Portfolio Philip A. Weber

Page 1

PHILIP A. WEBER

ARCHITECT | MSC ETH | ZUERICH

PORTFOLIO




PHILIP A. WEBER ARCHITECT | MSC ETH | ZUERICH

PORTFOLIO 2018


BUNKER • • • •

Powerhouse Company Housing | retail | office Eindhoven | The Netherlands In Development

The bunker project is an opportunity to repurpose ‘De Bunker’, a derelict community & student centre designed by Hugh Maaskant. The key to preserving the building while also keeping it lively was to add new programme. Mixed-use functions like a restaurant and working spaces would be introduced in the existing building, complemented with a residential high-rise in its middle. The design aims at a continuation of De Bunker’s distinguishing traits, gradually transforming the modernist low-rise volume into a contemporary high-rise. The specific shape of its footprint aims at integrating the tower in its multifaceted surroundings, rooting it in a low-rise neighbourhood and simultaneously marking an entrance point to the city.

425 150 150 40

275 90 20

125

PREFAB GEVELELEMENT - bestaande uit: -1 vliesgevel stijlen -en regels -2 vastglas -3 draaiende delen -4 sandwich panelen -5 latten invulling - geheel bevestigen aan vloerrand VENSTERBANK - natuursteen vensterbank verijmd op profiel - type ntb AFWERKING ELEMENT - gips, 12 mm dik GEVELAFWERKING - afwerking NTB. - mogelijkheden: Staal, lichtbeton, natuursteen - gevelbekleding bevestigen aan vliesgevel stijlen - principe bevestiging iom leverancier

SANDWICHPANEEL - dichte delen uitvoeren als sandwich paneel - RC waarde 4,5 cf. epc berekening - geheel geÏntergreerd in prefab gevel element

520

VLOEROPBOUW - vloerafwerking, 15 mm vo - anhydriet - isolatie - betonvloer cf. opgave con BEVESTIGING - elementen bevestigen op vloerrand - verankering iom leverancier

gkw Ø 180

cv Ø 120

cv Ø 120

wc Ø 120

wc Ø 120

toevoer

0,88 m2 retour

cv Ø 120

0,83 m2

wc Ø 120

wc Ø 120

gkw Ø 180

retour

cv Ø 120 cv Ø 120

gkw Ø 180

0,89 m2

cv Ø 120

retour gkw Ø 180 gkw Ø 180

toevoer

toevoer

gkw Ø 180 gkw Ø 180 cv Ø 120

retour

0,89 m2 toevoer

cv Ø 120

600 /600 E 900 /600

KPN 1.200 /600

600 /1.200

3,22 m2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

retour

600 /600

3,02 m2

cv Ø 120

retour

0,89 m2 toevoer

2000 x 2750mm

gkw Ø 180

1750 x 2650mm

1750 x 2650mm

cv Ø 120

retour

1.300 /2.400

gkw Ø 180 wc Ø 120

cv Ø 120 gkw Ø 180

gkw Ø 180

gkw Ø 180 wc Ø 120

cv Ø 120

cv Ø 120

cv Ø 120

gkw Ø 180

toevoer

0,93 m2

wc Ø 120

cv Ø 120

retour

0,89 m2 toevoer

cv Ø 120 gkw Ø 180 gkw Ø 180

retour

0,89 m2 toevoer

wc Ø 120

3,12 m2

15

VLIESGEVEL - aluminium stijlen en regels - fabr. Schueco, type FW50 + en FW50 SG o.g. - semi-structureel - geanodiseerd in kleur - diepte stijlen en regels 90 mm - geheel geÏntergreerd in prefab gevel element

122

143

20

480

toevoer

0,89 m2

gkw Ø 180 gkw Ø 180

1.000

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

gkw Ø 180

wc Ø 120 cv Ø 120 cv Ø 120

GLAS - dubbel of triple glas cf. epc berekening - U-waarde ... - ZTA - waarde ... - afstandhouder glas uitvoeren in kleur zwart - geheel geÏntergreerd in prefab gevel element

WESTERLAAN 17 3016 CK ROTTERDAM THE NETHERLANDS +31 (0) 10 404 67 89

PROJECTNUMMER

OPDRACHTGEVER

1553

Bunkertoren B.V.

