33

(above) DEAP value for heat energy consumption vs recorded heat energy consumption, and corresponding BER figures, for a scheme of eight dwellings.

Dr Shane Colclough is an energy research consultant and has been carrying out POE for over a decade, both within the university environment (Ulster University and UCD) and via his consultancy firm Energy Expertise Ltd.


Greenbuild test

testing & consultancy

Specialists in Passive House Airtightness

Better for You, Better for Nature. Airtightness Testing - NSAI certified for single and multi-fan applications

Thermal Imaging - PCN Level 2 Thermography for building applications

Sustainable Air to Water Heat Pumps

Ventilation Validation NSAI certified ventilation validator for Part F (2019) compliance

Contact Donal Reilly, Waterford Stanley for more information 00353 (0)87 227 1686

donalreilly@waterfordstanley.com

waterfordstanley.com

Greenbuild

Inch, Gorey, Co Wexford. t: 087 252 1032 e: contact@greenbuild.ie

www.greenbuild.ie


PAT B A R R Y

I G B C U P D AT E

Cutting embodied carbon: doing more with less We won’t be able to reduce the embodied carbon of construction fast enough just by switching to lower carbon materials, says Pat Barry of the Irish Green Building Council, so we urgently need smart design that allows us to build with less, and to create a genuine circular economy for building materials.

I

f everyone on the planet lived like the Irish, we would need 3.1 planets, ahead of the UK who only need 2.6 planets. The recent interest in embodied carbon in construction and climate action is hence welcome. Yet, there is a danger in focusing exclusively on carbon intensity per square metre. The Irish Green Building Council (IGBC), in its submission to the government’s consultation for its revised climate action, pointed out that Ireland will increase levels of home construction from

as possible. Car sharing schemes like GoCar and Yuko demonstrate that a product as a service can also result in major carbon savings for the built environment. According to Berkley university research carried out in North American cities, one shared car could in some cases replace the need for up to 11 other vehicles.i This could allow local authorities to relax minimum car parking rules for new developments, and thus reduce the need for carbon-intensive underground car parks. Not many incremental

In a climate emergency, provision of dedicated parking for a new home is now as daft as providing a chimney. 21,000 to 30,000 a year. Economist Ronan Lyons suggests the figure is closer to 50,000 a year. This will lead to a massive increase in carbon emissions and resource consumption from the construction sector, when the country is supposed to be cutting its emissions by 51 per cent in eight years. In simple terms, embodied carbon equals the carbon intensity of a material multiplied by the quantity of that material. Reductions in the carbon intensity of materials won’t happen fast enough to reach our target, so we also need to focus on quantity. That means housing more people with the least quantity of resources and material use possible. Circular thinking Circularity in construction is one key strategy. The goal is to retain value for as long as possible, through reuse, restoring, regenerating, recycling, circulating and re-manufacturing — and most importantly through co-operation. This encompasses urban planning, buildings, infrastructure and materials. It means breaking the linear make-break-waste model and replacing it with one where we can extract the maximum value from every product for as long

28 | passivehouseplus.ie | issue 39

changes to building regulations can beat the carbon savings of both eliminating the cars and the basement! In a climate emergency, provision of dedicated parking for a new home is now as daft as providing a chimney. Circularity at the urban scale Well-designed villages, towns and neighbourhoods offer the advantages of the circular economy, allowing efficient use of shared space, infrastructure, materials and energy. Densifying existing towns means reusing the same infrastructure more efficiently. A building properly designed and located should last 200 years and the infrastructure even longer. Dublin’s Phoenix Park tunnel was built in 1877 with manual labour, and is now proposed to be repurposed as part of a new metro, saving tens of millions of euros. We lost sight of this over the past 50 years and abandoned living space in our villages and towns often in favour of remote oversized homes, usually built when a household is starting a family. These often have maximum occupancy for only 18 to 20 years and are then largely underutilised. Enabling first-time buyers to refurbish a derelict building in a local town or village

instead would save substantial emissions from embodied carbon and transport, bring towns and villages back to life, and free up scarce construction material and labour. This requires a reversal of traditional financial and government policy, which prioritises the purchase or construction of new homes, to instead incentivise the renovation of underused space. Building in flexibility To extend the life of our buildings, they must be designed to adapt to other uses. This means thinking through floor-to-ceiling heights, location of sanitary services, stairwells, circulation, and floorplate depth, to test whether adaptation to other uses is possible. This can even mean trade-offs in increasing initial carbon emissions to extend the useful life of the building. Design of simple structural grids without obstructions allows better use of space and maximises furniture layouts. Within the Irish Green Building Council’s Home Performance Index certification, indicators for universal design ensure that homes can continue to be used throughout a person’s lifetime even if they are subject to a temporary mobility impairment. Innovation to integrate a range of shared social spaces or shared guest bedrooms and workspaces within housing are also needed. This would allow families to temporarily expand their space as needed, rather than building redundant space into each home. This may mean a move away from standard models of ownership or rental toward hybrid models that guarantee tenure and security. As your family grows you occupy more space and you pay into the pot, then when your family contracts as children leave you receive an income when you give up this additional space. No space is wasted. Designing for disassembly & product as a service Where a building inevitably will have a short life span, it is essential that every component is designed for disassembly. The concept of buildings as material banks


I G B C U P D AT E

PAT B A R R Y

(above) The Palais de Tokyo, a building renovated by Lacaton & Vassal, who won the 2021 Pritzker Prize. Lacaton & Vassal's philosophy is to reuse existing buildings, and sometimes to do nothing to the building; (left) the flat pack build system by Irish offsite specialist Glavloc, which lends itself towards disassembly.

imagines them as temporary material warehouses, where a product should come out of the building at end of its life with at least the same value it had when it went in. But this requires knowing what is in the product, and having digital material passports for each component. It also requires thinking through how each component is assembled and conceiving the different layers of the building as having different lifespans, from the core structure to the cladding to the internal finishes.

say a hotel or school. London is the first city to require circularity statements for developments over 5,000 square metres at planning stage. This requires the design team to think through the implication of their design to minimise resource use looking at all the indicators outlined above, including design optimisations, adaptability, and disassembly. The city has developed a series of useful primers on circularity, which are available at tinyurl.com/CircularLondon.

Making circularity measurable & regulated To transition to circularity, we need definitive quantitative and qualitive indicators. Level(s), the EU frameworks for sustainable construction, sets out several indicators including design for adaptability, design for deconstruction and disassembly, and measurement of waste and overall resource efficiency. Simple indicators such as the ratio of usable area to gross area tell us how efficiently a building is designed, but more complex evidence may require demonstrating alternative plans of the building converted to other uses, eg, an office block to

Practical implementation of circularity As part of the CircularLife EPA-funded project, IGBC will be testing the use of circularity indicators and is inviting design teams to participate in workshops, including one with Dutch architects and “urban miners” Superuse Studios, to develop circularity strategies for their live projects. Regenerate is one cloud-based tool developed by the University of Sheffield’s Urban Flows Observatory that the IGBC intends to trial. It takes a design team through a series of steps from early strategic design onwards through a series of questions and prompts, covering every concept outlined above,

scoring the circularity of the building, and measuring the degree to which strategies have been integrated. IGBC’s review of circularity indicators is intended to feed back into guidance on the integration of circularity in development plans and public procurement. IGBC will also pilot an online materials exchange platform with a Dutch partner, creating material passports for materials coming out of demolition, and finding potential users using blockchain. We are also rolling out a series of webinars on circularity across the autumn. These are available on our online learning hub at www.igbc.ie. None of this is easy! The solutions are not quite there yet but by switching to ‘think circular’ mode in our construction brains, hopefully rapid innovation will follow. This may yield faster results than just incremental reductions in per-square-metre embodied carbon. n

Impacts of car2go on Vehicle Ownership, Modal Shift, Vehicle Miles Traveled, and Greenhouse Gas Emissions', Elliot Martin & Susan Shaheen, Transportation Sustainability Research Center, UC Berkeley.

i

ph+ | pat barry igbc update | 29


DR PETER RICKABY

COLUMN

How will we decarbonise heating? Insulating our homes is critical and must be our first priority, but how do we get the rest of the way to zero carbon? Dr Peter Rickaby investigates the options…

W

e are committed to ‘net zero carbon’ by 2050. The use of fossil fuels for space and water heating, and for cooking, will not be permissible. There has been much promotion of decarbonisation options, but it is important to distinguish opportunities from myths. It is also important that we are not distracted by questions to which reliable answers will not be known for some time. Instead, we should be making progress in a ‘no regrets’ direction, while keeping options open. Questions to which the answers are not yet known include: • W hat will the emissions factor for electricity be in 2050? • H ow would local electricity networks cope with the electrification of heat? • What will the penetration of heat networks be? • To what extent will hydrogen be available via the gas network? • What will be the characteristics and costs of battery packs? • H ow might ‘smart homes’ technology help match supply and demand? We do know that demand reduction is an essential feature of all options. The no regrets

30 | passivehouseplus.ie | issue 39

strategy is therefore: 1 I mprove the building fabric to reduce heat demand. 2 Improve the building services to satisfy the remaining demand efficiently, and remove fossil fuel appliances. 3 Top-up performance to zero carbon when more is known about the residual emissions from electricity, and about other options. This approach gives us a little time to deliver stage one, while working out the answers to the questions above so we can decarbonise heat at stage two. If grid electricity is not completely decarbonised, stage three may involve local renewable energy systems and storage. However, Lowe and Oreszczyn (2020) point out that a convex trajectory to zero carbon may involve twice the emissions between now and 2050 than are associated with a concave trajectory in which early progress is made, so there is a case for prioritising decarbonisation as well as reducing demand (see diagram below). In the average UK dwelling, 87 per cent of energy use is for space heating, hot water and

cooking. Homes use nearly four times as much energy in the form of heat as in the form of power. The most frequently discussed option for decarbonising heat is to ‘electrify’ it, i.e., change to appliances such as heat pumps. This does not at present deliver decarbonisation: the emissions factor for electricity is similar to that for gas. However, progress is being made towards the decarbonisation of electricity by replacing fossil-fuelled generation with renewable systems such as wind power. Currently, the cheapest source of electricity supplied to the grid is offshore wind. If we convert all heat demand to electricity demand, we will need the equivalent of nearly thirty times as much wind power supplying the grid as we have now. If we use heat pumps with an average CoP of 2.5 we will still need the equivalent of twelve times as much wind power. If we adopt the ‘fabric first’ approach described above and reduce demand by 60 per cent, we should be able to reduce the factor from twelve to four. This emphasises how important demand-reduction via retrofit is to decarbonisation. Another problem is that local electricity distribution networks do not have sufficient capacity to cope with a four-fold increase in demand. This is exacerbated by the transition to electric vehicles, which may increase demand by a further factor of three. This emphasises


COLUMN

(above) Sketch of concave and convex carbon dioxide emissions reduction trajectories (source: Lowe and Oreszczyn 2020).

the importance of ‘smart’ demand management and the potentially transformative effect of local energy storage smoothing out the supply-demand mismatch. Electrifying heat is not a decarbonisation panacea, but it has a contribution to make, enabled by retrofit. Where we do it, there are technical considerations. Heat pumps supply heat at a relatively low temperature: typically, between 40 C and 50 C, therefore, for heat

Using hydrogen for heating makes little sense.

distribution within a home a larger radiator area is needed, or underfloor heating. An air source heat pump will struggle to cope with the demand of a poorly insulated house, especially during a prolonged cold snap; it is therefore essential to reduce demand to a level that the heat pump can satisfy, by improving insulation. Electricity currently costs more than gas, so unless homes are well insulated householders will see their costs rise, and fuel poor households will be disadvantaged. Tariff reform would help to address this: currently in the UK public subsidies are applied to gas, but energy efficiency levies are applied to electricity. This is the reverse of the arrangement we need to promote decarbonisation. Another frequently discussed option is connecting homes to local heat networks. Developing heat networks in urban areas (they are not viable in rural areas) is expensive and disruptive, and the supply has to be matched to demand. Small scale networks for blocks, estates or mixed-use developments have a part to play. If we can establish heat networks, the challenge is to secure zero carbon heat for them to supply. Sources include waste, biomass and hydrogen, but supplies are limited. The potential extent of heat networks is not clear, but networks have a contribution to make by reducing demand on the electric-

ity grid. Where networks are developed, the connection of new developments and retrofit schemes may become mandatory. Much has been claimed about replacing the natural gas that we distribute to our homes with hydrogen. When hydrogen is burned the only combustion product is water, so this is an attractive option. The problem is how to make the hydrogen; there are three methods:

DR PETER RICKABY

other system must also be in place. For cooking, replacing gas-fired hobs with electric hobs is straightforward. However, electric hobs are not as controllable as gas hobs, and electricity is more expensive than gas, so this change may be resisted. Electric induction hobs are more controllable, but they are expensive; prices may fall as demand increases. What can we conclude? Decarbonising heat is not easy, but it is urgent. There are several options, none of which is yet viable as a generic solution, but some of which will have a role to play. For urban areas with zero carbon heat networks, connection is probably the best option. Elsewhere, using electric heat pumps seems a good option, provided we can decarbonise the supply and increase local distribution capacity. Hydrogen heating makes little sense and seems unlikely to become widespread. While these options are being developed, the ‘no regrets’ approach is to focus on insulating our buildings, in order to reduce the demand for heat as much as possible. n Reference Lowe, R. and Oreszczyn, T. (2020) Building decarbonisation transition pathways: initial reflections. CREDS Policy brief 013. Oxford, UK: Centre for Research into Energy Demand Solutions.

• ‘Grey’ hydrogen is manufactured from fossil fuels, with substantial emissions. • ‘Blue’ hydrogen is manufactured the same way but with carbon capture and storage, a technology that has so far proven elusive and expensive. • ‘Green’ hydrogen is made by electrolysing water, so green hydrogen can be zero carbon if the electricity is zero carbon. Essentially this means wind power. The question raised by the green hydrogen option is why would we use electricity from wind to make hydrogen, then send the hydrogen to homes to be burned in 90 per cent efficient boilers, when we could send the electricity to the homes instead and use it in heat pumps at 250 per cent efficiency? Delivering 1.0 joules (J) of heating requires approximately 1.2 J of natural gas, or 1.6 J of electricity to make 1.2 J of green hydrogen; but only 0.4 J of electricity is needed to deliver 1.0 J of heat via a heat pump. Thus, using hydrogen for heating makes little sense, and the emerging role of hydrogen is as an industrial fuel, for large vehicles and for energy storage. Hydrogen heating seems unlikely to become common. Local solar systems have a role to play. Electricity from solar PV can be stored in batteries or used for water heating, or solar thermal systems can be used to make hot water. In both cases the solar systems can raise the tank temperature and reduce the load on the heat pump. In the UK, a solar thermal system can typically supply half of a dwelling’s annual hot water demand with no emissions. However, the solar input is insufficient in winter, so an-

Graph: Centre for Research into Energy Demand Solutions, 2020

(above) Insulating homes, heat pumps, and solar PV can all be part of the mix of solutions towards decarbonising our heating systems.

Dr Peter Rickaby helps to run the UK Centre for Moisture in Buildings and the Building Envelope Research Network at University College London. He is also Technical Director of the Retrofit Academy and chairs the BSI Retrofit Standards Task Group.

ph+ | dr peter rickaby column | 31


SHOWROOMS: CORK, DUBLIN, GALWAY & BELFAST UNPARALLELED CHOICE OF PASSIVE CERTIFIED PRODUCTS – OUTWARD OPENING, INWARD OPENING, UPVC, ALUMINIUM, ALUCLAD

GROUND BREAKING U-VALUES FROM AS LOW AS 0.47W/M2K

T. 064 7751151 E. info@munsterjoinery.ie

www.munsterjoinery.ie WINDOWS & DOORS


COLUMN

DR MARC Ó RIAIN

The Saskatchewan House, 1977 In his latest column on the history of low energy building during the 20th century, Dr Marc Ó Riain looks back at the Saskatchewan House, which was built in Canada in 1977, and established the principle of prioritising energy demand reduction over active systems.

