3 minute read

Moisture Sensor Plan Markup

Next Article
Project Background

Project Background

CLIENT Perkins&Will PROJECT R-11605.001

Pineview NRCan Research

Advertisement

VISIT DATE March 16th, 2021 WRITER James Higgins REVIEWER Graham Finch

TO Elton Gjata (PW) CC Mona Lemoine, Alysia Baldwin (PW) DATE March 30th , 2021 (update)

REGARDING Site Visit 02 Update: Balcony Mockup at 21551 Westminster Hwy, Richmond

2.1. Balcony Waterproofing/Flashing Mockup

The perimeter flashing has been installed at Level 3. Several items require correction for the Level 1 and Level 2 install as follows:

1. The vertical leg of the flashing at the front edge is slotted between the panel edge and the L-angle structure which is incorrect. It should extend over the exterior side of the L-angle to allow water shedding (see below).

2. The flashing is installed with nails into the deck. It should instead be set into sealant or temporarily taped in place to avoid penetrations into the bottom membrane.

3. The side edge flashing should include a drip edge over the structural tab (see below)

Action Required:

1. PW/U1 to confirm detail and U1 to install remaining components. Avoid penetrations into bottom membrane ply.

2. U1 to leave Level 3 flashing as is and install remaining membrane/components

2 3

1

2.3. Membrane Blistering

PW noted blistering spots beneath the Level 1 SBS membrane. It could not be confirmed if these are the result of membrane discontinuities.

Action Required:

U1 to cut open blisters to confirm if water is present, drain and dry wood surface if necessary, repair as necessary prior to second ply installation.

Yours truly,

James Higgins | AScT Associate, Building Science Technologist jhiggins@rdh.com T 604-873-1181 x153

RDH Building Science Inc.

Graham Finch | Dipl.T, MASc, P.Eng Principal, Senior Building Science gfinch@rdh.com

CLIENT Perkins&Will

VISIT DATE June 3rd, 2021

WRITER James Higgins TO Elton Gjata (PW) CC Mona Lemoine, Aik Ablimit (PW) PROJECT R-11605.001

Pineview NRCan Research

REVIEWER Graham Finch

DATE June 28th , 2021

REGARDING Site Visit 03: Balcony Mockup at 21551 Westminster Hwy, Richmond

Final Review

RDH was on site on 2021 05 13 and 2021 06 03 to view the balcony finish components including the decking and wood coating. All items noted in our Site Visit 03 Notes report appear to have been addressed adequately for the purpose of this balcony mockup. This visit serves as the last review for this phase of the mockup work. Sensor monitoring of the wood moisture content will continue for the foreseeable future.

Action Required: For information only.

Yours truly,

James Higgins | AScT Associate, Building Science Technologist jhiggins@rdh.com T 604-873-1181 x153

RDH Building Science Inc.

Graham Finch | Dipl.T, MASc, P.Eng Principal, Senior Building Science gfinch@rdh.com

Perkins&Will

Field Observation Report: No. 03 – 030621

To:

From: Deanna Yue Delta Land Developments Ltd. Mona Lemoine / Aik Ablimit Date Issued: July 12, 2021

Weather: Sunny, 22°C

Date of Visit: June 3, 2021 Time of Visit: 3:30 pm – 4:30 pm Project Name: 8th and Pine NRCAN Balcony

Project Number: 411629.103 Participants: Deanna Yue, Delta James Higgins, RDH Mona Lemoine, PW Aik Abilimit, PW Elton Gjata, PW Alysia Baldwin, PW Tom Bruvold, Urban One Brent Olund, Urban One

CC:

ITEM COMMENTS [new items shown in bold text, old items shown in regular text.]

2106.03.1

ON SITE Overall progress on site.

All items noted in RDH’s last Site Visit 03 Notes report and Perkins&Will Site Visit 02 report appear to have been addressed adequately for the purpose of this balcony mockup. This site visit serves as the last review for this phase of the mockup work. RDH will continue with sensor monitoring of the balcony timber deck moisture content for the foreseeable future. Info

ACTION

This article is from: