PHILIP A. WEBER
ARCHITECT | MSC ETH | ZUERICH
PORTFOLIO
PHILIP A. WEBER ARCHITECT | MSC ETH | ZUERICH
PORTFOLIO 2021
ALEXANDRIUM • Mulderblauw • Housing • Rotterdam | The Netherlands • In Development
The ‘Alexandrium’ is a large shopping center in the north of Rotterdam. The entrance closest to the trainstation passes beneath an existing office block. We have been assigned to redevelop this building into student housing. The structure allows for an addition of three layers on top. Various studies on how to treat these additional layers ranged from complete volumetric approaches to gradually refining and strengthening the horizontals while always treating it as a clear, unique element, an ‘ufo’ that had just landed on the existing base. For the base we wanted to be mindfull of the existing facade (which would be demolished) while translating it in a modern way as well as upgrading it in a clean, warm and elegant manner.
BESTAANDE SITUATIE
> WOONGEBOUW ALEXANDRIUM
PRINS ALEXANDERPLEIN
> PRINS ALEXANDERPLEIN
existing building to be transformed
> PEGASUSWEG
facade study #1 4
facade study #2
PEGASUSWEG IMPRESSIE
20
facade study #3
facade study #4
facade study #5
RIJSWIJK • Mulderblauw • Housing | retail | health care
BOVENBOUW
• Rijswijk | The Netherlands • In Development
RUIMTELIJKE ONTWERPPRINCIPES
‘In de Bogaard’, a modernist shopping district is being transformed into a bustling urban community, where we have the opportunity to develop one of the plots. Relating strongly to the ‘beeld-, en Intensieve zorg kwaliteitsplan’ of the masterplan, an open and interactive plinth forms the base of the volume. The ‘stedelijke laag’ references the horizontal language of the modernistic existing buildings. As a contrast and to refine the proportions of Zorgwoningen the tower we introduce a vertical oriented grid. The use case calls for an addition in form of a smaller volume. Using the same language as the tower it creates it’s own identity by sublty treating the main structure Commercieel and infills differently. Important elements in the design are the green outside spaces, the unity if the various volumes while still retaining a clear individual identity, warmth and the human scale.
PLATTEGRONDEN 7E T/M 9E VERDIEPING
setback - vermindering PLATTEGRONDEN windhinder
eenvoudige, orthogonale vormen
1E & 2E VERDIEPING
7
> IN DE BOGAARD RIJSWIJK
goede dimensie toren
8
9
7
GROENDAK
DETAILERING NAAST TERRAS
differentiatie materiaal diversiteit en toch SIERGRASSEN, VASTE PLANTEN EN HEESTERS woontoren - stedelijke laag een ensemble
8
9
1
130700 12150
12150
12150
12150
12150
2
3
4
130700
12150
5
6
1
2
3
4
5
eenvoudige torentop 6
Principe:
7
• 1
2
3
4
6
5
7
8
9
balkon
balkon
balkon
balkon
4 m2
4 m2
4 m2
4 m2
1
2
3
4
N
6
5
N
5 6
4
7
7
6
5
8
6
7 8
7
8 9
8
9
9
4
2-kamerapp.
Opp.: 34 m2
51 m2
14
4 m2
2-kamerapp.
2-kamerapp.
2-kamerapp.
57 m2
57 m2
71 m2
01
15
Opp.: 34 m2
2-kamerapp. 02
2-kamerapp. 02
01
02
51 m2
02
03
M
M
zorgkamer
M
zorgkamer Opp.: 34 m2 2-kamerapp. 51 m2
7
8 9
8
9
9
meerstammig boom ca. 200cm
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
02
03
51 m2
6
7 8
1 vasteplanten, siergrassen, kleine heesters 2 intensive substraatlaag
350
N
66 m2
balkon
6
5
03
03
03
02
02
zorgkamer
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
02
M
13
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
01
L
01
01
04
hwa
04
7 m2
11 m2
L 2-kamerapp. 2
6 m2
L
L
K
K
51 m
hwa
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
substraatlaag (extensief) 0-200mm 01 01 01 04 Siergrassen, vasteplanten en kleine heesters substraatlaag (intensief) 400mm
04
bergingen
bergingen bergingen
zorgkamer Opp.: 34 m2
02
04
60
zorgkamer
4 m2
hwa
AFSCHOT
14
59 m2
balkon
5 6
4
7
5
6
6
7 8
7
1 heesters 1.5 tot 2 meter hoog 2 intensive substraatlaag 3 extensive substraatlaag 4 filtermat 1mm zorgkamer zorgkamer zorgkamer 5Opp.: afwatering/bufferlaag Opp.: 34 m2 34 m2 Opp.: 34 m2 6 beschermende / absorberende 02 02 03 mat 3mm 7 betonconstructie
boomverankering
51 m2
L
4 5
3 filtermat 1mm zorgkamer zorgkamer zorgkamer 4 afwatering/bufferlaag Opp.: 34 m2 Opp.: 34 m2 Opp.: 34 m2 5 beschermende / absorberende 03 03 03 mat 3mm 6 betonconstructie
2-kamerapp.
2-kamerapp.
4
250
N
7
N
zorgkamer
M
5 6
4
8 9
9
O
3-kamerapp.
4 5
60
O
4 5
350
4
filterlaag
zorgkamer
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
04
01
01
01
•
Planter heeft allee 8 9 Onderkant van de Het moet allemaa
Waar de lage mee ondergrond minim plantenbakken ka
zorgkamer
zorgkamer
•Opp.:Rootball is verank 34 m Opp.: 34 m 2
•
2
03
03
Druppelleiding irri
•
Uitgebreide subst zal ca.zorgkamer 850kg/m2 zorgkamer Opp.:gewicht 34 m Opp.: m is 34afhanke 2
04
2
04
04
drainage-buffer laag 60mm bescherm-absorptie laag
13 4800+ 2-kamerapp.
K
K
59 m2
balkon
12
4 m2
bergingen
bergingen
2 m2
125 m2
opslag
med.opslag opsl.
med. opsl. opslag
med. zorgkamer opsl.
-
-
-
-
bergingen Opp.: 34 m2 2 m2 5152mm22 Opp.:Opp.: 2 m2 5 m2 Opp.: 2 m2 Opp.: 5 m2 Opp.: Opp.:
2-kamerapp. J
K
J
51 m2
12
Konmar 3688 m2
bergingen 10 m2
-
-
balkon
11
H
Opp.: 34 m2
05
opslag
med.opslag opsl.
med. opsl. opslag
med. zorgkamer opsl.
-
-
-
-
zorgkamer
Pyrus nivalis 2 Pyrus nivalis 2mOpp.: high 34 m2 Opp.: 2m 34 mhigh 2 m2 5 m2 Opp.:Opp.: 2 m2 5 m2 Opp.: 2 m2 Opp.: 5 m2 Opp.: Opp.: 600
05
-
-
zorgkamer Opp.: 34 m2
opslag Pycnanthemum muticum Heesters van 1.5 tot 2 meter hoog Pycnanthemum muticum
opsl. med.opslag opsl. med. opsl. med.slaapwacht opslag slaapwacht Calamintha nepetanepeta ‘Blue Cloud’ bonariens Calamintha ‘Blue Cloud’slaapwachtVerbena Verbena bo
2 m2 5 m2 Opp.:Opp.: 2 m2 5 m2 Opp.: 2Opp.: m2 34 m2 Opp.: 5 m2 Opp.: Opp.:
600
Opp.: 34 m2
Opp.: 34 m2
05
05
05
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
06
06
06
05
05
05
zorgkamer
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
-
-
-
-
-
-
dak
16 m2
59 m2
4 m2
zorgkamer
Opp.: 34 m2
geen
2-kamerapp. H
zorgkamer
05
bergingen
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
06
06
06
2-kamerapp. hwa
51 m2
Konmar 196,1
hwa
hwa
Afwatering
11 2-kamerapp.
2-kamerapp.
56 m2
56 m2
69 m2
06 G
05
J
2-kamerapp. J
2-kamerapp.
2-kamerapp.
54 m2
54 m2
66 m2
04
06
05
59 m2
4 m2
2-kamerapp.
10
>
51 m2
10 F
F
H
balkon
59 m2
2-kamerapp.
patio 86 m2 lift
E
lift
E
liftmachine kamer
UIT
56 m2
4800+
2
UI
T
4m
08
UIT
bevoorradingsgang/vluchtgang
UIT
UIT
BM
2
Konmar 106 m2
Lady Sting 32 m2
C
F
F
00 48
2-kamerapp.
2 Opp.: 9 m>2 Alle maten Opp.: 9 mwerk Opp.: 9 m2 in het te controleren
07
07
zorgkamer
zorgkamer
zorgkamer
Opp.: 35 m2
Opp.: 35 m2
Opp.: 35 m2
P2-20
07
07
07
>
08
08
zorgkamer
zorgkamer
08
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
huiskamer
huiskamer
Opp.: 95 m2
Opp.: 95 m2
-
-
huiskamer
In De Bogaard - Fase 1 Opp.: 95 m
08
2
Opp.: 9 m2
07
Opp.: 35 m2
08
werkplek
zorgkamer werkplek Opp.: 34 m2
Opp.: 9 m2
Opp.: 9 m2
06
06
zorgkamer
zorgkamer
zorgkamer
Opp.: 35 m2
Opp.: 35 m2
Opp.: 35 m2
Opp.: 35 m2
Informatie van adviseurs (bijv. brand, geluid en installaties) zijn ter indicatie
verantwoordelijkheid van de juiste uitvoering van dit advies ligt bij de desbetreffende adviseur. zorgkamer zorgkamer
Opp.: 35 m2
werkplek
zorgkamer
-Pinus nigra austriaca 2m hoog Pinus nigra austriaca 2m hoog op tekening Mulderblauw overgenomen. In geval van tegenstrijdigheden Acer tataricum (multi-stem shrub) 2m hoog Acer campestre (multi-stem shrub) tussen deze stukken zijn de stukken van de betreffende adviseur bindend. De 2m hoog
zorgkamer
Opp.: 95 m2
zorgkamer werkplek Opp.: 34 m2
werkplek werkplek > Peil = 0 = x,xx+NAP
-
00 +
B
07
00
24 +
+
00 24
Fase 2 - Parkeerdek
A
F > balkon DOC NR 6m VO101
> balkon STATUS 6m CONCEPT
> DATUM 12.03.2021
> SCHAAL 1:200
> REVISIE
> FORMAAT A2
2
2
+
50 m2
48
07
4 m2
huiskamer
2
-
Opp.: 34 m2
afschot 15 mm/m
hwa
hwa
9600+
08
DBN 32 m2
60 m2
B
huiskamer
huiskamer
-
zorgkamer
Opp.: 34 m2
08
Rijswijk-
G
> PLATTEGRONDEN 1:200 1e VERDIEPING (OPTIE >50m2 APP.)
49 m2
2-kamerapp. balkon
Opp.: 9 m2
Informatie van adviseurs (bijv. brand, - geluid en installaties) - zijn ter indicatie-
Rijswijk
G
2-kamerapp.
UIT
BM
Coolcat 41 m2
C
UIT
Opp.: 9 m2
Opp.: 9 m2 Alle maten in het werk te controleren
>
zorgkamer
Pinus sylvestris ‘Watereri’2m hoog hoog Pinus sylvestris ‘Watereri’2m Pennisetum alopecuroides ‘Hameln’
06
- mugo Pinus Pinus mugo Anemanthele lessoniana
huiskamer
huiskamer
huiskamer
Opp.: 95 m2
Opp.: 95 m2
Opp.: 95 m2
-
-
-
FestucaFestuca mairei ma Schizachyrium scop
07
07
07
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
laagspanning
D
2-kamerapp.
balkon
zorgkamer werkplek Opp.: 34 m2
patio In De Bogaard - Fase 1Opp.: 95 m Opp.: 95 m
09
G
patio D
werkplek
>
51 m2
09
4 m2
werkplek
Peil = 0 = x,xx+NAP
op tekening Mulderblauw overgenomen. In geval van tegenstrijdigheden H balkon bindend. De tussen deze stukken zijn de stukken van de betreffende adviseur 4 m2 ligt bij de verantwoordelijkheid van de juiste uitvoering van dit advies desbetreffende adviseur.
H
4800+
4 m2
2-kamerapp. balkon
04
G
2-kamerapp. balkon
J
AFSCHOT
2-kamerapp.