TEKENINGNUM

DET 002

SCHAAL

1:10

WWW.POWERHOUSE-COMPANY.COM OFFICE@POWERHOUSE-COMPANY.COM

FORMAAT

PROJECTNAAM

A3

BUNKER DATUM

xx-xx-2018


DISTRICT E - BRAINPORT • • • •

Powerhouse Company Housing | retail | office Eindhoven | The Netherlands Competition | 1. price

‘To live, to meet and to stay in an environment that is fitting for a city like Eindhoven, where the pioneering spirit and the experimental are celebrated’ - that is the atmosphere in which the design was realised In addition to becoming the new entry point to the city at the railway station, there will be an extensive, dynamic landscape of retail spaces, workshops, meeting & showcase areas, restaurants & office spaces. The towers themselves growing out of open plinths each facilitate a 360° sky lobby, making the vertical in addition to the base of the tallest buildings in Eindhoven accessible to the public. With the tallest tower soaring to a 165m height, the trio will transform the skyline quite a bit. Steps in the towers, as well as the volumes themselves will maintain the integration in the surroundings and continue the tradition of fine scaling in the city of Eindhoven.

XL L M S XS


LOYENS & LOEFF • • • •

Powerhouse Company Office | meeting | restaurant Amsterdam | The Netherlands Competition | 1. price

Winning the competition for the entrance hall of Loyens & Loeff’s new HQ in Amsterdam led to the follow up assignment of designing the entirety of their available spaces in the ‘hourglass’ building by Dam & Partners. Next to the development of office floor concepts this included a meeting centre, an entrance hall with a multi-story atrium and a vast restaurant area. Ranging over eight stories, the development of a suitable work environment for the office floors made up the main focus of our design process, all the while refining the other design tasks, gradually finding the atmosphere which will embody what Loyens & Loeff stands for as a company.

MATERIALENPALET LOBBY


Bürofläche 280 m2

SECURITY CENTER

LPD. EGFA. Flex Verstärkung. Bereithalteraum 1_1_07_23 10 m2 LPD. EGFA. Flex Verstärkung. Büro 1_1_07_20 18 m2 LPD. EGFA. Flex Verstärkung. Bereithalteraum 1_1_07_24 10 m2

LPD. EGFA. Flex Verstärkung. Büro 1_1_07_21 18 m2

LPD. EGFA. Flex Verstärkung. Büro 1_1_07_22 18 m2

LPD. EGFA. Flex Verstärkung. Bereithalteraum 1_1_07_25 10 m2

LPD.EGFA.ET Zentrum/LPD/DSE Sporthalle 1_1_08_40 405 m2

LPD. EGFA. PI SODI. Bereithalteraum M 1_1_07_13 10 m2

LPD. LA. ALLGEMEIN Sozialraum 1_7_00_07 24 m2

LPD. LA. AL Büro AL Stv 1_7_00_02 15 m2

LPD. EGFA. PI SODI. Umkleideraum W 1_1_07_19 40 m2

LPD. LA. ALLGEMEIN Besprechungsraum 1_7_00_06 25 m2

LPD. EGFA. PI SODI. Bereithalteraum M 1_1_07_14 10 m2

• • • •

Powerhouse CompanyGrundriss 1. Obergeschoss M 1:200 Office | operations center Innsbruck | Austria Competition | 2. round

LPD. LA. AL Büro AL 2. Stv 1_7_00_03 15 m2

LPD. EGFA. PI SODI. Bereithalteraum W 1_1_07_15 10 m2

LPD. EGFA. PI SODI. Sanitär/Dusche W 1_1_07_17 6 m2

LPD. LA. AL Büro Führungsunterstützung 1_7_00_04 12 m2 LPD. EGFA. PI SODI. Umkleideraum M 1_1_07_18 72,5 m2

LPD. EGFA. PI SODI. Sanitär/Dusche M 1_1_07_16 8 m2

LPD. EGFA. PI SODI. Sozialraum 1_1_07_10 15 m2

Kletterwand LPD. LA. AL Büro Führungsunterstützung 1_7_00_05 12 m2

LPD. LA. FB 1 Büro FBL 1_7_01_01 12 m2 LPD. LA. AL Büro AL 1_7_00_01 18 m2 LPD. EGFA. PI SODI. Büro MA 1_1_07_04 18 m2

LPD. EGFA. PI SODI. Büro DF 1_1_07_02 18 m2

LPD. LA. FB 1 Büro FBL Stv 1_7_01_02 18 m2 LPD. LA. FB 1 Büro FPS Centre 1_7_01_05 18 m2

LPD. EGFA. PI SODI. Büro Kdt u Stv 1_1_07_01 18 m2

LPD. EGFA. PI SODI. Büro MA 1_1_07_03 18 m2

LPD. LA. FB 1 Büro MA 1_7_01_03 18 m2 LPD. LA. FB 1 Büro MA 1_7_01_04 18 m2

LPD. EGFA. PAZ AGM. Erkennungsdienstl. Behandlungsraum 1_1_05_12 25 m2

LPD. EGFA. PI SODI. Büro MA 1_1_07_05 18 m2

LPD. LA. FB 1 Büro FB Kraftfahrgruppe 1_7_01_07 18 m2 LPD. LA. FB 1 Büro FB Kraftfahrgruppe 1_7_01_08 18 m2

