FUND BUILD MANAGE Capability statement
BUILD OVER 40 YEARS OF CONSTRUCTiON EXCELLENCE In operation since 1977, and with our founding directors still at the helm today, Pindan is a leading national property group. Our expertise to FUND BUILD MANAGE property Australia-wide is well recognised and trusted as a symbol of quality and reliability. With an annual turnover of A$500 million and employing 350 staff, Pindan has proven capabilities and a can-do commitment that delivers results. We offer a comprehensive range of services including construction management, design management, property funds management, development management, asset maintenance and project marketing and sales. Today, our portfolio of partnerships include private and public enterprise and federal, state and local governments. Our award-winning projects span from non-process infrastructure and villages, commercial, industrial and health and care facilities through to community, education, residential, civil works, infrastructure, asset management and maintenance. It’s a track record that speaks volumes about our expertise. About how we partner with clients and consultants from the outset to safeguard the viability and vision of every project. About combining leading-edge techniques and materials to reduce costs, time frames and complexity. And about doing all this while elevating safety, quality and sustainability standards on every project. Our Building on Partnerships ethos has seen Pindan prosper with our personal and collective commitment to get the job done. It sets Pindan apart and is the reason why our clients choose us time and again, safe in the knowledge that we truly embody our belief in partnerships.
Capability Statement 18/19
FUND While many clients come to us solely for our construction expertise and capabilities, we also collaborate with clients as joint venture and capital raising partners where appropriate. That’s where our AFS-licensed and ASIC-compliant property funds management arm – Pindan Capital – comes in, raising capital to finance our clients’ projects if feasible, or by potentially co-investing and sharing the financial risk. Backed by a financial partnership with international property group, Oxley Holdings Ltd, we make for an industry powerhouse, combining decades of skill and experience with the capital and proven record to deliver major projects.
MANAGE Having managed a host of property development projects throughout Australia – for clients, as well as ourselves – we’re uniquely qualified as development management consultants. We have an enormous amount of project management experience, helping you through all facets of your own development and ensuring it is completed as efficiently as possible. We can assist in initial feasibilities and site acquisition, through to planning, project marketing and sales. All seamlessly integrated with our design & construct capabilities to ensure a streamlined experience.
Capability Statement 18/19
THE PINDAN EDGE DESIGN & CONSTRUCT AND EARLY CONTRACTOR INVOLVEMENT Our in-house design management, engineering and cost-planning capabilities means we can value-add from the outset. Indeed, that’s where our renowned Design & Construct (D&C) and Early Contractor Involvement (ECI) expertise can make all the difference to the success of your project. More and more of our clients and consultants are using our invaluable in-house perspective and expertise to find innovative ways to improve buildability by refining and streamlining projects. In fact, since 2008 we’ve been awarded D&C and ECI contracts worth over A$1.8 billion. Whether we’re consulting and contributing to design development, or taking on full project management responsibility, our early involvement means we can ensure construction feasibility and provide recommendations and solutions that minimise timeframes and budgets. It could mean suggesting structural solutions or alternative construction methods and materials, through to mitigating risk by flagging up potential construction or compliance issues. In short, our D&C and ECI input provides peace of mind that your project will be planned, documented and realised as efficiently and effectively as possible, providing certainty around costs, as well as schedules, thanks to our fixed budget commitment.
INNOVATIVE METHODS AND MATERIALS We understand the best construction techniques and structural systems that best suit each project’s unique specifications. We carefully consider materials, warranty periods, equipment and plant to ensure they are sufficiently robust to provide the lowest overall cost when considering capital, maintenance and operational cost over the building’s life cycle.
Capability Statement 18/19
LIFE CYCLE MAINTENANCE Our significant in-house maintenance operations via our dedicated business unit Pindan Asset Management enables us, after we have successfully constructed your project, to efficiently maintain, both planned and reactive, your facility over its lifespan thereby further ensuring lowest possible life cycle cost.
A TRUSTED NETWORK We’ve nurtured a loyal workforce and network of trusted consultants, sub-contractors, tradesmen and suppliers. They are the embodiment of our partnership ethos and one of the main reasons we’re able to consistently deliver the highest quality across an increasingly diverse range of projects. From engaging their early involvement at the design phase through to undertaking the works onsite, there’s no substitute for relationships which have developed over many years of working together. The result being the best possible outcome for our clients.
THE BEST PEOPLE When you engage Pindan, you’ll get the best people on the job. Highly qualified and at the top of their game, our executive and management team is arguably one of the most stable in the industry with no less than 50 top performers employed for 10 or more years. We invest in highly experienced personnel with architectural and engineering backgrounds who speak the same language as our consultants. We have dedicated people in cost-planning, programming and quality control whose main purpose is to add further value into your project. Our high levels of staff loyalty - over 50% of the construction team have been with Pindan for more than five years – means we’ll retain all the intellectual knowledge needed to see you through efficiently from concept-to-completion.