09
hwa
09
> zorgkamer zorgkamer PLATTEGRONDEN 1:200 Opp.: 34 m Opp.: 34 m 2e VERDIEPING (OPTIE <50m2 APP.) 09 09 2
09
2
> NRbalkonSTATUS Opp.: 18 Opp.: 18 Opp.: 18 m CONCEPT Amelanchier lamarckii 2m hoogVO102 Elaeagnus angustifolia 2m hoog Cornus mas 2m hoog Cornus mas 2m hoog
zorgkamer Opp.: 34 m2
09
08
08
08
>
balkon
balkon DOC
balkon
6 m2
m2
m2
-
> PROJECT
-
6
5000+
7E VERDIEPING7E VERDIEPING 7E VERDIEPING
2
-
> DATUM De
Boogaard
> SCHAAL
> PROJECT
> FORMAAT A2
> TEKENAAR PHILIP
balkon Opp.: 18
balkon Opp.: 18
m2
balkon Opp.: 18
m2
Pennisetum villosum Melica cilia Festuca glauca Blue’ Agastache hybr. ‘Blackadder’ Echinacea ‘Fatal Attraction’ G Ginkgo‘Elijah biloba 2m hoog Pyrus nivalis 2m high Agastache hybr. ‘Blackadder’ Echinacea ‘Fatal Attraction’ Ginkgo biloba 2m hoog Sesleria- nitida Fl
8E VERDIEPING8E VERDIEPING 8E VERDIEPING 12.03.2021 1:200 2920
Fase 2 - Parkeerdek 2920
m2
9E VERDIEPING9E VERDIEPING 9E VERDIEPING
A
Fase 2 - Kantoor
Fase 2 - Kantoor
4050
spuwer
spuwer
spuwer
7.5 72
~5
7.5 72
~5
4050
spuwer
4050
4050
8100
N
N
2E VERDIEPING 7E VERDIEPING
apartment floor
~778
spuwer
N
1E VERDIEPING 1:300
> REVISIE
> TEKENAAR PHILIP
12150
12150
12150
~778
4050
4050
4050 12150
4050
~134978
health care
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
> Mulderblauw 028100 www.mulderblauw.nl
02
Overgoo 6
1215071 517 73 11 +31 (0) 02
2266 JZ Leidschendam
03
12150
03
2920@mulderblauw.nl
8E VERDIEPING zorgkamer zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
30
03
12150
02
Opp.: 34 m2
02
12150 ~134978
zorgkamer
Opp.: 34 m2
> Mulderblauw 02 www.mulderblauw.nl
Opp.: 34 m2
03
Overgoo 6
2266 JZ Leidschendam
adding green zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
+31 (0) 71 517 73 11
03
9E VERDIEPING
>
03
>
2920@mulderblauw.nl
> M
M
L
L
M
Pinus nigra austriaca 2m hoog
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
01
01
01
04
J
1:300
H
K
J
H
04
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
01
01
01
04
04
04
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
I opslag
med.opslag opsl.
med. opsl. opslag
med. zorgkamer opsl.
-
-
-
-
Opp.: 34 m2 2 m2 5 m2 Opp.:Opp.: 2 m2 5 m2 Opp.: 2 m2 Opp.: 5 m2 Opp.: Opp.:
K
04
L
o tu v d
-
-
05
05
05
zorgkamer
zorgkamer
Opp.: 34 m2
06
opslag
med.opslag opsl.
med. opsl. opslag
med. zorgkamer opsl.
-
-
-
-
Opp.: 34 m2 2 m2 5 m2 Opp.:Opp.: 2 m2 5 m2 Opp.: 2 m2 Opp.: 5 m2 Opp.: Opp.:
05
05
05
zorgkamer
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
Opp.: 34 m2
06
06
06
06
06
zorgkamer
zorgkamer
zorgkamer
Opp.: 34 m2
werkplek
werkplek
zorgkamer werkplek Opp.: 34 m2
zorgkamer
Opp.: 34 m2
07
07
Opp.: 9 m2
Opp.: 9 m2
Opp.: 9 m2
-
-
-
-
-
R
K
J
werkplek
werkplek
zorgkamer werkplek Opp.: 34 m2
Opp.: 9 m2
Opp.: 9 m2
Opp.: 9 m2
-
-
-
07
Opp.: 34 m2
Opp.: 34 m2
07
07
07
zorgkamer
zorgkamer
zorgkamer
Opp.: 35 m2
Opp.: 35 m2
Opp.: 35 m2
H
huiskamer
huiskamer
huiskamer
zorgkamer
zorgkamer
zorgkamer
Opp.: 35 m2
Opp.: 35 m2
Opp.: 35 m2
huiskamer
huiskamer
huiskamer
Cornus mas 2m hoog
> P 7
>
Peil = 0 = x,xx+NA
>
Alle maten in het
>
Informatie van ad
> D V
op tekening Mulderb tussen deze stukken z verantwoordelijkheid desbetreffende advis
>
D In De Bogaa
UITGANGSPUNTEN
ZOOM IN
> IN DE BOGAARD RIJSWIJK
TOREN
Kroon Microbeton - bruin, geïmpregneerd
CONCEPT
Lamellenhekwerk Metal - brons, donker
UITGANGSPUNTEN
3 volumes | 1 family
Kozijn Metal - brons, donker
Invulling voor kozijn Microbeton - licht bruin, geïmpregneerd
volumen
verbinding
- drie distinc te volumen - 1 familie / tone in tone
- connect - open plin
Hoofdstructuur Microbeton - bruin, geïmpregneerd
‘tower’
ZOOM IN
MIDDEN VOLUME
22
CONCEPT
> IN DE BOGAARD RIJSWIJK
> IN DE BOGAARD RIJSWIJK
UITGANGSPUNTEN
connect with surroundings
Groendaken Beplanting met siergrassen, vaste planten en heesters
Kozijn Metal - licht brons
volumen
verbinding
st
- drie distinc te volumen - 1 familie / tone in tone
- connectie bovenbouw met straatbeeld door groen - open plint
-h (a -g -v (v
Invulling voor kozijn Microbeton - bruin, geïmpregneerd Lamellenhekwerk Metal - licht brons
Hoofdstructuur Microbeton - bruin, geïmpregneerd
CONCEPT
UITGANGSPUNTEN
horizontality in “stedelijke laag” -
middle volume
ZOOM IN
verticality in tower structuur
verbinding
volumen - drie distinc te volumen - 1 familie / tone in tone
- connectie bovenbouw met straatbeeld door groen 21 - open plint
- horizontaliteit in stedelijke laag (aanbinding aan moderne oorsprong) - grid in bovenbouw (menselijke maat) - verticaliteit in bovenbouw dominant (verbinding met plint & dynamisch toren)
> IN DE BOGAARD RIJSWIJK
PLINT & STEDELIJKE LAAG
Groendaken Beplanting met siergrassen, vaste planten en heesters
CONCEPT
> IN DE BOGAARD RIJSWIJK
UITGANGSPUNTEN 13 Horizontale banden Metal - Anodized, champagne brons
open plinth
Prive scherm Metal - licht brons, geperforeerd Lamellenhekwerk Metal - licht brons Aangewezen gebied voor reclame microbeton - bruin, geïmpregneerd
plint
stedelijke laag
-
-
transparente plint luifel deel van stedelijke laag ruimte voor reclame aanbinding aan toren door structuur
horizontaliteit in ste grid in bovenbouw ( verticaliteit in bove grootste diepte + de
Hoofdstructuur Microbeton - bruin, geïmpregneerd
plinth / ‘stedelijke laag’
20
connection, human scale & plint
stedelijke laag
-
-
transparente plint luifel deel van stedelijke laag ruimte voor reclame aanbinding aan toren door structuur
warmth
horizontaliteit in stedelijke laag (aanbinding aan moderne oorsprong) grid in bovenbouw (menselijke maat) verticaliteit in bovenbouw dominant (verbinding met plint & dynamische toren) grootste diepte + detailing voor stedelijke laag, versterken van de menselijke schaal
NUNSPEET • Mulderblauw • Hotel | meeting center | office | restaurant • Nunspeet | The Netherlands • In Development
Located in a dense forrest, right at the exit of the freeway leading to Amsterdam, we are developing a meeting center linked to a hotel and restaurant. The municipality is keen to highlight the ‘entrance’ of the city with an accent. This gives us as a starting point the idea to develop something that blends into the surroundings as well as highlighting the city and the function of the meeting center. Working with the topography most of the base volume (parking / restaurant / meeting center) is hidden. Carefully articulated ‘glimpses’ communicate to the passer by. The accent comes in form of a tower which houses the hotel and office spaces. This is moved away from the road, to give the eye some space and create a calm yet distinct setting. Further parts of the design are the clear articulation of the functions in the facades as well as a hirarchy of verticals, directly linking the building into its surroundings.
embeding into landscape
‘sneak peak’
CONCEPT: UITGANGSPUNTEN
Bos
Elspeterweg verbinding Nunspeet & snelweg Accent
CONCEPT: UITGANGSPUNTEN
CEPT: UITGANGSPUNTEN
ebouw in landschap
Geprofileerd Terrein
Accent
Integratie
bar | flex kantoor | hotel
Meeting Center | Parkeergarage
Accent
Integratie
bar | flex kantoor | hotel
Meeting Center | Parkeergarage
Integratie
bar | flex kantoor | hotel
Meeting Center | Parkeergarage
CONCEPT: UITGANGSPUNTEN integratie gebouw in landschap
accent met afstand tot de straat
functies met uitstraling
CONCEPT: UITGANGSPUNTEN
integratie gebouw in landschap
accent met afstand tot de straat
functies met uitstraling naar buiten
11
accent met afstand tot de straat
functies met uitstraling naar buiten
11
stappeling van functies, maar een gebouw
CONCEPT: UITGANGSPUNTEN
verdiepte verbinding met omgeving door accent on verticaliteit
stappeling van functies, maar een gebouw
verdiepte verbinding met omgeving door accent on verticaliteit
12
AMPERESTRAAT • Mulderblauw • Intensive care | horeca • Hilversum | The Netherlands • In Development
We transformed an existing cigar factory from the early 18th century into a lively place of recovery for intensive care patients. The program called for additional densification for which we introduce an individual pavilion building, which, as an ensemble forms an inner courtyard, an inviting oasis for patients and staff to relax and recover. The pavilion takes up the atmosphere, continuing the green along its facades, creating context in the courtyard and becoming an integral part of its surroundings. Mindfull also of the adjacent neighbours, aware of its rather large volume, we strive to use architectural elements in order to make it blend. The lower of the two volumes is split in verticals, reducing its size and creating an all round feeling, through avoiding to articulate a distinct front and back. The top volume is reduced in size. One family with the base it connects to this through similar form language with a playfull touch, lightening the ensemble even more.