W

e have all probably heard the saying that a dollar spent on energy conservation is equivalent to ten dollars spent on energy generation, in terms of real energy saved. It is the basis for the principle of ‘passive first’, supplemented by active technologies. As low energy building technology developed in the late 1970s and early 1980s, this was a finding that was starting to dawn on many researchers, and nowhere more so than at Saskatchewan House in Canada in 1977. The Philips House (Aachen 1974), the

It acted as an exemplar, with thousands of people visiting monthly. first Zero Energy House (Copenhagen 1975) and Lo-Cal House (Illinois 1975) were all driven initially by interest in active systems like heat pumps or seasonal thermal storage tanks. The insulation of these buildings would have been to improve the efficiency and performance of the active equipment within a test building. Designers attempted to reduce fabric heat loss by passive means to make the heat pumps and other technologies viable. Harold Orr and a team of researchers, which included William Shurcliff, Dave Eyre, Bob Besant and Rob Dumont, were interested in heat exchange technology and solar thermal collectors in their 1977 Saskatchewan project. By focusing on energy conservation or passive aspects first, Orr and the team realised that “conservation is much less expensive than solar. For every dollar we spent on reducing heat loss from the house, with a better air barrier and more insulation, we saved at least $10 on the size of solar collectors and equipment needed to achieve the same thing” (Orr 2013). Using this principle, they super insulated

their house against winter night temperatures of -24 C. The climate of Saskatchewan had very small solar gains in the winter months and the researchers decided to optimise the angle of the 17.9 m2 array of solar collectors on the facade, creating a skewed and unique form. This form and building typology developed from first principles rather than aesthetics, a low energy house from the ground up, form following function! It was a low energy solar-heated residential structure, which acted as an exemplar, with thousands of people visiting it monthly. It was designed with wall insulation specified at six times the concurrent standard, triple glazed windows, no basement and a very tight air envelope supported by an active heat exchanger. Unlike the Copenhagen House, the researchers rejected seasonal heat storage tanks due to the potential for heat loss. By removing the basement and suspending the ground floor above the soil they could effectively mitigate 80 per cent of downwards heat loss. Orr believed that greater demand-side space heating savings could be made by "reducing air leakage by 80%; we would have a 64% reduction in heat loss without touching the windows and doors, walls, and ceiling. If we use 6 times as much insulation in the walls and ceiling and use much better windows and doors, we would be down to a total heat loss that is about 20% of the heat loss of a conventional house”, and the remaining demand could be met with renewable solar and heat exchangers. He also found that building a double wall was cheaper than cross-battening the interior of the external wall, and that blown mineral fibre was much cheaper than rigid insulation, having identified the potential to locate the vapour barrier on the outside of the internal wall, and thus avoid potential services clashes. The construction achieved 0.8 air changes per hour at 50 Pascals. The house layout, with the living accommodations and most windows facing south, and utility accom-

modations to the north, plus shading devices, heat exchanger and super-insulation, would influence Wolfgang Feist’s principles of passive house in 1988. Feist said: “At the time we knew about other similar buildings —buildings made by William Shurcliff and Harold Orr —and we relied on these ideas” (Holladay 2015). Although these early documented exemplars of low energy housing and retrofit were all residential applications, they established energy conservation and demand reduction as the first principles of low energy design. n

Photo: © Harold Orr

Sketch: © Marc Ó Riain Dr Marc Ó Riain is a lecturer in the Department of Architecture at Munster Technological University (MTU). He has a PhD in zero energy retrofit and has delivered both residential and commercial NZEB retrofits In Ireland. He is a director of RUA Architects and has a passion for the environment both built and natural.

ph+ | dr marc ó riain column | 33


DARTRY ENERPHIT

CASE STUDY

ON WA R D S AND U P WA R D S DEEP RETROFIT AND EXTENSION INSPIRED BY DARTRY’S VICTORIAN VILLAS This Enerphit project in the suburbs of South Dublin has dramatically transformed and extended a dated 1970s dwelling by adding an extra storey, radically reducing its energy consumption and creating a smartly-designed, light filled family home and office. By Jason Walsh

34 | passivehouseplus.ie | issue 39


CASE STUDY

DARTRY ENERPHIT

IN BRIEF Building: 251 m2 detached home & office Method: External insulation on blockwork Location: Dartry, Dublin Standard: Enerphit (passive house retrofit, certification pending) BER: A3 Heating & hot water bill: €47 per month (to run the compact heat pump for space heating, hot water & ventilation, for a family of six and two home offices. See ‘In detail’ for more)

€47 per month

Aerial photos: Sam Neely

Areas of contrast render colour at ground floor level

EAST ELEVATION

AS BUILT peter nickels architects client: Peter Nickels & Edelle O'Doherty project: The Willows, Sunbury Gardens, Dartry, Dublin 6 wi-s-2c

drawing: Proposed Elevations drawing no: 1312/AB/007

revision:

scale: 1:100 @ A3

SOUTH ELEVATION

The Willows, Sunbury Gardens, Dartry, Dublin 6 e: mail@peternickelsarchitects.ie m: +353 (0) 86 315 8902

date: May 2019 © peter nickels architects

EAST ELEVATION

ph+ | dartry enerphit case study | 35


DARTRY ENERPHIT

CASE STUDY

W

hen architect Peter Nickels took on the The Willows project, he was working for the most demanding of clients: himself. This deep retrofit involved partially demolishing a dated 1970s dwelling and replacing it with a modern, energy efficient, and taller building. The Willows was not Nickels’ first refurbishment, but it was an opportunity to put his interest in passive design into practice. “I had refurbished my own home before and I sort of realised fairly soon afterward, within five or six years, that I could have done things differently. In the last ten to 15 years things have changed tremendously in terms of what we’re trying to achieve,” he says. In 2013 Nickels and his wife Edelle O’Doherty bought the house — a two-storey flat-roofed structure in Dartry, Dublin 6 — with the aim of undertaking an extensive renovation. When finished, it would have to serve not only as a home to their family of six, but also as an office for both (Edelle works as a nutritional therapist and functional medicine practitioner). “I thought ‘this is an opportunity to do things properly,” Nickels says. The couple, both widowed and each with two teenage children, had decided to

36 | passivehouseplus.ie | issue 39

bring their two families together. Buying a house to raise the blended family was a huge stepping stone, Nickels says. They had been renting nearby and had seen the house come up for sale, although at first sight it did not appear to be an obvious choice. “It was one of a pair of identical infill houses which had been built in the side garden of a large Victorian redbrick villa. These houses were completely out of scale and character with their surrounding context – to one side was Sunbury Gardens, a Victorian architectural set piece, comprising three-storey redbrick villas, all protected structures, arranged around a formal landscaped garden. To the other side was a 1990s development of three-storey townhouses.” The positive thing about this was the existing house had neither aesthetic nor historical value. “I felt pretty free in the design, because of the age of the building,” Nickels says. “There was nothing precious about it, even though we were right next to these protected structures. Whatever we did was going to make it perform better, function better, and look better.” Nickels received planning permission for the refurb in 2016, but at first the aim wasn’t to go passive. It was only after this


CASE STUDY

that he became an avid reader of Passive House Plus, and subsequently decided to undertake training to become a certified passive house designer. “I designed the scheme and obtained planning permission before undergoing passive house training – so although originally it did embody many of the principles of passive house, the scheme needed to be reviewed and the details re-visited before tendering.” He says this magazine was a big help in finding the right materials and suppliers. “I was looking for passive house performance window systems and external insulation systems, and originally was considering timber frame on the top floor as a lightweight way to extend over the existing structure.”

Nickels was working for the most demanding of clients: himself.

Main photos: Andrew Campion

Technical challenges Angelo Babos, owner of main contractor Leopardstown Construction, says that working for an architect building his own house only had a positive effect on the project. “The only thing I could see different from other jobs in terms of the client being an architect was that he was able to make changes in the layout, finish and location of [things like] electricals,” he says. This does not mean the job was easy, though. In fact, soon into the build major problems requiring remedial work made themselves apparent. “We had to dig out some of the old lobby and found the middle wall and back were not strong enough to put another floor on.” At this point, total demolition was considered. But Nickels says that by now, the importance of limiting the embodied carbon of the build was high on his mind. This guided a lot of the big decisions, such as preserving as much of the existing structure as possible, in spite of the technical challenges. Some of the original walls had have to be rebuilt for structural purposes, and while Nickels originally wanted to specify timber for the second floor, he ended up using

DARTRY ENERPHIT

lightweight thermal blocks from Mannok due to concerns over the compatibility of different render systems applied over timber frame and block, and the associated detailing issues. Thankfully, Angelo Babos and his team were not entirely new to passive house construction. “I have done other passive house standard building, a lot of upgrading, especially heat recovery ventilation and Part L compliance,” Babos says. “Because of the changes in regulations over the last few years, architects are keeping an eye on airtightness and upgrading the U-values of walls.” Although retrofitting is increasingly seen as the only way Ireland can, at least in terms of its housing stock, meet its climate targets, Babos says the sheer amount of skilled labour required should not be underestimated. “When you have a retrofit it’s much harder than building from scratch,” he says. “It was very hard to go around and make it airtight, you have weak spots to deal with. That made my life and my lads’ life very hard; we had to put a lot of work in to make it right.” The main airtightness layer was formed by internal plaster on the new walls and exist-

ph+ | dartry enerphit case study | 37


DARTRY ENERPHIT

CASE STUDY

WANT TO KNOW MORE? The digital version of this magazine includes access to exclusive galleries of architectural drawings. The digital magazine is available to subscribers on passivehouseplus.ie & passivehouseplus.co.uk

38 | passivehouseplus.ie | issue 39


CASE STUDY

ing plaster on old walls, which needed to be re-done in places. Airtightness tapes from Partel were used to seal junctions, while Blowerproof liquid airtight membrane was applied along door thresholds and where the external walls met the concrete slab (below where plaster could be applied). Babos says that while the job was challenging, the positive side of this is that it was a learning experience, and a better one than you can get in the classroom or workshop. “Next time will be easier as we learned a lot. When I did a course, back in 2013, we brought techniques from the workshop, but that was a workshop not reality. And when you go outside into the world you have to do a lot of research,” he says. Nickels says part of his reasoning in choosing Leopardstown Construction was the need for confidence. “We tendered to builders who had passive house experience and passive house training. Angelo came at it with a very rigorous approach, he was thinking things through, methodologies and so on.” Design for life Clues as to how to extend the dwelling lay in the original design: the house had a central staircase and hall, running east-west, dividing the plan into two equal halves, and the roof was flat. Nickels says: “The obvious design solution was to go up – forming a new stair

over the existing straight stair flight, a new second floor comprising a master bedroom to the north, and a spacious home office on the southern side with views out to the trees and the Dublin mountains. This solution provided the space required, without extending the footprint any closer to surrounding boundaries – and brought the house into scale with the three-storey Victorian houses and the 1990s townhouses.” The decision to build up rather than out also provided another embodied carbon win: it improved the building’s form factor, the surface area from which heat can escape, to such an extent that the house could meet Enerphit, the passive retrofit standard, even without digging up the floor slab. This is despite the fact that there was only 50 mm of insulation underneath. “This is where the use of the PHPP software really came into its own,” Nickels says, “to analyse and inform important and costly decisions like this.” (Some of the slab did ultimately have to be replaced to allow for underpinning of walls.) At first floor level, the simple arrangement of the original house meant that the layout could be re-configured to provide four equally sized bedrooms, which were large enough for double beds and work desks, something that will have proved its value in recent months. “This was the perfect democratic solution for four teenagers studying from home and meant that none of the children had to set-

DARTRY ENERPHIT

He became an avid reader of Passive House Plus.

ph+ | dartry enerphit case study | 39


DARTRY ENERPHIT

CASE STUDY

40 | passivehouseplus.ie | issue 39


CASE STUDY

DARTRY ENERPHIT

THERMAL COMFORT AT THE WILLOWS

T 1 2

3 4

emperature and humidity monitors were fitted in several rooms in the house, as the project was part of the SEAI Deep Energy Retrofit scheme. In the first year post-retrofit, the overall indoor air temperature (as measured by the return air on the Nilan unit) did not rise above the 25 C threshold for overheating specified by PHPP, the passive house design software. The top floor office was prone to localised higher temperatures, as it has a large south-facing window (with shading) and two rooflights (without shading). In practice, this was not a particular problem, as it is a large house and temperature differentials can be eased by leaving internal doors open. In addition, the rooflights can be opened to allow cross ventilation on the top floor. Conversely, the den at ground floor, which is located to the north of the house and has three external walls and a flat roof, does not benefit from solar gain during the day, and has intermittent occupancy. It is therefore regularly cooler than other rooms. This was anticipated at the design stage, and an electrical point was provided here so that an electric convector heater could be added later.

Peter Nickels, architect & homeowner

A HUGE CHANGE IN AIR QUALITY

5

7

6

8

1 The southern side of the house prior to renovation; 2-5 much of the external wall on the south elevation at ground floor level was removed and replaced with full height glazing, and the relocated kitchen now feels like part of the garden; 6-8 the masonry walls were insulated externally with graphite enhanced EPS with silicon render finish.

D

uring construction, extensive mould growth inside the stud partitions in the kitchen was discovered as a result of water leakage. One family member, who suffers with rhinitis and has a sensitivity to mould, had difficulty with the air quality in this room. But it had not been known that that the issue was within the fabric of the building. The clean filtered air supplied by the Nilan ventilation unit has now resulted in a huge change in indoor air quality for him and for the whole family. In addition to the improvement in air quality, Edelle was particularly keen to avoid the introduction of toxins into the interior of the house. Specifications therefore included Keim mineral paints – which are solvent and chemical free, non-allergenic, odourless and breathable — and Keracoll Cementoflex cement-based resin floor topping, a seamless thin finish with very low volatile organic compound (VOC) emissions that was applied over the floor slabs.

Peter Nickels, architect & homeowner

ph+ | dartry enerphit case study | 41


DARTRY ENERPHIT

CASE STUDY

10 REASONS

TO BUILD WITH MANNOK AIRCRETE THERMAL BLOCKS

Building with Aircrete blocks is on the rise in Ireland, and the outlook tells us demand will continue to grow both nationally and globally, with recently published research forecasting the continued surge of the autoclaved aerated concrete market: “Rising demand for sustainable building materials and eco-friendly nature of AAC material are key factors driving industry growth,” says Emergen Research.

1 SUPERIOR COMFORT

There is no substitute for a comfortable home, and Aircrete’s unique properties ensures greater comfort for the homeowner.

2 REDUCED ENERGY BILLS

Reduced energy usage means reduced energy bills. It’s all down to the unique properties of Aircrete and their superior thermal performance.

3 THERMAL PERFORMANCE

Aircrete blocks offer superb thermal performance, insulating up to ten times better than dense concrete blocks. With the walls of the house traditionally the biggest source of heat loss, the blocks can significantly reduce this and easily achieve better U-Values whilst maintaining an optimal thermal mass. The blocks’ thermal performance is undoubtedly one of its most appealing properties.

4 ELIMINATES DAMP & MOULD RISK

It’s unsightly and unhealthy, and quite frankly, damp and mould should not be a problem in modern homes, but unless the potential cold spots in a new build are dealt with effectively, it can still be a risk. With Aircrete, the risk is eliminated.

5 SUPERIOR FIRE PERFORMANCE

Aircrete blocks far outperform some of the other alternatives on the market when it comes to fire performance, with timber frame only providing 30 minutes fire resistance and Aircrete up to 4 hours for the 215mm block and 2 hours for the 100mm block.

6 FASTER HEATING RESPONSE

Aircrete walls respond quicker when heating is turned on. So rooms heat faster and the heating is on for a shorter period with less 42 | passivehouseplus.ie | issue 39energy usage.

7

9

SUSTAINABLE SOLUTION

Made from up to 80% recycled materials, an A+ Green Guide rating and one of the first construction products to have an Environmental Product Declaration published by the Irish Green Building Council. But it’s not just the block that’s more sustainable, it’s the building. Aircrete’s superior performance means new builds are much more energy efficient, with passive house or net zero standards much easier to achieve.

INTERNATIONAL BEST PRACTICE Aircrete is tried and tested as a strong and durable construction material. It’s been established for decades as the material of choice in wall construction in countries right across Europe and beyond, including Germany, Italy, France, the Netherlands, Poland and the UK.

10 COST EFFECTIVE

8 REDUCE HEAT LOSS THROUGH THERMAL BRIDGING

Aircrete reduces heat loss through thermal bridging by up to 80%. As thermal bridging occurs at every junction where there is a break in the insulation fabric, it is one of the largest sources of heat loss and important to address correctly.

Aircrete built is not only better built, but also a very cost-effective way to achieve a superior home. For example, the cost of upgrading from using Aircrete in all key junctions of a house to building the entire inner leaf with Aircrete is typically only a very small percentage of the overall build cost. This is then offset quickly by the resulting energy savings, and well worth it for the added performance benefits. In many cases the net result can be cost neutral.