Fund BUILD Manage
Key Personnel LEADERSHIP TEAM
George Allingame
David Pringle
Tony Gerber
Managing Director, Pindan Group
Director, Pindan Group
Managing Director, Pindan Contracting
Managing Director, Pindan Capital
James Allingame
Steven Pringle
Mark Thompson
Director, Pindan Contracting
Director, Pindan Contracting
Director, Pindan Constructions
Simon Greenlaw
Scott Davison
Nick Allingame
General Manager, Pindan Projects
Director Business Development, Pindan
General Manager, Pindan Homes
Director, Pindan Developments
General Manager, Pindan Capital
Sam Fisher
Andrew Macpherson
Chief Financial Officer, Pindan Group
General Counsel, Pindan Group
GENERAL MANAGERS
Jaco van Staden
Stephen Arndt
General Manager, Pindan Contracting
General Manager Pindan Asset Management
Capability Statement 18/19
DESIGN & CONSTRUCT TEAM
Mark Lee
Michael Blomfield
Ian Downs
Senior Design Manager, Pindan Contracting
Design Manager, Pindan Contracting
Estimating Manager, Pindan Contracting
Jacques Krynauw
Justin West
Paul McKenna
Senior Estimator & Bid Manager
Planning Manager, Pindan Contracting
Services Manager, Pindan Contracting
Jim Gutteridge
Derek Hammond
Kenneth Becker
Operations Manager, Pindan Contracting
Operations Manager, Pindan Contracting
Operations Manager, Pindan Contracting
Greg House
James Wong
Kevin Little
HSE Manager, Pindan Contracting
Quality Manager, Pindan Contracting
Contracts Manager, Pindan Contracting
Wendy Hyatt
Shanre’ D’Oliveira
Inge Blakiston
Office Manager, Pindan Contracting
Submissions Coordinator
Document Controller
Pindan Contracting
Pindan Contracting
Pindan Contracting
PINDAN ASSET MANAGEMENT TEAM
Neil Delaney
Craig Matthews
Growth & Support Services Manager
Operations Manager
Pindan Asset Management
Pindan Asset Management
Fund BUILD Manage
AWARDS & achievements National Award for Best Multi-Units/ Apartments in Australia 2013, 2007
National award for Best Commercial Building in Australia
Best Multi-Units/ Apartments 2018, 2017 2014, 2013, 2010, 2009, 2007, 2006, 2005, 2004, 2003
Best High/Medium Density Development 2015, 2009, 2005
Best Commercial Building
Best Historic Restoration/Renovation
2018, 2016, 2015, 2014
2015, 2009
Best Commercial Alterations/Additions
Best Aged Care Facility
2015
Best Office Building 2018
2011, 2008, 2007
2017, 2016, 2012, 2009
Best Regional Project
Best Education Building
2018
2018
Asset Management Information Management 2018
Ric New Rising Star 2018
Indigenous Apprentice of the Year 2018
Capability Statement 18/19
#1
#1
LARGEST MULTI-UNIT BUILDER IN WA & TOP TEN LARGEST IN AUSTRALIA
LARGEST SEMIDETACHED DWELLING BUILDER IN WA & TOP TEN LARGEST IN AUSTRALIA
Top 10
Top 40
LARGEST HOME BUILDER IN WA & TOP 40 LARGEST IN AUSTRALIA
LARGEST NON-RESIDENTIAL CONSTRUCTION COMPANY IN AUSTRALIA
Fund BUILD Manage
HEALTH, SAFETY, ENVIRONMENT & QUALITY Visit any Pindan work site and you’ll find it operates like a well-oiled machine. That’s due in no small part to our team’s ongoing investment in refining our quality, safety and environmental systems, ensuring everything and everyone at Pindan meets or exceeds all industry standards and regulations.
Pindan Contracting holds the following accreditations via Bureau Veritas: • AS4801:2001 Occupational Health and Safety Management System • ISO14001:2015 Environmental Management System
Pindan Contracting is a registered builder in WA, NSW, QLD, NT and SA.
• ISO9001:2015 Quality Management Systems Pindan Contracting additionally holds:
Pindan Contracting is State Government prequalified with the Department of Finance to Financial Level 5 - A$50 million, Technical Level Complex in WA; Department of Housing and Public Works to PQC Level 3 - A$44 million in QLD; and Contractor Accreditation Ltd (CAL) Financial Level - A$50 million in NT.
