Cherry Street Pier Vendor Presentation

Page 1

THE DELAWARE RIVER WATERFRONT CORPORATION


DRWC’S CORE RESPONSIBILITIES Planning / Development • • •

Design and build high quality parks, open space and other public amenities, including recreational trails and ecological restoration projects Promote and support high quality private investment in new development, including residential, commercial, entertainment, and light industrial Connect waterfront to adjacent neighborhoods with new streetscapes, signage, and dramatic lighting schemes

Programming • • •

Activate waterfront public spaces with a diverse range of high quality events and activities throughout the year Operate highly successful public events such as Spruce Street Harbor Park & Blue Cross RiverRink Winterfest and Summerfest Complement DRWC’s development mission by generating more demand for and excitement about the riverfront

Maintenance / Security • •

Ensure waterfront public spaces are kept free of litter and graffiti and in good repair with regular sidewalk sweeping, trash removal, and site maintenance and ensure waterways are kept clear through regular dredging Reduce and prevent crime and enhance perception of safety through regular security presence in close collaboration with Philadelphia Police


Race Street Pier


Washington Avenue Pier


Spring Garden Street Connector


Spruce Street Harbor Park


Blue Cross RiverRink Summerfest


Pier 9 (Cherry Street Pier)


Feasibility Study (2012)


Feasibility Study (2012)


FringeArts Feastival


Philadelphia Fringe Festival Performances


Jordan Griska’s Wreck


Ann Hamilton’s Habitus


Cherry Street Pier Conceptual Plan


Cherry Street Pier Open House


Cherry Street Pier Open House


Cherry Street Pier Open House


What We Learned


What We Learned


CHERRY STREET PIER


CHERRY STREET PIER


CHERRY STREET PIER


THE HUB & THE GARDEN

 Approximately 3500 square feet at the front of the Pier  Approximately 500 square feet at the end of the Pier  Space for food trucks


THE HUB & THE GARDEN

Restaurant Fit-Out Will Likely Include:  Self-contained handwashing station  Exhaust hood  Ansul fire suppression system

    

Fryer Grill Small refrigerator Small freezer Prep table


THE MARKET & THE PLATFORM

 Flexible space for small-scale retail and large-scale installations, exhibitions, and events  Approximately 10,000 square feet, unconditioned  Twenty 8’ Farmhouse-Style Tables Provided


OPERATIONS HOURS Likely ~11:00 am to ~10:00 pm

TRASH Shared trash receptacles will be placed out of the way and collected/disposed of regularly by DRWC maintenance staff or contractors

SECURITY On-site DRWC security during operating hours, roaming security for nonoperating hours

MARKETING & WEBSITE Work with DRWC marketing team to promote your business and opportunities at the pier


LEASE TERMS (TENTATIVE) THE HUB & THE GARDEN | RESTAURANT & FOOD TRUCKS Restaurant • Exploring a number of different concepts, including a monthly rotation • Opportunities for just the Hub, just the Garden, or both Food Trucks • Electrical hookup provided • Daily Rate TBD

THE MARKET | SMALL-SCALE RETAIL Studio tenants Free for Ground Floor Studios, outside each space $17.50/per day for market stall Non-studio tenants $700 - Season pass (40 days/20 weekends) $35 – daily rate

THE PLATFORM | EVENTS AND INSTALLATIONS To Be Determined


NEXT STEPS Fill out the Vendor Survey (now!) • Help us understand your needs and desires as we develop the specifications for each area of the pier

Submit an application (Spring 2018) •

More details to come – keep an eye on our website, sign up for email alerts, and follow us on social media

Cherry Street Pier Opens (Mid-Summer 2018)


THANK YOU


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.