LPD. EGFA. PI SODI. Waffen und Einsatzmittelraum 1_1_07_11 25 m2

LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum / Familien 1_1_05_25 18 m2

LPD. LA. FB 1 Bereithalteraum 1_7_01_10 12 m2 LPD. LA. FB 1 Handarchiv 1_7_01_06 16 m2

LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum 1_1_05_20 18 m2

LPD. EGFA. PAZ AGM. Lager Utensilien 1_1_05_26 12 m2

LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum 1_1_05_24 18 m2

LPD. LA. FB 1 Bereithalteraum 1_7_01_09 12 m2 LPD. LA. FB 2 Büro FBL + Stv 1_7_02_00 18 m2

LPD. EGFA. PAZ AGM. Teeküche 1_1_05_14 10 m2

LPD.SPK.KR FB 2 Büro 1_8_02_36 18 m2

BMI/DSE EKO Cobra KOST Bereithalte- / Umkleideraum ESD 2_1_02_07 13 m2

LPD.SPK.KR FB 2 Büro 1_8_02_37 18 m2

BMI/DSE EKO Cobra KOST Bereithalte- / Umkleideraum DHF 2_1_02_09 14 m2

LPD.SPK.KR FB 2 Büro 1_8_02_35 18 m2

LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum 1_1_05_23 18 m2 BMI/DSE EKO Cobra KOST Bereithalte- / Umkleideraum IA 2_1_02_08 13 m2

BMI/DSE EKO Cobra ALLG Waffenraum 2_1_01_06 20 m2

LPD. EGFA.

PAZ AGM. Raucherzimmer für Aufgriffe 1_1_05_15 12 m2

LPD. LA. FB 2 Büro MA 1_7_02_01 18 m2

LPD. EGFA.

LPD. EGFA.

BMI/DSE EKO Cobra KOST Büro ZDF 2_1_00_05 20 m2

LPD. LA. FB 3 Bereithalteraum 1_7_03_07 12 m2

PAZ AGM. Sanitärraum WC W 1_1_05_18 10 m2

PAZ AGM. Sanitärraum WC M 1_1_05_17 10 m2

Up to date the various departments of Austrians internal affairs ministry exist as Sicherheitszentrum Tirol / 2. Stufe Sicherheitszentrum Tirol / 2. Stufe isolated clusters in the city of Innsbruck. A total of fourteen separate departments are now being organized in one building complex. We chose to give our project a symbolic element by having the volumes form two interlocking links of a chain, strengthened at the centre through a higher element, portraying the virtues of strength, integrity and cooperation. The connecting link serves as a central hub, connecting the different departments. A clearly defined rhythm in the street wards facade portraits a calm authority in front of which life of the city unfolds, undisturbed. The more playful inner volume acts as a counterpoint, focusing the ensemble on itself. It is the meeting point where the departments are interacting, which will be perceivable in the atrium at its core. BMI/DSE EKO Cobra EE 3-4 Büro 2_1_00_12 25 m2

LPD.SPK.KR FB 2 Büro 1_8_02_34 18 m2

BMI/DSE EKO Cobra KOST Trockenraum KOST BMI/DSE EKO Cobra 2_1_02_11 KOST 10 m2 Dusch- / Waschraum 2_1_02_12 15 m2