• Australian Government Building and Construction WHS Accreditation (0214) Pindan Contracting is a member of CCIWA, MBA, HIA, UDIA, Property Council and TSBE. Pindan is a Building and Construction Industry (Improving Productivity) Act 2016 compliant company.
Safety Statistics Period of Record (Year)
2018
2017
2016
2015
2014
1,002,924
953,434
1,108,943
1,017,060
1,116,671
LTIFR
0.00
0.00
1.09
0.00
0.00
TRIFR
2.08
3.46
1.89
1.57
2.08
TRIFR Commercial, Residential & Maintenance Sectors
2.08
3.46
1.89
1.57
2.08
TRIFR Resource Sector
0.00
0.00
0.00
0.00
0.00
Hours Worked
NOTE: LTIFR – Lost Time Injury Rate per 1 million man-hours worked
Capability Statement 18/19
Environmental Management System – ISO 14001:2015
Occupational Health & Safety Management System – AS-NZS 4801:2001
Quality Management System – ISO 9001:2015
Federal Safety Commissioner Certificate
Fund BUILD Manage
Corporate social responsibility Family values define our culture. Supporting local charities We have a long history of working with local charities, such as the Cancer Council, Parkerville Children and Youth Care, Cystic Fibrosis and the Association for the Blind. Since 2007, we’ve raised circa A$1 million through the construction and sale of charity homes and staff fundraising. They’re why we care for our people and our partners, promoting a safe and inclusive family-friendly environment where everyone enjoys the support, training and flexible working arrangement they need. The same values mean our community, charity and environmental initiatives are part and parcel of life at Pindan.
Engaging with communities Our commitment to local communities can be seen in everything we do, from the way we consult with local people so we can design and build in harmony with the environment and community, through to proactively promoting Indigenous employment. We are particularly proud of our mentorship of fledgling Indigenous businesses into multiskilled enterprises, which is why many of our projects in remote areas far exceed the 20% Indigenous labour component required.
Capability Statement 18/19
From the Red Cross’ corporate blood donation drive, through to donations for crisis relief and Christmas gifts for children in care, giving back is very much part of the fabric of our caring culture at Pindan.
Caring for the environment Just as we care for local people and communities, we also care for the environment. This commitment is perhaps most obvious in the way we integrate sustainable design features into our buildings to minimise their environmental impact. However, it’s a commitment that goes beyond our design team. Sustainable work practices are embedded in everything we do. Our sites are managed to ensure minimum impact on the local environment, and we adhere to all statutory and local government requirements, always.
Fund BUILD Manage
Capability Statement 18/19
NON-PROCESS INFRASTRUCTURE & VILLAGES
KANGI & DALLY CONSTRUCTION CAMPS Solomon Mine Site WA | Camp Design & Construct A$132.5M Project Value 70 Weeks Client Fortescue Metals Group Combined 2,788 person accommodation village
Fund BUILD Manage
CAPE LAMBERT LOCO WASH FACILITY Cape Lambert WA | NPI Design & Construct A$11.7M Project Value 60 Weeks Client Rio Tinto Manual and auto locomotive wash facilities
Capability Statement 18/19
NON-PROCESS INFRASTRUCTURE & VILLAGES
KOODAIDERI VILLAGE ENABLING PROJECT Koodaideri, Pilbara WA | Camp
CAJUPUT VILLAS & WICKHAM LODGE CLADDING Wickham WA | Camp
Design & Construct A$49.1M Project Value | 30 Weeks Client Rio Tinto
A$6.8M Project Value 23 Weeks
Design, procurement and offsite fabrication, delivery to site, construction installation, commissioning, training and handover of a 780 bed accommodation village & supporting facilities
Client Rio Tinto Removal of existing cladding & recladding of accommodation facilities
Watch video
CAPE LAMBERT POWER STATION UTILITIES BUILDING Cape Lambert WA | NPI
CAPE LAMBERT SAMPLE BUILDING Cape Lambert WA | NPI Design & Construct
Design & Construct
A$15.8M Project Value