DISCUSS USING AIRCRETE IN YOUR NEXT PROJECT WITH OUR TECHNICAL EXPERTS: E: technical@mannokbuild.com T: 1800 322 122


CASE STUDY

DARTRY ENERPHIT

SELECTED PROJECT DETAILS

Clients: Peter Nickels & Edelle O’Doherty Architect: Peter Nickels Architects Main contractor: Leopardstown Construction Structural engineer: Niamh O’Reilly Structural Engineering Heating & ventilation: Nilan Ireland Passive house consultant: Earth Cycle Technologies Quantity surveyors: FMMP Electrical contractor: John Bombu Electrical Airtightness tester: Building Envelope Technologies External wall insulation system: Atlas Aval EPS insulation: Thermotech Thermal breaks: Partel Thermal blocks: Mannok Low thermal conductivity structural fixings: Schoeck, via Contech Accessories Roof insulation: Saint-Gobain Additional roof insulation: Gutex, via Ecological Building Systems Floor insulation: Xtratherm Airtightness tapes: Partel Liquid airtight membrane: Blowerproof Ireland Windows & doors: Viking, via Prestige Aluclad Roof lights: Fakro Cement fibre cladding: Cembrit Ireland Resign floor topping: Keracoll Cementoflex, via Stone Seal Roof slates: Tegral Warm roof system: Moy Materials Solar PV: Sunpower Ventilation installation: Allied Air Conditioning Eco paints: Keim, via McConnell Coatings

tle for a tiny ‘box room’ – which is a typical issue in many existing house types,” Nickels says. At ground floor, the existing plan again made it very simple to swap the kitchen and living room, with the kitchen relocated to the southern side of the house where it has views out to the garden, whilst the living room was moved to the north side, with a large west-facing window, where it is bright in the evening. Much of the external wall on the south elevation at ground floor level was removed and replaced with full height glazing, so the kitchen feels like part of the garden, and the movement of the sun around the house throughout the day can be fully experienced. With the addition of the extra floor and steeply pitched roof, the house is now much

1 2

3 4

5

7

6

8

Airtightness works included 1 use of blowerproof liquid airtight paint, seen here at the wall-to-floor junction; 2 & 3 use of airtightness membrane behind joist ends and partition walls; 4 Partel Izoperm membrane behind service cavity battens to the roof; and 5 Partel Conexo tape around window frames; meanwhile thermal bridging measures included 6 Schoeck Isokorb thermal breaks; 7 & 8 and Partel Alma Vert structural insulation (seen here in green).

ph+ | dartry enerphit case study | 43


DARTRY ENERPHIT

CASE STUDY

The original in airtight coatings... ... also functions as vapour control and radon barrier

OUTSTANDING INDOOR CLIMATE Tailor the ideal ventilation and climate solution and get total control of the indoor climate in the dwelling directly from the mobile phone.

Blowerproof Liquid is the only Liquid Air Tight and Vapour Control Membrane that has been approved by BBA, Passive House Germany with NSAI pending Warrington Class C s1 d0 Fire rated More than 500 reference projects in Ireland.

Nilan’s Compact P solution is certified to the highest Passive House standards including nZEB/Part L. • Passive House (nZEB/Part L certified) • Extract air • Supply air • Humidity control • Domestic Hot Water • Heating • Cookerhood control • All in one technical room

The only way to protect your windows during construction

www.nilanireland.ie • info@nilan.ie • Tel +353(0)66 7169587

tstanding Indoor Climate 93mm x 135mm.indd 1

info@blowerproof.ie - www.hevadex.ie - 0404 61901

09-03-2021 11:23:41

SAFER, HEALTHIER INDOOR AIR QUALITY

Ventilation Systems with Heat Recovery

Heat recovery rate of up to 83%

Highly energy-efficient, heat provision level of 88%

Higher quality filters

Designed for use in schools, offices, hotels, medical practices as well as in the homes

FULL CONTROL OF IAQ WITH EFFICIENT LUNOS VENTILATION Email: sales@partel.ie | Visit: www.partel.ie | Call: 091428714 44 | passivehouseplus.ie | issue 39

Scan the QR code and watch the VIDEO


CASE STUDY

DARTRY ENERPHIT

EMBODIED CARBON

T 1

2

he building’s embodied CO2e emissions were calculated by John Butler using PHribbon, resulting in a cradle to grave figure of 79.1t CO2e, or 282 kg CO2e /m2 GIA when calculated in accordance with the RIBA 2030 Climate Challenge. The biggest element of this total was the external walls – including new and retrofitted walls (22.6t CO2e), followed by the solar PV array (15.4t), a new roof system (8.6t), building services (6.1t), windows, doors and roof windows (6.1t), the steel frame (6t), and demolition (5.8t). Sixty-year lifespans were assumed for all building fabric, excluding the flat roof system, where 30 years was assumed, and 40 years for the render system, based on the Atlas Aval NSAI Agrément certif-

icate. The PV array and compact heat pump were assumed to have 30-year and 20-year lifespans respectively, with the ductwork assumed to last for 60 years. Where Environmental Product Declarations (EPD) were not available for the exact product, data from equivalent products was used (e.g., from the closest matched Product Environmental Passports for a heat pump and EPD for a different EWI system), or emissions are based on emissions for the component materials (e.g., window frames and ventilation ducting). In all 69 per cent of materials mass and 82 per cent of lifecycle stage A-C material emissions are accounted for by EPD data and 18 per cent by reference values (mainly from the ICE database).

3 1 The roof features three Fakro quadruple glazed timber aluclad roof lights, while the new roof finishes include 2 fibre cement slates to the pitched sections; and 3 bituminous membrane on the flat.

more visible from the street. But the increased scale and massing fits much better alongside the Victorian villas that inspired the house’s design. Their influence is reflected in features such as the prominent street-facing gable and the grouping of windows at first and second floor level (with brise soleil for shading). An existing mature pear tree was also retained to provide summer shading to the south elevation. The merging of passive principles, aesthetics and meeting the needs of a modern family — all things missing from many mass-produced houses — should be the logical outcome of the reality of construction, Nickels says: it should all be right. “There’s so much money invested in construction that you have to succeed on all fronts. Reducing embodied and operational energy is obviously critical to all building projects now, but as an architect the challenge is not just to incorporate these requirements but to use them to inform and help generate a contemporary design aesthetic.” Though it seems unlikely that he would settle for a standard house, Nickels said the pressure created by the surrounding context helped. “There was a real challenge, being surrounded by historic red brick houses, to make a low energy, contemporary design work.” Additional words by Peter Nickels

ph+ | dartry enerphit case study | 45


DARTRY ENERPHIT

CASE STUDY

Meeting the demands of Passive House construction. Thermal break technology you can trust.

Certified by the Passive House Institute in Darmstadt, selected products in the Schöck Isokorb® range meet demanding passive house standards for the design of cantilever and supported balconies, parapets and balustrades. www.schoeck.com

210552_Anz_IK_190x135 _GB_rz.indd 1

16.09.21 15:44

leopardstown CONSTRUCTION

NZEB CONSULTANTS AND RETROFIT PROJECT MANAGERS • NZEB COMPLIANCE – NEW BUILD AND RETROFIT • HEAT PUMP TECHNICAL ASSESSMENT AND DESIGN HEAT LOSS CALCULATION • NSAI-CERTIFIED AIRTIGHTNESS TESTING AND VENTILATION VALIDATION • ‘ONE-STOP-SHOP’ HOME ENERGY UPGRADE

Specialists in low energy building New build at Passive House standard Retrofit at EnerPHit standard Mechanical ventilation with heat recovery TEL: 087 0542605 EMAIL: DAVID@DONOVANLOWENERGY.IE

46 | passivehouseplus.ie | issue 39

Email - angelobabos@gmail.com Tel: (353) 86 3818357


CASE STUDY

DARTRY ENERPHIT

IN DETAIL Building type: Detached 251 m2 (TFA) home, created from the retrofit of 179 m2 1970s dwelling. Site & location: Urban site, Dartry, Dublin 6 Budget: Not disclosed Completion date: September 2020 Passive house certification: Pre-submission for Enerphit certification Number of occupants: 6 BER Before: D2 (295.2 kWh/m2/yr) After: A3 BER (54.16 kWh/m2/yr) PHPP Space heating demand: 24.6 kWh/m2/yr Heat load: 13 W/m2 Primary energy demand: 94 kWh/m2/yr Heat loss form factor: 1.16 Overheating: 2 per cent of hours above 25C Energy performance coefficient (EPC): 0.431 Carbon performance coefficient (CPC): 0.401 MEASURED ENERGY CONSUMPTION Before: 132 kWh/m2/yr (January to December 2018 inclusive, all energy use, gas & electricity) After: 33.76 kWh/m2/yr (September 2020 to August 2021 inclusive, all energy use, all electricity) ENERGY BILLS Before: €2,500 on gas and electricity for all of 2018. After: €1,294 on electricity (September 2020 to August 2021 inclusive). Includes all energy use. This period included lockdowns when the house was fully occupied with six people working/ studying from home. The measured energy consumption for the Nilan Compact P heating & ventilation unit between September 2020 and January 2021 inclusive (1,811 kWh total), which we have estimated (and likely overestimated) to increase to a total of 3,644 kWh over 12 months. Bonkers.ie suggests a cheapest available bill of €567/year or €47 per month to run the heat pump for space heating, hot water and ventilation – for a family of six and two home offices, and with higher-than-normal occupancy due to the pandemic. The heat pump energy use figures include VAT but exclude standing charges & PSO levy, as these charges apply for any dwelling with an electricity connection. This also assumes no contribution from the PV array to power the heat pump. Summer heat pump data was not available due to IT issues. AIRTIGHTNESS (AT 50 PASCALS) Before: 11.32 (m3/hr)/m2

After: 0.98 (m3/hr)/m2 GROUND FLOOR Original floor (before): Generally, 150 mm concrete floor slab on 50 mm PIR insulation. U-value: 0.488 W/m2K. Original extension floor: 150 mm concrete floor slab on 25 mm EPS insulation. U-value: 1.078 W/m2K Original floor (after): Existing floor build up retained generally. Approx 25 per cent of slab replaced where required by underpinning works. Upgraded floor build up: 150 mm concrete slab on 100 mm PIR insulation U-value: 0.261 W/m2K New extension ground floor: 150 mm concrete slab on 150 mm PIR insulation. U-value: 0.141 W/m2K WALLS Original walls (before): 103 mm brick outer leaf followed inside by 100 mm cavity filled with EPS blown bead, 100 mm concrete block inner leaf, 13 mm plaster. U-value: 0.335 W/m2K Original walls (after): 120 mm or 140 mm graphite enhanced EPS insulation with silicon render finish externally, over existing cavity wall build up as above. U-value: 0.146 W/m2K or 0.133 W/m2K New extension walls: 200 mm or 220 mm (depending on location) graphite enhanced EPS insulation with silicon render finish, over 200 mm Quinn Lite (Mannok) standard blocks laid on flat, 13 mm plaster internal finish to form airtightness layer. U-value: 0.138 W/m2K or 0.128 W/m2K ROOF Original roof (before): Flat roof, bituminous roofing felt on 18 mm plywood, followed underneath by timber firring pieces, and timber joists with approx 175 mm mineral wool insulation between joists, 13 mm plasterboard internal ceiling finish. U-value: 0.190 W/m2K New flat roof over den (retaining original roof structure): Bituminous roof membrane on 200 mm Xtratherm PIR insulation, on 18 mm OSB3 deck laid to falls, over timber firring pieces and 175 mm deep existing timber joists; Isover Metac mineral fibre insulation between joists (average depth 325 mm), on Partel Izoperm airtightness/ VCL membrane below joists, 50 mm battens to form service cavity below joists, 13 mm plasterboard internal ceiling finish. U-value: 0.071 W/m2K Extension pitched roof: Fibre cement roof slates, on 50 mm counter battens, 50 mm battens to form ventilated air space and breather membrane; on 35 mm Gutex Multiplex Top wood fibre board insulation laid over 200 mm deep timber rafters; Isover Metac mineral fibre insulation between rafters, on Partel Izoperm airtightness/VCL membrane below rafters, on 50 mm battens to form service cavity below rafter with 50 mm mineral fibre insulation within cavity, on 13 mm plasterboard internal

ceiling finish. U-value: 0.145 W/m2K Extension flat roof (over utility room): Bituminous roof membrane on 200 mm Xtratherm PIR insulation, on 18 mm OSB3 deck laid to falls, Partel Izoperm airtightness/ VCL membrane above joists, over timber firring pieces and 175 mm deep timber joists, 13 mm plasterboard internal ceiling finish. U-value: 0.113 W/m2K WINDOWS & DOORS Before: Mixture of double glazed PVC, aluminium and timber windows, solid timber front door. Overall approximate U-value: 3.50 W/m2K New windows: Viking DK88 triple glazed windows. Timber frames at first & second floor, timber aluclad at ground floor. Argon-filled, with two low-E glasses (Planitherm One) and SGG Swisspacer Ultimate warm edge solution. Average whole house U-value 0.80 W/m2K New pitched roof windows: Fakro FTT U8 Thermo quadruple glazed timber aluclad roof light. Overall window U-value 0.58 W/m2K New flat roof windows: Fakro DXF DU6 non-opening triple glazed roof light with multi chamber PVC kerb profile. Overall window U-value 0.70 W/m2K HEATING & VENTILATION Before: Gas fired back boiler with low temperature hot water radiators and 2 x gas fires. Natural ventilation through hit & miss wall vents. No mechanical ventilation to kitchen or bathrooms. After: Warm air distribution from the Nilan Compact P XL combined heating & ventilation unit. Passive House Institute certified to have heat recovery efficiency rate of 80 per cent. The Compact P unit uses the return air heat exchanger to pre-heat supply air being distributed to the house, and for hot water with its integral DHW tank. Space heating supplemented by three Dimplex Girona electric panel convector heaters, located in circulation areas. The electric heaters are controlled by the Nilan unit and only switched on when the return air temperature for the whole house falls below the temperature designated by the user on the Nilan unit. In addition, a supplementary buffer hot water tank is pre-heated (when excess solar PV production allows) and raises the water temperature to the Nilan unit to reduce energy consumption. Green materials & measures: Keim EcoSil mineral paint (solvent free, non-allergenic, odourless and breathable); Partel Alma Vert thermal break (made from recycled PET material); Keracoll Cementoflex cement-based resin floor topping. Electricity: 10 square metre Sunpower solar photovoltaic array with average annual output of 2.34kWh. Surplus electricity generated is diverted to the hot water buffer tank. Point provided for future electric vehicle charger.

ph+ | dartry enerphit case study | 47


OAK FRAME HOUSE

CASE STUDY

HEA RT OF OA K A striking new oak-framed passive house in an area of outstanding natural beauty in the English countryside has just opened its doors to the public, and already there has been a flood of guests seeking to experience life in a passive house. By David W Smith

48 | passivehouseplus.ie | issue 39


CASE STUDY

OAK FRAME HOUSE

IN BRIEF Building: 182 m2 detached B&B Method: Oak frame Location: Malvern, Worcestershire, England Standard: Passive house classic certified Energy bills: £25 per month for heating, hot water & cooling (see ‘In detail’ for more)

£25 per month

ph+ | oak frame house case study | 49


OAK FRAME HOUSE

CASE STUDY

It seemed so fantastic, we thought the house was not really ours.

A

ndrew and Linda Burnett have been on quite a journey. When they began looking for a retirement home near Malvern, in Worcestershire, back in 2013, their aim was simply to purchase a house in the area that they could convert into a bed and breakfast. But they ended up opting to self-build the first oak-framed passive house B&B in the UK. An eight-acre field with 700 pear trees, 75 plum trees and seven beehives was not part of the original plan either. “When we set out we’d not thought about building an environmentally friendly house and we hadn’t even heard of passive houses,” says Andrew. “But we’ve shifted the whole idea of our bed and breakfast now. All but two of the guests staying since we opened at the beginning of July have done so to experience staying in a passive house, and to ask us about our experiences of self-build.” As for the land attached to their house, it has brought about a complete change in

50 | passivehouseplus.ie | issue 39

lifestyle. “Our old house in Kent had a third of an acre with one plum tree and I said to Linda, ‘this grass cutting is getting a bit much at weekends, let’s look for something smaller’. And we ended up buying part of a former fruit farm with two orchards, which we’re now restoring,” says Andrew. “We’re also turning a four-acre field into a wildflower meadow and we’ve planted new hedges. I’ve learned to use a chainsaw, and I own a compact tractor and gigantic lawnmower. A beekeeper comes to look after the bees, and we get annual rent of two jars per hive. We’re making plum and damson jams and more things with pears than you can throw a stick at.” When their search began for a new home, the couple were living in a village in Kent. To make it easier, they relocated to a rented bungalow near the spa town of Malvern, in Worcestershire, where Linda grew up. The couple visited a few barn conversions and liked the idea of a house with exposed


CASE STUDY

wooden beams. But no suitable property was available and the idea of a self-build became more attractive. In 2015, Andrew and Linda visited a self-build exhibition at the NEC in Birmingham, where they came across Oakwrights, a Herefordshire-based oak frame design-and-build practice. There were three specialist providers of oak-framed houses available, but Oakwrights was the only one offering their own insulation and encapsulation system as well. Oakwrights’ founder Tim Crump brought up the idea of passive house construction. Andrew and Linda liked the idea and began to do some research. Initially the appeal was the promise of exceptionally low heating bills during their retirement. The next step was to visit and stay in Oakwrights’ show home in Herefordshire. “After we stayed in The Woodhouse, we both said, ‘that’s it, that’s what we want!’” says Linda. The show-house gave the couple a clear

Photos: Mark Bolton

direction forward. They liked its oak framed gable ends and traditional tiled roof. They decided they wanted a brick finish on the ground floor and timber cladding above, which would fit in with the barn conversions in the local area. But they still needed to find a plot within a ten-mile radius of Malvern, and that did not prove easy. Andrew was working outside the area as a public health consultant, so Linda took charge of finding a site. It was practically a full-time job. She spent a year trawling through websites for hours every day. Finally, after a couple of near misses, she spotted a large plot in an area of outstanding natural beauty (AONB) between the Malvern and Suckley hills. The picturesque site with its panoramic views and tranquility won them over and their offer was accepted in October 2016. The site had existing planning permission for a smaller two-storey dwelling and the pre-

OAK FRAME HOUSE

vious owner had begun excavating part of the valley in preparation for that build. But the design for the new oak frame passive house was substantially different, and a new application had to be submitted. Based on Andrew and Linda’s wishes, Oakwrights’ in-house architectural team designed the house with the living space upstairs to offer panoramic views. Their en-suite master bedroom is also upstairs and has a walk-in dressing room. Meanwhile, the two en-suite guest bedrooms are downstairs, along with a home office and the large hallway. There is space to install a lift one day too, if necessary. The Burnetts originally wanted to build a four-bedroom home, but later opted to reduce it to three, which allowed Oakwrights to design larger bedrooms and left space for a double-height hallway with a “bit of a wow factor”. Oakwrights also included two south-facing gables and a rustic tiled roof, which helps the

ph+ | oak frame house case study | 51


OAK FRAME HOUSE

CASE STUDY

It’s time to spill the beans A sustainable, safe, natural, and breathable thermal and acoustic insulation upcycled from used coffee bean bags combined with carbon negative hemp. Thermo Hemp Combi Jute is an easy to fit, natural way to insulate your home.