LPD.SPK.KR FB 2 Büro 1_8_02_33 18 m2

LPD.SPK.KR FB 2 Büro 1_8_02_32 18 m2

LPD.SPK.KR FB 2 Büro 1_8_02_31 18 m2

LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum 1_1_05_22 18 m2

BMI/DSE EKO Cobra ALLG Journaldienstraum 2_1_01_01 30 m2

BMI/DSE EKO Cobra ALLG Teeküche 2_1_01_02 10 m2

BMI/DSE EKO Cobra KOST Büro ESD 2_1_00_09 15 m2

BMI/DSE EKO Cobra Leitung Büro Kdt 2_1_00_01 15 m2

BMI/DSE EKO Cobra ALLG Kopierraum 2_1_01_07 10 m2

BMI/DSE EKO Cobra Leitung Büro Kdt Stv 2_1_00_02 12 m2

BMI/DSE EKO Cobra Leitung Büro IA 2_1_00_03 15 m2

LPD.SPK.KR FB 1 Büro 1_8_02_23 18 m2

BMI/DSE EKO Cobra ALLG Kommando - & Schulungsraum 2_1_01_03 70 m2

LPD. LA. FB 3 Büro 1_7_03_03 18 m2

LPD. EGFA. PAZ AGM. Erstuntersuchung Rot Kreuz 1_1_05_16 24 m2

BMI/DSE EKO Cobra ALLG Putzraum 2_1_01_10 5 m2

LPD. LA. FB 4 Büro FBL 1_7_04_01 12 m2

LPD. LA. FB 5 Kantine Verkaufsraum 1_7_05_23 20 m2

BMI/DSE EKO Cobra ALLG Lager 2_1_01_08 10 m2

BMI/DSE EKO Cobra KOST Büro ZTechnik BMI/DSE EKO Cobra 2_1_00_07 KOST 12 m2 Büro / San 2_1_00_10 12 m2

