Metal sculptors' residency porfolio

Page 1

L3 l IR-3006

Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed

FD CEPT Spring 2020

Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed Forgotten / Transformed

Tutors : Errol Reubens Ratna Shah T.A. : Milan Desai

Pruthviraj

UI2815


Readings_Objective : Measure drawing Make detailed measure drawings of the give two sites:

01 1

1. N.C. Mills,Ahmedabad 2. Old Stock Exchange Building,Ahmedabad The drawings should capture the current condition of the buildings in terms of ruination, renovations and extensions. Details of elements such as structure, openings, staircases and roof structure.


New Commercial Mills : Plan

Read,Reduce,Reflect

N

Week 1-3


Redings_Objective : Mapping Make detailed measure drawings of the give two sites:

012

1. N.C. Mills,Ahmedabad 2. Old Stock Exchange Building,Ahmedabad Overlaid information of site location in its immediate context as well as the area location in the city of Ahmedabad. Site Drawing to best convey it’s organisation and characteristic elements.


New Commercial Mills NC MILLS

INSIDE 3

Maruti Industrial Estate

Shell Petrol Pump

Government Officer Colony

TEXTURES

5

Sonya Ceramics

Ashok Mills

Raghunath Hind School

India Colony Ward Office

Viranjan Garden

ESIC Branch Office

Asarwa Lake NC MILLS Arvind Denim Division

Arvind Ltd.

Reliance Textiles Ltd.

Kakadiya Hospital

2

Mazhar E Qutubi

Arvind Corporate House

6

Dena Bank

Star Hospital

Kamdar Hospital

Shree Shakti Hospital Kasturba Garden

VEGETATION

Jethabhai Parmar Garden

6

Punjab National Bank

5

1

4

MILLS

BANKS

GOVERNMENT BUILDINGS

PETROL PUMP 3

HOSPITALS

SCHOOLS

TEMPLES

MOSQUES

PARKS

LAKE

N

OUTSIDE

2

STREET ELEVATION

1

Read,Reduce,Reflect

4

Week 1-3


Reflections_Subjective: Impressions •Pick/Take 25 selected photographs each of both the sites.

013

• Associate and express your first impressions and multiple readings thereof of each site with metaphors/labels/captions of those assigned/expressed attributes in the photographs. • These associative captions/labels can express both the strong subjective emotional attribute/affiliation or a spatial attribute/reading.


New Commercial Mills

POROSITY OF STRUCTURE

DO NOT ACCESS

BEAUTY OF CONSTRUCTION

PAPER ROLL TO ENTER

WAY

ROUGHNESS

CONTINOUS

LONGITUDE

OFFSET

RUSTIC

SACRED

TECTONICS

LIGHTS

WELCOME

SHADOW

SHAMIYANA

TECTONICS

REACTION

UNEVEN

vGDO

ZAROOKHO

ABSTRACTION

FRAME

BAPOR

Read,Reduce,Reflect

CONJUNCTION

Week 1-3


Reflections_Subjective: Montage

014

A photo montage composed having a narrative of the site observations and impressions_Macro scale and micro scale captures.


Read,Reduce,Reflect Week 1-3


Reduction_Analytical • Make analytical diagrams depicting the spatial configuration, contextual elements and transitional attributes.

015

• Use the associative captions used for exercise 1.3 as leads/ clues to develop an abstract model depicting the same with appropriate selection of materials. Full or any part of the site can be used to build up the expression of your reflections into the model.


Read,Reduce,Reflect Week 4-5


Identifying the transformers

021

Identify the location and make drawings representing your understanding of the making of the following transformers in site: 1. Threshold/Transition 2. Connectors 3. Planes 4. Apertures 5. Blocks 6. Crown


Read,Reduce,Reflect

Threshold

SLOPING ROOF ACTING AS SLATING HORIZONTAL PLANE WATER CHANNEL

CROWN ELEMENT

ROOFING SYSTEM

Week 4-5


Transforming the Transformers

022

• Combining a chosen attitude (varies each time) with language of dialogue interpreted from your artist( from the above list, stays constant for all 3 stages) design an architectonic installation. Stage 1 : Entrance + Volume Stage 2 : Skin(Aperture)+volume Stage 3 : Crown+Volume Final Stage : Volume+Skin+Crown Interventions need to address the site with observations/physical elements,their scale position/change or remove certain elements for proposing transformation.


CONTRUCTIVISUM Menifesto •To communicate the reality of life,art should be based on the two fundamental elements : space and time. •Volume is not the only spatial concept. •Kinetic and dynamic elements must be used to express the real nature of time; static rythms are not sufficient. •Art should stop being imitative and try instead to discover new forms.