A$18M Project Value
40 Weeks
60 Weeks
Client Rio Tinto
Client Rio Tinto
Sample preparation building and equipment
Utilities Building compromising ablution, offices, meeting rooms & communications room
Fund BUILD Manage
NON-PROCESS INFRASTRUCTURE & VILLAGES
CAPE LAMBERT 10KP ADMIN BUILDING Cape Lambert WA | Office Design & Construct
RIO TINTO REMOTE OPERATIONS FACILITY Perth Airport WA | Office
A$6.7M Project Value
A$18M Project Value
34 Weeks
60 Weeks
Client Rio Tinto
Client Westralia Airports Corporation
New building to house operations personnel
5 Star green star rated office building
NORTHERN LINK CONSTRUCTION CAMP
WILDFLOWER CONSTRUCTION CAMP
Northern Link WA | Camp
130km NWN of Newman WA | Camp
A$49.7M Project Value
Design & Construct
35 Weeks
A$16.3M Project Value
Client Rio Tinto
37 Weeks
200 Bed accommodation village
Client Rio Tinto 120 Room combined construction & exploration accommodation village
Capability Statement 18/19
NON-PROCESS INFRASTRUCTURE & VILLAGES
Yandi Sustaining & Infrastructure Facilities Project
HAMILTON EXPANSION PROJECT STAGE 5
Yandicoogina Mine Site WA | Camp & NPI
Port Hedland WA | Camp
Design & Construct
A$10.8M Project Value
A$12.6M & A$5.8M Project Value | 35 & 45 Weeks
29 Weeks
Client Rio Tinto 120 Bed accommodation village & Design & Construct of infrastructure facilities
Client Fortescue Metals Group 160 Bed extension and refurbishment of accommodation village
WANDOO HOUSING
SUNDRY SMALLER VILLAGES
Pannawonica WA | Camp
• Inata Gold Mine, Burkino Faso
A$12.5M Project Value 30 Weeks Client Rio Tinto Permanent village including earthworks & services
• Kambalda Accommodation Village • Karara Exploration Camp • Fitzroy Crossing Camp • Darlganya Workers Camp • Pindan Karratha Camp • Yandi Pocket Billiard South Project Joint venture with
Fund BUILD Manage
Capability Statement 18/19
COMMERCIAL & INDUSTRIAL
INTEGRATED MARINE OPERATIONS CENTRE Port Hedland WA | Office Design & Construct A$40M Project Value 104 Weeks Client Pilbara Ports Authority Shipping control tower
Watch video
Fund BUILD Manage
NEWMAN TOWN CENTRE REDEVELOPMENT Newman WA | Retail Design & Construct A$26M Project Value 74 Weeks Client St Bartholomews Developments 6,200m2 retail shopping precinct
Capability Statement 18/19
COMMERCIAL & INDUSTRIAL
MERCURY TREATMENT FACILITY Karratha WA | Industrial
ELECTRICAL & INSTRUMENTATION BUILDING Karratha WA | Office
A$6.4M Project Value 27 Weeks
A$6M Project Value
Client Contract Resources
51 Weeks
Office, workshop, process warehouse, evaporation ponds, liquid waste storage bund, LPG tanks, wash pad & process infrastructure installation works
Client BMW New electrical and instrumentation control building, demolition & refurbishment to existing
Watch video
WATER CORP OPERATION CENTRES Karratha & Carnarvon WA | Office A$4M & A$7M Project Value
KARRATHA WASTE MANAGEMENT & RECYCLING FACILITY Karratha WA | Office & Workshop
35 & 35 Weeks
A$14.9M Project Value
Client Water Corporation
27 Weeks
Regional operation centres
Client Transpacific Industries New waste management and recycling facility
Fund BUILD Manage
COMMERCIAL & INDUSTRIAL
FITZROY CROSSING REPLACEMENT COURTHOUSE Fitzroy Crossing WA | Courthouse
NEWMAN ARTS CENTRE Newman WA | Art Centre A$7.7M Project Value
A$4.1M Project Value | 47 Weeks
36 Weeks
Client BMW
Client Shire of East Pilbara
New courthouse and demolition of existing
Gallery space, accommodation & meeting areas
2016 MBA WA Award for Best Commercial Building 2016 MBA WA Award for Best Commercial/Industrial Building 2016 MBA WA Award for Excellence in Innovative Cladding
KARRATHA DEPOT ADMIN BUILDING
WORKSHOPS & WAREHOUSES
Karratha WA | Office
Swire Oilfields, Lot 105 Gap Ridge & Lot 118 Pinnacles | Karratha & Wedgefield WA
A$3.4M Project Value 39 Weeks
A$5.9M & A$12.4M & A$2.9M Project Value
Client City of Karratha
34 Weeks
New administration building and modifications to existing
Client Swire Oilfields Services & AD Canci Nominees & Oceancity Investments Office, workshop and warehouse developments
Capability Statement 18/19