LPD.SPK.KR FB 1 Büro 1_8_02_26 24 m2

LPD. LA. FB 3 Büro 1_7_03_04 18 m2

LPD. LA. FB 4 Bereithalteraum 1_7_04_06 12 m2

BMI/DSE EKO Cobra KOST Büro ZAusb 2_1_00_06 20 m2

LPD. LA. FB 5 Speisesaal 1_7_05_22 240 m2

BMI/DSE EKO Cobra ALLG Einsatzmittelraum 2_1_01_05 20 m2

LPD. LA. FB 4 Büro MA 1_7_04_04 18 m2

Dachterrasse / Aussenbereich Cafeteria

LPD.SPK.KR FB 1 Büro 1_8_02_22 18 m2

LPD. LA. FB 5 Büro techn. Gebäudeaufsicht 1_7_05_11 12 m2

LPD. LA. FB 4 Büro MA 1_7_04_05 18 m2

LPD. LA. FB 5 Küche 1_7_05_25 110 m2

LPD. LA. FB 5 Büro HV 1_7_05_10 18 m2

LPD.SPK.KR FB 1 Büro 1_8_02_21 18 m2

LPD. LA. FB 5 Büro FBL 1_7_05_01 12 m2

LPD.SPK.KR FB 1 Büro FBL 1 1_8_02_20 12 m2

LPD. GF. L1 Veranstaltungsraum 1_0_01_40 240 m2

LPD. LA. FB 5 Handarchiv 1_7_05_03 20 m2

LPD.SPK.KR Büro 1_8_02_07 18 m2

LPD. LA. FB 5 Büro FBL Stv 1_7_05_02 18 m2

LPD.SPK.KR Büro 1_8_02_08 24 m2

LPD. LA. FB 5 Tiefkühlraum Küche 1_7_05_28 10 m2

LPD. LA. FB 6 Büro MA 1_7_06_03 18 m2

LPD. LA. FB 5 Kühlraum Küche 1_7_05_27 15 m2

LPD. LA. FB 5 Büro MA 1_7_05_06 18 m2

LPD. LA. FB 5 Büro MA 1_7_05_04 18 m2

Lastenaufzug

LPD. LA. FB 5 Kantine/Speise/ Aufenthaltsraum 1_7_05_24 60 m2

LPD. GF. L1 Lager Musik 1_0_01_41 30 m2

LPD.LVA.FB 2.2 Büro MA 1_2_04_02 18 m2

LPD.SPK.FB 4 Büro 1_8_02_50 18 m2

LPD. LA. FB 5 Büro MA 1_7_05_05 18 m2

LPD. LA. FB 6 Büro MA 1_7_06_06 18 m2

LPD. LA. FB 5 Lager Küche 1_7_05_26 40 m2

LPD. LA. FB 5 Büro Küche 1_7_05_20 12 m2

LPD.SPK.FB 4 Büro 1_8_02_48 18 m2

LPD. LA. FB 6 Büro FBL Stv 1_7_06_02 18 m2

LPD. LA. FB 4 Installations Konfig.- raum 1_7_04_08 18 m2

LPD.SPK.KR Besprechungsraum 1_8_02_03 20 m2

LPD.SPK.KR Journaldienstraum I 1_8_02_01 12 m2

LPD.SPK.FB 4 Büro 1_8_02_49 18 m2

LPD. LA. FB 6 Handarchiv 1_7_06_05 18 m2

LPD. LA. FB 4 Reparatur Annahme 1_7_04_07 10 m2

LPD.SPK.KR Sozialraum 1_8_02_04 20 m2

LPD.SPK.KR Vernehmungsraum 1_8_02_05 12 m2

LPD.SPK.KR Journaldienstraum II 1_8_02_02 18 m2

LPD.SPK.FB 4 Büro 1_8_02_47 18 m2

LPD. LA. FB 3 Büro 1_7_03_06 18 m2

LPD. LA. FB 4 Büro FBL Stv 1_7_04_02 18 m2

LPD. LA. FB 4 Büro MA 1_7_04_03 18 m2

BMI/DSE EKO Cobra Leitung Besprechungsraum 2_1_00_04 15 m2

LPD.SPK.KR FB 1 Büro 1_8_02_24 18 m2

LPD.SPK.FB 4 Büro FBL 4 1_8_02_46 12 m2

LPD. LA. FB 3 Büro FBL 1_7_03_01 12 m2

LPD. LA. FB 3 Büro 1_7_03_05 18 m2

LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum 1_1_05_21 18 m2

BMI/DSE EKO Cobra ALLG Büro GPS Leitstand 2_1_01_04 25 m2

LPD. LA. FB 5 Garderobe 1_7_05_21 20 m2

BMI/DSE EKO Cobra ALLG Archiv 2_1_01_09 15 m2

BMI/DSE EKO Cobra KOST Büro SchA, Sport 2_1_00_08 15 m2

LPD. LA. FB 3 Büro FBL Stv 1_7_03_02 18 m2

LPD. EGFA. PAZ AGM. Aufenthalt / Essensraum 1_1_05_13 18 m2

BMI/DSE EKO Cobra ALLG Sozialraum 2_1_01_00 45 m2

BMI/DSE EKO Cobra KOST Umkleideraum 2_1_02_10 20 m2

BMI/DSE EKO Cobra KOST Bereithalte- / BMI/DSE EKO Cobra Umkleideraum SchA KOST 2_1_02_06 Bereithalte- / BMI/DSE EKO Cobra 13 m2 Umkleideraum ZTechnik KOST 2_1_02_05 Bereithalte- / BMI/DSE EKO Cobra 13 m2 Umkleideraum ZAusb KOST 2_1_02_04 BMI/DSE EKO Bereithalte- / 13 m2 Umkleideraum ZDF Cobra Leitung BMI/DSE EKO Bereithalte- / 2_1_02_03 Cobra Leitung Umkleideraum Kdt Bereithalte- / 13 m2 2_1_02_02 Umkleideraum Kdt 10 m2 Stv 2_1_02_01 10 m2

LPD.SPK.KR FB 2 Büro FBL 2 1_8_02_30 12 m2

LPD.SPK.KR FB 1 Büro 1_8_02_25 18 m2

BMI/DSE EKO Cobra EE 1-2 Büro 2_1_00_11 25 m2

LPD.SPK.Kdo Schulungs- & Besprechungsraum 1_8_01_16 45 m2

LPD.SPK.Kdo LPD.SPK.Kdo LPD.SPK.Kdo LPD.SPK.Kdo LPD.SPK.Kdo Waffen- & Bereithalteraum M Bereithalteraum W Büro Kriminalreferent Büro Kriminalreferat Einsatzmittelraum 1_8_01_18 1_8_01_08 1_8_01_17 1_8_01_10 1_8_01_15 10 m2 15 m2 10 m2 12 m2 10 m2

