Teaser Portfolio

Page 1

Open here

Portfolio

Perriann Hodges

mobile: 661.343.9531 email: perriannhodges@gmail.com


Perriann Hodges

mobile: 661.343.9531 email: perriannhodges@gmail.com

Montgomery High School Gym Best Value Project Competition with Davy Architecture


Perriann Hodges Montgomery High School Gym Best Value Project Competition with Davy Architecture

mobile: 661.343.9531 email: perriannhodges@gmail.com

Assisted in the production of competition-quality renderings, graphics and layouts for a final presentation to the school district. Tasks include but not limited to interior perspectives, exterior perspectives, site plan, floor plans, building sections, board layouts, presentation format, generation of a revit walkthrough, and 3D modeling in revit. Year Time Program Size Collaboration

2012 4 Weeks Revit, Photoshop, Illustrator, 45,000 Sq Ft Davy Architecture Lusardi Construction KTU+A Landscape


Perriann Hodges

mobile: 661.343.9531 email: perriannhodges@gmail.com

The NewDorms of Architecture & Design School Project Proposal


Perriann Hodges The NewDorms of Architecture & Design School Project Proposal

mobile: 661.343.9531 email: perriannhodges@gmail.com

The NewDorms of Architecture & Design is situated right in the mecca of the NewSchool campus. The high rise facilitates dorm rooms for graduate and undergraduate students. 8 four story atrium gardens allowing students to grow food just steps from their home. Other facilities through out the high rise include a gallery space, workshop, cafe, restaurant, and art store. Assignment Year Time Program Size Collaboration

Studio Assignment 2010 10 Weeks Revit, Photoshop 200,000 Sq Ft Group Project


Perriann Hodges

mobile: 661.343.9531 email: perriannhodges@gmail.com

Soccer Facility Competition


Perriann Hodges Soccer Facility Competition

mobile: 661.343.9531 email: perriannhodges@gmail.com

A sign of hope and a sense of community will develop in Buenos Aires around the soccer facility. Due to extenuating circumstances, the facility does not have electrical or water hook ups and must be self sustaining. Also, the budget is limited to a total of 45,000 USD. Construction of phase one is to be finished in 3 months, and phase two in another 6 months. Assignment Year Time Program Size Collaboration

Buenos Aires Competition 2011 4 Weeks Revit, Photoshop 2,000 Sq Ft Group Project


Perriann Hodges

mobile: 661.343.9531 email: perriannhodges@gmail.com

Cultural Center School Project Proposal


Perriann Hodges Cultural Center School Project Proposal

mobile: 661.343.9531 email: perriannhodges@gmail.com

Cultural Center for the LGBT Community with a small health clinic, restaurant, art gallery, library, and educational center.

Assignment Year Time Program Size Collaboration

Studio Assignment 2010 7 Weeks Revit, Photoshop 250,000 Sq Ft Individual Project


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.