COMMERCIAL & INDUSTRIAL
FITZROY CROSSING POLICE STATION
EAST KIMBERLEY REGIONAL AIRPORT
Fitzroy Crossing | Police Station
Kununurra WA | Airport
A$9.5M Project Value
A$9M Project Value
39 Weeks
74 Weeks
Client BMW
Client Shire of Wyndham East Kimberley
New police station and demolition of existing
Terminal building to accommodate domestic flights 2012 MBA WA Award for Best Commercial Alteration/ Addition
TAYLOR BARRACKS GUARD HOUSE
REMOTE SHOPPING CENTRES
Karratha WA | Defence
Wirrimanu Store & Tarunda Shopping Centre | Kimberley WA
A$0.3M Project Value
A$3.2M & 10.7M Project Value
12 Weeks
24 & 34 Weeks
Client Department of Defence
Client Wirrimanu Aboriginal Corporation & Leedal Pty Ltd
New guard house
Extensions, renovations to existing store & Construction of new shopping centre
Joint venture with
Fund BUILD Manage
Capability Statement 18/19
HEALTH & CARE FACILITIES
WARREN HEALTH SERVICE Manjimup WA | Health A$29M Project Value 104 Weeks Client BMW New hospital & demolition of old
Fund BUILD Manage
GASCOYNE HEALTH REDEVELOPMENT Exmouth & Carnarvon WA | Health A$27M Project Value 60 Weeks Client BMW New health campuses for Exmouth and Carnarvon 2016 MBA WA Award for Best Commercial Alteration/Addition 2016 MBA WA Award for Best Innovative Use of Building
Capability Statement 18/19
HEALTH & CARE FACILITIES
KALGOORLIE HEALTH CAMPUS
NORTHAM HEALTH SERVICE
Kalgoorlie WA | Health
Northam WA | Health
A$42M Project Value
A$34M Project Value
173 Weeks (over 2 stages)
113 Weeks
Client Dept of Education & Training & BMW
Client BMW
New & extended hospital buildings, install of equipment, refurbishment & demo of old
Additions, alterations & refurbishment of existing hospital over multiple stages
DALWALLINU HEALTH CENTRE REFURBISHMENT
ESPERANCE HEALTH CAMPUS
Dalwallinu WA | Health
Esperance WA | Health A$21M Project Value
A$3.5M Project Value
104 Weeks
46 Weeks
Client BMW
Client BMW
Refurbishment and expansion of emergency department, redevelopment of maternity facilities over multiple stages
Additions, alterations & refurbishment of existing hospital over multiple stages
Fund BUILD Manage
HEALTH & CARE FACILITIES
PILBARA DRUG & ALCOHOL REHABILITATION FACILITY Port Hedland WA | Health
CARNARVON RENAL HOSTEL Carnarvon WA | Hostel A$2.4M Project Value
A$10.8M Project Value
39 Weeks
48 Weeks
Client The Housing Authority
Client Yaandina Family Centre Corporation
5 Bed renal hostel
18 Treatment beds, 6 accompanying beds, administration offices, treatment rooms & communal areas
YAANDINA AGED CARE FACILITY
KUNUNURRA RESIDENTIAL CARE
Roebourne WA | Care Facility
Kununurra WA | Care Facility
Design & Construct
A$10.9M Project Value
A$9.5M Project Value
55 Weeks
52 Weeks
Client Juniper
Client Yaandina Family Centre Corporation
40 Bed residential care facility
20 Bed aged care facility
Capability Statement 18/19
HEALTH & CARE FACILITIES
RENAL HOSTEL, KUNUNURRA
WILLIAMS HEALTH CENTRE
Kununurra WA | Hostel
Williams WA | Health
A$1.7M Project Value
A$3M Project Value
29 Weeks
60 weeks
Client Housing Authority
Client BMW
8 Bed renal hostel
New health centre & demolition of old over multiple stages
2018 MBA WA Award for Best Commercial Industrial Building 2018 MBA WA Award for Best Steel Building
HEALTH CLINICS
COMMUNITY HACC FACILITIES
Bayulu Health & Wiluna Health Clinic | Fitzroy Crossing & Wiluna WA
Yaandina HACC & Tjuntjuntjara HACC | Roebourne & Tjuntjuntjara WA
A$0.8M & A$10.8M Project Value
Design & Construct
19 & 52 Weeks
A$2.5M & A$1.8M Project Value
Client Department of Defence & Ngangganawali Aboriginal Community Controlled Health & Medical Services Corporation
55 & 20 Weeks Client Yaandina Family Centre Ltd & Paupiyala Tjarutja Aboriginal Corporation
New medical clinic & new aboriginal medical service clinic
New Home and Community Care facilities
Fund BUILD Manage
Capability Statement 18/19
COMMUNITY
DAMPIER COMMUNITY HUB Dampier WA | Community Centre A$15M Project Value 60 Weeks Client City of Karratha Early learning centre & community building, refurbishment of community hall 2017 MBA WA Award for Best Commercial Alteration/Addition