LPD.SPK.Kdo Handarchiv / Besprechungsraum 1_8_01_03 18 m2

LPD.SPK.Kdo Besprechungsraum 1_8_01_13 18 m2

LPD.SPK.Kdo Büro Kriminalreferat 1_8_01_09 18 m2

LPD.LVA.AGM. Büro Kdt und Stv 1_2_07_00 18 m2

LPD.LVA.AGM Büro DF 1_2_07_01 18 m2

LPD.LVA.ALLG Journaldienst- / Einsatzraum 1_2_00_07 20 m2

LPD.LVA.ALLG Sozialraum 1_2_00_08 20 m2

LPD.LVA.ALLG Besprechungsraum 1_2_00_09 18 m2

LPD.LVA.FB 1.1 Büro FBL u Stv 1_2_01_00 18 m2

LPD.LVA.FB 1.2 Büro FBL 1_2_02_00 12 m2

LPD.LVA.FB 1.2 Büro 1_2_02_01 18 m2

LPD. LA. FB 5 Büro MA 1_7_05_08 18 m2

LPD. LA. FB 5 Büro MA 1_7_05_07 18 m2

LPD.LVA.AL Büro AL Stv 1_2_00_02 15 m2

LPD.LVA.ALLG Bereithalteraum M 1_2_08_05 10 m2

LPD.SPK.FB 4 Spurenträgerasservierungsraum 1_8_02_54 15 m2

LPD. LA. FB 6 Büro FBL 1_7_06_01 12 m2

LPD.LVA.AL Besprechungsraum 1_2_00_03 18 m2

LPD.LVA.FB 2.2 BDF 1_2_04_01 18 m2

LPD.SPK.FB 4 Fotoaufnahmeraum 1_8_02_52 15 m2

LPD. LA. FB 6 Büro MA 1_7_06_04 18 m2

LPD.LVA.AL Büro AL 1_2_00_01 18 m2

LPD.LVA.FB 2.2 Büro FBL & Stv 1_2_04_00 18 m2

LPD.SPK.FB 4 Spurenbehandlungsraum 1_8_02_53 15 m2

LPD. LA. FB 4 EDV Schulungsraum 1_7_04_10 80 m2

LPD.LVA.FU Büro 1_2_00_05 12 m2

LPD.LVA.ALLG Bereithalteraum M 1_2_08_04 10 m2

LPD.LVA.FU Handarchiv 1_2_00_06 16 m2

LPD.LVA.FU Büro 1_2_00_04 18 m2

LPD.SPK.FB 4 Einsatzmittelraum 1_8_02_55 15 m2

Lastenaufzug

LPD.SPK.KR Waffen- & Einsatzmittelraum 1_8_02_06 10 m2

LPD.SPK.Kdo Umkleideraum 1_8_01_19 18 m2

LPD.LVA.ALLG Waffenraum 1_2_00_10 10 m2

LPD.SPK.Kdo Teeküche 1_8_01_14 10 m2

LPD.LVA.FB 2.1 Technikraum Radar / Rotlicht 1_2_03_03 10 m2

LPD.LVA.FB 2.4 Büro MA 1_2_06_01 18 m2

LPD.LVA.FB 2.3 Lager 1_2_05_03 10 m2

LPD.LVA.FB 2.4 Büro FBL & Stv 1_2_06_00 18 m2

LPD.SPK.FB 4 Büro 1_8_02_51 18 m2

GF

SVA SPK

LPD.SPK.FB 4 Bereithalteraum 1_8_02_56 10 m2

LPD.SPK.FB 3 Büro FBL 3 1_8_02_40 18 m2

LPD.SPK.FB 3 Büro 1_8_02_41 18 m2

LPD.SPK.KR Bereithalteraum M 1_8_02_09 10 m2

LPD.SPK.KR Bereithalteraum W 1_8_02_10 10 m2

LPD.SPK.Kdo LPD.SPK.Kdo Büro Organisationsreferent Büro Organisationsreferat 1_8_01_07 1_8_01_06 18 m2 15 m2

LPD.SPK.Kdo Büro Einsatzreferat 1_8_01_05 18 m2

LPD.SPK.Kdo Büro Einsatzreferent 1_8_01_04 15 m2

LPD.SPK.Kdo Büro Verkehrsreferat 1_8_01_12 15 m2

LPD.SPK.Kdo Büro Führungsunterstützung 1_8_01_02 18 m2

LPD.SPK.Kdo Büro SPKdt 1_8_01_00 18 m2

LPD.SPK.Kdo Büro Verkehrsreferent 1_8_01_11 15 m2

LPD.SPK.Kdo Büro Sekretariat 1_8_01_01 12 m2

LPD.LVA.AGM. Büro MA 1_2_07_02 18 m2

LPD.LVA.AGM Büro MA 1_2_07_03 18 m2

LPD.LVA.FB 2.1 Büro tech. Auswertung 1_2_03_02 45 m2

LVA

LPD.LVA.ALLG Bereithalteraum M 1_2_08_06 10 m2

LPD.LVA.FB 2.1 Büro FBL & Stv 1_2_03_00 18 m2

LPD.LVA.FB 2.1 Büro MA 1_2_03_01 18 m2

LPD.LVA.FB 2.3 Büro FBL & Stv 1_2_05_00 18 m2

LPD.LVA.FB 2.3 Büro DF 1_2_05_01 18 m2

EKO

EGFA

LPD.LVA.FB 2.3 Büro MA 1_2_05_02 18 m2

LA

PA

IV/8 I.12

LVT

LKA IV/2 HT

Grundriss Erdgeschoss | 1:200

Illustra

Fassadenschnitte M 1:50 Fassadenschnitt Neubau

Fassadenschnitte M 1:50 Fassadenschnitt Neubau Fassadenansicht Beton

Fassadenschnitt Neubau Fassadenschnitt Bestand

Fassadenansicht Beton

+ 15m

+ 15m

Beton

Beton

Champagnerfarbenes Aluminium Fassadenelement (anodisiert)

Champagnerfarbenes Aluminium Fassadenelement (anodisiert)

Glas (3fach Isolierverglasung)

Glas (3fach Isolierverglasung)

Glas (3fach Isolierverglasung)

Glas (3fach Isolierverglasung)