NING
> AMPÈRESTRAAT 10 HILVERSUM
CONCEPT
> AMPÈRE HILVERSU
MONUMENT 3,7
m
pa
ee
rg
ara
ge
en
m
tr
ee
Sig
are
nfa
bri
BOUWFASE 1950 (niet monumentaal)
ek
BOUWFASE 1882
SLOOP
9,4
m
2 ,4
m
2 ,7
m
2 ,3
rk
3,3 m
en tr ee Pa vil jo en
6,6
9,2
m
m
6,3 m
Oppervlakte kavel: 3.427 m2 Oppervlakte bebouwd: 1.583 m2
BOUWFASE 1915
BOUWFASE 1909
46% bebouwd 30% vergroend
ZWAAR BESCHADIGD DOOR BRAND
6
green inner courtyard
HISTORIE monumental heritage • gegroeid monument
SITUATIE NA BRAND
weaving thedeel pavilion into its sur• grootste gesloopt i.v.m. veiligheid • bouwfase 1950 slopen om de situatie van het roundings ensemble te verduidelijken
D
13
4.000
7.570
155 4.000
Zorgkamer VBR 21 m2
300
Zorgkamer VBR
4.000
21 m2
Badkamer BADR
12
Zorgkamer VBR
4.000
21 m2
dgm=
950x
Opp.: 7 m2
16.940
155
2320
7.356
dgm= 950x
300
2320
0
Badkamer BADR
6.144 dgm=
x230
Opp.: 7 m2
950x
2320
x232
2320
0
Badkamer BADR
dgm=
3 m2
dgm=
1134
x232
0
1134
x232
0
93 m2
dgm=
1134
x232
Gang VKR
0
B
dgm=
15 m2
1134
x232
0
9.370
Woonkamer VBR
Opp.: 7 m2
dgm=
1.800
PB
dgm=
1134
884x
1075
dgm=
Trappenhuis VKR
dgm=
1200
x230
0
Badkamer BADR Opp.: 7 m2
opslag BERG
dgm= 1134
1 m2
Badkamer BADR
2320
dgm=
1296
dgm=
x232
0
1134
x232
0
Opp.: 7 m2
x232
0 950x
Badkamer BADR
2320
Zorgkamer VBR
09
opslag BERG
Opp.: 7 m2
Opp.: 7 m2
21 m2
155
dgm=
950x
Zorgkamer VBR
4.000
2320
Gang VKR
+30
14 m2
21 m2
bra
ndca
rdlift
dgm=
1666
x232 0
dgm=
21 m2
155
Bestaande vloer
125
Zorgkamer VBR
4.000
woonkamer villa VBR 8.344
300
0
2.850
x230
9 m2
dgm=950x2320
dgm=
waterruimte TR 150
1180
1.000
Terras 38 m2
10 m2
1134
0
dgm= 950x
7.356
0 x230 1075 dgm=
11
dgm=
x232
11 m2
gasruimte TR
Gang VKR
woonkamer villa VBR
13 m2
AA
117 m2
Terras 47 m2
6.030
dgm=3080x2300
Entreehal VBR
214
dgm=1800x2300
4.086
dgm=1800x2300
56 m2
8.519
+30
woonkamer 2 VBR
8.455
178 m2
dgm=
1053
D
x213
BB
0
dgm=6212x2300
23.369
dgm=5429x2300
08
6.395
CC
155
11.103 8.454
10.672
dgm=930x2253
+280
dgm=930x2253
29.553
A
DD
dgm=900
+30
Gang VKR
Opslag BERG
6,25 %
4 m2
27 m2 dgm=930x2253
155
Zorgkamer VBR
Zorgkamer VBR
25 m2
25 m2
7 m2
5.810 dgm=850x2320
25 m2
6 m2
6 m2
Badkamer BADR
Badkamer BADR
6 m2
6 m2
dgm=1134x2320
dgm=1134x2320
dgm=1134x2320
8.455 dgm=1134x2320
Badkamer BADR
6 m2
6 m2
Zorgkamer VBR
Zorgkamer VBR
18 m2
Zorgkamer VBR
Zorgkamer VBR
24 m2
155
5.800
155
5.800
155
5.800
Badkamer BADR
Opp.: 7 m2
Opp.: 7 m2
Gas TR
2 m2
2 m2
06
Inkoopruimte TR
Zorgkamer VBR
22 m2
4.000
Watermeter TR
dgm=950x2320
Zorgkamer VBR
Zorgkamer VBR
24 m2
10 m2
22 m2
155
4.000
05
24 m2
1.620
24 m2
4.160
Badkamer BADR
dgm=950x2320
6,25 %
6 m2
Badkamer BADR
dgm=1134x2320 dgm=884x2320
dgm=950x2320
6 m2
dgm=950x2320
Badkamer BADR
dgm=950x2320
Badkamer BADR
Techniek TR 6 m2
dgm=1134x2320
+280
dgm=1134x2320
dgm=1134x2320
5.270
dgm=950x2320
dgm=1000x2033
02
16 m2
55 m2
+280
Gang VKR dgm=1134x2320
125
dgm=1134x2320
C
4 m2
54 m2
10 m2
6.000
dgm=850x2320
MIVA/P. wc TOI
Gang VKR
Entree VKR dgm=930x2253
dgm=1134x2320
2.425
dgm=884x2320
11.710
260
Badkamer
dgm=850x2320
dgm=1000x2320
beddenlift
dgm=930x2253
Badkamer BADR
dgm=950x2320
Badkamer BADR
dgm=950x2320
9 m2
dgm=850x2320
dgm=884x2320
dgm=950x2320
Trappenhuis VKR
dgm=950x2320
C
03
7 m2
400
Zorgkamer VBR
4.300
24 m2
5.800
18,00 %
Zorgkamer VBR
155
9,00 %
5.800
Dames wc TOI
dgm=884x2320
155
dgm=1000x2320
5.549
dgm=1300x2300
125
Heren wc TOI
rolstoellift
dgm=1000x2320
dgm=900x2300
07 04
dgm=900
Tochthal VKR
dgm=1900
155
5.810
01
dgm=4805x2959
±0
5 m2
4.566
5.759
5.822
B
A
dgm=1938
5.709
6.244
4.470
8.370
9.380
11.221
61.541
A
B
C
D
E
F
G
H
J
K
ground floor
IMPRESSIE
1:500
> AMPÈRESTRAAT 10 HILVERSUM
FLEUR • Mulderblauw • Housing | horeca • Hoogvliet | The Netherlands • In Development
Located in the outskirts of the bustling city of Rotterdam we are planning a building which will consist of ca. 84 apartments. It’s urban setting requires the volume to be mindfull and catering to various needs. It is situated in the center of the town, neighbouring on one side a large scale post-war building block, while connecting on the other side to a sprawl of small scale family homes. Creating a strong identity and being tolerant of the different neighbours is our starting point of the design. In an area where the vast spaces remain virtually untouched we aim to provide the residents with a safe and usable space by creating an inner courtyard. This ‘hidden’ garden is surrounded with a low volume, lined with galleries providing moments of spontaneous interaction. The language of the building uses clear horizontals to bind both volumes together and referencing the surroundings. Volumetric balconies make for a playfull element, harmonizing with the use of burnt wood, which creates texture and a play in light while moving around the building.
ensemble creating an inner courtyard
sculpting balconies
shou sugi ban
ARCHITECTUUR
> KRUISNETLAAN 200 ROTTERDAM
CONCEPT
ontwerp verbindt laagbouw met hoogbouw
aansluiten op horizontaliteit van omgeving
sterke identiteit door massa van volume te benadrukken
de relatie met de omgeving versterken met publiek programma op begane grond
zet de geweldige kwaliteit van de omgeving voort in programma en buiten ruimte
laagdrempelig gebouw met een allround oriëntatie
1
2
3
4
5
1
2
3
4
1
5
2
3
4
5
38.300 38.300
38.300 11.100
11.100
8.050
8.050
11.100
11.100
8.050
8.050
8.050
8.050
11.100
11.100
0 punt
A
A
Horeca
Lobby
lobby 39 m2
7.800
Woning C1
vide 43 m2
55 m2 7.800
66 m2
horeca 69 m2
10 m2
woning 72 m2
Woning C1 woning
87 m2
94 m2
C
547 m
660L rolcontainer
Vuilopslag
4 m2
2,1x2,1m glas
C
14 m2
86 m2
woning 65 m2
1.750
fietsparkeren 219 m2
2
1.750
64 m2 vuilopslag 41 m2
Woning C2
6 m2
B
B 1.750
B
woning 72 m2
87 m2
lift 2650x1600
lift 2650x1600
78 m2
55 m2
woning Woning 66 m2 E
woning 65 m2 4 m2
Fietsenstalling
lift 2650x1600
80 m2
woning 72 m2
glas
Fietsenstalling
Woning C2
98 m2 7.800
A
63 m2 690 m2
41 m2
2,1x2,1m
C Slaapkamer 11 m2
Entreehal 6 m2
Berging
Berging
3 m2
4 m2
660L rolcontainer
tech 13 m2
65 m2
7 m2
scootmobiel 38 m2
woning 81 m2
Woning A2
Gemeeschappelijke ruimte
2
66 m gemeenschappelijke ruimte 64 m2
woning 2 64 m 65 m2
woning 81 m2
Woning B
Woning B
86 m2
86 m2
9.050
Woning A1
65 m2
9.050
9.050
Slaapkamer
Woning A1
Woonkamer 31 m2
D
Woning A1
Woning A1
Woning A1
Woning A1
65 m2
65 m2
7.400
Stallingsgarage
Woning A1
65 m2
7.400
Woning D
66 m2
66 m2
65 m2
> WIJZIGINGEN:
7.400
7.400
Woning A1
65 m2
7.400
Woning A1
64 m2
>
3 m2
>
Peil = 0 = x,xx+NAP
>
Alle maten in het werk te controleren
>
Informatie van adviseurs (bijv. brand, geluid en installaties) zijn ter
H
indicatie op tekening Mulderblauw overgenomen. In geval van tegenstrijdigheden tussen deze stukken zijn de stukken van de betreffende van de juiste uitvoering van dit
tech
tech
12 m2
21 m2
7.000
85 m2
>
Peil = 0 = x,xx+NAP
>
Alle maten in het werk te controleren
>
Informatie van adviseurs (bijv. brand, geluid en installaties) zijn ter
H
indicatie op tekening Mulderblauw overgenomen. In geval van tegenstrijdigheden tussen deze stukken zijn de stukken van de betreffende van de juiste uitvoering van dit
adviseur bindend. De verantwoordelijkheid E1 desbetreffende adviseur. advies ligt bij de Woning 75 m2
Woning E1
Woning E2
Woning A4
Woning A4
77 m2
63 m2
63 m2
HOOGVLIET FLEUR
adviseur bindend. De verantwoordelijkheid E2 desbetreffende adviseur. advies ligt bij de Woning 76 m2
ROTTERDAM
ROTTERDAM I
I
> PLATTEGRONDEN tijdelijk BEGANE GROND
9 P.P.
> DOC NR OV100
> STATUS
> DATUM 08.09.2021
> SCHAAL 1:200
> REVISIE
> FORMAAT A3
9 P.P.
ground floor
> Mulderblauw www.mulderblauw.nl
> PLATTEGRONDEN tijdelijk 3E T/M 6E VERDIEPING
> PLATTEGRONDEN tijdelijk 1E VERDIEPING > DOC NR OV102
> STATUS
> PROJECT 3029
> DATUM 08.09.2021
> SCHAAL 1:200
> PROJECT 3029
> TEKENAAR LARA
> REVISIE
> FORMAAT A3
> TEKENAAR LARA
CONCEPT
Overgoo 6
+31 (0) 71 517 73 11
2266 JZ Leidschendam
3029@mulderblauw.nl
Alle maten in het werk te controleren Informatie van adviseurs (bijv. brand, geluid en installaties) zijn ter
HOOGVLIET FLEUR
HOOGVLIET FLEUR
ROTTERDAM I
Peil = 0 = x,xx+NAP
> >
indicatie op tekening Mulderblauw overgenomen. In geval van tegenstrijdigheden tussen deze stukken zijn de stukken van de betreffende adviseur bindend. De verantwoordelijkheid van de juiste uitvoering van dit advies ligt bij de desbetreffende adviseur.
7.000
H
7.000
woning 64 m2
Woning A3
66 m2
> WIJZIGINGEN:
Woning A1
65 m2
1:1000
woning 65 m2
Woning A3
G
G
Woning A1
> TEKENAAR LARA
woning 65 m2
15 m2
55.200
Woning A1
65 m2
-550 P
4 m2
Slaapkamer
34 m2
7.400
Woning A1
64 m2
7.400
Woning A1
65 m2
> WIJZIGINGEN:
Badkamer
Woonkamer
F
F
Woning A1
G
1 m2
65 m2
7.400
F
Toilet
5 m2
Woning A1
Gemeenschappelijke daktuin
65 m2
28 P.P.
Entreehal
woning 65 m2
E
Woning A1
65 m2
7.400
65 m2
65 m2
7.400
Woning A1
55.200
55.200
632
E
m2
Woning A3
7.400
65 m2
7.400
65 m2
4 m2
66 m2
D
D
E
Badkamer
woning 64 m2
Woning D
first floor > TEKENAAR LARA
> Mulderblauw www.mulderblauw.nl
CONCEPT
Overgoo 6
+31 (0) 71 517 73 11
2266 JZ Leidschendam
3029@mulderblauw.nl
3rd to 6th floor > TEKENAAR LARA
> DOC NR OV104
> STATUS
> DATUM 08.09.2021
> SCHAAL 1:200
> PROJECT 3029
> REVISIE
> FORMAAT A3
> TEKENAAR LARA
Overgoo 6
+31 (0) 71 517 73 11
2266 JZ Leidschendam
3029@mulderblauw.nl
> Mulderblauw www.mulderblauw.nl
CONCEPT
DC VENLO • Mulderblauw • Warehouse | office • Venlo | The Netherlands • completed
Two distribution centers (ca. 75,000m2) have been designed for a fast expanding client. Each distribution center comes with its own office, the larger of which (ca. 5,000m2) will function as the new headquarter for the client. At its center it consists out of 4 storeys and features a central atrium as well as an expansive rooftop terrace. The office also continues on either side, spanning most of the facade, a little less than 300m in length.