Fund BUILD Manage
KARRATHA LEISURE CENTRE Karratha WA | Multi-purpose Facility Design & Construct A$65M Project Value | 86 Weeks Client City of Karratha Multi-purpose facility & aquatic centre 2015 MBA WA Award for Best Commercial Building 2015 MBA WA for Excellence in Structural Steel Watch video
Capability Statement 18/19
Community
FREMANTLE CIVIC CENTRE
PARABURDOO COMMUNITY HUB
Fremantle WA | Community Centre
Paraburdoo WA | Multi-purpose Facility
A$48.9M Project Value
A$12.4M Project Value
80 Weeks
52 Weeks
Client City of Fremantle
Client Shire of Ashburton
New civic building and library in Kings Square
Multi-purpose facility & sports pavilion
ONSLOW & LAVERTON AQUATIC CENTRES
PARABURDOO CHILD CARE CENTRE
Onslow & Laverton WA | Aquatic Centre
Paraburdoo WA | Child Care Design & Construct
A$7.1m & A$6.6M Project Value
A$3.8M Project Value
44 & 35 Weeks
46 Weeks
Client Shire of Ashburton & Shire of Laverton
Client Shire of Ashburton
New aquatic centre & community hub
Childcare and out of school hours facility
Fund BUILD Manage
Community
AACAP YALATA
YARRAWONGA EMERGENCY SERVICES
Yalata Community SA | Child Care
Palmerston NT | Health
A$5M Project Value
A$0.5M Project Value
25 Weeks
17 Weeks
Client Army Aboriginal Community Assistance Programme
Client Department of Infrastructure (NT)
New child parent centre and community meeting area, demolition of roadhouse
New emergency services building
Joint venture with
TAMBREY PAVILION
ONSLOW MULTIPURPOSE COURTS
Karratha WA | Sports Facility
Onslow WA | Multi-purpose Facility
Design & Construct
Design & Construct
A$2.5M Project Value
A$3.7M Project Value
41 Weeks
34 Weeks
Client City of Karratha
Client Shire of Ashburton
New pavilion including community hall, kitchen, servery & change rooms
Multi-purpose sporting facility
Capability Statement 18/19
The Rise
Community
JURIEN BAY CIVIC CENTRE
GASCOYNE JUNCTION
Jurien Bay WA | Civic Centre
Gascoyne WA | Resort
A$7.8M Project Value
Design & Construct
47 Weeks
A$7.6M Project Value
Client Shire of Dandaragan
60 Weeks
New visitor & civic centre including tourist information facility
Client Shire of Upper Gascoyne
PAM BUCHANAN CENTRE
ONSLOW MULTI-PURPOSE CENTRE
Baynton West WA | Multipurpose Facility
Onslow WA | Multipurpose Facility
Design & Construct
Design & Construct
A$8.6M Project Value
A$8.6M Project Value
48 Weeks
49 Weeks
Client City of Karratha
Client Shire of Ashburton
Family health centre, childcare centre, playgroup centre & community centre
Sporting complex, day care centre & community emergency evacuation centre
24 Hour fuel station, roadhouse, tavern, managers’ residence, caravan park, cabins & swimming pool
Fund BUILD Manage
Capability Statement 18/19
Education
KALGOORLIE BOULDER COMMUNITY HIGH SCHOOL Kalgoorlie WA | Education A$41M Project Value 120 Weeks Client BMW Additions, refurbishments & demolition over 3 stages 2018 MBA WA Award for Best Regional Project 2018 MBA WA Award for Best Education Building
Fund BUILD Manage
KARRATHA SENIOR HIGH SCHOOL Karratha WA | Education Design & Construct A$44M Project Value 91 Weeks Client BMW 5 Classroom blocks, admin & external plant room
Capability Statement 18/19
Education
CARNARVON COMMUNITY COLLEGE – STAGE 3
NEWMAN SENIOR HIGH SCHOOL FIRE REPLACEMENT BLOCK
Carnarvon WA | Education
Newman WA | Education
A$18.8M Project Value
A$6.2M Project Value
64 Weeks
36 Weeks
Client BMW
Client BMW
New secondary and specialist facilities to cater for 250 secondary students & refurbishment to existing
New single storey masonry and steel building
SKILLS CENTRE, PILBARA INSTITUTE
EXMOUTH DISTRICT HIGH SCHOOL
Karratha WA | Training
Exmouth WA | Education
A$4.2M Project Value
A$15.3M Project Value
21 Weeks
63 Weeks
Client BMW
Client BMW
New industrial skills centre training facility
5 New classrooms, undercover courts, library, student services & covered assembly
Fund BUILD Manage
Education
SOUTH HEDLAND SENIOR HIGH SCHOOL South Hedland WA | Education