Aluminium Fenster

Aluminium Fenster

Dezentrales Lüftungsgerät mit Heizregister und Wärmerückgewinnung

Dezentrales Lüftungsgerät mit Heizregister und Wärmerückgewinnung

Dezentrales Lüftungsgerät mit Heizregister und Wärmerückgewinnung

Dezentrales Lüftungsgerät mit Heizregister und Wärmerückgewinnung

Doppelboden

Doppelboden

Doppelboden

Doppelboden

Betonboden

Betonboden

Betonboden

Betonboden

Schnitt AA | Nord Süd 1:200

+ 1.20m

Grundriss Erdgeschoss | 1:200

Fassadenschnitt Fassadenschnitt Neubau Bestand

Fassadenansicht Aluminium Fassadenschnitt Bestand

Grundriss Erdgeschoss | 1:200

Nord-Süd 1:500

+ 1.20m


SPITALSTRASSE • • • •

Peter F. Oswald Architekten Housing Muri | AG | Switzerland Completed

2011 the zoning laws in Switzerland changed. A small town consisting mainly out of low density one-family homes is suddenly confronted with a possible increase in the built density by nearly three times. The plot we had the opportunity to work on was roughly four times the size as its surroundings. In effect the possible new mass was roughly twelve times larger, dwarfing even the large adjoining villas. Understanding the possible friction this crass jump in scale could cause we invested a great amount of time in finding a balance between making a strong individual architecture and letting the new buildings react very specifically to its surroundings. Displacements and altering densities in the volumes function as a gradient to the increased density and interweave the new buildings with the green landscape. The result is a play of volumes relating to the existing structures, noticeably larger but never alienating them.

e ass alstr Spit

e strass uben Zurla

GSPublisherVersion 0.0.100.100


HORECA • • • •

Peter F. Oswald Architekten Hotel | meeting | restaurant Muri | AG | Switzerland Sketch Design

An existing, nearly 800 year old hotel/ restaurant in the heart of the well known monastery town was to be refurbished. In this process an extension of the restaurant, the hotel and a new meeting centre where to be included in the overall design. Strict regulations for the preservation of the core town picture had to be considered. In accordance with the volumetric language we placed a second volume housing the hotel & meeting centre opposite the existing restaurant/hotel, completing the block in the townscape. In between old and new we create a place to meet for the town and a linking element for the project, housing an entrance hall, a restaurant and a rooftop terrace.

+15.00

+14.70 (+492.00)

14.19

6.00

~ +12.95

3.55

+14.12

10.80

2.45

+11.15

+8.70 (+486.00)

+6.15 (Lift 2.OG)

+6.15 (+483.45)

+3.48 (Lift 1.OG)

+3.48 (+480.78)

ca. +0.70 (Niveau Lift EG)

ca. +0.70 (+478.00)

8.00

2.12

+6.91 (Niveau Estrich)

2.55

43

+8.70 (Lift DG)

2.67

2.37

30

5.45

2.78

±0.00 (+477.30)

0.00

eg f-W Wol par Cas

-1.80 (+475.50)

2.50

2.50

-0.30 (Niveau EG?)

Zurlaubenstrasse

CW-W

2.78

2.43

35

+3.43 (Niveau Saal)

Seetalstrasse

WEST +15.00 +14.12

g we gli Re sse stra en ub rla Zu +15.00

4.62

+14.12

1.20 35 2.80

27/ 30

Korr

17/ 20

-0.91 (+476.39)

Seet alst rass e

NORD

2.80

1 / 6

Korr

7 / 10

2.45

35

+6.70 (+484.00)

70

+3.90 (+481.20)

3.90

Restaurant

3.20

Foyer

GSPublisherVersion 0.0.100.100

±0.00 (+477.30)

2.40

40

±0.00 (+477.30)

2.80

-0.77 (+476.53)

CASPAR WOLF-WEG

2.45

14.12

Korr +9.50 (+486.80)

11/ 1 6

A / B / C

Hallengarage

SCHNITT A-A

GSPublisherVersion 0.0.100.100

±0.00 (+477.30)

-0.35 (+476.95)

21/ 26

-2.80 (+474.50)

Keller

ZURLAUBENSTRASSE


SINGISENSTRASSE • • • •

Peter F. Oswald Architekten Housing | atelier Muri | AG | Switzerland Definite Design