> Renvooi Prefab betonplint
Kalkzandsteen (vellingblok)
Prefab betonpanelen (scheidingswand Warehouses)
Kalkzandsteen (vellingblok) met Metal stud voorzetwand
Sandwichpaneel buitenbekleding
Sandwichpaneel met Metal stud voorzetwand
Metal stud wand buitenzonwering brandwerendheid gevel conform opgave Brand1heid
Brandveiligheid Ruimte voorzien van Noodverlichting (NEN-EN 1838), exacte positie n.t.b. door installateur
Deur zelfsluitend 20
20
20 minuten brandwerend
20
20
20 minuten brandwerend en zelfsluitend constr. onderdeel
Handbrandmelder Slow whoop Prim. bluswatervoorzieining intern cap. 60 m3/hr, gedurende 1 uur
30 minuten brandwerend 30 minuten brandwerend en zelfsluitend constr. onderdeel
Sec. bluswatervoorzieining extern geboorde put: cap. 90 m3/hr, 4 uur Prim. bluswatervoorzieining extern geboorde put: cap. 90 m3/hr, 4 uur
60 minuten brandwerend 60 minuten brandwerend en zelfsluitend constr. onderdeel
brandwerende scherm
04.101 K1b
K1e
695
Sb04
903
2.600
178
75
1.747
125
75 1.450
125
3.500
178
72
3.500
125
1.450
1.853
4.200
304
125
2.177
125
1.000
1.000
H13
H13
499
Hb02
Hb02
H12
6.932
H08
H12
Overig Informatie van gebruiksinrichting mbt meubels in het kantoor en stellingen in het warehouse zijn indicatief op tekening Mulderblauw opgenomen. Hieraan kunnen geen rechten ontleend worden. 1.0.S009
H13
H13
Invulling, positie en uitwerking technische ruimten (in- en extern) volgt na opgaaf installatie adviseur
DOUCHE W 30
SECURITY
125 30
Situatie/Terrein - Weergegeven draaicirkels op terrein zijn gegenereerd met Autoturn Online en zijn indicatief - Gebruikt voertuigtype: CROW 2012 (NL): Trekker Oplegger
Rc-Waardes
1.0.K014
FACILITY MANAGEMENT
A03a
>
A03a
A03a
A09
250
A09
250
H01
O02
O02
O01
30 fietsen
constructie conform opgave constructeur
A02 A04 Issue Name
Entree
WijzID Change Name
Constructie conform opgave construteur
Datum
Entree 7.645
PANTRY
7.645
- WH2: 203 parkeerplaatsen incl. 1 MIVA
1
O01
A09
O01
A09
O02
250
250
O02
- WH1: 731 parkeerplaatsen incl. 2 MIVA incl. 3 el. laadpalen 50 fietsen 10 motoren
A03a
1 O01
Belangrijk: Hal en kantoor 2 NIET definitief
A08
Opp.: 37 m2
1 A05
Parkeersituatie
- Vloer: Rc ≥ 3,5 m2K/W - Wand kantoor: Rc ≥ 4,5 m2K/W - Wand magazijn: Rc ≥ 4,5 m2K/W - RC Dak: Rc ≥ 6,0 m2K/W
125
MEETING Opp.: 22 m2
A09
MEETING Opp.: 34 m2
30
30
SECURITY
1.0.K010
1.0.K009
MAIL ENTRY TECH.
1.0.V006
INGANG Opp.: 93 m2
5.217
30
H01
30
Opp.: 36 m2
A03a
30
Hb05
30
Hb01
SECURITY
30
125 5.217
30
1.0.K004
4.015 A03a
30
h=5400 o=180 a=250 b=3000
Opp.: 15 m2
Hb06
1.930
GANG Opp.: 88 m2
30
1.0.V002 30
> Belangrijk: Alle bouwkundige onderdelen en details moeten nog op de constructie afgestemd worden
H05
SPORT Opp.: 43 m2
h=5400 o=186 a=220 b=1500
Peil = 0 b.k. vloer
1.930
1.000
h=5400 o=186 a=220 b=1500
Hb06 30
30
125
1.000
Toiletten, doucheruimte en kleedruimtes zijn voorzien van tegelwerk op vloeren en wanden tot aan plafond Nieuw te plaatsen hekwerken <13 mtr hoogte= 1000 mm +vlp, >13 mtr hoogte = 1200 mm +vlp Hekwerken tpv kantoren uitgevoerd zonder opstapmogelijkheden tussen 200 - 700 +vlp Bk leuningen op trappen hebben een hoogte tussen de 800 en 1000 +trede
Haspelkast
125
14.560
30
1.0.B001
schacht = 2295x1810 cabine = 1400x1100
RESERVATION ELEVATOR
125 1.450
125 1.575
14.400
Hb02
H12
Hb03
Hb04
W-M01
Opp.: 20 m2
Opp.: 15 m2
GANG Opp.: 12 m2
TOILET M H12
H12
H12 H12
1.450 125 240
240
1.846
Hb02
H12
71
30 H12
2.775
Hb02
H12
125
H12 90
3.046
90
Opp.: 19 m2
- Scherfwerende beglazing (klasse P2A conform EN 356) geplaatst in een kitsponning; - Onbrandbare gevelbekleding conform brandvoortplantingsklasse 2 zoals gesteld in NEN 6065;
2
Bouwkundig
DOUCHE M
1.0.V005
Opp.: 4 m2
TECHNICAL
1.0.S004
125 30
30
Opp.: 25 m2
125
H12 H12
1.0.K003
LAB OFFICE
H01
2 R01
1.0.S010
TOILET M Opp.: 16 m2
H08
Rood flitslicht
STORAGE
H05
GANG Opp.:H01 9 m2
Opp.: 19 m2
H01
EXPEDITION
H08
1.0.V001 H01
1.0.K002
EXPEDITION OFFICE
H05
1.0.S007
30
1.0.S008
TOILET W Opp.: 16 m2
Opp.: 19 m2
Haspelkast
90
90
1.0.S001
TOILETS Opp.: 8 m2
1.0.K001
Gevelopbouw: Rc ≥ 4,5 m2K/W sandwichpaneel verticaal geplaatst met microribbel
Warehouse wordt voorzien van sprinklerinstallaties. Voor prestatie eisen zie rapport: Uitgangspunten document tbv : Sprinklerinstallatie, brandinstallatie, ontruimsinstallatie met referentie : 18.65 SBO, versie 1.1, 21-12-2018 Exacte positie brandslanghaspels, Handmelders en noodverlichting nader te bepalen in overleg met brand1heid Exacte locatie opstelplaats brandweer in overleg met betreffende instantie
30
Hb06
30
1.0.S006 1.0.T001
1.0.S002
TOILETS M Opp.: 12 m2
90
Sb03
90
1.450
> DC TRADE PORT NOORD - VEN03 VENLO +17.550 b.k. dakrand
125 125
30
TOILET W Opp.: 17 m2
H12
14.554
150 125 1.677 215
125
1.0.S005
240
H12
Automatische brandmelder pictogram nooddeur vrijhouden conform NEN 3011
Toegepaste constructieve materialen voldoen aan NEN 6065 en NEN 6066 Voor prestatie eisen zie rapport: Masterplan brandveiligheid, de brand1heid met referentie: 18.65 MBP, versie 1.1, dd. 21-12-2018
75 1.000
Sb02
240
H12
Rookmelder niet ioniserend NEN 2555
Brandveiligheid hoofddraagconstructie met betrekking tot bezwijken conform opgave constructeur Overige brandcriteria aan constructie zie rapport: Masterplan brandveiligheid, de brand1heid met referentie: 18.65 MBP, versie 1.1, dd. 21-12-2018
97 125
125 1.000
Brandweerpaneel Nevenpaneel
> 90 minuten brandwerend > 240 minuten brandwerend
475
2.174
240
Sb04 240
1.0.S003
TOILETS W Opp.: 11 m2
LAB
A03a
289
240
Sb04
374
7.920
107 240
1.0.L001 Opp.: 55 m2
The walls must resist fire for at least 90 minutes The doors have to be steel T30 standard The floor has to be acid- and alkali-resistant The lab needs a sprinkler A direct vent is required to the outside for the hood and explosion-safe wardrobe There must be at least 20 sockets in the lab There must be connections for hot and cool water Ait-condition is required for the lab
Brandmeldcentrale
30 minuten brandwerend 60 minuten brandwerend
Dakopbouw: Rc ≥ 6,0 m2K/W nuttige belasting: ≥ 0,56 kN/m2 enkel laags kunsstof dakbedekking beloopbare FM goedgekeurd PIR isolatie dampremmende laag stalen dakplaten conform opgave constructeur
220
2.467
Sb02
125
240
1.450
240
150
4.256
214
90
Exact position of the Ventilation to be determined
Brandweertoegang/Neven toegang (brandweertoegang vv flitslicht)
20 minuten brandwerend
240
Sb04
240
72 214
1.534
90
2
Sleutelkluis brandweer
Vluchtwegaanduiding nooduitgang NEN-EN 1838 en NEN 3011
120 minuten WBDBO
De brandslanghaspels in kantoren en nevenruimtes krijgen een lengte van 20m1 en 30m1 Uitgaande van een ingedeelde ruimte mag er gerekend worden met werkelijke lengte + 5m1 worp: dus 25 resp. 35m1. De haspelwagens in warehouses worden: 45m1 -1”/15m1 – ¾”. Bij een oningedeelde ruimte dient men derhalve rekening te houden met een straal van: 45+15+ 5m1 worp/ 1,5 = 43m1 Bij een definitieve indeling (stellingplan) zal er een definitief ontwerp komen gebaseerd op een ingedeelde ruimte en mag er gerekend worden met werkelijke lengte : 45+15+5m1 worp = 65m1
41.484
12.107
7.637
6.103
K1d
11.626
K1a
K1c
Loopdeur met panieksluiting 90 minuten WBDBO
ATRIUM
+16.400 b.k. kozijn
L
B K1-3
aluminium waterslag/lekprofiel
1.405
1.405
A
BV 401-3
1.0.V004
ATRIUM Opp.: 164 m2
A09
A09
MEETING
EINKAUF OPERATIV
H01
Opp.: 211 m2
1.880 330
v.v.dakconstructie: HR++ beglazing opbouw ≥ 0,56 kN/m2 tegels afstandhouders enkel laags kunsstof dakbedekking beloopbare FM goedgekeurd PIR isolatie dampremmende laag stalen dakplaten conform opgave constructeur
1.0.K013
Opp.: 11 m2
24.950
Opp.: 11 m2
Opp.: 175 m2
6.795
4.010 24.950
1.0.K012 A07
SPREEKKAMER
aluminiumkozijn in kleur poedercoaten
plafond hoogte minimaal vp+3.000
H01
575
Haspelkast
1.0.K008 1.0.K005
MAIL ENTRY
1.0.K011
RECEPTION Opp.: 11 m2 1.0.K007
1.0.V003
PHARMACY
INGANG
Opp.: 11 m2
Opp.: 60 m2
N 2.253
2.128
K1-2
125
binnen
buiten
5.947
Houten treden vastgezet op houten raamwerk voorzien van anti-slip 5.947
A06
350
1.0.K006
350
Drainage/afschot volgens opgave adviseurs
QM 4 Opp.: 36 m2
2.400
30.200
4.800
4.200
2.795
205
160
>
Alle maten in het werk te controleren
>
Informatie van adviseurs (bijv. brand, geluid en installaties) zijn ter indicatie
375
op tekening Mulderblauw overgenomen. In geval van tegenstrijdigheden tussen deze stukken zijn de stukken van de betreffende adviseur bindend. De verantwoordelijkheid van de juiste uitvoering van dit advies ligt bij de desbetreffende adviseur.
700
DC TRADE PORT NOORD - VEN03 VENLO BV 401-2
+13.400 b.k. afwerkvloer
> FRAGMENTEN OVERZICHT - WH1 BEGANE GROND > DOC NR BV401
> STATUS DEFINITIEF
> DATUM 03.05.2019
> SCHAAL 1:100
> PROJECT 2757
> REVISIE
> FORMAAT A0+ (1399x841)
> TEKENAAR PHILIP
> Mulderblauw www.mulderblauw.nl
Overgoo 6
+31 (0) 71 517 73 11
2266 JZ Leidschendam
2757@mulderblauw.nl
80
2.400
400
4.800
Peil = 0 = 27.20m + NAP
320
4.200
>
160
2.795
700
HOOFDENTREE
905
Stalen stootbord zelfde uiterlijk als hoofdtrap
205
A01
K1-1
Rood flitslicht
BV 401-1
905
M
> PROJECT 2757 > DATUM 03.05.2019 > FORMAAT A3
> REVISIE > SCHAAL 1:10
Healthcare • Mulderblauw • Healthcare | medical center • The Netherlands • VO | cancelled
The development consists out of a combination of healthcare apartments and medical center. Analysis of law and context, sketch design and diagrammatic layouts characterise this phase. In essence I was aiming at creating an elegant and clear language, slightly curving the volume to follow the curve of the plot. Accentuating the horizontal bands, adding a small shadow relief and eliminating the vertical grout where some of the elements I was interested in exploring to further the elegant expression.