MERREDIN COLLEGE Merredin WA | Education A$15.6M Project Value
A$4.6M Project Value
56 Weeks
47 Weeks
Client BMW
Client BMW
New primary school & renovations to existing high school with library, staff room, offices & ED support extensions
New canteen, landscaping & painting
BER SCHOOLS
WILUNA CENTRAL TAFE
Regional WA | Education
Wiluna WA | Training
A$21M Project Value
A$2.4M Project Value
56 Weeks
47 Weeks
Client BMW
Client BMW
18 School upgrades throughout Mid-West, Midlands, Goldfields & Esperance regions
Administration building, classroom block, skills shed & associated works
Capability Statement 18/19
Education
PUNDULMURRA HEALTH AND COMMUNITY SERVICES TRAINING CENTRE
PUNDULMURRA MACHINERY CAR & SHEDS
South Hedland WA | Training
South Hedland WA | Training
A$13.1M Project Value
Design & Construct
60 Weeks
A$1.1M Project Value
Client BMW
21 Weeks
New training facility including civil & roadworks
Client BMW New machinery shed, car shed & demolition of basketball courts
Fund BUILD Manage
Capability Statement 18/19
RESIDENTIAL
CHEVRON RESIDENTIAL HOUSING Onslow WA | Grouped Dwellings Design & Construct A$44M Project Value 83 Weeks Client Chevron Australia Pty Ltd 50 Modular single storey detached houses
Fund BUILD Manage
JINGARRI HOUSING Karratha WA | Grouped Dwellings Design & Construct A$54.2M Project Value 104 Weeks Client Rio Tinto 100 House & land packages in Nickel West
Capability Statement 18/19
Residential
Tjuntjuntjara Community
CEACA SENIORS HOUSING
Tjuntjuntjara WA | Grouped Dwellings
Wheatbelt Region WA | Low Rise ILU’s
A$11.3M Project Value
Design & Construct
47 Weeks
A$19M Project Value
Client Housing Authority
52 Weeks
10 New houses and refurbishment of 12 houses including water reticulation upgrade and power extensions
Client Shire of Merredin
KMJV Housing
WICKHAM MODULAR HOUSING
Port Hedland WA | Grouped Dwellings
Wickham WA | Grouped Dwellings
Design & Construct
A$27.5M Project Value
A$6.3M Project Value
76 Weeks
37 Weeks
Client Rio Tinto
Client KMJV
181 Modular properties completed with ancillary structures
75 Independent living units across 13 sites
12 Turn-key houses including landscaping
Fund BUILD Manage
Residential
ROY HILL HOUSING
WICKHAM HOUSING
Port Hedland WA | Grouped Dwellings
Wickham Houses & Saltbush Court & Acacia Place | Wickham WA
A$27.5M Project Value 43 Weeks
Design & Construct
Client Roy Hill
A$16M & A$22.3M Project Value
22 Residential dwellings including earthworks & sub-division
60 Weeks Client Rio Tinto 29 houses within 5 subdivision lots & 31 houses including fabrication, manufacture & supply
DEFENCE HOUSING AUSTRALIA
GROH HOUSING
Exmouth WA | Multi Residential
Onslow, Karratha, Fitzroy Crossing, Pilbara/Midwest Regions | Pilbara & Midwest WA
A$2.3M Project Value 23 Weeks
A$4.3M, A$3M, A$1.5M & A$3.8M Project Value
Client Defence Housing Australia
36, 42, 17 & 8 Weeks
4 houses within newly constructed estate
Client Housing Authority
2018 MBA WA Award for Best Multi Residential Developments
Capability Statement 18/19
10, 6, 3, & 64 GROH specification houses
The Rise
Residential
YARA HOUSING Karratha WA | Grouped Dwellings Design & Construct
WOODSIDE HOUSING REFURBISHMENTS Karratha WA | Refurbishment
A$24.8M Project Value
A$20M Project Value
65 Weeks
156 Weeks
Client Yara Pilbara Nitrates Pty Ltd
Client Woodside Energy Ltd
33 Houses & 10 duplexes in Jingarri Estate
3 year contract for housing refurbishments
NEW INDIGENOUS HOUSING Yugunga Housing
INDIGENOUS REFURBISHMENT PROGRAMME
Indigenous Houses in Kununurra
NPARIH Refurbishments Fitzroy Valley
Derby Houses & Yungngora Houses
Imintji Refurbishment (NPORH)
Wakathuni Community
Roebourne Crisis Accommodation
Indigenous Housing Project (2014 - 2018)
Kupungarri Community
Client Department of Communities
Ngalingkadji Community Client Department of Communities
Fund BUILD Manage
Capability Statement 18/19
CIVILS & INFRASTRUCTURE
JINGARRI HOUSING Karratha WA | Civil Works A$30M Project Value 44 Weeks over 3 stages Client Pindan Capital Creation of 330 lot subdivision
Fund BUILD Manage