A

13.80

3.10

C

5.60

3.20

5.00

85

87

2 4.1

3.10

5 8.2

2 .7 Z N F 5 .8 B F 11 F

N

WOHNEN BF 25.7 FF 21.0

ESSEN BF 12.0 FF 12.0

KS

N

BO

KÜCHE BF 12.9 FF 4.2

W

3 .7 Z N F 5 .8 B F 11 F

3 1/2 ZI-WHG 109.8 m2 BWF 105.2 m2 NWF

2 4.1

E H U /R N FE LA H 4.6 SC F 4 7.0 B F4 F

SCHLAFEN BF 14.4 FF 4.2 BALKON 13.0

D

NZ 2 BF 4.4

S

SCHLAFEN BF 15.7 FF 4.2 NZ 1 BF 5.0

N

SCHLAFEN 63.2 m2 BWF 57.0 m2 NWF

B

B 20.10

I

B

7.50

5 8.2

20.10

B

W

R BF 4.2

5.45

N O LK BA 6.5 1

E S

S G

NZ 1 BF 5.0

C SCHLAFEN 15.7

I S

E

NZ 2 BF 4.4

BALKON 13.0

E

SCHLAFEN BF 14.4 FF 4.2 5.45

N S

KÜCHE BF 12.9 FF 4.2

ESSEN BF 12.0 FF 12.0

WOHNEN BF 25.7 FF 21.0

KS

BO

R A

87

85

5 8.2

R BF 4.2

3 1/2 ZI-WHG 109.8 m2 BWF 105.2 m2 NWF

T S

The good thing about having an artist as client is that, if familiar with your work, you get a highly enthusiastic partner, very involved and at the same time leaving a high degree of freedom to your professional judgement. An existing single-family home and an atelier where to be redefined in two separate volumes, allowing for an increase to a total of six apartments. Preserving most of the open green space of the plot we pushed the multi-family home to the utmost edge of the plot, giving it unparalleled view over the town. This allowed for the private atelier/residence of our client, although quite a bit smaller, to be the expressive statement on the site, that he loved so much.

3.10

S

5 8.2

5.60

3.20

5.00

13.80

3.10

E DIE BAUHERRSCHAFT:

A

5630 MURI,

50

±0.00 = 473.71 m.ü.M.

2.50

NEUBAU MFH + ATELIER, SINGISEN

40

BAUPROJEKT

2.50

ATTIKAGESCHOSS 1:100

40

P E T E R F. O S W A L D D I P L. A ZUGERSTRASSE 14 SINGISENSTRASSE 18

2.50

GSPublisherVersion 0.0.100.100

42

2.50

40

GewTer

1515

6

HG

SINGISE

SCHNITT

1799 1511

22

3123

+12.30 +8.50

3101

1548

+5.50

W

18.00 Uhr

18

+7.30

16 14

2377

18.00 Uhr 755

E

+2.60

I

40

S

S

6.89

Uhr

N

18

+5.55

40

16.00

14.00 Uhr 16.00 Uhr

2.90

12.00 Uhr

10.00 Uhr

2.50

r Uh 767

Uhr .00 14

0 .0 12

10.0 0U hr

3.00

8

2.50

50

30

G E

6.92

S

2.50

I

17

2.90

N

19

N

GewTer

S

-0.30

1467

T

834

697 A

40

R

835

S 1

2.50

E

2.90

S 8

3124

+0.30

14

GewTer

-3.20

GewTer

2525

42

GewTer

12b 12d

12c

1870

1869

12a

2465

HG 1868

SINGISEN 14

SCHNITT B-B

12

1867

14

+12.30

SINGISEN 18

SINGISEN 18

HG

SINGISEN 14

3453 3451

Architekt:

3452

3454

SÜD

Bauherrschaft:

SÜD +12.30

+7.30

+8.50

5630 Muri, Datum: 11.85

+7.30 6.92

5630 Muri, Datum:

+5.55

+5.55


AIRPORT DUEBENDORF • • • •

Master in City Design Prof. Marc Angelil Duebendorf | ZH | Switzerland Design - repurposing airport

Zürich as a city is the heart of the entire metropolitan region of northern Switzerland. As such an expanding pressure is weighing on the city, which has been steadily growing over the last years, at a rate of several thousand apartments a year. In the past this has been happening mainly on the outskirts, increasing the sprawl without adding much to the overall density of the city structure. In this situation, an old military airfield is becoming available for re purposing. My approach at the cities future development was to propose to utilise the space as a new recreation space. This would contribute to a densification of the city while also keeping the huge plot open for future adaptation. Specifically my proposal was to restore the landscape to its ‘natural’ state, before being used as an airfield. The border to the city was to be populated witch an expansion of the ETH and a multitude of ‘HORECA’ spaces.


PHILIP A. WEBER ARCHITECT | MSC ETH | ZUERICH

+31 (0) 61 977 69 13 Stadhoudersweg 44D 3039 CE Rotterdam email: PhilipAdWeber@gmail.com LinkedIn: https://www.linkedin.com/in/PhilipAdrianWeber Telegram: https://t.me/PhilipWeber


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.