Discover our solutions online at

ecologicalbuildingsystems.com 52 | passivehouseplus.ie | issue 39


CASE STUDY

1 2

3

5

4

6

7

9

8

1-4 The ground floor consists of an Isoquick insulated foundation system and reinforced concrete slab; 5 the slab is completely encased by the insulation to prevent thermal bridging; 6-8 construction of the oak frame underway; 9 fitted to the frame is Oakwrights’ encapsulation system, which features I-joists insulated with cellulose.

OAK FRAME HOUSE

home to blend into its setting. “There are also an east-facing and a west-facing gable ends, the four gables creating an intriguing roof externally and substantially adding to the attractiveness of the high ceilings in the upstairs rooms,” Andrew says. The south elevation has four large, tripled-glazed lift and slide doors alongside a triple-glazed front door and two roof lights. The emphasis was on positioning windows, doors and balconies to take advantage of the views of the hills and garden. “There’s an Oakwrights vernacular running through all our designs. It uses areas of oak outside, as well as large and well-proportioned windows,” says Oakwrights architect Craig Alexander. While the dwelling that was originally intended for the site had a north-south axis, with large east and west facing facades, this would have presented an overheating risk from low-angle morning or evening sun. So Oakwrights’ design flipped the main axis to east-west, giving the house a large south-facing façade (within 30 degrees of due south is considered ideal for a passive house). “We balanced potential summer heat grains through the south-facing windows with the introduction of shading from the balcony structures, with integrated blinds above,” Craig says. Planning permission for the build was achieved without any issues even though the use of cellulose insulation to achieve onerous U-values meant having thick wall and roof build-ups, and consequently, increasing the overall size of the house so as not lose internal floor space. Legal complexities held the project up and it was not until April 2018 that the first spade went into the ground. Andrew and Linda chose a young and enthusiastic firm of builders called Furber Young, which turned out to be one of the best decisions they made. “While Andrew was away I came to sit in the field and watched the build almost every day. It was wonderful to see the oak frame being pulled into place by the crane. You could see the markings on the beams showing where they needed to go. It’s a shame Andrew couldn’t watch, but I filmed it for him,” Linda says. “When I came down I would bring cake and everyone was friendly and welcoming. The builders had all been at school and college together. They were great friends and there were a few stag-dos during the build. They even came across at weekends specially to show Andrew what they’d done.” Andrew and Linda had planned the build meticulously together with Furber Young, Oakwrights and Green Building Store, who provided the mechanical ventilation with heat recovery system (MVHR) and the triple-glazed doors and windows. As a result, everything went smoothly and the house was completed a week early in just 11 months. The work also came in on budget. Project costs were £699,000, added to the land costs

ph+ | oak frame house case study | 53


OAK FRAME HOUSE

CASE STUDY

MAKING THE DIFFERENCE Where deep technical knowledge meets product innovation you’ll find that the Gyproc experience really makes the difference. Check out how Gyproc is Making the Difference:

http://bit.ly/2KUnlSk

Get in touch with our technical team: Email: enquiries@gyproc.ie ROI: 1800 744480 NI: 0845 3990159

54 | passivehouseplus.ie | issue 39


CASE STUDY

OAK FRAME HOUSE

SELECTED PROJECT DETAILS

Clients: Andrew & Linda Burnett Architecture & passive house design: Oakwrights Civil & structural engineer: J Turner & Associates Main contractor: Furber Young Developments Airtightness testing: db Air Tightness Testing Build system supplier: Oakwrights Airtightness tapes, membranes & wood fibre insulation: Ecological Building Systems Airtight OSB: Medite Smartply Additional airtightness tapes: Siga Wall & roof insulation (cellulose): Isofloc LM, via Oakwrights Insulated foundations: Isoquick Windows, doors & MVHR: Green Building Store Roof lights: Velux Shading: Solihull Blinds Ltd Ground source heat pump, DHW tank, underfloor heating: Energy Zone Lighting: Mr Resistor Wastewater treatment: Conder sewage treatment unit, via Furber Young Developments Mortgage: Ecology Building Society Self-build site insurance and structural warrantee: Protek

of £413,00, so around £1.1 million in total. Andrew and Linda moved in on 5 March 2018. At first, they could barely believe they owned such a property. “For weeks it felt like we were on holiday. It seemed so fantastic, we thought the house was not really ours and any minute we’d have to pack up and leave,” says Linda. The MVHR system keeps the house feeling fresh. Meanwhile, a ground source heat pump takes heat from the field to warm up the hot water and the underfloor heating in the hallway and bathrooms. Oakwrights also designed an enhanced version of their WrightWall Natural and WrightRoof Natural encapsulation system to seamlessly wrap around their frame, which is prefabricated in their Herefordshire workshops and includes recycled paper cellulose insulation. While working at home during the second Covid-19 lockdown, Andrew enjoyed walking barefoot on the warm tiles. The house was certified to the passive house classic standard in September 2019. According to Andrew, the house is performing better than predicted in PHPP, the passive house design software, for both electricity consumption and overheating. “PHPP stipulates that overheating must not exceed 25C for more than 10 per cent of the time. Our estimation was for 1.9 per cent, but we’ve had data loggers measuring internal

1 2

3

5

4

6

7

9

8

1 & 2 Smartply Propassiv airtight OSB3 board on the inner side of the wall build up, with all joints taped; 3 continuity of insulation between the upstand of the Isoquick insulation foundation system and the insulated wall panels; 4 external leaf ready for erection of brick rainscreen to the outside of the Oakwrights encapsulation system; 5 construction of the insulated encapsulation system at first floor level; 6 installation of the insulated roof panels; 7 false eaves and verge fixed to the outside of the encapsulation system to give the appearance of traditional construction without creating a thermal bridge; 8 airtightness taping around door frame; 9 additional Xtratherm rigid insulation to the inside of the frame for the Velux roof light.

ph+ | oak frame house case study | 55


OAK FRAME HOUSE

CASE STUDY

simplifies door threshold details + + + +

load-bearing eliminates thermal bridging highly durable easy to install

Call for more information about the Triotherm+ thermal bracket system prodomo.ie

|

t +353 66 4014045

|

e hello@prodomo.ie

save your energy nea are independent energy consultants, fully qualified and registered BER assessors for both Domestic and Non-Domestic BER assessments. Operating nationwide, nea are a one-stop shop for:

BERs Air Tightness Testing Sound Testing Ventilation Testing Part L Compliance

BERs

Domestic/Commercial BERs Sale/Rental/New Build Properties SEAI Grant Applications

Air Tightness Testing

Air Permeability Testing for New Builds Draft Detection Diagnostics for Existing Buildings NSAI Registered

Sound Testing Part E Compliance Airborne Testing Impact Testing

Part L Compliance

Preliminary BER Analysis Insulation, Ventilation and Heating System Specification One off self builds to major developments

Ventilation Validation Testing Part F Compliance

Training

Registered QQI Training for becoming a BER Assessor Training for building professionals on using and understanding BER Software

Please visit nea.ie to find out more or arrange an appointment.

T: 096 31622 info@nea.ie 56 | passivehouseplus.ie | issue 39


CASE STUDY

and external temperatures every 30 minutes and our overheating over 12 months was 0.57 per cent, which is absolutely brilliant,” he says. “And also, for electricity the PHPP predicted 98 kWh per square metre for everything, whereas our level was 61.65 kWh.” The Burnett’s current ‘green’ electricity supplier predicts their annual electricity bill will be £1,560, which covers all their energy costs. Any other energy required to heat the house comes from the sun, people in the house, the heat output from household devices, and recovery of heat from air removed in winter. Back in 2014, in the couple’s Kent house, which was about 140 square metres rather than the current 200 square metre house, they paid more than £3,500 for energy. But their oak-framed house is as much an aesthetic experience as it is thermally efficient. Andrew and Linda particularly enjoy having two balconies at the front. “They provide shading from the summer sun, but they make the house look more interesting. We frequently eat on one balcony and we’ve put comfortable chairs on the other one. It’s idyllic sitting there with a single malt enjoying the views across the fields,” says Andrew. “The wildlife is also incredible. There are birds of prey and swallows in the sky and we see deer coming out of the woods. A family of badgers arrives every night and we have visits from a little fox. All of that is easy to see from the house, especially in the living room with the windows that go right down to the floor. But the views are incredible everywhere.”

OAK FRAME HOUSE

EMBODIED CARBON

O

akwrights commissioned John Butler Sustainable Building Consultancy to analyse the embodied carbon of the house, using PHribbon. The analysis included the substructure, the superstructure (excluding stairs), internal walls and intermediate floor, wall and ceiling finishes (but not floor finishes) and building services. The services included the ground source heat pump, heating and hot water pipes, underfloor heating system, but not the external collectors, or the associated excavation. The MVHR system is included, along with the stainless-steel ductwork. Electrics were not included. Internal doors, baths, and sinks were also included, but the kitchen fit out wasn’t included. The building’s timber windows and MVHR system were assumed to need one replacement each within the 60-year time period for the LCA, though it was assumed that the ductwork would last for 60 years. The heat pump was assumed to need two replacements. All other components were assumed to last for 60 years or more. Based on these assumptions, the building achieved a cradle to grave score of 71.1 kg of CO2e, or 339 kg CO2e/m2

GIA, comfortably beating the revised RIBA 2030 Climate Challenge target of 625 kg CO2e/m2. The figure for module A alone – which deals with emissions up to the point of practical completion of the building – is 274 kg CO2e/m2 GIA, with a further 270 kg CO2e/m2 GIA sequestered in the building’s timber, meaning that if it was permitted to engage in carbon accountancy sleight of hand and net sequestered emissions off against upfront emissions, the two figures would almost cancel each other out. Instead, it is considered that the sequestered CO2 is released into the atmosphere at the building’s end of life. Even if the CO2 sequestering products were assumed to be reused or recycled, the amounts sequestered would pass on to that future use, meaning that in the context of this building’s LCA, it’s effectively no different to the products being incinerated at their end of life. The A1-A3 emissions (the materials, from cradle to factory gate) for the as built external walls comes out at 10.8 tonnes of embodied CO2e – compared to 21.7 t for a rendered cavity wall alternative of the same walls.

Homeowners Andrew and Linda Burnett

WANT TO KNOW MORE? The digital version of this magazine includes access to exclusive galleries of architectural drawings. The digital magazine is available to subscribers on passivehouseplus.ie & passivehouseplus.co.uk

ph+ | oak frame house case study | 57


OAK FRAME HOUSE

CASE STUDY

Passive House Institute Certified Mechanical Ventilation with Heat Recovery Systems With Self Balancing technology for better energy efficiencies. Brink. Quiet, efficient and technologically advanced complete MVHR Systems.

Say goodbye to: • Mould, mildew and condensation • Stale, foul, unpleasant, humid air • Musty and unpleasant odours • High humidity levels

Say hello to: • Warm, freshly filtered air • Reduced asthma, hay fever and allergy triggers • Lower energy bills and emissions • Guaranteed, Dutch quality

Brink systems are also fully compatible with Ubbink’s Air Excellent air distribution systems. Air Excellent’s clever, push-together connection system combines unsurpassed ease of installation, with incredible levels of airtightness.

We only offer designs and systems that are fully NZEB and TGD Part F compliant. Learn more at www.BrinkHRV.com/newbuild Brink and Ubbink are distributed throughout Ireland by Kernohan Distribution. Web: www.iakonline.com or www.brinkhrv.com | Email: info@BrinkHRV.com or info@iakonline.com

Coming soon. Underfloor heating packages. Intuitive underfloor heating packages with high performance Valsir multilayer PEX pipe and smart self calibrating controls from Danfoss. Combine your MVHR system with an underfloor heating package for even greater savings. Visit www.BrinkHRV.com/underfloorheating to find out more. 58 | passivehouseplus.ie | issue 39


CASE STUDY

OAK FRAME HOUSE

IN DETAIL Building type: 182 m2 (treated floor area) detached, oak-frame, certified passive house 
 Location: Storridge, Malvern (Malvern Hills Area of Outstanding Natural Beauty) Completion date: March 2019 Cost: £1.106m (£699,000 for the build, £413,000 for the site) Passive house certification: Certified Space heating demand (PHPP): 13 kWh/m2/yr Heat load (PHPP): 10 W/m2 Primary energy demand (PHPP): 108 kWh/m2/yr Heat loss form factor (PHPP): 3.06 Overheating: 1.9 per cent of the year >25C (projected in PHPP); 0.57 per cent (measured) Number of occupants: 2 + B&B guests (PHPP completed based on 4 occupants) Airtightness (at 50 Pascals): 0.57 m3/hr/m2 Energy performance certificate (EPC): B (89) Total electricity consumption: 8,366 KWh per year for all energy (29 Oct 2019 - 30 Sept 2020), equates to 45.93 kWh per m2 treated floor area. Energy bills (measured or estimated): From Oct 2019 to Sept 2020 Andrew and Linda paid £1,289 for the above quantity of energy (£107 per month), including all charges. The ground source heat pump consumed 1.489 kWh over 12 months up to 7 August 2021, so on the same tariff it would cost £300 (or £25 per month) to run the heat pump for space heating and cooling, and domestic hot water. Tariff rate of 19.943p per kWh inc VAT used. Thermal bridging: Use of low thermal conductivity cavity wall ties, thermally broken window frames, insulated reveals. Thermal bridge

Y-values (figures in W/mK): eaves: - 0.009; verge: - 0.043; valley: 0.034; base to wall: - 0.028; normal corner: - 0.049; wall to flat: - 0.029; pitch to flat: - 0.003; reverse verge 0.027; reverse pitch to flat: - 0.80 Ground floor: Isoquick insulated foundation system incorporating 250 mm BASF Peripor EPS insulation completely encasing 300 mm reinforced concrete slab (with 50 per cent GGBS). U-value: 0.127 W/m2K Walls: 12.5 mm plasterboard internally, followed outside by 46 mm service void battens with mineral fibre insulation (0.039 W/mK), 12.5 mm Smartply Propassiv airtight OSB3 board, all joints taped, 300 mm JJI I-beam frame factory filled with Isofloc cellulose insulation (0.038 W/mK) to 72 kg/m3, 60 mm Gutex moisture resistant insulation board (0.039 W/mK), Solitex Fronta Humida breather membrane, ventilated cavity, rainscreen of either: 102.5 mm brickwork (ground floor) or horizontal timber boarding (first floor). U-value: 0.10 W/m2K. Sloping ceiling: 12.5 mm plasterboard internally, followed outside by 46 mm service void battens/ mineral fibre insulation (0.039 W/mK), Novia airtightness membrane, 9 mm OSB, 300 mm JJI I-beam frame factory filled with Isofloc cellulose insulation (0.038 W/mK) to 72 kg/m3, 60 mm Gutex moisture resistant insulation board (0.042 W/mK), Solitex breather membrane, vented pitched roof with battens, counter battens and clay tiles. U-value: 0.10 W/m2K Flat capped ceiling: 12.5 mm plasterboard internally, followed outside by 100 mm service void battens, 12.5 mm Smartply Propassiv airtight OSB/3 board, all joints taped,2 x 300 mm JJI I-beam frame factory filled with Isofloc cellulose insulation (0.038 W/mK) to 72 kg/m3, 60 mm

Gutex moisture resistant insulation board (0.042 W/mK), Solitex breather membrane, vented pitched roof with battens, counter battens and clay tiles. U-value: 0.07 W/m2K. Windows & external doors: Triple-glazed, argon-filled, wood-framed windows and doors from Green Building Store Ultra range. U-value: 0.75 W/m2K (based on whole window U-value for standard window 1,230 mm x 1,480 mm for this range). The windows and doors have insulated frames, with Swisspacer Ultimate edge spacers; 52 mm thick triple glazed units. Roof windows: Four Velux GGU passive house certified roof windows. U-value (whole window): 0.51 W/m2K (EN ISO 12567-2) Space heating & cooling: Ground source heat pump 3-8kW Mastertherm modulating unit with desuperheater (COP 4.5) for domestic hot water and underfloor heating in the three en-suite bathrooms, hall and boot room. There are also electric towel rails in the three bathrooms. The heat pump also has a cooler battery that can drop incoming air temperature 5 to 7 C during hot weather. Domestic hot water: Ground source heat pump as above heating 400 litre unvented Tempest cylinder from Telford Stainless Steel Ltd with two probes and a switch to enable heating of upper 200 L or whole tank. Tank also fitted with an electric immersion heater controlled by a timer to ensure once-weekly Legionella pasteurisation heating to just above 60C. Ventilation: Zehnder Comfoair Q MVHR; Passive House Institute certified efficiency 90 per cent. Water: Low flow fittings used.

