mauritius doc

Page 1

R.Eldridge,N.Fearon&N.Bhageloo

Sterling Global Consultancy SGP

1 1


Mauritius

is rightly described as a paradise but this creates ademand for energy not only from its own population of 1.3 million but the million tourists that visit the island. Mauritius

is the only fully electrified African country using 2.3billion kw/h and currently produces 20% of its own energy from baggasse, wood and hydropower. However

despite the excellent National Programme for SustainableConsumption and Production, imported LPG, Diesel and other fossil fuels remain at too high a percentage of GDP

Confidential Draft 2


In-house experts with extensive knowledge and specialties SGP

Supplying innovative energy efficient products

Partnerships with industry innovators 3


Electricity Waste to Energy

Wind Towers

Fuel

Cut costs

Grow fuel

Green Construction

Algae fuel

Money from waste


Millions of tons wasted

Create energy


SOLUTIONS Municipal waste first produces precious metals

Balance of waste produces electricity

Go small with portable 0.5MW units or Large with 200MW power stations


ďƒ‰ Metals

from waste and then energy from the residue ď€


Technology and process 

    

Plasma arc separation technology converts electronic waste into precious metals which can be sold into global markets or used locally.  Separate waste technology uses a variety of processes including a gasification and arc technology plant which produces a net 12MW of electricity and heating 

Confidential Draft 8


precious metals 

The extraction process assumes 2000 MT per annum of circuit boards, leads and some batteries which will produce 

copper, nickel, iron, aluminium and some precious metals including Gold, Silver, Platinum, Palladium, Iridium, Osmium and Ruthenium. 

   

The gold yields from 2000MT are 24,000 ounces of gold per year on average with considerably more silver, copper and nickel  The value will depend on market rates for recovered metals 

Confidential Draft 9


WASTE TO ENERGY

A standard plant assumes 150,000 MT per year of municipal waste delivered to a central point.    It consists of a collection hall where the recylclables are separated, a gasification plant, plasma arc plant and power island.    Depending on the exact nature of the waste, it will produce 12MW of net usable energy and usable heat for distribution    The balance will be saleable recyclates such as glass and general waste derived metals.  

Confidential Draft 10


The cycle for all waste