BUNKER • Powerhouse Company • Housing | horeca | office • Eindhoven | The Netherlands • Under construction
Visit “Bunkertoren.nl”; sales page for current information
The bunker project is an opportunity to repurpose ‘De Bunker’, a derelict community & student centre designed by Hugh Maaskant. The key to preserving the building while also keeping it lively was to add new programme. Mixed-use functions like a restaurant and working spaces would be introduced in the existing building, complemented with a residential high-rise in its middle. The design aims at a continuation of De Bunker’s distinguishing traits, gradually transforming the modernist low-rise volume into a contemporary high-rise. The specific shape of its footprint aims at integrating the tower in its multifaceted surroundings, rooting it in a low-rise neighbourhood and simultaneously marking an entrance point to the city.
425 150 150 40
275 90 20
125
PREFAB GEVELELEMENT - bestaande uit: -1 vliesgevel stijlen -en regels -2 vastglas -3 draaiende delen -4 sandwich panelen -5 latten invulling - geheel bevestigen aan vloerrand VENSTERBANK - natuursteen vensterbank verijmd op profiel - type ntb AFWERKING ELEMENT - gips, 12 mm dik GEVELAFWERKING - afwerking NTB. - mogelijkheden: Staal, lichtbeton, natuursteen - gevelbekleding bevestigen aan vliesgevel stijlen - principe bevestiging iom leverancier
SANDWICHPANEEL - dichte delen uitvoeren als sandwich paneel - RC waarde 4,5 cf. epc berekening - geheel geÏntergreerd in prefab gevel element
520
VLOEROPBOUW - vloerafwerking, 15 mm vo - anhydriet - isolatie - betonvloer cf. opgave con
1.000
BEVESTIGING - elementen bevestigen op vloerrand - verankering iom leverancier
122
143
20
480
15
VLIESGEVEL - aluminium stijlen en regels - fabr. Schueco, type FW50 + en FW50 SG o.g. - semi-structureel - geanodiseerd in kleur - diepte stijlen en regels 90 mm - geheel geÏntergreerd in prefab gevel element
GLAS - dubbel of triple glas cf. epc berekening - U-waarde ... - ZTA - waarde ... - afstandhouder glas uitvoeren in kleur zwart - geheel geÏntergreerd in prefab gevel element
view from city entrance
layout visualisation
WESTERLAAN 17 3016 CK ROTTERDAM THE NETHERLANDS +31 (0) 10 404 67 89
facade detail
WWW.POWERHOUSE-COMPANY.COM OFFICE@POWERHOUSE-COMPANY.COM
PROJECTNUMMER
OPDRACHTGEVER
1553
Bunkertoren B.V.
TEKENINGNUM
DET 002
SCHAAL
1:10 FORMAAT
PROJECTNAAM
A3
BUNKER DATUM
xx-xx-2018
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
hekwerk 1200 +vl.p
KK
VW
hekwerk 1200 +vl.p
wc Ø 120
wc Ø 120
toevoer cv Ø 120
wc Ø 120
wc Ø 120
toevoer
0,83 m2 retour
gkw Ø 180
gkw Ø 180
retour
gkw Ø 180
0,89 m2 toevoer
toevoer
600 /600 E 900 /600
KPN 1.200 /600
3,20 m2
600 /1.200
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
gkw Ø 180
cv Ø 120
1,01 m2
cv Ø 120
retour
cv Ø 120
retour
cv Ø 120
0,89 m2 cv Ø 120
gkw Ø 180 gkw Ø 180
cv Ø 120
retour
0,89 m2 toevoer
cv Ø 120
cv Ø 120
cv Ø 120
2000 x 2750mm
gkw Ø 180
1800 x 2650mm
cv Ø 120 gkw Ø 180
gkw Ø 180 wc Ø 120
600 /600
3,00 m2
gkw Ø 180
1.300 /2.400
cv Ø 120
retour
gkw Ø 180
0,93 m2
retour
0,89 m2
gkw Ø 180
toevoer
toevoer
wc Ø 120
wc Ø 120
hekwerk 1200 +vl.p
3,12 m2
hekwer
k 1200
+vl.p
A
B
C
D
E
b.k. liftuitloop +105.720
b.k. kroonlijst +103.720
Dak +102.700
hekwerk 1200 +vl.p
32e verdieping +99.600
hekwerk 1200 +vl.p
31e verdieping +96.500
hekwerk 1200 +vl.p
30e verdieping +93.400
band 500 +vl.p
hekwerk 1200 +vl.p band 0 +vl.p
75,4°
29e verdieping +90.300
hekwerk 1200 +vl.p
28e verdieping +87.200
hekwerk 1200 +vl.p
27e verdieping +84.100
hekwerk 1200 +vl.p
26e verdieping +81.000
hekwerk 1200 +vl.p
25e verdieping D +77.900
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
75,4°
24e verdieping +74.800
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
23e verdieping +71.700
22e verdieping +68.600
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
21e verdieping +65.500
20e verdieping +62.400
19e verdieping C +59.300
b.k. blok +57.220 hekwerk 1200 +vl.p hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
18e verdieping +56.200
17e verdieping +53.100
hekwerk 1200 +vl.p hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
16e verdieping +50.000
hekwerk 1200 +vl.p hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
15e verdieping +46.900
hekwerk 1200 +vl.p hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
14e verdieping +43.800
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
13e verdieping +40.700
band 1000 +vl.p hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
band 500 +vl.p
hekwerk 1200 +vl.p
75,4°
band 0 +vl.p
75,4°
12e verdieping +37.600
band 1000 +vl.p hekwerk 1200 +vl.p
band 500 +vl.p
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
11e verdieping +34.500
band 1000 +vl.p hekwerk 1200 +vl.p hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
10e verdieping +31.400 band 1000 +vl.pm b.k. blok +29.320 hekwerk 1200 +vl.p hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
75,4°
9e verdieping B +28.300
band 1000 +vl.p hekwerk 1200 +vl.p hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
8e verdieping +25.200
hekwerk 1200 +vl.p hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
7e verdieping +22.100
hekwerk 1200 +vl.p hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
6e verdieping +19.000
band 1000 +vl.p hekwerk 1200 +vl.p hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
5e verdieping +15.900
hekwerk 1200 +vl.p
hekwerk 1200 +vl.p
4e verdieping A +12.800
RENVOOI 3e verdieping +9.700
2e verdieping +6.600
1e verdieping +3.300
Algemeen Bouwbesluit: -Trappen voldoen aan Art. 2.33 t/m 2.36 van Bouwbesluit 2012 - Afscheidingen van vloer, trap en hellingbaan voldoen aan Art. 2.18 t/m 2.20 - Detaillering van gebouw voldoet aan Afdeling 3.17 (Bescherming tegen ratten en muizen), Art 3.114 t.m 3.116 - Electrische installatie conform NEN 1010 voor laagspanning - Electrische installatie conform NEN-EN-IEC 61936-1 en NEN-EN 50522 voor hoogspanning - Gasinstallatie conform NEN 1078 - Drinkwatervoorziening conform NEN 1006 - Warmwatervoorziening conform NEN 1006 - Afvoervoorziening voor afvalwater conform NEN 3215 - Vluchtrouteaanduiding conform NEN 6088 en art. 5.2 t/m 5.6 van NEN-EN 1838 - Aanduiding blusmiddelen conform NEN 3011 - Scheidingsconstructies van sanitaire ruimten waterdicht conform NEN 2778 - Volumestromen en thermisch comfort ventilatievoorzieningen conform NEN 1087 - Deur meterkasten voorzien van rooster - Luchttoevoer en verbrandingsgasafvoer stooktoestel conform NEN 2757 - Rc-waarden conform details
Rapporten - Adviseur -
Constructie Peil ±0 = +18.700 NAP
- Constructie cf. berekeningen en tekeningen constructeur (IMD)
Begane grond ±0
Installatie - Installatie cf. tekeningen en berekeningen van installatie adviseur (Deerns)
Legenda - Bouwkundig Wanden bestaande binnenwand
west facade & 25th - 32nd floor A
Opbouw: gevelconstructie Rc=4,5 m²K/W minimaal - gevelbekleding - HSB binnenblad - binnenafwerking
bestaande betonnen wand
B
C
D
Opbouw: 70mm metalstud -1x12,5mm gipsplaat - 45mm minerale wol - metalstudprofielen h.o.h. 600mm - 1x12,5mm gipsplaat
E
Opbouw: gevelpaneel Rc=4,5 m²K/W minimaal - gevelbekleding - isolatie - binnenafwerking
Opbouw: 210mm metalstud -2x12,5mm gipsplaat - 75mm minerale wol - 10mm luchtspouw - 75mm minerale wol - metalstudprofielen h.o.h. 600mm - 2x12,5mm gipsplaat
Prefab betonkolom
Vloeren
Opbouw: 260mm metalstud -2x12,5mm gipsplaat - 100mm minerale wol - 10mm luchtspouw - 100mm minerale wol - metalstudprofielen h.o.h. 600mm - 2x12,5mm gipsplaat
bestaande betonnen vloer Opbouw: vloerconstructie - 60mm afwerkvloer - 20mm isolatie - 300mm betonvloer Opbouw: vloerconstructie Rc=6,0 m²K/W minimaal - sedumbedekking - bitumineuze dakbedekking - afschotisolatie - 300mm betonvloer
100mm kalkzandsteen 150mm kalkzandsteen 250mm i.h.w gestort beton 400mm i.h.w gestort beton
Opbouw: balkonconstructie - vloerafwerking buiten - afschotisolatie - 260mm betonvloer
* alle schuine wanden hebben een hellingshoek gelijk aan bestaand (75,4 graden, i.h.w. n.t.b.)
1:750 Westgevel
Woensel K 1248, 1249, 1250 10210 m²
N
KADASTRAAL BEKEND GEMEENTE: SECTIE: KAVEL: OPP KAVEL:
PEILMAAT PEIL=0 is 18.7M +NAP
W
ALLE MATEN IN HET WERK TE CONTROLEREN
WESTERLAAN 17 3016 CK ROTTERDAM THE NETHERLANDS +31 (0) 10 404 67 89 WWW.POWERHOUSE-COMPANY.COM OFFICE@POWERHOUSE-COMPANY.COM
TEKENINGNUMMER
OV.304 ONDERWERP
DISTRICT E - BRAINPORT • Powerhouse Company • Housing | retail | office • Eindhoven | The Netherlands • Competition | 1. price
‘To live, to meet and to stay in an environment that is fitting for a city like Eindhoven, where the pioneering spirit and the experimental are celebrated’ - that is the atmosphere in which the design was realised In addition to becoming the new entry point to the city at the railway station, there will be an extensive, dynamic landscape of retail spaces, workshops, meeting & showcase areas, restaurants & office spaces. The towers themselves growing out of open plinths each facilitate a 360° sky lobby, making the vertical in addition to the base of the tallest buildings in Eindhoven accessible to the public. With the tallest tower soaring to a 165m height, the trio will transform the skyline quite a bit. Steps in the towers, as well as the volumes themselves will maintain the integration in the surroundings and continue the tradition of fine scaling in the city of Eindhoven.
spatial relationship plinth
section of the ensemble
view of skybar
hotel
XS
S
M
L
XL
LOYENS & LOEFF • Powerhouse Company • Office | meeting | restaurant • Amsterdam | The Netherlands • Competition | 1. price
Winning the competition for the entrance hall of Loyens & Loeff’s new HQ in Amsterdam led to the follow up assignment of designing the entirety of their available spaces in the ‘hourglass’ building by Dam & Partners. Next to the development of office floor concepts this included a meeting centre, an entrance hall with a multi-story atrium and a vast restaurant area. Ranging over eight stories, the development of a suitable work environment for the office floors made up the main focus of our design process, all the while refining the other design tasks, gradually finding the atmosphere which will embody what Loyens & Loeff stands for as a company.