ph+ | oak frame house case study | 59


NEW FOREST ENERPHIT

CASE STUDY

IN BRIEF Building: Deep retrofit to 144 m2 detached home Method: External insulation on cavity brick wall Location: Barton-on-Sea, Hampshire Standard: Enerphit (certified) Space heating cost: £36 per month (see ‘In detail’ for more)

£36 per month

60 | passivehouseplus.ie | issue 39


CASE STUDY

NEW FOREST ENERPHIT

W I T NE SS T H E

P H I T N E SS HAMPSHIRE HOUSE HITS 70% ENERGY SAVING VIA ENERPHIT The deep retrofit of this 1930s dwelling on the Hampshire coast provides a pitch-perfect example of how to transform old dwellings while preserving their original structure and minimising embodied carbon, utterly transforming the living space without the need for an extension, and creating a cosy home that uses two-thirds less energy than before. Words by David W Smith

ph+ | new forest enerphit case study | 61


NEW FOREST ENERPHIT

CASE STUDY

Homeowners Julie Botham and David Dacombe

D

avid Dacombe and Julie Botham spent the best part of three decades living in a cold and damp four-bedroom 1930s detached house, in Hampshire. Passionate environmentalists, they set out to insulate the 144 square metre brick property a few years ago. But somewhere along the way, their ambitions soared and a new goal emerged to achieve the Enerphit (passive house) standard for retrofits. The project ended up costing 50 per cent more than they initially envisaged, but their “new” home achieved Enerphit and has transformed their living experience. “We spent a scary amount of money in the end, but we’re very pleased with the house and definitely glad we did it. We’ve ended up with almost a brand-new home,” says David, a retired engineer (the project was not fully costed until the contracting stage, and bids from builders came back higher than anticipated). “We get lovely comments from visitors and passers-by about the outside. The tiles have been replaced with slates which together with white and grey render gives a contemporary appearance outside. Inside, the main advantage is the comfort all-year round as it used to be cold, draughty and damp in winter.” Before consulting an architect in 2016, the couple spent a long time thinking through their options. One ambitious plan

62 | passivehouseplus.ie | issue 39

was to knock down their existing house and build three townhouses in its place, then sell them and use the profit to build a passive house. “But we couldn’t find a suitable plot anywhere in the local area, and we felt it wasn’t a green thing to do because of all the embodied energy,” says David. Neither did they want to tear themselves away from the local area, where they have lived since 1994. The house is 500 metres from a beautiful stretch of coastline, near Bournemouth, and close to the border of the New Forest National Park. Another option was to attempt a DIY approach to insulation. David read up on how to do this and started by stripping off the plaster in two rooms. But the reality proved more complex than the manuals had suggested. “Cold bridges were a big issue. If you don’t get rid of them, you end up introducing even bigger ones,” David says [editor’s note: when you insulate internally, any remaining cold bridges — uninsulated paths that cut through the insulation layer — are exacerbated and potential points for condensation]. At this stage, they opted to seek the help of a professional architect. RIBA recommended three local architects and the couple were impressed with Ruth Butler, who also lives in Hampshire. She had previously built four passive houses, including her own home, previously featured

Ground Floor

First Floor 1 2 3 4 5 6 7 8 9 10 11 12 13

entrance hall kitchen dining room living room utility / plant room WC & shower garage landing bathroom bedroom bedroom (master) bedroom bedroom


CASE STUDY

in Passive House Plus issue 33. When David and Julie met her in 2016, their intention was simply to improve the insulation. But it was obvious that significant internal changes would in any event be essential to upgrade the airtightness. The couple had become familiar with the Enerphit standard and decided to go for it. Ruth worked with the couple to develop options in 2017 and showed them three reconfigurations using 3D models. David and Julie wanted an open-plan design and agreed to get rid of a conservatory. Ruth convinced them to give up plans for an extension in favour of spending more money on the existing structure. The original roof structure was kept too, and all-in-all the house provides a first-class example of how to undertake a deep retrofit while preserving as much of the existing building as possible, in order to reduce the embodied carbon of the build. An analysis in PHribbon calculated the embodied carbon of the retrofit at 111.7 kgCO2e per square metre, for building life cycle stages A (product stage) through to C (end of life). For comparison, this smashes even the older, more stringent RIBA 2030 target for new build homes of 300 kgCO2e, emphasising the importance of preserving existing structures. There was no opposition from New Forest District Council to the application for plan-

Photos: Peter Langdown Photography

ning. But finding the right builder proved far more challenging. When David and Julie’s initial choice pulled out just as the project was about to get underway in mid 2018, they nearly gave up. “It was very frustrating and we were on the verge of quitting,” David says. “There were a few builders with passive house experience in other parts of the south, but no one was prepared to travel for a small job.” Ruth persuaded them to change their strategy and give it another shot. Instead of looking for a specialist, they put out a tender for skilled local builders and hoped to train them up in passive house methods. There were two bids and Ruth advised them to go with Tuakana Construction, who are based nearby. “I thought they’d be a good fit for an Enerphit project as they’d worked on a lot of historic buildings,” Ruth says. “I think there’s a synergy with the attention to detail you need for passive house projects.” The builders began work in February 2019 while the couple rented a property for eight months. Tuakana’s operations manager Neil Woodley says the company likes to be stretched by new challenges, but admits to a few nerves at the outset. “We were a bit daunted at first because we weren’t sure what would happen if we didn’t meet the Enerphit criteria. We even joked that if we don’t get passive house accreditation, do we not

NEW FOREST ENERPHIT

The experience of living in the house is radically different now.

get paid? But when you break it down, if you follow all the necessary details, you reap the rewards,” he says. The key to success was to get the experienced team of builders thinking a little bit differently. “The foreman in charge had been doing things in a certain way for 30 years,” Neil says. “Suddenly he was asked to do things differently, the standard methods and processes he had been adopting for years were suddenly not permitted, basic things like the running of electrical and plumbing services were carried out in a completely different way. The few times we slipped up were where we did things out of habit that we have always considered good practice in a standard build, but you have to think differently in passive house. It comes down to understanding the reason behind the different ways of doing things. If you realise why all the little details are important, it becomes a much much more logical process.”

ph+ | new forest enerphit case study | 63


NEW FOREST ENERPHIT

CASE STUDY

Build warmth with Grant Our complete integrated heating packages provide everything needed to build a highly efficient, warm and comfortable home. Tailored to suit the homeowners’ requirements, each Grant heating package is correctly sized and specified, free of charge, to achieve compliance, maximise efficiencies and provide long-term savings. Packages feature the Grant Aerona3 air to water, air source heat pump, Grant hot water cylinders, Grant Afinia aluminium radiators and the Grant Uflex underfloor heating system. Smart controls are also available.

Trust Grant on the journey to warmth and comfort by sending house plans to

heatpump@grantengineering.ie 64 | passivehouseplus.ie | issue 39


CASE STUDY

NEW FOREST ENERPHIT

9

1 5

2

3

4

6

10

7

11 6

8

12

1 The cold and damp 1930s detached house prior to renovation; 2 the old conservatory on the south-facing side was removed, allowing direct access to the garden; 3 as much of the existing roof timbers as possible were retained; 4 Bill Butcher (left) of Green Building Store providing on-site airtightness training; 5 airtightness taping at joist ends; 6 mineral wool between rafters with 50 mm PIR insulation fixed to underside of rafters; 7 Intello vapour control and airtightness membrane to ceiling; 8 airtightness taping around the Lacuna bi-fold door; 9 airtightness taping around ventilation ductwork penetrations; 10 the house’s only fixed heating source, a 1.5 kW Zehnder electric radiator, waiting to be installed; 11 using a smoke pencil to identify air leaks; 12 a blower door test underway — the project achieved an airtightness result of 0.48 air changes per hour.

ph+ | new forest enerphit case study | 65


NEW FOREST ENERPHIT

CASE STUDY

0 P AM No AS V w SIV I C Av E ail FO ab RM le

35

Insulated Concrete Forms - A Rated Structures

ZEB READY - NZEB READY - NZEB READY - NZEB READY - NZEB READY - NZEB REA

Amvic 350 Passive Form available now, offering o U-Value: 0.15W/m²K o Y-Value: 0.02 o Air Permeability: <2m³/h.m² • High Performance REINFORCED CONCRETE Homes • A One Stop Solution that exceeds Building Regulations for Structure, Insulation, Sound Resistance, Fire, Airtightness and Thermal Bridging - all as standard, at no extra cost • Sound Resistance + 58DnTw. • Certified and Approved • Cost Competitive, Rapid Build • For Self Build, Housing Schemes, Apartments, Commercial, etc.

Amvic Ireland

Unit 11 Rosemount Business Park Ballycoolin, Dublin 15 01 899 1883 www.amvicireland.com Made in Ireland I

PASSIVE HOUSE PERFORMANCE - TRADITIONAL BUILD COSTS 66 | passivehouseplus.ie | issue 39


CASE STUDY

NEW FOREST ENERPHIT

SELECTED PROJECT DETAILS

Clients: David Dacombe & Julie Botham Architect: Ruth Butler Architects Main contractor: Tuakana Construction M&E engineer: Cundall Civil & structural engineer: Andrew Waring Associates Energy consultant: Cundall Passive house consultant: Green Building Store Passive house certifier: Mead Consulting Electrical contractor: LSB Electrical, Plumbing & Heating Airtightness tester: BRE External wall insulation system: Permarock, via Specialist Rendering Services Airtightness products: pro clima, via Green Building Store Windows & doors: Green Building Store Electric radiator: Zehnder Ventilation: Brink MVHR, via CVC Direct Passive fire safe door: James Latham

To challenge their pre-existing habits, all the builders in the team received half a day’s hands-on airtightness training from Bill Butcher, director of Green Building Store. That proved invaluable: the project went on to achieve an airtightness of 0.48 air changes per hour, beating not just the Enerphit standard of 1.0 but also the passive house new build standard of 0.6. “The success was in many ways down to the training. The building team really related to Bill as a fellow builder. It meant that they all started off on the project with the same language and understanding,” says Ruth. Naturally, one of the main difficulties of achieving Enerphit was working around the original structure. “You’re stuck with all the thermal bridges, and it can be complicated to get the airtightness line around the existing pieces of construction,” Ruth says. “It’s a nice challenge to have and you have to get your brain working in how to resolve issues in the simplest, most practical way possible. We chose to use plaster parge on the walls [as the airtightness line] and put membranes over the existing floor and ceiling.” To create an open-plan space the team removed a number of walls. The builders knocked through the old entrance lobby and pulled down the wall between the kitchen and dining room. The kitchen was re-modelled entirely. “Opening up the living and dining areas and having the stairs as part of the house makes it feel like a much bigger house. We’ve taken away a rather ratty old conservatory on the south-facing side which was preventing direct access to the garden. They’re keen gardeners so that was import-

ant for them,” she says. Ruth’s plans for the retrofit included a new thermal jacket for the house. This involved installing a rendered external insulation system on the outside of the cavity brick walls, raising the timber flooring to add insulation and installing a Brink mechanical ventilation with heat recovery unit (MVHR). All the old heating pipework was stripped out, leaving just one 1.5 kW fitted electric radiator, and one portable 1.5 kW radiator that is now used in the lounge (separate to the open-plan area). This ultra-minimal heating setup is testament to David, Julie and Ruth’s confidence that the house will perform as it is designed to (of course, the mild climate on the south coast of England also made it easier to achieve the Enerphit standard). The house had recently had most of its old windows replaced with triple glazed units from Green Building Store. But during the retrofit these had to be re-positioned to accommodate the external wall insulation, and some windows were moved too. Thankfully, this this was reasonably easy to accomplish

as straps had been used to fit the windows. They were moved 200 mm out into the insulation zone, and deeper extension sills were fitted. There were not as many structural changes to the four bedrooms upstairs. But the design enlarged the bathroom, allowing both a shower and bath to be fitted. The builders also reconfigured the roof slopes and removed a dormer with two windows, so the bedrooms became less constrained. To be awarded an Enerphit certificate, retrofitted homes must achieve a maximum space heating demand of 25 kWh/m2/yr. PHPP, the passive house design software, showed that the remodeled house’s space heating demand was 19 kWh/m2/yr, and it was certified in 2020. It was a finalist in the 2021 UK Passivhaus Awards in the small projects category. David and Julie have monitored the house’s energy consumption over the past two years and they are using approximately one third of what they were pre-retrofit, although this has only resulted in marginally lower energy

ph+ | new forest enerphit case study | 67


NEW FOREST ENERPHIT

CASE STUDY

bills – likely due to comfort-taking and the switch from comparatively inexpensive gas to direct electric for heating and hot water. (see ‘In detail’ for more). In summer, they generate a small amount of electricity from their 12 m2 solar PV array and never switch the heating on. David says the lounge can sometimes get too warm, but that they manage this with an internal blind and by opening the bi-fold doors. In winter, the fitted electric radiator in the open place space provides whole house heating; the portable radiator in the lounge is only used on very cold winter days. The experience of living in the house, David says, is radically different now. For Ruth Butler, the New Forest Enerphit project proved equally as life-changing. Although passionate about passive house new build, she points out that retrofitting old houses is more critical to the climate crisis. “When they said they were interested in a deep retrofit I jumped at the chance. It turned out to be a landmark project in my career as an architect. It helped me to realise that deep retrofitting was my primary concern as an architect.” The New Forest Enerphit turned out to be her final design for her own company, Ruth Butler Architects. In February 2020, she took a new job with Pritchard Architecture, in Portsmouth. The company carries out a lot of conservation and conversion work and Ruth’s role is to work on low energy refits. Her current projects include retrofitting a home in Prinsted, near Chichester and converting a barn into offices for Seven Sisters Country Park.

EMBODIED CARBON

A

n embodied carbon analysis by PHribbon author Tim Martel and sustainable building consultant John Butler revealed high and low estimates for cradle to grave totals, with the difference in results depending on the assumptions made about component lifespans and consequent replacement. The high estimate was based on using the default values on expected lifespans from the RICS document, ‘Whole life carbon assessment for the built environment’. This assumed a lifespan of 30 years for windows, external doors and renders, and a 20 year lifespan for the ventilation system and ductwork. The low estimate – which was informed by the results of a destructive monitoring study on the first passive house 25 years after it was completed, assumed a 60 year lifespan for the windows, doors and renders and ventilation ductwork, with one replacement of the ventilation system. In both cases, it was assumed the PV array would last for 30 years.

The high estimate resulted in a total of 20.9 tonnes, 136.1 kg CO2e/m2 – less than a quarter of the 625 kg total set for dwellings in the RIBA 2030 Climate Challenge. The low estimate total was 16.9 tonnes of CO2e, or 110.1 kg CO2e/ m2 – less than a fifth of the RIBA 2030 target. In either case, the result confirms the importance of focusing on retrofit over new build in terms of reducing embodied CO2. The analysis included the external envelope, including new roof, along with the ventilation system and ductwork. The ventilation system calculations were based on a draft Product Environmental Passport for the Brink Flair unit, which hasn’t yet been independently verified, and calculations for the ductworks provided by ventilation supplier CVC systems, in accordance with CIBSE’s TM65 methodology. Any changes to the internal layout and finishes were not included, nor was the building’s single electric panel heater.

WANT TO KNOW MORE? The digital version of this magazine includes access to exclusive galleries of architectural drawings. The digital magazine is available to subscribers on passivehouseplus.ie & passivehouseplus.co.uk

(above) Comparison of imported and solar-generated electricity for the retrofitted house, versus David & Julie’s old energy consumption figures.