Transformers Week 4-5


Transforming the Transformers this exersice unfolds in 3 stages of operative dialogues based on 3 different attitudes adopted with respective sites. 1.Weave 2.Box-in-Box 3.Parasite

022

Each student would be given an artist work to stimulate the language of the dialogue being established with the chosen site. the shared sample of work of each artist should be studied for this compostion, elemnets,rules of structuring the elements,detailing, and scale. Design an architectonic installation to achieve scales of volumes, atmospheres of spatiality(dense space,stretched space,labyrinthine space.busy space. layered space etc.)connections within to allow a visitor to climb.sit,occupy and move through volumes.


Entrance + volume

Transformers Week 5-6


Skin + volume

Transformers Week 5-6


Crown + volume + Skin

Transformers Week 5-6


Case study_analysis •chosen case studies should compise of a variety of strategies such as : box in a box/weave/parasite/wrap/scoop/scavenge/ juxtaposition etc.

031

•Case studies should have clearly demonstrated strategies of altering/adding elements of threshold/transition/connectors/ planes/apertures/crown. •larger insertion strategy(in schematic plan/section) •Junctions where old meet the new (gap/skew/dent/layering/ setback etc. •Details of elements and joinery •Material palette


Case studies HEAVYBIT INDUSTRIES PROJECT HEAVYBIT INDUSTRIES

FUNCTION OLD : WAREHOUSE NEW : INCUBATION SPACE

LINK : https://www.archdaily.com/162461/in-progress-kings-cross-station-john-mcaslan-partners?ad_source=search&ad_medium=search_result_all

FORGOTTEN -TRANSFORMED

PRUTHVIRAJ UI2815

Case study_analysis

DESIGNER IWAMOTOSCOTT ARCHITECTURE LOCATION SAN FRANCISCO,U.S.A.

Week 5-6


Case studies synergy lifestyle building PROJECT SYNERGY LIFESTYLE BUILDING DESIGNER SJK Architects

The central "courtyard" area is illuminated from above by new skylights that extend along the length of the space, whereas the previous ones ran width-wise along the trusses.

LOCATION

FUNCTION OLD : WAREHOUSE NEW : CONTEMPARARY OFFICE

Section :

A corporate office space surrounded by series of mills, corresponding to it’s old function.

Ground Floor Plan :

Materials:

Extended columns to support the newly made roof stucture at extended hieght.

Enter Area Reception Area Meeting Room Fabric Team Showroom Workstudio

Flush of natural light entering through an intentional offset in the roof.

Cafe Waterboby Restroom Electrical Room Server Room

Mezzanine FLoor Plan :

Library Assistance Cabin Owner’s Cabin Showroom Owner’s Restroom

FORGOTTEN -TRANSFORMED

Concrete

Stone

Wood

glass

Plywood

Mild Steel

granite stone

PRUTHVIRAJ UI2815

Case study_analysis

MUMBAI

The initial design utilised the existing pitched roof and introduced skylights to bring daylight into the voluminous space.

Skylight :

Week 5-6


MATERIAL PALLETE

Case studies Niccolò PagaNiNi

:

PROJECT NICCOLO PAGANINI RENZO PIANO

CONCRETE

DESIGNER

FUNCTION OLD : SUGAR FACTORY NEW : AUDITORIUM OLD 1996 Eridiana sugar factory

PLAN

BRICK

NEW 2001 AUDITORIUM

AXONOMETRIC VOLUME

+

METAL

FABRIC

INTERIOR VIEW

RECEPTION

FOYER

PLENARY ROOM

TEST ROOM

OLD CHIMNEY

EXTERIOR VIEW

FORGOTTEN -TRANSFORMED

TRANSFORMING TRUSS TIMBER

GLASS

PRUTHVIRAJ UI2815

Case study_analysis

LOCATION PARMA CITY,ITALY

Week 5-6


Program Statement and Details •Site and it’s brief description: The name and location details of the site. It’s history, its context, it’s architectural description and your own brief reading of it.

041

•Program and it’s premise: The title of your proposed Program and its functional objective as a subtitle. State briefly the reason and studies leading to the proposed program. State the alignment of the objective of the program with the findings from site and historical studies of the site. •Program details: List the Functional Requirements along with area details. The functions should be categorised as Public, Semi-public and Private. •Design stand: Combining the nature of proposed program and the subjective reading of the historicity of the given site, state your design stand in a single line/an abstract diagram.