MATERIALENPALET LOBBY
view of office floor
color palette
layout office floor
SECURITY CENTER • Powerhouse Company • Office | operations center Sicherheitszentrum Tirol / 2. Stufe • Innsbruck | Austria
171978 4
• Competition | 2. round Bürofläche 280 m2
LPD. EGFA. Flex Verstärkung. Bereithalteraum 1_1_07_23 10 m2 LPD. EGFA. Flex Verstärkung. Büro 1_1_07_20 18 m2 LPD. EGFA. Flex Verstärkung. Bereithalteraum 1_1_07_24 10 m2
LPD. EGFA. Flex Verstärkung. Büro 1_1_07_21 18 m2
LPD. EGFA. Flex Verstärkung. Büro 1_1_07_22 18 m2
LPD. EGFA. Flex Verstärkung. Bereithalteraum 1_1_07_25 10 m2
LPD.EGFA.ET Zentrum/LPD/DSE Sporthalle 1_1_08_40 405 m2
LPD. EGFA. PI SODI. Bereithalteraum M 1_1_07_13 10 m2
LPD. LA. ALLGEMEIN Sozialraum 1_7_00_07 24 m2
LPD. LA. AL Büro AL Stv 1_7_00_02 15 m2
LPD. EGFA. PI SODI. Umkleideraum W 1_1_07_19 40 m2
LPD. LA. ALLGEMEIN Besprechungsraum 1_7_00_06 25 m2
LPD. EGFA. PI SODI. Bereithalteraum M 1_1_07_14 10 m2
LPD. LA. AL Büro AL 2. Stv 1_7_00_03 15 m2
LPD. EGFA. PI SODI. Bereithalteraum W 1_1_07_15 10 m2
Grundriss 1. Obergeschoss M 1:200
LPD. EGFA. PI SODI. Sanitär/Dusche W 1_1_07_17 6 m2
LPD. LA. AL Büro Führungsunterstützung 1_7_00_04 12 m2
Up to date the various departments of Austrians internal affairs ministry exist as isolated clusters in the city of Innsbruck. A total of fourteen separate departments are now being organized in one building complex. We chose to give our project a symbolic element by having the volumes form two Sicherheitszentrum Tirol / 2. Stufe Sicherheitszentrum Tirol / 2. Stufe interlocking links of a chain, strengthened at the centre through a higher element, portraying the virtues of strength, integrity and cooperation. The connecting link serves as a central hub, connecting the different departments. A clearly defined rhythm in the street wards facade portraits a calm authority in front of which life of the city unfolds, undisturbed. The more playful inner volume acts as a counterpoint, focusing the ensemble on itself. It is the meeting point where the departments are interacting, which will be perceivable in the atrium at its core. LPD. EGFA. PI SODI. Umkleideraum M 1_1_07_18 72,5 m2
LPD. EGFA. PI SODI. Sanitär/Dusche M 1_1_07_16 8 m2
LPD. EGFA. PI SODI. Sozialraum 1_1_07_10 15 m2
Kletterwand
LPD. LA. AL Büro Führungsunterstützung 1_7_00_05 12 m2
LPD. LA. FB 1 Büro FBL 1_7_01_01 12 m2
LPD. LA. AL Büro AL 1_7_00_01 18 m2
LPD. EGFA. PI SODI. Büro MA 1_1_07_04 18 m2
LPD. EGFA. PI SODI. Büro DF 1_1_07_02 18 m2
LPD. LA. FB 1 Büro FBL Stv 1_7_01_02 18 m2
LPD. LA. FB 1 Büro FPS Centre 1_7_01_05 18 m2
LPD. EGFA. PI SODI. Büro Kdt u Stv 1_1_07_01 18 m2
LPD. EGFA. PI SODI. Büro MA 1_1_07_03 18 m2
LPD. LA. FB 1 Büro MA 1_7_01_03 18 m2
LPD. LA. FB 1 Büro MA 1_7_01_04 18 m2
LPD. EGFA. PAZ AGM. Erkennungsdienstl. Behandlungsraum 1_1_05_12 25 m2
LPD. EGFA. PI SODI. Büro MA 1_1_07_05 18 m2
LPD. LA. FB 1 Büro FB Kraftfahrgruppe 1_7_01_07 18 m2
LPD. LA. FB 1 Büro FB Kraftfahrgruppe 1_7_01_08 18 m2
LPD. EGFA. PI SODI. Waffen und Einsatzmittelraum 1_1_07_11 25 m2
LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum / Familien 1_1_05_25 18 m2
LPD. LA. FB 1 Handarchiv 1_7_01_06 16 m2
LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum 1_1_05_20 18 m2
LPD. EGFA. PAZ AGM. Lager Utensilien 1_1_05_26 12 m2
LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum 1_1_05_24 18 m2
LPD. LA. FB 1 Bereithalteraum 1_7_01_10 12 m2
LPD. LA. FB 1 Bereithalteraum 1_7_01_09 12 m2
LPD. LA. FB 2 Büro FBL + Stv 1_7_02_00 18 m2
LPD. EGFA. PAZ AGM. Teeküche 1_1_05_14 10 m2
LPD.SPK.KR FB 2 Büro 1_8_02_36 18 m2
BMI/DSE EKO Cobra KOST Bereithalte- / Umkleideraum ESD 2_1_02_07 13 m2
LPD.SPK.KR FB 2 Büro 1_8_02_37 18 m2
BMI/DSE EKO Cobra KOST Bereithalte- / Umkleideraum DHF 2_1_02_09 14 m2
LPD.SPK.KR FB 2 Büro 1_8_02_35 18 m2
LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum 1_1_05_23 18 m2
BMI/DSE EKO Cobra KOST Bereithalte- / Umkleideraum IA 2_1_02_08 13 m2
BMI/DSE EKO Cobra ALLG Waffenraum 2_1_01_06 20 m2
BMI/DSE EKO Cobra KOST Büro ZDF 2_1_00_05 20 m2
BMI/DSE EKO Cobra EE 3-4 Büro 2_1_00_12 25 m2
LPD.SPK.KR FB 2 Büro 1_8_02_34 18 m2
BMI/DSE EKO Cobra KOST Trockenraum KOST BMI/DSE EKO Cobra 2_1_02_11 KOST 10 m2 Dusch- / Waschraum 2_1_02_12 15 m2
LPD.SPK.KR FB 2 Büro 1_8_02_33 18 m2
LPD.SPK.KR FB 2 Büro 1_8_02_32 18 m2
LPD.SPK.KR FB 2 Büro 1_8_02_31 18 m2
BMI/DSE EKO Cobra ALLG Teeküche 2_1_01_02 10 m2
BMI/DSE EKO Cobra KOST Büro ESD 2_1_00_09 15 m2
BMI/DSE EKO Cobra Leitung Büro Kdt 2_1_00_01 15 m2
LPD. LA. FB 2 Büro MA 1_7_02_01 18 m2
LPD. EGFA. PAZ AGM. Sanitärraum WC W 1_1_05_18 10 m2
LPD. LA. FB 3 Büro FBL Stv 1_7_03_02 18 m2
BMI/DSE EKO Cobra ALLG Kopierraum 2_1_01_07 10 m2
BMI/DSE EKO Cobra Leitung Büro Kdt Stv 2_1_00_02 12 m2
BMI/DSE EKO Cobra Leitung Büro IA 2_1_00_03 15 m2
LPD.SPK.KR FB 1 Büro 1_8_02_23 18 m2
LPD. LA. FB 3 Büro 1_7_03_05 18 m2
LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum 1_1_05_21 18 m2
BMI/DSE EKO Cobra ALLG Büro GPS Leitstand 2_1_01_04 25 m2
BMI/DSE EKO Cobra ALLG Kommando - & Schulungsraum 2_1_01_03 70 m2
LPD. LA. FB 3 Büro 1_7_03_03 18 m2
LPD. EGFA. PAZ AGM. Erstuntersuchung Rot Kreuz 1_1_05_16 24 m2
BMI/DSE EKO Cobra ALLG Putzraum 2_1_01_10 5 m2
LPD. LA. FB 4 Büro FBL 1_7_04_01 12 m2
LPD. LA. FB 5 Kantine Verkaufsraum 1_7_05_23 20 m2
BMI/DSE EKO Cobra ALLG Lager 2_1_01_08 10 m2
BMI/DSE EKO Cobra KOST Büro ZTechnik BMI/DSE EKO Cobra 2_1_00_07 KOST 12 m2 Büro / San 2_1_00_10 12 m2
LPD.SPK.KR FB 1 Büro 1_8_02_26 24 m2
LPD. LA. FB 3 Büro 1_7_03_04 18 m2
LPD. LA. FB 4 Bereithalteraum 1_7_04_06 12 m2
BMI/DSE EKO Cobra KOST Büro ZAusb 2_1_00_06 20 m2
LPD. LA. FB 5 Speisesaal 1_7_05_22 240 m2
BMI/DSE EKO Cobra ALLG Einsatzmittelraum 2_1_01_05 20 m2
LPD. LA. FB 4 Büro MA 1_7_04_04 18 m2
Dachterrasse / Aussenbereich Cafeteria
LPD.SPK.KR FB 1 Büro 1_8_02_22 18 m2
LPD. LA. FB 5 Büro techn. Gebäudeaufsicht 1_7_05_11 12 m2
LPD. LA. FB 4 Büro MA 1_7_04_05 18 m2
LPD. LA. FB 5 Küche 1_7_05_25 110 m2
LPD. LA. FB 5 Büro HV 1_7_05_10 18 m2
LPD.SPK.KR FB 1 Büro 1_8_02_21 18 m2
LPD. LA. FB 5 Büro FBL 1_7_05_01 12 m2
LPD.SPK.KR FB 1 Büro FBL 1 1_8_02_20 12 m2
LPD. GF. L1 Veranstaltungsraum 1_0_01_40 240 m2
LPD. LA. FB 5 Handarchiv 1_7_05_03 20 m2
LPD.SPK.KR Büro 1_8_02_07 18 m2
LPD. LA. FB 5 Büro FBL Stv 1_7_05_02 18 m2
LPD.SPK.KR Büro 1_8_02_08 24 m2
LPD. LA. FB 5 Tiefkühlraum Küche 1_7_05_28 10 m2
LPD. LA. FB 6 Büro MA 1_7_06_03 18 m2
LPD. LA. FB 5 Kühlraum Küche 1_7_05_27 15 m2
LPD. LA. FB 5 Büro MA 1_7_05_06 18 m2
LPD. LA. FB 5 Büro MA 1_7_05_04 18 m2
Lastenaufzug
LPD. LA. FB 5 Kantine/Speise/ Aufenthaltsraum 1_7_05_24 60 m2
LPD. GF. L1 Lager Musik 1_0_01_41 30 m2
LPD.LVA.FB 2.2 Büro MA 1_2_04_02 18 m2
LPD.SPK.FB 4 Büro 1_8_02_49 18 m2
LPD. LA. FB 5 Büro MA 1_7_05_05 18 m2
LPD. LA. FB 6 Büro MA 1_7_06_06 18 m2
LPD. LA. FB 5 Lager Küche 1_7_05_26 40 m2
LPD. LA. FB 5 Büro Küche 1_7_05_20 12 m2
LPD.SPK.FB 4 Büro 1_8_02_50 18 m2
LPD. LA. FB 6 Büro FBL Stv 1_7_06_02 18 m2
LPD. LA. FB 4 Installations Konfig.- raum 1_7_04_08 18 m2
LPD.SPK.KR Besprechungsraum 1_8_02_03 20 m2
LPD.SPK.KR Journaldienstraum I 1_8_02_01 12 m2
LPD.SPK.FB 4 Büro 1_8_02_48 18 m2
LPD. LA. FB 6 Handarchiv 1_7_06_05 18 m2
LPD. LA. FB 4 Reparatur Annahme 1_7_04_07 10 m2
LPD.SPK.KR Sozialraum 1_8_02_04 20 m2
LPD.SPK.KR Vernehmungsraum 1_8_02_05 12 m2
LPD.SPK.KR Journaldienstraum II 1_8_02_02 18 m2
LPD.SPK.FB 4 Büro 1_8_02_47 18 m2
LPD. LA. FB 3 Büro 1_7_03_06 18 m2
LPD. LA. FB 4 Büro FBL Stv 1_7_04_02 18 m2
LPD. LA. FB 4 Büro MA 1_7_04_03 18 m2
BMI/DSE EKO Cobra Leitung Besprechungsraum 2_1_00_04 15 m2
LPD.SPK.KR FB 1 Büro 1_8_02_24 18 m2
LPD.SPK.FB 4 Büro FBL 4 1_8_02_46 12 m2
LPD. LA. FB 3 Büro FBL 1_7_03_01 12 m2
LPD. EGFA. PAZ AGM. Aufenthalt / Essensraum 1_1_05_13 18 m2
BMI/DSE EKO Cobra ALLG Sozialraum 2_1_01_00 45 m2
LPD. LA. FB 5 Garderobe 1_7_05_21 20 m2
BMI/DSE EKO Cobra ALLG Archiv 2_1_01_09 15 m2
BMI/DSE EKO Cobra KOST Büro SchA, Sport 2_1_00_08 15 m2
LPD. EGFA.