68 | passivehouseplus.ie | issue 39


CASE STUDY

NEW FOREST ENERPHIT

IN DETAIL Building type: Deep retrofit to 144.4 m2 (treated floor area) detached 1930s house Location and site: Village site, Barton-on-Sea, New Forest Completion date: September 2020 (practical completion & handover September 2019) Space heating demand (PHPP): 19 kWh/m /yr Heat load (PHPP): 13 W/m2 Heat loss form factor (PHPP): 2.86 Overheating (PHPP): 0 per cent of year above 25C Number of occupants (PHPP): 2.9 Primary energy renewable (PHPP): 72 kWh/m2/yr 2

MEASURED ENERGY CONSUMPTION: Before: 147 kWh/m2/yr (20,061 kWh total, 17,730 kWh of gas & 2,331 kWh electric, for 2018) After: 45.74 kWh/m2 (or 6,605 kWh total, 12 months from Sept 2020 to Sept 2021) Energy bills (estimated): Based on measured energy use (electricity + gas) prior to retrofit, and based on Energy Saving Trust figures from June 2021 on average tariffs, the calculated pre-retrofit combined electricity and gas bill for this property of £1,302 per year, including VAT and standing charges. Based on post-retrofit metered electricity consumption, the cost drops slightly to £1,168. This is due to the higher price of electricity (based on an average tariff of 16.36p per kWh versus 4.17p per kWh of gas) in spite of the house’s energy use dropping by two-thirds. This is an indicative figure and we give it for illustrative purpose only. In reality the homeowners say their total annual bill has reduced from approximately £1,490 per year to £1,040, as estimated on their latest bill, including all charges. Given that the gas bill pre-retrofit may have included hot water use

and cooking, we haven’t attempted to estimate heating costs pre retrofit. Based on PHPP figures for space heating, and the EST electricity tariffs, the post retrofit heating use is estimated at £437 per year, or £36.42 per month. Airtightness (at 50 Pascals): 0.48 air changes per hour GROUND FLOOR Before: Mix of uninsulated concrete floor and uninsulated suspended timber floor After: Concrete slab insulated with 50 mm PUR insulation. U-value: 0.257 W/m2K. Suspended timber floor with air tightness membrane (Contega Solido) and 80 mm PUR insulation beneath. U-value: 0.166 W/m2K WALLS Before: Render, brick cavity walls After: Permarock external insulation render system comprising render on 100 mm graphite EPS, on existing 100 mm brick cavity walls, 100 mm blown bead insulation into existing cavity, brick inner leaf, plaster parge as airtightness layer. U-value: 0.27 W/m2K ROOF Before: Concrete roof tiles followed beneath by felt, sarking boards, plasterboard ceiling internally. Loft mineral wool insulation. After: Fibre cement slates externally, followed inside by battens/county-battens, existing roof structure and sarking board, 400 mm loft mineral wool insulation between and over ceiling joists and continuous with cavity wall insulation, highly vapour permeable membrane to underside of mineral wool (pro clima Solitex Plus), plasterboard

ceiling with skim finish. U-value: 0.09 W/m2K WINDOW AND DOORS Ultra triple glazed timber windows by Green Building Store. Overall reference U-value of 0.75 W/m2K (the existing GBS windows were repositioned and some new ones installed). Two Lacuna bi-folding doors installed (each including three glazed sections 2.52 m high x 2.2 m wide). Heat treated beech frames, with breathable off-white paint. Ug value: 0.72 W/m2K, Uw 0.90 W/m2K. New Moralt Ferror Passiv Fire Safe door added between utility room and garage (By James Latham). HEATING SYSTEM Before: Gas boiler & radiators throughout entire building After: 1.5 kW Zehnder Road electric panel radiator to open plan living area; one plug-in 1.5 kW radiator in lounge VENTILATION Before: No ventilation system. Reliant on infiltration, chimney and opening of windows for air changes After: Brink Flair 325 heat recovery ventilation system, Passive House Institute certified to have heat recovery rate of 91 per cent. Green materials & features: FSC certified timber, re-use of existing kitchen units in utility room, re-use of some existing sanitaryware, cork flooring in bedrooms, low flow water fixtures, rainwater butts to garden. Electricity: 12.7 m2 solar photovoltaic array.

ph+ | new forest enerphit case study | 69


ECOLOGY IN CONSTRUCTION

INSIGHT

SEEING THE WOOD FOR THE TRE E S

PLACING ECOLOGY AT THE HEART OF CONSTRUCTION In recent years, as energy efficiency targets for new buildings have tightened, attention has turned to cutting the embodied carbon of buildings by switching from materials like concrete and steel to lower carbon alternatives like timber. But if we are serious about solving the ecological emergency as well as stabilising the climate, we must look even further than embodied carbon, and think more deeply about the core values we apply to materials and buildings, and the manner in which we use them. By Lenny Antonelli & AECB CEO Andy Simmonds

O

n 30 May 2019, British architects Steve Tompkins and Michael Pawlyn launched the Architects Declare pledge, now widely shared in the industry, which states that, “the twin crises of climate breakdown and biodiversity loss are the most serious issues of our time.” It continues: “For everyone working in the construction industry, meeting the needs of our society without breaching the earth’s ecological boundaries will demand a paradigm shift in our behaviour. Together with our clients, we will need to commission and design buildings, cities and infrastructures as indivisible components of a larger, constantly regenerating and self-sustaining system.” Since spreading to become the wider

70 | passivehouseplus.ie | issue 39

#ConstructionDeclares and #BuiltEnvironmentDeclares pledges, it has been signed by almost 7,000 companies across the global building industry. The first issue addressed in the pledge, climate breakdown, is an ever-growing focus for the construction sector — as evidenced by tightening energy efficiency regulations for new buildings, the growth of standards like passive house, and the more recent push to measure and limit embodied carbon. But the second issue, the biodiversity emergency, still remains largely unaddressed by the industry. What is the biodiversity emergency? The ecological crisis is just as immediate as the climate crisis. Global populations of

vertebrate animals have declined by an average of 60 per cent since 1970. Just three per cent of global land ecosystems remain intact, while the world’s total mass of insects is falling by a rate of about 2.5 per cent annually, threatening a collapse of nature, scientists say. Destruction of primary rainforest is also accelerating, and the Amazon rainforest is nearing a point of irrevocably switching from canopy rainforest to open grassland (see passivehouseplus.ie & passivehouseplus.co.uk for a referenced version of this article). If climate change has been a rather nebulous concept, ecological collapse is arguably more so. It is happening all around us, yet is easy to miss because we are so disconnected from nature. It also challenges the idea that


INSIGHT

CHART 1.C: CARBON REDUCTION CURVE

(above) Hierarchy of ways to reduce the carbon footprint of construction. Source: HM Treasury (2013) and Green Construction Board (2013).

we can ‘fix’ environmental crises through technological solutions, instead requiring a complete reinvention of our relationship with food, materials, and the rest of the living world. Knowing how to respond effectively to ecological collapse is difficult from within a technological and growth-based mindset. But just like reducing our consumption of meat and dairy, which generally require more land than plant-based foods and thus put greater pressure on natural habitats, we can also seek to limit the area of land, and the quantity of raw natural resources, required to produce and maintain our buildings. We can also explore specifying materials that are, or could be, produced as integrated by-products of healthy ecosystems. Half Earth The importance of simply setting aside more land for nature, free of extractive human use, should not be underestimated. It is perhaps best exemplified by the ‘Half Earth’ idea devised by EO Wilson, the great evolutionary biologist, which proposes setting aside half the planet for nature. Wilson was one of the developers of island biogeography theory, one of the most important ideas in twentieth century ecology. This states that the smaller an island of habitat is — think a natural forest surrounded by monocultures of wheat — and the further it is from other habitat islands, the fewer species it will support. “When 90 per cent of habitat is removed, the number of species that can persist sustainably will descend to about a half,” Wilson’s project website, half-earthproject.org, states. “If on the other hand, we protect half the global surface, the fraction of species

protected will be 85 per cent, or more. At one-half and above, life on earth enters the safe zone.” Wilson’s Half Earth idea has captured the imagination of many, but also been criticised by those questioning whether, if deployed, it could lead to the displacement of poorer people in the majority world. One study concluded that one billion people live in areas that the project has earmarked for protection and restoration. How they would be affected depends on the type of management envisioned for these areas. Whatever its flaws, the Half Earth idea does at least make clear the scale of action needed to restore the earth’s living systems. Half Earth also has an important principle at its heart: that we share the planet with other species, and that we might seek to limit our own footprint to make space for them. Ecological restoration must now be at the heart of everything we do, including construction. And it cannot just focus on the world’s last remaining biodiversity hotspots in the tropics. If we expect developing nations to save their last wild habitats in the interests of a stable biosphere, we must lead by example and restore our own depleted ecosystems here in western Europe. Embodied carbon: just the beginning As the building industry seeks to lower its carbon footprint, it has increasingly looked to timber as an alternative to materials like plastics, fired clay, concrete and steel. As well as causing less pollution in manufacture, timber-based products can be sourced from well-managed forests and woodlands, which draw down carbon as they grow. This atmospheric carbon is sequestered in the tissues of trees’ roots, trunks, branches, and

ECOLOGY IN CONSTRUCTION

leaves. The current thinking in our industry is that where timber extraction from a forest is managed in a sustainable manner, under the various certification schemes, that growing trees for long-term uses such as construction can ‘be good for the climate’. Construction timber is of particular interest in climate conversations because of its longevity: carbon in shorter-lifespan products, such as pulp, paper, pallets, woodchip and fencing, is generally returned to the atmosphere much sooner. Venerable research bodies, including the Intergovernmental Panel on Climate Change (IPCC), the Royal Society, the Potsdam Institute, and the Committee on Climate Change (CCC) have endorsed strategies of using more timber in the built environment. However, switching from energy and carbon intensive materials to timber and other natural fibres must be just the starting point, rather than the end point, of our journey to explore ever more ecological ways of creating and refurbishing buildings. Beyond the concepts of ‘up front’ and ‘embodied’ carbon, we must develop our understanding of the land-footprint of the resources we use, and their wider impact on the living world. While Environmental Product Declarations (EPDs) now thankfully provide us with a lot more information about the environmental impact of construction products — including climate warming, acidification, eutrophication and resource depletion — they do not yet include any specific metric for biodiversity loss, a difficult parameter to measure and present meaningfully. (An impending update to how EPDs are calculated, however, will introduce a requirement to include carbon emissions resulting from direct land use change in a product’s life cycle. It will also remove the ability to claim carbon sequestration if wood is sourced from a native forest not otherwise managed for timber extraction). Restoring flourishing ecosystems while transitioning from a growth-driven economy to an equitable circular and sustainable society — one that works within the planet’s ecological limits — is an urgent task, yet it is also a job that will take decades. For a safe climate, and the restoration of nature, we will need many years of social, natural and economic rehabilitation — along,

Use natural resources extracted from our shared biosphere respectfully and efficiently.

ph+ | ecology in construction insight | 71


ECOLOGY IN CONSTRUCTION

INSIGHT

mostly likely, with periods of fossil fuel “cold turkey”. This presents humanity with our greatest creative challenge. Rising to it is not a chore but potentially our best opportunity in half a century for a renewed sense of meaning and purpose. Our industry’s immediate tasks include radically reducing the operational and embodied energy of all construction. In addition, we are likely to have to fully decommission some of our most polluting infrastructure, salvaging what we can from the dismantling. The fossil fuel valves must be turned down each year, and will have to be almost completely closed within a decade to avoid the nightmare of a world with more than 1.5 C of warming. The reality is that we also need to minimise the area of land and the quantity of raw natural resources required to produce our buildings. And while material substitution — replacing high embodied carbon materials with lower embodied carbon ones — is important, it will never be sufficient within a growth-driven system. And it is not more important than fundamental measures such as building less and building more modestly, prioritising the retrofit of existing infrastructure, developing a genuine circular economy for building materials, and creating low land-use, zero-carbon construction materials. This is the essence of the challenge facing us: we need to use human ingenuity and our inherent ability to cooperate to do more with less, in order to live safely within the ecological limits of the Earth. We suggest the following framework of principles to guide building design, and selection of materials. 1. Sufficiency Before building something, we should start by asking if it is really needed, and if there any strategic alternatives to the brief. Discuss this early, once you have your client’s trust. Prepare and signal your ‘sophisticated sufficiency’ arguments in advance and market them cleverly. Can existing structures be reused first or retrofitted first before creating something new? We encourage everyone to critically examine claims about the need for new buildings, particularly when a project seems to be designed simply to provide a return on capital, rather than benefitting people or nature. Even if we replace polluting materials with “greener” ones, we will not solve the ecological crisis if growth, profit and inequality remain the dominant values in our society and economy. In its 2019 report on tackling the UK housing crisis, the UK Collaborative Centre for Housing Evidence concluded that the goal of building 300,000 new homes annually in the UK would not lead to a significant drop in prices, but would lead to more

72 | passivehouseplus.ie | issue 39

(above) The Doughnut Economics framework, which aims to ensure the basic needs of all people are met while not exceeding the earth’s environmental capacity, can be used to help guide decisions on when new construction is needed.

empty homes. A report from the think tank Green House reached similar conclusions. This is not to say that new construction is never required, sometimes even on a significant scale, but such claims must be critically scrutinised. We suggest employing the Doughnut Economics framework of ensuring the basic needs of all people are met, while not exceeding the earth’s environmental carrying capacity, to ensure all development remains within the ‘safe and just space’ for humanity. This framework will become increasingly important as we seek to meets the material needs of all people, and improve living standards for those in the majority world, while restoring the biosphere. 2. Simplicity Designing and building as simply as possible — true value engineering or “integrated design”. Asking: can this building be made simpler and more modest? Can the building be smaller or use less materials through innovative engineering approaches? 3. Circular economy Explore circular design approaches. Design realistically for reuse and disassembly, be open about your assumptions for the endof-life stage of buildings and products, in order to facilitate wider discussion and development. Design buildings to last a long

time, or at the very least, to be easily disassembled and their parts easily reused. For example, can insulation and other materials be easily separated, with significant value retained, and be reused or repurposed at the end of the building’s life? At the very least design and build to facilitate easy recycling — incineration for energy should be the very last resort. 4. Efficiency – only take what you need Use natural resources extracted from our shared biosphere respectfully and efficiently to substitute for higher embodied carbon materials. Use as few materials as possible to achieve the design. Using a “renewable” material inefficiently, whether to ‘develop the market’ or ‘store carbon’ is wrongheaded – efficient use of the same quantity of material, substituting for higher carbon options across many projects, makes far more sense. The latest State of Europe’s Forests report, by the pan-European body Forest Europe, says that European forests are expanding, storing carbon, and supplying wood on a “sustainable basis”. The area of forest in Europe has increased by 9 per cent over the last 30 years and the amount of carbon it stores has grown by half in that time. The forest area protected for biodiversity stands at 24 per cent and growing. But the report warns that threats associated with global heating — droughts, heat-waves, bark-beetle out-


INSIGHT

ECOLOGY IN CONSTRUCTION

The new systems view of life should form the conceptual framework for how we view materials derived from the natural world

(above) Recent analysis, though the subject of much debate, suggests that the size of forest clear-cuts in Europe increased by approximately 30 per cent from the period 2011-2015 to 2016-2018.

breaks, and forest fires — are now a major risk. It says there is a limit to the capacity of forests to respond to increased demand for wood products, carbon sequestration, and other functions. Demand for biomass for energy and materials has grown in Europe since 2000, and over 70 per cent of this comes from forestry (growth of bioenergy has been particularly rapid, to meet renewable energy targets), According to a recent report from the consultancy Material Economics, by 2050 demand for biomass in the EU 27 and UK will exceed available supply by 40 to 70 per cent. Recent analysis, though the subject of intense debate, suggests that the size of forest clear-cuts in Europe increased by approximately 30 per cent from the period 2011-2015 to 2016-2018. The rate of afforestation is also slowing, and the European Commission’s latest State of Nature report, published last year, says that: “the increased extraction of forest products and intensified forestry practices have diverse impacts on the various habitats and species protected under the nature directives.” It also says: “Over the last few centuries, forests managed to varying degrees of intensity have replaced almost all of Europe’s natural forests. Currently, less than one third of Europe’s forests are uneven-aged, 30 per cent have only one tree species (mainly conifers), 51 per cent have only two to three tree species, and only 5 per cent of forests have six or more tree species.” One major 2018 study of forests across northern Europe concluded that, in general, the more efficiently a forest produces wood, the less effective it as at conserving biodiversity. In Sweden, natural forests are being systematically clear-cut and replaced with even-aged plantations, according to five environmental NGOs. Recent logging of protected forests has also been reported in Estonia, Lithuania, and Romania. And with

(above) The UK and Ireland are among the least forested countries in Europe, meaning there is potential for new forests of all types, from ecologically-minded timber production to those purely set aside for nature. See the ‘Home Grown Homes’ programme delivered Wood Knowledge Wales for an example of a project that has aimed to develop a market for locally grown construction timber.

Image source: European Environment Agency

extractive demand on land increasing, nature is more at risk of being squeezed out. So, while supporting a move from concrete and steel to timber and other natural fibres, our primary goal should be to dramatically reduce the quantity of raw materials needed in the first place. When specifying timber or other natural materials, how efficiently they are used can minimise the pressure on landscapes. As well as prioritising reclaimed or recycled materials where possible, smart choice of build system matters too.