Programme Week 5-6


Metal Sculptors’ residency sculpting from scrap

Site:NEW COMMERCIAL MILL, AMDUPURA, AHMEDABAD N.C. Mills is an industrial building close to Naroda Airport Road, which used to manufacture cotton fabric. It is surrounded by other industrial buildings and residential units.The built-form from the outside appears heavy and full of mass, while from the inside it appears porous, huge, light, and raw with a rustic appeal. It has a metal structure internally which helps cover larger spans. The large span interior volume feels like a floating mass exaggerated by the roof and its north light openings. A mill used to have a lot of production happening, so the impressions of the site were work in-process and with rustic interior surfaces.This suggested to me, that “why not convert this into a workplace for sculpture, where the space converts into a creative place surrounded by nature and silence.My thoughts came from the fact that people prefer to reside near a river because the basic need of water is fulfilled, similarly for a metal sculptor, the basic requirement is material where waste metals such as copper, iron, aluminum, etc. are found close by at a low cost”.These materials are found easily in areas such as Naroda, Delhi Darwaja, Kalupur, Prem Darwaja, Dariyapur, Tawdipura, Dudheshwar, Rakhiyal, Vatva, GIDC areas, which are in close proximity to the site, from which a sculptor can make sculptures. If we make a sculptors’ residency here, it could help them produce their work and also avail of the easy access to all the required materials available nearby.They could produce work on whatever scale from small to large as per their requirements.


Context study programme related contextual study of nearest areas around site •research about places •Material availability •Transportation •Programme research •Metal scrapes availability



Sculpture artist references: vinit barot,ketan kanzaria, vyom mehta, anuj anjaria, ram suthar.


Programme Schematic bubble diagram:


Space Impression

Intervention

Interweave

•Huge Volume •Calm •Peace

•Natural light •Nature around

Wrap


Space division

Formal

Informal

Exhibition Workshop Studios Admin Residence

CafĂŠ Courtyard space Plinth area


Space division

Public

Semi-Public

Private

Exhibition Retail store CafĂŠ Courtyard space Plinth area

Workshop Computer studio Studios Admin

Residences


Activity+path axis Individual Bedrooms

storage

Individual studio spaces

Informal seating

Outdoor Exhibition

workshop

workshop

kitchen

toilet

toilet

cafeteria

Indoor Exhibition

Retail


Space division


Site plan from LVL. 1500mm


Site view


Ground floor plan

from LVL. 1500mm


Mezzanine floor plan from LVL. 4300mm


MAIN ENTRY

Entry

welding machine AUTO K 600 AUTOMATION

Foyer

sheet folding

sheet bending

AUTO K 600 AUTOMATION

AUTO K 600 AUTOMATION

AUTO K 600 AUTOMATION

band saw

welding machine

welding machine

welding machine

Outdoor Plinth 14x7

Male

Female

Sculpture area 9x4.5

STUDIO 1 10X7

lathe machine

Reception Area 4.5x3.5

Artist's Common Studio 15x15

STUDIO 2 10X7

ENTRY

LVL. 600

LVL. 00

O.T.S Central Courtyard 10x7

Exhibition Space 15.5x10

LVL. 600

UP

±600mm LVL

3500 MM WIDE PASSAGE

LVL. 00

WATER BODY

+2550 LVL

ENTRY

LVL. 00

RAMP 1:10

LVL. 600

Retail Store 9.5x10

UP

Cafe 12x7

Admin office 7x3.5

Kitchen 5x7

3d printer

Computer Studio+ Digital lab 7.5x7

STUDIO 3 10X7

3d printer

display work

drill machine

sheet cutting

Female TOILET 5x4

NORTH

STUDIO 4 10X7

Male TOILET 5X4

Water Cooler

drop saw

RAMP 1:10

Existing site Proposed site

colour printer


Section AA’ 0 600 1800

3600

Sculptures by vinit barot


Section BB’ 0 600 1800

3600


Section CC’ 0 600 1800

3600 MM

Sculptures by vinit barot


Studio 1

Studio 2

Studio 3

Studio 4

Section DD’ 0 600 1800

3600 MM


Section EE’ 0 600 1800

3600 MM


Section FF’ 0 600 1800

3600 MM


Right Elevation


Front Elevation

Back Elevation


Views


Entrance (Outdoor exhibition space)


Retail Store Entrance


Indoor exhibition area


Central Courtyard Space


Sculptors’ Common Studio area


Sculptors’ Common Studio area


Cafeteria


Vertical Connection


Sculptos’ Individual studio space


Interconnection of bedroom and studio space


Intersecting Tunnel

Passage


Exploded Isometric view


Mezzanine floor +4300mm

Ground floor +600mm Exploded Isometric view


Isometric view



thank you Pruthviraj UI2815


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.