PAZ AGM. Raucherzimmer für Aufgriffe 1_1_05_15 12 m2
LPD. EGFA. PAZ AGM. Sanitärraum WC M 1_1_05_17 10 m2
LPD. EGFA. PAZ AGM. Anhalte- und Schlafraum 1_1_05_22 18 m2
BMI/DSE EKO Cobra ALLG Journaldienstraum 2_1_01_01 30 m2
BMI/DSE EKO Cobra KOST Umkleideraum 2_1_02_10 20 m2
BMI/DSE EKO Cobra KOST Bereithalte- / BMI/DSE EKO Cobra Umkleideraum SchA KOST 2_1_02_06 Bereithalte- / BMI/DSE EKO Cobra 13 m2 Umkleideraum ZTechnik KOST 2_1_02_05 Bereithalte- / BMI/DSE EKO Cobra 13 m2 Umkleideraum ZAusb KOST 2_1_02_04 BMI/DSE EKO Bereithalte- / 13 m2 Umkleideraum ZDF Cobra Leitung BMI/DSE EKO Bereithalte- / 2_1_02_03 Cobra Leitung Umkleideraum Kdt Bereithalte- / 13 m2 2_1_02_02 Umkleideraum Kdt 10 m2 Stv 2_1_02_01 10 m2
LPD.SPK.KR FB 2 Büro FBL 2 1_8_02_30 12 m2
LPD.SPK.KR FB 1 Büro 1_8_02_25 18 m2
BMI/DSE EKO Cobra EE 1-2 Büro 2_1_00_11 25 m2
LPD. LA. FB 3 Bereithalteraum 1_7_03_07 12 m2
LPD.SPK.Kdo Schulungs- & Besprechungsraum 1_8_01_16 45 m2
LPD.SPK.Kdo LPD.SPK.Kdo LPD.SPK.Kdo LPD.SPK.Kdo LPD.SPK.Kdo Waffen- & Bereithalteraum M Bereithalteraum W Büro Kriminalreferent Büro Kriminalreferat Einsatzmittelraum 1_8_01_18 1_8_01_08 1_8_01_17 1_8_01_10 1_8_01_15 10 m2 15 m2 10 m2 12 m2 10 m2
LPD.SPK.Kdo Handarchiv / Besprechungsraum 1_8_01_03 18 m2
LPD.SPK.Kdo Besprechungsraum 1_8_01_13 18 m2
LPD.SPK.Kdo Büro Kriminalreferat 1_8_01_09 18 m2
LPD.LVA.AGM. Büro Kdt und Stv 1_2_07_00 18 m2
LPD.LVA.AGM Büro DF 1_2_07_01 18 m2
LPD.LVA.ALLG Journaldienst- / Einsatzraum 1_2_00_07 20 m2
LPD.LVA.ALLG Sozialraum 1_2_00_08 20 m2
LPD.LVA.ALLG Besprechungsraum 1_2_00_09 18 m2
LPD.LVA.FB 1.1 Büro FBL u Stv 1_2_01_00 18 m2
LPD.LVA.FB 1.2 Büro FBL 1_2_02_00 12 m2
LPD.LVA.FB 1.2 Büro 1_2_02_01 18 m2
LPD. LA. FB 5 Büro MA 1_7_05_07 18 m2
LPD.LVA.AL Büro AL Stv 1_2_00_02 15 m2
LPD.LVA.ALLG Bereithalteraum M 1_2_08_05 10 m2
LPD.SPK.FB 4 Spurenträgerasservierungsraum 1_8_02_54 15 m2
LPD. LA. FB 5 Büro MA 1_7_05_08 18 m2
LPD.LVA.AL Besprechungsraum 1_2_00_03 18 m2
LPD.LVA.FB 2.2 BDF 1_2_04_01 18 m2
LPD.SPK.FB 4 Fotoaufnahmeraum 1_8_02_52 15 m2
LPD. LA. FB 6 Büro FBL 1_7_06_01 12 m2
LPD.LVA.AL Büro AL 1_2_00_01 18 m2
LPD.LVA.FB 2.2 Büro FBL & Stv 1_2_04_00 18 m2
LPD.SPK.FB 4 Spurenbehandlungsraum 1_8_02_53 15 m2
LPD. LA. FB 6 Büro MA 1_7_06_04 18 m2
LPD. LA. FB 4 EDV Schulungsraum 1_7_04_10 80 m2
LPD.LVA.FU Büro 1_2_00_05 12 m2
LPD.LVA.ALLG Bereithalteraum M 1_2_08_04 10 m2
LPD.LVA.FU Handarchiv 1_2_00_06 16 m2
LPD.LVA.FU Büro 1_2_00_04 18 m2
LPD.SPK.FB 4 Einsatzmittelraum 1_8_02_55 15 m2
Lastenaufzug
LPD.SPK.KR Waffen- & Einsatzmittelraum 1_8_02_06 10 m2
LPD.SPK.Kdo Umkleideraum 1_8_01_19 18 m2
LPD.LVA.ALLG Waffenraum 1_2_00_10 10 m2
LPD.SPK.Kdo Teeküche 1_8_01_14 10 m2
LPD.LVA.FB 2.1 Technikraum Radar / Rotlicht 1_2_03_03 10 m2
LPD.LVA.FB 2.4 Büro MA 1_2_06_01 18 m2
LPD.LVA.FB 2.3 Lager 1_2_05_03 10 m2
LPD.LVA.FB 2.4 Büro FBL & Stv 1_2_06_00 18 m2
LPD.SPK.FB 4 Büro 1_8_02_51 18 m2
GF SVA SPK
LPD.SPK.FB 4 Bereithalteraum 1_8_02_56 10 m2
LPD.SPK.FB 3 Büro FBL 3 1_8_02_40 18 m2
LPD.SPK.FB 3 Büro 1_8_02_41 18 m2
LPD.SPK.KR Bereithalteraum M 1_8_02_09 10 m2
LPD.SPK.KR Bereithalteraum W 1_8_02_10 10 m2
LPD.SPK.Kdo LPD.SPK.Kdo Büro Organisationsreferent Büro Organisationsreferat 1_8_01_07 1_8_01_06 18 m2 15 m2
LPD.SPK.Kdo Büro Einsatzreferat 1_8_01_05 18 m2
LPD.SPK.Kdo Büro Einsatzreferent 1_8_01_04 15 m2
LPD.SPK.Kdo Büro Verkehrsreferat 1_8_01_12 15 m2
LPD.SPK.Kdo Büro Führungsunterstützung 1_8_01_02 18 m2
LPD.SPK.Kdo Büro SPKdt 1_8_01_00 18 m2
LPD.SPK.Kdo Büro Verkehrsreferent 1_8_01_11 15 m2
LPD.SPK.Kdo Büro Sekretariat 1_8_01_01 12 m2
LPD.LVA.AGM. Büro MA 1_2_07_02 18 m2
LPD.LVA.AGM Büro MA 1_2_07_03 18 m2
LPD.LVA.FB 2.1 Büro tech. Auswertung 1_2_03_02 45 m2
LVA
LPD.LVA.ALLG Bereithalteraum M 1_2_08_06 10 m2 LPD.LVA.FB 2.1 Büro FBL & Stv 1_2_03_00 18 m2
LPD.LVA.FB 2.1 Büro MA 1_2_03_01 18 m2
LPD.LVA.FB 2.3 Büro FBL & Stv 1_2_05_00 18 m2
LPD.LVA.FB 2.3 Büro DF 1_2_05_01 18 m2
EKO EGFA
LPD.LVA.FB 2.3 Büro MA 1_2_05_02 18 m2
LA PA IV/8 I.12 LVT LKA IV/2 HT
Grundriss Erdgeschoss | 1:200
Illustra
Fassadenschnitte M 1:50
Fassadenschnitte M 1:50
Fassadenschnitt Neubau
Fassadenschnitt Neubau Fassadenansicht Beton
Fassadenschnitt Neubau Fassadenschnitt Bestand
Fassadenansicht Beton
+ 15m
Beton
Champagnerfarbenes Aluminium Fassadenelement (anodisiert)
Glas (3fach Isolierverglasung)
Glas (3fach Isolierverglasung)
Glas (3fach Isolierverglasung)
Glas (3fach Isolierverglasung)
Aluminium Fenster
Aluminium Fenster
Dezentrales Lüftungsgerät mit Heizregister und Wärmerückgewinnung
Dezentrales Lüftungsgerät mit Heizregister und Wärmerückgewinnung
Beton
Dezentrales Lüftungsgerät mit Heizregister und Wärmerückgewinnung
Doppelboden
Doppelboden
Doppelboden
Doppelboden
Betonboden
Betonboden
Betonboden
Betonboden
Nord-Süd 1:500
+ 1.20m
Grundriss Erdgeschoss | 1:200
Champagnerfarbenes Aluminium Fassadenelement (anodisiert)
Dezentrales Lüftungsgerät mit Heizregister und Wärmerückgewinnung
Schnitt AA | Nord Süd 1:200
volumes merging
Fassadenschnitt Fassadenschnitt Neubau Bestand
Fassadenansicht Aluminium Fassadenschnitt Bestand
+ 15m
Grundriss Erdgeschoss | 1:200
view of atrium
+ 1.20m
strength & warmth
+28.7 m
+15 m
+15 m
SPITALSTRASSE • Peter F. Oswald Architekten • Housing • Muri | AG | Switzerland • Completed
2011 the zoning laws in Switzerland changed. A small town consisting mainly out of low density one-family homes is suddenly confronted with a possible increase in the built density by nearly three times. The plot we had the opportunity to work on was roughly four times the size as its surroundings. In effect the possible new mass was roughly twelve times larger, dwarfing even the large adjoining villas. Understanding the possible friction this crass jump in scale could cause we invested a great amount of time in finding a balance between making a strong individual architecture and letting the new buildings react very specifically to its surroundings. Displacements and altering densities in the volumes function as a gradient to the increased density and interweave the new buildings with the green landscape. The result is a play of volumes relating to the existing structures, noticeably larger but never alienating them.
e ass alstr Spit
12 h 13 h 14 h
15 h 16 h
e strass uben Zurla
11 h
10 h
9h
Zurlaubenstras se
N W E S
Zweistündiger Dauerschatten am mittleren Wintertag (08.02. / 03.11.)
shadow studies REBBERG AG, SINGISENSTRASSE 18, 5630 MURI WOHNÜBERBAUUNG SPITALSTRASSE 5 / 5a, 5630 MURI
copyright Firmenmitglied SIA
1979.08
D 27.11.2015
BAUEINGABE DAUERSCHATTEN mittlere Wintertage
GSPublisherVersion 0.0.100.100
1:500
P E T E R F. O S W A L D D I P L. A R C H I T E K T E T H / S I A 5620 BREMGARTEN ZUGERSTRASSE 14 5630 MURI SINGISENSTRASSE 18
Z PW F A4 info@oswaldarch.ch
FAX 056 633 37 75 TEL 056 633 37 33 FAX 056 664 21 08 TEL 056 664 21 06
situation
view of living room
S p i t a l s t r a s s e TROTTOIR
473.01 472.95
472.92
472.02
471.90 471.24
471.06
GARTENMAUER BEST.