For example, when comparing types of timber construction, one recent review concluded: “For buildings up to about six storeys, CLT uses substantially more timber to achieve the same function as a light timber frame building. For buildings over six stories, the use of CLT together with light timber frame may use less timber than CLT alone, and for buildings taller than ten stories, the only proven system to date is the external glulam frame supporting internal CLT units.” Exploring the use of DLT (dowel laminated timber) as a glue-free

ph+ | ecology in construction insight | 73


ECOLOGY IN CONSTRUCTION

74 | passivehouseplus.ie | issue 39

INSIGHT


INSIGHT

alternative to CLT also offers potential for improving on ‘mass timber’ practice. Reducing our use of biomass-based fuels (in favour of energy efficiency and cleaner renewables) and of shorter-lived forest products (through efficiency, recycling and making do with less, rather than by replacing them with plastic) might allow us to use a greater proportion of our forests for long-lasting construction timber. In the UK and Ireland, which have some of the lowest tree cover in Europe, there is no doubt room for more forests of all types, both for ecologically-minded timber production, and to be set aside for nature. There may also be potential for designers, foresters, and ecologists to explore together the potential for under-utilised forestry products that could be harvested sustainably, such as forestry wastes, lower grade timber, small diameter trees removed during thinning, coppiced poles, and bamboo, reeds, and grasses. (We would like to see much closer collaboration between the building industry and ecologists in general).

phors of western civilisation — one that has now ultimately expressed itself in all manner of ecological destruction. “The approach to the natural world encouraged by reductionist thinking—conquering nature and nature as machine — has created imbalances that are becoming increasingly unstable. As we peer into the future, the threat of uncontrolled climate change looms, in addition to other impending global crises such as deforestation, freshwater scarcity, and an accelerated extinction of species.” It would be a mistake to view whole land-

ECOLOGY IN CONSTRUCTION

scapes, crops, trees, forests, or natural materials purely as a machine for human utility — whether the function of that machine to be provide food, building materials, or carbon sequestration. Lent calls for a new worldview, “based on the emerging systems view of life—recognizing the intrinsic interconnectedness between all forms of life on earth and seeing humanity as embedded integrally within the natural world.” This new systems view should form the conceptual framework for how we view materials derived from the natural world.

5. Upskill, measure the carbon, be honest Measure embodied carbon as transparently and accurately as possible, along with embodied energy. Be open and transparent. Quantify carbon emissions and stored carbon clearly and separately rather than combining them into one figure. 6. Become a systems thinker In his profound and influential book, The Patterning Instinct, the systems thinker Jeremy Lent outlines in painstaking detail how the metaphor of nature as a machine to be engineered, rather than something living and animate, became one of the root meta-

(above) The density of structural timber used to achieve a given height of building for various structural systems.

Source: ‘The wood from the trees: the use of timber in construction’, Renewable and Sustainable Energy Reviews, Volume 68, Part 1, February 2017, Pages 333-359.

Spruce forest affected by bark beetle outbreak in the Harz, Germany.

Source: Fährtenleser (CC BY-SA 4.0) ph+ | ecology in construction insight | 75


ECOLOGY IN CONSTRUCTION

INSIGHT

www.buildingkudos.com Brand New Website

- Specialising in the design and build of - atmospherically controlled & energy - efficient timber frame homes. - Distributing bespoke high-specification - window & door solutions. - Designing & manufacturing turnkey all - season modular buildings.

h e l l o @ b u i l d i n g k u d o s . c o m // 0 2 8 9 0 8 3 8 9 5 1

300mm in Attic = U-value 0.11 W/m2K

225mm in Timber Frame wall = U-value 0.14 W/m2K

The warmest and safest natural fibre insulation, made in Ireland As Ecocel cellulose is pumped in it achieves a level of air-tightness not possible with any other sheet or roll out material. Ecocel will last the life span of the building and make building safer in event of fire. Ecocel Ecocel, due to its natural fibres creates a healthy indoor air quality and is Carbon Negative when installed.

Passive sills provide superior window sills, over sills and decorative mouldings to the construction and external insulation industries.

• • • •

Passive Sills can be retrofitted to existing window sills making them the ideal choice for external insulation contractors, or can be used in new build and can be fitted to the most awkward windows.

• • • •

Eliminate Cold Bridging Lightweight Easy to install Available up to 3.6m in length Traditional appearance Can be painted For all types of construction – ICF, timber frame, block build, external insulation Easy to repair

ROI: 021 201 9056 UK: +44 203 808 5149 E: info@passivesills.com 76 | passivehouseplus.ie | issue 39


INSIGHT

ECOLOGY IN CONSTRUCTION

“All construction is likely to warm the climate”

A

Source: Lilly M (CC BY-SA 3.0) (above) Białowieza, one of Europe’s last large remaining tracts of old growth forest; (top) the Glengarriff Valley in County Cork harbours some of the most extensive woodland in Ireland, with a core of ancient oak forest surrounded by naturally regenerating native woodland and areas of conifer plantation.

7. Connect with the forest Of course, make sure your wood is properly certified. But if any of it is locally grown, can you visit and build a connection with the forest where it grew, and with the people who grew and processed it? What can you learn about environmental issues and forest management in the regions it is sourced from? Can you specify wood from forests where managers are actively practicing ‘close to nature’ forestry or engaging in ecological restoration? (see for example www. prosilva.org). The future of building materials Ultimately, we should not view timber as the end-game for ecological construction materials either. Natural materials such as

straw, mud and hemp — long overlooked — are worthy of much further research and market development. And in the future, innovative factory-based biotechnologies using bacteria and fungi could allow us to produce buildings using far less land and resources. Scientists have already used E.coli to produce both limestone and styrene, the chemical used to make polystyrene, one of the most common insulation materials. Cyanobacteria have also been used to grow a bio-based structural building material. Building materials based on fungi also have the potential to create safe, low carbon materials that sequester carbon using agricultural and industrial wastes, though there is still a long way to go for these technologies.

n insightful paper published earlier this year that uses dynamic life cycle assessment to compare the climate impact of concrete, steel and timber buildings, concludes with a warning that “any form of construction is likely to warm the climate”. The authors, all experts in the fields of sustainable engineering and energy, state that the primary aim of the construction sector should now be to “avoid new construction unless the societal benefits are clearly justified”. The paper says widespread adoption of timber over steel and concrete in buildings can substantially reduce — but not eliminate — climate impacts, provided the timber is from sustainably managed forests. It also adds: “This raises the question of resource availability: what are the wider potential impacts of increased timber demand? Planting new forest may be appropriate in some locations, but competing land demands for food production, urban space and biodiversity should not be overlooked.” It notes that many developing countries, where most new construction is anticipated, are those where sustainable timber supplies are under most pressure. It calls for researchers and designers to work more closely with forest managers to develop timber buildings and supply chains that are responsive to the sustainable management of local forests. The paper also says: “The climate benefits of timber components improve the longer that their stored biogenic carbon is prevented from re-entering the atmosphere. Structural engineers should therefore exert whatever influence they can to maximise longevity of building structures and create opportunities for reuse, whilst also reusing existing buildings wherever possible.” The paper, ‘Embodied carbon assessment using a dynamic climate model: Case-study comparison of a concrete, steel and timber building structure’ is published in Volume 33 of the journal Structures.

This article was funded by the Association for Environment Conscious Building. A fully referenced version can be found online at passivehouseplus.ie & passivehouseplus.co.uk.

ph+ | ecology in construction insight | 77


MARKETPLACE

PASSIVE HOUSE+

Marketplace News Daikin launches new hot water heat pump

Ecological Building Systems launch Thermo Hemp Combi Jute insulation

E

D

aikin Europe has launched the Daikin Altherma M HW, its second generation domestic hot water heat pump. The Daikin Altherma M HW comes with an integrated storage tank of either 200 or 260 litres for domestic hot water, and is suitable for small houses or apartments. With a compact and modern design, it is ideal for homes where hot water is needed for up to three or four persons. Moreover, the white design makes it discreet and ideal for fitting in alongside other household appliances. The Daikin Altherma M HW is an all-in-one exhaust air solution that has obtained an A+ energy label on all models, with features including energy use optimisation from photovoltaic solar, while one dedicated model also integrates solar thermal control. The user interface has a very simple and intuitive display with a programmable digital interface with touch keys. To meet the widest range of needs, the Daikin Altherma M HW has five different operating modes, from eco to boost mode. Each of these modes uses energy differently depending on the needs of its users. While eco mode uses exclusively renewable energy, boost mode combines renewable energy with an additional electricity input. With this mode, as well as with the full electric mode, the temperature can rise above 75 C. “With all its features, Daikin Altherma M HW can heat water for all types of needs,” said Patrick Crombez, heating and renewables manager at Daikin Europe. “The five operating modes make this heat pump a consistent choice to answer the domestic hot water needs of every family. Moreover, features such as anti-legionella control, scheduled or off-peak operations and holiday mode make it the perfect heat pump if you don’t especially need or want to invest in space heating.” •

(above) An illustration showing Daikin’s Altherma M HW domestic hot water heat pump.

78 | passivehouseplus.ie | issue 39

cological Building Systems have launched Thermo Hemp Combi Jute insulation in Ireland and the UK. Manufactured in Germany, this natural, flexible insulation material is made from a mixture of upcycled natural jute fibres and hemp. The natural jute fibres are sourced from discarded cocoa and coffee bean bags which have been processed using 100 per cent renewable energy, and then combined with hemp, which is renowned for its ecological credentials, and which sequesters considerably more CO2 when it is growing than is released in processing it. Thermo Hemp Combi Jute therefore combines the best properties of each material to create a unique high-performance insulation product. Ideal for both new builds and retrofit, Thermo Hemp Combi Jute is safe to handle and requires no special equipment or extra precautions to use. The insulation batts are available in a range of thicknesses from 40 mm to 100 mm, with widths of either 375 mm or 580 mm, and are ideal for installation into timber members at 400 mm or 600 mm centres. For areas which require a greater depth, the batts can be doubled up on top of each other for added insulation. Ecological Building Systems said the high heat storage capacity and low thermal conductivity of both jute and hemp assist in ensuring a building is warmer and more cost effective to heat during winter months, but also less likely to overheat in summer – a particularly beneficial feature for rooms within attics which are often characterised as being too cold or oppressively hot, depending on the season. Thermo Hemp Combi Jute also provides effective soundproofing and has attained a Class A sound absorption rating according to EN ISO 11654. Thermo Hemp Combi Jute also has full European Technical Approval (ETA), which verifies its performance characteristics. “Substituting building materials with a high embodied energy for more environmentally benign solutions such as Thermo Hemp Combi Jute is an effective way for homeowners and specifiers to reduce upfront carbon emissions from our buildings,” said Ecological Building Systems group technical manager Niall Crosson. Further information regarding Thermo Hemp Combi Jute can be found at www.ecologicalbuildingsystems.com. •

(above) Ecological Building Systems has launched Thermo Hemp Combi Jute natural insulation in the UK and Ireland.


PASSIVE HOUSE+

(left) The Passive Ultra aluclad window, supplied by Prestige Aluclad.

MARKETPLACE

Pat Cox appointed chair of Ecocem

L

Aluclad windows offer numerous advantages: Prestige Aluclad

A

nyone looking to purchase new windows could easily be overwhelmed by the sheer choice on the market, and nowhere is this more evident that when it comes to choice of materials. But leading supplier Prestige Aluclad says that choosing aluminium-clad timber, commonly known as aluclad, can offer a number of big advantages. “There are many options available for windows in the current market such as timber, aluclad, aluminium, uPVC, and a combination of all the above,” says Declan Loy of Prestige Alculad. “Recently I was asked why should I choose aluclad over other types of windows? There are a number of key reasons. “Firstly, aluclad windows and doors are visually more appealing than uPVC or aluminium. Aluminium can look very commercial in a home, and feels colder to look at. But the natural timber used internally in aluclad windows creates a natural, warm feel. With aluclad windows 95 per cent of the design is timber, which makes it a more sustainable option.” Loy said that aluclad can achieve superior whole-window U-values, with Prestige Aluclad’s Passive Ultra passive-certified range achieving as low as 0.6. He continued: “The airtightness and water tightness can also be superior, for example Prestige Passive Ultra windows and doors have a triple rebated seal which offers superior performance and protects the ironmongery from the external environment. It can achieve up to 2,000 pascals of wind pressure and 1,500 pascals of water tightness.” “The life expectance of aluclad is also much longer than uPVC or aluminium, and it holds the colours much better. There is also greater design flexibility: for example, large window and sliding door sizes can be achieved.” Loy also said that aluclad windows are maintenance free and less prone to service on moving parts. He added: “Our Passive Ultra windows are also more secure. Traditionally windows in Ireland are outward opening with two-to-threepoint locking systems, which you can upgrade to Secure-by-Design standards. Our Passive Ultra windows are outward opening, but they have an eight-point locking system which wraps completely around the window, meaning the product is ultra-secure by its nature. They also come with a ten-year warranty. “Of course budget must come into the equation as well, however when you weight up the benefits of aluclad and take budget into consideration over the lifespan of a home then aluclad wins all day long.” See www.prestigealuclad.ie. •

ow carbon cement company Ecocem has announced the appointment of Pat Cox, former TD and president of the European Parliament, as chair of Ecocem Group. Cox is currently chair of the Finance Green Ireland committee, is chairing the inaugural Dublin Climate Dialogues this year, and is also chair of the Gore Street Energy Storage Fund – the first ever fund for grid scale battery storage listed by the London Stock Exchange. He is also a board member of Supernode, an Irish renewables start up. He built his own passive house in Blackrock, Dublin in 2013, as featured in issue 10 of Passive House Plus. Ecocem is Europe’s leading producer of low carbon cement and says that it has achieved a cumulative reduction in CO2 emissions of over 14 million tonnes since it was founded in 2000 – equivalent to almost a quarter of Ireland’s total greenhouse gas emissions in 2020. The company produces a range of low-carbon cements based on ground granulated blast furnace slag at four plants in Ireland, the Netherlands and France. “Concrete, after water, is the most widely used substance on earth,” Pat Cox said. “The cement industry globally would, if it was a state, be the third largest carbon dioxide emitter in the world. Ecocem, through its commitment to innovation and new technologies, is determined to make a difference at scale – a quality that makes the privileged engagement of chairmanship a challenging duty consistent with the needs of our times.” Ecocem managing director Donal O’Riain added: “We are now in a period of major growth for our business as we deploy new low-carbon technology across the cement sector in Europe. We are delighted to have someone of Pat Cox’s experience and commitment to sustainability to chair the Ecocem board at such an exciting and challenging time for Ecocem.” • (below) Former European Parliament president Pat Cox is the new chair of the Ecocem Group.

ph+ | marketplace | 79


MARKETPLACE

PASSIVE HOUSE+

Zyle Fenster now using Triotherm thermal brackets W

aterford-based high-performance window supplier and installer Zyle Fenster Ireland is now offering Triotherm thermal brackets from Prodomo Ireland as standard under door thresholds on all of its projects. Speaking to Passive House Plus, Walter Power from Zyle Fenster Ireland said that eliminating thermal bridging under door thresholds remains a big challenge for many passive house and low energy building projects. “The big issue we found was how to insulate under door thresholds for passive house projects, particularly for sliding doors, how to stop cold bridging at that point,” he said. He explained that while previously the company sought to install some insulation at this point to prevent thermal bridging through the concrete that is most typically used under thresholds, this was a difficult detail to execute, so the company has now switched to using Triotherm as standard. Triotherm thermal brackets are made from expanded polystyrene and are certified by the Passive House Institute. They are highly load bearing and designed to simplify thermal

detailing around windows and doors, offering the same insulating value as mineral wool insulation. “We’ve been using them for about 12 months now, and we made the decision to use them as standard under doors on all of our jobs because they’re so good,” Walter Power said. “The fact that they come in such a high measurement of up to 230 mm means they are effectively the same size as a concrete block, so you can stand the same size as a concrete block underneath the doors.” Zyle Fenster’s Ireland agency is a small, family-owned firm specialising in high performance and passive house windows, and it has developed a reputation for its attention to detail and high quality installation. “Installation is absolutely critical, especially with doors,” Walter Power said. For more information on Triotherm thermal brackets see www.prodomo.ie. • (left) Triotherm thermal bracket under Zyle Fenster front door.

Mannok named one of Ireland’s best managed companies M

annok was named as one of Ireland’s best managed companies at a virtual awards ceremony on Wednesday, 8 September. The prestigious awards programme, led by Deloitte Ireland in association with Bank of Ireland, is renowned as the premier business management awards across the island of Ireland and part of the global Best Managed standard. Mannok, which rebranded from Quinn Building Products last year, is well known in the sustainable building sector for its insulation products and low thermal conductivity blocks, as well as becoming an early adopter of Environmental Product Declarations for a number of its products. The company was recognised for the first time at this year’s awards, having demonstrated “superior business performance, strong leadership and resilience, organisational excellence, and an entrepreneurial approach”. Ireland’s Best Managed Companies Awards programme promotes and recognises excellence in Irish/Northern Irish-owned and managed companies and is the only awards scheme on the island of

80 | passivehouseplus.ie | issue 39

Ireland that considers a business’s performance from every perspective. Now in its 13th year, the programme saw record entries, with the list of winners representing 26 counties across the island of Ireland from a range of sectors. Mannok was one of 25 companies to qualify for the first time this year, bringing the total number of businesses recognised as Ireland’s best managed companies to 139. “We are very proud to be recognised as one of Ireland’s best managed companies, particularly given the unprecedented challenges of Covid and Brexit over the last eighteen months,” said Mannok CEO Liam McCaffrey. “Our agility in dealing with such trials has undoubtedly contributed to our awards success, and this is down to the excellence of our team of 830. With their resilience and innovative spirit, they continually demonstrate that our people are our greatest strength, and we are extremely thankful to each and every one of them. “Despite the uncertainty, we have continued to progress with our strategic development plans, investment and innovation. In the midst of the pandemic,

and with Brexit on the horizon, we undertook a rebrand, developed new sustainable food packaging solutions, and invested millions in industry leading technology to support our growth plans. “We have further developed our digitisation and skills development programmes, extended our educational partnerships, and actively scaled up our environmental and biodiversity initiatives.” • (below) Mannok directors Liam McCaffrey (CEO), Kevin Lunney (COO) and Dara O’Reilly (CFO) with Mannok’s Best Managed Companies award.