2.60
4.00
ENTSORGUNG
18.80 11.30
7.50 4.00
2.60
VK EL
NZ 2 BF 4.8 m2 FF 1.3 m2
13
14
15
1.25
12
8.30
3 1/2
9 8 7 6
4
3
5
5
3 1/2
17 x 27 x 175
2
40
R BF 6.0 m2
1
KÜCHE BF 9.8 m2
Spielen
±0.00 (473.98)
11 10
17.00 15.40
A
1.50
1.20
17.00
WOHNEN / ESSEN BF 43.2 m2 FF 20.3 m2
SCHLAFEN 2 BF 14.0 m2 FF 2.7 m2
16
1.00
7.95
A
11.50
SCHLAFEN 1 BF 16.7 m2 FF 7.5 m2 GARDEROBE BF 14.5 m2 FF 2.7 m2
470.98
1.65
1.60
15.50 4.00
NZ 1 BF 4.8 m2 FF 1.3 m2
8.00
3.95
Nr. 2 3 1/2 ZI-WHG 119.0 m2 BWF
1.80
40
1.60
VK TV
C
14.45
R BF 4.9 m2 KÜCHE BF 8.0 m2 60
SCHLAFEN 1 BF 15.1 m2 FF 2.7 m2
1.50
40
Nr. 1 3 1/2 ZI-WHG 111.9 m2 BWF
NZ 1 BF 3.5 m2 FF 1.3 m2
WOHNEN / ESSEN BF 41.2 m2 FF 21.6 m2
7.05
SCHLAFEN 2 BF 17.3 m2 FF 5.4 m2
1.35
6.25
1.20
NZ 2 BF 5.4 m2 FF 1.3 m2 12.42 1.80
2.60
4.00
8.42
18.50 4.00
21.10
4.00
1.60
18.80 11.30
7.50 7.51
1.60
4.00
NZ 1 BF 4.8 m2 FF 1.3 m2 NZ 2 BF 4.8 m2 FF 1.3 m2
SCHLAFEN 1 BF 16.7 m2 FF 7.5 m2
14
15
8.30 SCHLAFEN 2 BF 14.0 m2 FF 2.7 m2
16
12
WOHNEN / ESSEN BF 43.2 m2 FF 20.3 m2
3 1/2
11 10
2.93
9 8 7 6
R BF 6.0 m2
3
2
5
5a
3 1/2
17 x 27 x 175
1
KÜCHE BF 9.8 m2
4
1.52
40
17.00 15.40
1.41
B
1.50
1.20
±0.00 (473.98)
B
1.25
13
7.95
1.00
GARDEROBE BF 14.5 m2 FF 2.7 m2
1.65
470.83
3.51
Nr. 7 3 1/2 ZI-WHG 119.0 m2 BWF
1.80
40
1.60
4.00
2.60
17.00
9.60
8.00
AK HG
AK HG
2.60
R BF 4.9 m2
21.86 13.86
KÜCHE BF 8.0 m2
8.00
60
SCHLAFEN 1 BF 15.1 m2 FF 2.7 m2
1.50
40
Nr. 6 3 1/2 ZI-WHG 111.9 m2 BWF
NZ 1 BF 3.5 m2 FF 1.3 m2
WOHNEN / ESSEN BF 41.2 m2 FF 21.6 m2
7.05
SCHLAFEN 2 BF 17.3 m2 FF 5.4 m2
1.35
6.25
1.20
NZ 2 BF 5.4 m2 FF 1.3 m2
1.80
4.00
DIE BAUHERRSCHAFT:
DER ARCHITEKT:
5630 MURI,
5630 MURI,
471.21 2.60
18.50
473.16
473.23
473.42
C
473.58
473.85
4.00
21.10 473.98
474.42
474.50
N W E 473.10
S
±0.00 = 473.98 m ü. M. REBBERG AG, SINGISENSTRASSE 18, 5630 MURI copyright WOHNÜBERBAUUNG SPITALSTRASSE 5 / 5a, 5630 MURI Firmenmitglied SIA
BAUEINGABE 472.33
472.99
GRUNDRISSE ERDGESCHOSS 5 und 5a 1:100
471.47
P E T E R F. O S W A L D D I P L. A R C H I T E K T E T H / S I A ZUGERSTRASSE 14 5620 BREMGARTEN SINGISENSTRASSE 18 5630 MURI
ground floor
ground floor
1:500
1st floor
Attika floor
1979.03 D 27.11.2015 Z PW / PF F 840x740 info@oswaldarch.ch
FAX 056 633 37 75 TEL 056 633 37 33 FAX 056 664 21 08 TEL 056 664 21 06
HORECA • Peter F. Oswald Architekten • Hotel | meeting | restaurant • Muri | AG | Switzerland • Sketch Design
An existing, nearly 800 year old hotel/ restaurant in the heart of the well known monastery town was to be refurbished. In this process an extension of the restaurant, the hotel and a new meeting centre where to be included in the overall design. Strict regulations for the preservation of the core town picture had to be considered. In accordance with the volumetric language we placed a second volume housing the hotel & meeting centre opposite the existing restaurant/hotel, completing the block in the townscape. In between old and new we create a place to meet for the town and a linking element for the project, housing an entrance hall, a restaurant and a rooftop terrace.
+15.00
+14.70 (+492.00)
14.19
6.00
~ +12.95
3.55
+14.12
10.80
2.45
+11.15
+8.70 (+486.00)
+6.15 (Lift 2.OG)
+6.15 (+483.45)
+3.48 (Lift 1.OG)
+3.48 (+480.78)
ca. +0.70 (Niveau Lift EG)
ca. +0.70 (+478.00)
8.00
2.12
+6.91 (Niveau Estrich)
2.55
43
+8.70 (Lift DG)
2.67
2.37
30
5.45
2.78
±0.00 (+477.30)
0.00
-1.80 (+475.50)
eg f-W Wol par Cas
2.50
2.50
-0.30 (Niveau EG?)
Zurlaubenstrasse
CW-W
2.78
2.43
35
+3.43 (Niveau Saal)
Seetalstrasse
WEST +15.00 +14.12
g we gli Re sse stra en ub rla Zu +15.00
4.62
+14.12
1.20 35 2.80
Korr
27/ 30
Korr
17/ 20
+9.50 (+486.80)
11/ 1 6
-0.91 (+476.39)
Seet alst rass e
-0.77 (+476.53)
CASPAR WOLF-WEG
NORD
2.45
14.12
±0.00 (+477.30)
-0.35 (+476.95)
21/ 26
2.80
1 / 6
Korr
7 / 10
2.45
35
+6.70 (+484.00)
70
+3.90 (+481.20)
3.90
Foyer
Restaurant
3.20
A / B / C
GSPublisherVersion 0.0.100.100
±0.00 (+477.30)
2.80
2.40
40
±0.00 (+477.30)
Hallengarage
evolution of volumes
-2.80 (+474.50)
situation
SCHNITT A-A
GSPublisherVersion 0.0.100.100
Keller
facade of new hotel
ZURLAUBENSTRASSE
SINGISENSTRASSE • Peter F. Oswald Architekten • Housing | atelier • Muri | AG | Switzerland • Definite Design
A
13.80
3.10
C
5.60
3.20
5.00
85
87
2 4.1
3.10
5 8.2
2 .7 Z N F 5 .8 B F 11 F
N
WOHNEN BF 25.7 FF 21.0
ESSEN BF 12.0 FF 12.0
KS
N
BO
KÜCHE BF 12.9 FF 4.2
W
3 .7 Z N F 5 .8 B F 11 F
3 1/2 ZI-WHG 109.8 m2 BWF 105.2 m2 NWF
2 4.1
E H U /R N FE LA H 4.6 SC F 4 7.0 B F4 F
SCHLAFEN BF 14.4 FF 4.2 BALKON 13.0
D
NZ 2 BF 4.4
S
SCHLAFEN BF 15.7 FF 4.2 NZ 1 BF 5.0
N
SCHLAFEN 63.2 m2 BWF 57.0 m2 NWF
B
B 20.10
I
B
7.50
5 8.2
20.10
B
W
R BF 4.2
5.45
N O LK BA 6.5 1
E S
S
The good thing about having an artist as client is that, if familiar with your work, you get a highly enthusiastic partner, very involved and at the same time leaving a high degree of freedom to your professional judgement. An existing single-family home and an atelier where to be redefined in two separate volumes, allowing for an increase to a total of six apartments. Preserving most of the open green space of the plot we pushed the multi-family home to the utmost edge of the plot, giving it unparalleled view over the town. This allowed for the private atelier/residence of our client, although quite a bit smaller, to be the expressive statement on the site, that he loved so much. G
NZ 1 BF 5.0
C SCHLAFEN 15.7
I
S
NZ 2 BF 4.4
BALKON 13.0
E
E
SCHLAFEN BF 14.4 FF 4.2 5.45
N S T
3 1/2 ZI-WHG 109.8 m2 BWF 105.2 m2 NWF
KÜCHE BF 12.9 FF 4.2
ESSEN BF 12.0 FF 12.0
WOHNEN BF 25.7 FF 21.0
KS
BO
R A
87
85
5 8.2
R BF 4.2
S 3.10
S
5 8.2
5.60
3.20
5.00
13.80
3.10
E DIE BAUHERRSCHAFT:
A
5630 MURI,
±0.00 = 473.71 m.ü.M.
NEUBAU MFH + ATELIER, SINGISEN
BAUPROJEKT ATTIKAGESCHOSS 1:100
P E T E R F. O S W A L D D I P L. A ZUGERSTRASSE 14 SINGISENSTRASSE 18
2.50
40
2.50
40
2.50
50
GSPublisherVersion 0.0.100.100
42
2.50
40
GewTer
1515
6
HG
SINGISE
SCHNITT
1799 1511
22
3123
+12.30 +8.50
3101
1548
+5.55
+5.50 40
14.00 Uhr 16.00 Uhr
18
+7.30
W
18.00 Uhr
18
16 14
2377
18.00 Uhr 755
E
+2.60
I
40
S
S
6.89
Uhr
N
2.90
12.00 Uhr
10.00 Uhr
16.00
767
2.50
r Uh
Uhr .00 14
0 .0 12
10.0 0U hr
3.00
8
2.50
50
30
G E
6.92
S
2.50
I
17
2.90
N
19
N
GewTer
S
-0.30
1467
T
834
697 A
40
R
835
S 1
2.50
E
2.90
S 8
3124
+0.30
14
GewTer
-3.20
GewTer
2525
42
GewTer
12a
12b 12d
12c
1870
1869
2465
HG
SINGISEN 14
SCHNITT B-B
12
1867
1868
14
+12.30
SINGISEN 18
SINGISEN 18
HG
SINGISEN 14
3453 3451
Architekt:
3454
3452
SÜD
Bauherrschaft:
SÜD +12.30
+7.30
5630 Muri, Datum: shadow study
view of studio
section of multi family home +8.50
+7.30
+5.55
11.85
6.92
5630 Muri, Datum:
6.85
+5.55
1318.08
copyright Firmenmitglied SIA
6.90
NEUBAU MFH + ATELIER, SINGISENSTRASSE 14-18
+0.30 GewTer GewTer
BAUPROJEKT
14
D 10.08.2015
-0.30
-1.68
Z PW
SCHATTENDIAGRAMM 1:500
SOMMER (21. JUNI)
P E T E R F. O S W A L D D I P L. A R C H I T E K T E T H / S I A 5620 BREMGARTEN ZUGERSTRASSE 14 5630 MURI SINGISENSTRASSE 18 GSPublisherVersion 0.0.100.100
+0.30
GewTer GewTer
-0.30
F A4
GewTer
info@oswaldarch.ch SINGISEN 18
FAX 056 633 37 75 TEL 056 633 37 33 FAX 056 664 21 08 TEL 056 664 21 06
SINGISEN 18
HG
SINGISEN 14 SINGISEN 18
SÜD
+12.30
WEST GSPublisherVersion 0.0.100.100
SINGISEN 14
SÜD WEST DIE BAUHERRSCHAFT:
DER ARCHITEKT:
AIRPORT DUEBENDORF • Master in Urban Design / Architecture • Prof. Marc Angelil • Duebendorf | ZH | Switzerland • Design - repurposing airport
Zürich as a city is the heart of the entire metropolitan region of northern Switzerland. As such an expanding pressure is weighing on the city, which has been steadily growing over the last years, at a rate of several thousand apartments a year. In the past this has been happening mainly on the outskirts, increasing the sprawl without adding much to the overall density of the city structure. In this situation, an old military airfield is becoming available for re purposing. My approach at the cities future development was to propose to utilise the space as a new recreation space. This would contribute to a densification of the city while also keeping the huge plot open for future adaptation. Specifically my proposal was to restore the landscape to its ‘natural’ state, before being used as an airfield. The border to the city was to be populated witch an expansion of the ETH and a multitude of ‘HORECA’ spaces.
study of urban texture
new urban revitalisation area
return to nature - urban park
LIST OF WORK
PHILIP A. WEBER ARCHITECT | MSC ETH | ZUERICH
+31 (0) 61 977 69 13 Stadhoudersweg 44D 3039 CE Rotterdam email: PhilipAdWeber@gmail.com LinkedIn: https://www.linkedin.com/in/PhilipAdrianWeber Telegram: https://t.me/PhilipWeber