NZEB/Retroot

PASSIVE HOUSE+

Centre of Excellence National Construction and Training Centre, Mount Lucas

MARKETPLACE

Ionad Náisúnta Oiliúnta Foirgníochta National Construction Training Centre

Fully Funded Programmes NZEB Fundamental Awareness

Saturday courses: 23rd October, 27th November and 11th December 1 full day - Onsite Morning online courses: 14th and 15th Octobe October, 15th and 16th November, 2nd and 3rd December

NZEB Ventilation

Start dates: 2nd, 16th and 30th November, 14th December 3 half days - Online 1 day practical - Onsite

Ret Retroot / Thermal Insulation Installation Start date: 2nd November 1 day per week over 8 weeks - Onsite

Courses also available in the evenings and at weekends

Register now: 085 2539167 jhall@loetb.ie

www.loetb.ie

ph+ | marketplace | 81


MARKETPLACE

PASSIVE HOUSE+

Efficient ventilation key to healthier indoor spaces – Partel

P

artel, specialist in developing sustainable building envelope materials, is aiming to raise awareness of the key role of efficient ventilation for safer and healthier indoor living spaces. The company recently ran a campaign titled ‘Breathe healthy with efficient Lunos ventilation’. During the pandemic, the World Health Organisation has recommended a ventilation rate of 10 litres per second per person in both residential and non-residential settings, or 60 litres (or six air changes) in healthcare facilities. For a new dwelling in Ireland, the building regulations typically require 0.3 litres per second, per square metre of floor area. “We’re gratified to have been able to play our part in educating and informing business owners and homeowners about the critical role of adequate ventilation,” said Hugh Whiriskey, founder and technical director at Partel. “Ventilation not only enhances human health and comfort by improving indoor air quality and reducing the impact of airborne viruses, but it also controls humidity and protects the structural integrity of buildings.” There has been particular focus on improving ventilation in schools to prevent the spread of Covid-19, with CO2 monitors being supplied to schools across the country so that teachers can monitor indoor air quality (IAQ). While welcoming this move, Partel technical consultant Dara McGowan says that there may be more fruitful measures for improving classroom ventilation than those suggested by the Department of Education. “They suggest keeping windows and doors partially open during class, and fully open when the classroom is not in use to encourage natural ventilation. In my opinion, this approach to ventilation is not

82 | passivehouseplus.ie | issue 39

an appropriate long-term solution for two main reasons: first, it is too crude to provide adequate ventilation for indoor air quality while minimising energy demand, and second, it will cause discomfort for students.” He continued: “A continuous mechanical extract (CMEV) system, or a mechanical ventilation system with heat recovery capabilities (MVHR) is a much more effective way of providing excellent IAQ while maintaining occupant comfort. Decentralised MVHR is one of the most common ventilation strategies in central Europe and is what makes Partel’s Lunos system somewhat unique in the Irish market. Decentralised ventilation negates the need for a large central ventilation unit, instead using smaller individual units which are installed in the wall of each room. “Lunos Nexxt units are constantly supplying fresh air and extracting stale air, increasing the air change rate in the room. These units have been specifically designed for large spaces, such as classrooms, and are capable of up to 30 litres per unit, meaning three units would provide enough fresh air for approximately 30 students. And unlike the purge ventilation techniques being utilised by schools across Ireland currently, the Lunos system can maintain a comfortable temperature in classrooms.” Partel’s technical design specialists can calculate an appropriate ventilation rate for any type of project. This service is often available free of charge as part of the company’s technical support. McGowan added that perhaps the biggest advantage of decentralised MVHR in a school setting is the simplicity of retrofitting compared to a centralised system. For more information visit www.partel.ie. • (above) An illustration showing three Lunos decentralised ventilation options.

Waterford Stanley launch monobloc heat pumps

W

aterford Stanley will launch a new range of monobloc air-to-water heat pumps this November. The new monobloc range will come in outputs ranging from to 2 kW to 6 kW, complementing the company’s range of split heat pumps, which offer outputs from 4 kW to 12 kW. While both split and monobloc heat pumps have an indoor and outdoor unit, the monobloc is a plug-and-play type system that results in a quicker installation time with no requirement for a refrigeration engineer to be present on site. “All of our heat pumps are certified to the EN standards EN 14825 and EN 16147 and offer a co-efficient of performance [COP] of up to 5.0,” Donal Reilly, business development manager for renewables at Waterford Stanley, told Passive House Plus. “They are ideal for retrofitted homes or new homes and can provide 100 per cent of domestic hot water and 100 per cent of space heating.” Reilly explained that Waterford Stanley offers an extensive design and support service including heat pump and underfloor heating design, as well as heat loss calculations and support for SEAI heat pump grants. The company supplies underfloor heating systems including Danfoss manifolds and Heatmiser thermostats. “We also give on-site support to our installers as well as commissioning our systems, and we work closely with engineers, architects, builders, and homeowners. All of our heat pumps also come with a seven-year warranty, plus remote diagnostic support.” See www.waterfordstanley.ie for more information. •


PASSIVE HOUSE+

Introducing AG’s latest premium flamed granite-effect flagstone: Fiamma. Purposefully strong and stain resistant, Fiamma is manufactured to Enduur Level 2 using AG’s advanced concrete technology with surface protection. It’s especially suitable for heavily trafficked and commercial projects, and is available in 3 formats | 3 colours | 50-70mm depths. Bowling ball shown demonstrates resistance to abrasion and wear and tear of surface texture only.

MARKETPLACE

Introducing

Fiamma flamed granite-effect flagstones

Go.Lightly. 16-684 Fiamma AG Pro Bowler Press Initial Concepts_v4.indd 9

AG.UK.COM 17/06/2021 11:43

Advertise with us.

81%

have made decisions on projects because of ads in the magazine*

*source, Passive House Plus Irish edition 2019 reader survey

To enquire about advertising, contact Jeff Colley on +353 (0)1 2107513 or email jeff@passivehouseplus.ie

www.passivehouseplus.ie ph+ | marketplace | 83


MARKETPLACE

PASSIVE HOUSE+

Tackling the retrofit skills shortage head on

The National Construction Training Centre in County Laois is aiming to meet the challenge of training the huge number of skilled workers needed for Ireland’s planned housebuilding and deep retrofitting programmes.

T

he national airwaves are buzzing on the topic of how Ireland can meet both the new home building and deep retrofitting targets with the current labour and skills shortage. One senior ESRI commentator recently proposed that it must be one or the other – that we simply don’t have enough resources for both. Unless Ireland gears up radically in terms of skills for the retrofit sector, therefore, it is quite likely that new homes provision will take precedence and the ambition to retrofit 500,000 homes by 2030 will be scaled back. Late in 2020, Minister Simon Harris set down his ambitions for the sector, announcing the National Construction Training Centre (NCTC), Mount Lucas as the centre of excellence in deep retrofitting/nearly zero energy building (NZEB) in the Midlands. The facility at the NCTC includes a large purpose-built deep retrofit hall of 600 square metres. The retrofit training hall includes full-scale rigs representing the gamut of situations encountered on most projects — everything from roof, wall and floor insulation to airtightness application, ventilation installation and commissioning, and renewable

84 | passivehouseplus.ie | issue 39

energy installation. It is truly a showcase in terms of state-of-the art upskilling facilities for those involved in delivering deep retrofits. An extensive suite of courses is available at the NCTC, all of which are fully funded for people in employment under the national Skills to Advance initiative. Three different course types are provided. First, there are shorter courses which are City and Guilds assured, and which focus on delivery of NZEB. These courses include the very popular NZEB Fundamentals (one day), NZEB Retrofit (two days) and NZEB Ventilation (three days). There are also trade-specific courses for carpenters, bricklayers, plumbers, electricians, and plasterers, as well as a more detailed programme for site supervisors. The second category of courses include practical programmes which are industry-recognised, the objective of which is to ensure learners, including new entrants, have the skillset currently required by employers to contribute to the government’s retrofit targets. Examples of such courses include those on external wall insulation, internal wall insulation and airtightness.

The third category of programmes are longer courses which are QQI accredited, including Thermal Insulation Installation. These courses typically run for five to eight days and include formal assessment on completion. The key attraction for learners attending the NCTC is the quality of training rigs which provides for a deep immersion experience. As well as learning about deep retrofit from a theoretical perspective, learners get to grips with the very latest products, details and application methods from expert tutors who are deeply passionate about delivering deep retrofits at scale. We feel that we do not have to make a choice between new-build homes and deep retrofitting. The facilities, programmes and educational resources needed to deliver a growing pool of retrofit experts is now in place. There’s an exciting education programme for every level, from entry to expert. Further information or to register for any of the programmes contact Jolene Hall at jhall@loetb.ie or see www.loetb.ie. • (above) Deep retrofit and NZEB training at the National Construction Training Centre, Mount Lucas, Co Laois.


PASSIVE HOUSE+

MARKETPLACE

New Brink Flair 225 heat recovery ventilation unit launched T

he new Brink Flair 225 heat recovery ventilation unit from Brink Climate Systems has officially been released. According to Brink it comes with some “exciting” technologies including highly efficient EC constant flow fans, fitted with rotating vane anemometers, TFT colour touchscreen for easy programming, 100 per cent bypass, guided vanes for equal airflow over the whole heat exchanger, condensate connection, with special ball syphon included and a pre-heater with a larger surface and new aerodynamic design. The system is available in Ireland and Northern Ireland from Kernohan Distribution, Brink’s official Irish partner. Brink Climate Systems has used constant flow fans in their heat recovery ventilation units since 1990 and employ software that monitors changes to airflow in their systems. This adjusts the fan speeds accordingly, ensuring that the dwelling is ventilated at the correct rate, with the fans working at optimum efficiency and airflows equally balanced. The constant flow fans in the Brink Flair 225 unit have been manufactured to Brink’s specifications and provide an accurate

control of the airflow. This is achieved using an anemometer fitted to the discharge tube of each fan which enables a fast and very precise response to airflow requirements. The integrated digital programmer enables a system to be commissioned easily, with balanced airflows (as an unbalanced system can swiftly lose thermal efficiency, and cause pressure differences between the internal and external environments). The Brink Flair 225 includes the same proven heat exchanger used on the rest of the Flair family with vanes guiding the airflow over the whole surface area of the heat exchanger. This design feature provides a laminar airflow to the heat exchanger, giving an even distribution of air through the heat exchanger for higher thermal efficiency and lower pressure loss (Pa). The Brink Flair 225 is tested and listed on SAP Appendix Q and is certified by the Passive House Institute. Kernohan Distribution is the sole Irish supplier of Brink passive house-certified products. For more see www.brinkhrv.com. • (right) The new Brink Flair 225.

Grant invests in biofuel tech for oil boilers L

eading Irish heating appliance manufacturer Grant has invested over €250,000 in enabling the use of hydrotreated vegetable oil (HVO) in traditional oil boilers. The company said this represented a “major R&D breakthrough that could help reduce carbon emissions in rural and hard to heat homes” and would “prevent Irish homeowners from incurring the high cost and subsequent disruption to daily life of deep retrofitting.” Over the past six years, Grant’s research and development team has worked with third level institutions, industry partners and renewable fuel producers, “focusing on more sustainable and carbon saving fuels and innovating its boilers to be biofuel compatible”. “In the early days of our research, we identified potential bio and synthetic fuels that would both meet greenhouse gas reduction targets and be commercially viable,” said company founder Stephen

Grant. “The breakthrough came during testing and field trialling with boilers successfully using 100% biofuel known as hydrotreated vegetable oil (HVO). While HVO is a relatively new fuel to Ireland, in Europe and the UK it is used for marine and public transport and to power generators.” While globally HVO fuels can still include some virgin vegetable oils such as palm, soy and rapeseed, there is a drive by producers to switch to lower quality waste and residues, and to develop advanced new materials, such as algae and microbial oils. Leading manufacturer Neste says that its HVO is now based on 92 per cent “wastes and residues”. HVO currently available in the UK and Ireland is certified via the International Sustainability and Carbon Certification (ISCC) scheme. “The use of 100% HVO, can result in around 88% reduction in carbon emissions and using this or a percentage blend of HVO with kerosene,

will enable rural and hard to heat Irish homes to transition to a renewable green alternative from 100% kerosene at an affordable cost, with minimum disruption to everyday home lives,” Stephen Grant said. All of Grant’s condensing boilers are now “future-proofed” to use HVO through making a slight modification to the boiler. Older Grant condensing boilers can also be adapted to HVO, but this may require a new biofuel burner that is matched with the specific boiler. These modifications can be carried out by a service engineer during an annual service. [Editor’s note: some environmental groups question the true carbon footprint and environmental impact of common HVO feedstocks and fuels due to their potential effect on land use change, as well as whether some key ‘waste’ feedstocks warrant that definition. See our report on page 22 for more]. •

ph+ | marketplace | 85


TO B Y C A M B R AY

COLUMN

How do breather membranes work? How do underlays manage to let water vapour through while keeping the rain out? Toby Cambray delves into the physics…

A

while back someone asked me how breather membranes work, and I admit to being initially stumped. I’m writing this in the hope that I’m not the only one to whom the answer is not immediately obvious. To be clear, we’re talking about the sort of materials that are used as underlay in roofing, or on the outside of timber frames; they let vapour out so as to avoid moisture accumulation (or, if you insist, interstitial condensation) but by some witchcraft, they also keep the rain out. The H2O molecules are the same, so what gives? If you wanted to make a breather membrane, there are two possible approaches. Firstly, we could make some sort of plastic sheet that’s thin enough to allow vapour to diffuse through fast enough. The drawback is that with typical materials, it would have to be really very thin – for example, common or garden 500-gauge polythene (that’s about an eighth of a mm) has an Sd value of around 50 metres – about right for a vapour barrier (though plain polythene isn’t really robust enough). But a “low resistance underlay” is, according to BS 5250, anything with a vapour resistance less than 0.05 m, so we’d need our breather membrane to be 1,000 times thinner. The cling film in your kitchen cupboard is roughly a tenth the thickness of 500-gauge, and 100 times thinner than that is really quite thin, with the obvious difficulties that brings (making it, and protecting it).

The answer comes down to an important property of water we call surface tension.

Of course, if you can make a polymer that’s much more vapour open, you could produce it in more practical thicknesses. The second approach is how most practical breather membranes work. If you’ve ever taken a moment to peel a bit apart, you’ll find they are fluffy, and fray at a torn edge,

86 | passivehouseplus.ie | issue 39

with no hint of a continuous membrane. They are made by spinning plastic into fine fibres and squashing them together while hot to make a sheet. This effectively creates a sheet with lots of small holes. This means water vapour can pass through much more easily and we don’t have to manufacture insanely thin layers of plastic. But why doesn’t the liquid water come through? They are not working by osmosis, or behaving like some sort of molecular sieve. The answer comes down to an important property of water we call surface tension. Surface tension is caused by the fact that molecules in water ‘prefer’ to be below the surface than on it. This manifests itself in several ways; for example, in the absence of other forces, a drop will form itself into a sphere. Although it is harder to see (apart from in special cases like the Prince Rupert’s drop – google this and thank me later), solids have surface tension too. When a liquid interacts with a solid, the relationship between the surface tensions plus that of air, sets up a contact angle, which we can observe in the shape of the droplets. If they are relatively flat, the contact angle is high, and the material is said to by hydrophilic; if it is low, the water ‘beads up’ and the surface is said to be hydrophobic. As long as the contact angle is lower than 90 degrees, the water won’t be absorbed into the material, because the surface tension acts like a balloon, stopping the liquid ‘dropping into the gaps’. Incidentally, when you put a fresh coat of Nikwax on your breathable jacket, you’re doing the same thing. And so, if the surface of our breather membrane is hydrophobic, it can have some gaps to let vapour through easily, but also prevent liquid water penetrating. I wanted to focus on the physics of these materials in this column, but I should also mention another disadvantage of most breather membranes: they aren’t good for bats. Essentially, bats crawling up the membrane tend to pull those fibres out and can get tangled up and die. There’s an excellent AECB webinar on the subject – do have a listen if you haven’t already. Details that avoid fibrous breather membranes are possible, and indeed bat-friendly membranes are available. Presumably these don’t rely on spun plastic fibres. I wonder how they work… n

Toby Cambray is a founding director at Greengauge and leads the building physics team. He is an engineer intrigued by how buildings work and how they fail, and uses a variety of methods to understand these processes.


ph+ | editor’s letter | 91


European market leader in heat pump technology

Future proof your new home

Space Heating Hot Water

All your heating and hot water provided with market leading efficiency Save space with our 180 or 230L integrated stainless steel tank Manage your system from anywhere via app or voice control Meets all the Part L requirements for your new home with one system

Daikin Altherma 3 Low temperature air to water heat pumps Floor standing, wall mounted and solar integrated versions available

For more information visit www.daikin.ie or email heating@daikin.ie for dedicated project support

88 | passivehouseplus.ie | Issue 21


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.