WEST KIMBERLEY REGIONAL PRISON Derby WA | Infrastructure A$10.1M Project Value 43 Weeks Client BMW Forward bulk earthworks and piling for the East Kimberley Regional Prison site
Capability Statement 18/19
CIVILS & INFRASTRUCTURE
PARKVIEW, THE CRESCENT & WATERS EDGE Ferndale & Viveash WA | Civil Works
CBH BROOMEHILL & PINGRUP Broomehill & Pingrup WA | Civil Works A$4M & A$3.7M Project Value
A$9.3M Project Value
17 & 20 Weeks
14 Weeks, 49 Weeks & 47 Weeks over several stages
Client CBH Group
Client Pindan Capital
2 New Open Bulk Heads, associated roads, drainage systems & basins including all required CSME works at each location
Subdivision bulk earthworks and civils
ROY HILL HOUSING
BELSWAN PINJARRA
Port Hedland WA | Civil Works
Pinjarra WA | Civil Works
A$27.5M Project Value
A$3.3M Project Value
43 Weeks
34 Weeks
Client Roy Hill
Client Belswan Pinjarra Pty Ltd
Earthworks & sub-division
Earthworks & civils for the Belswan Estate
Fund BUILD Manage
CIVILS & INFRASTRUCTURE
KARRATHA LEISUREPLEX Karratha WA | Civil Works A$4M Project Value 12 Weeks Client City of Karratha Forward works for multi-purpose facility & aquatic centre
LAKELANDS Perth WA | Civil Works A$2.5M Project Value 21 Weeks Client PEET Bulk site sub-division works
TJUNTJUNTJARA PTAC AIRFIELD Tjuntjuntjara Community WA | Infrastructure A$0.2M Project Value 8 Weeks Client Paupiyala Tjarutja Aboriginal Corporation Airfield boundary fencing and gates
Capability Statement 18/19
VASSE NEWTON BRIDGE Vasse WA | Infrastructure A$2M Project Value 40 Weeks Client Perron Developments & Stawell JV Bridge carrying a new road across drain
GARDEN ISLAND BRIDGE Garden Island WA | Infrastructure A$6M Project Value 26 Weeks Client Spotless/Defence Support Group HMAS Stirling high level bridge repairs
Fund BUILD Manage
PINDAN ASSET MANAGEMENT Rounding out Pindan’s onestop-shop capabilities is the Pindan Asset Management division specialising in facility management. The service complements the company’s core
• Licenced Electricians
construction business by bringing a ‘whole-of-
• Licenced Refrigeration Technicians
life solution’ to the management of their clients’ assets. Pindan Asset Management has a current
• Licensed Plumbers • Licensed Gas Fitters
eleven-year contract to maintain and service
• Carpenters
6,000 houses throughout the Pilbara and
• Painters
Mid-West/Gascoyne for the Department of
• Glazers
Communities. The contract sees a dedicated team respond to a daily average of 100 work orders containing around 400 individual operations across a vast geographic area and be on call 24 hours a day, 365 days a year. We directly engage trades including plumbers, gas fitters, electricians, carpenters and painters, to manage the expected workload and have branches in Geraldton, Carnarvon, Meekatharra, Karratha, Port Hedland and Newman. To support the works Pindan Asset Management also operates a shared services function out of Belmont, Perth providing administration, safety, supply and works management support.
Our Services At Pindan Asset Management we directly employ our skilled tradespeople to deliver the full range of maintenance services including:
Capability Statement 18/19
• Licensed Security Installers (Doors, locks and screens) • Grounds people • Cleaners All our trade employees hold valid and approved police clearances offering peace of mind.
Our Approach We offer a new approach to Maintenance for our Western Australian clients assuring a leading edge value add solution that provides safe, consistent and cost effective outcomes. Our team brings decades of experience in facility management & maintenance, constructing and refurbishing residential housing through-out Western Australia. We are a corporate member of the Asset Management Council and are also represented on the Asset Management Committee WA Chapter and through our various individual members.
Capability
Value for Money
We currently provide maintenance to ~7,000 properties across Western Australia responding to circa 500 maintenance activities daily.
All the above benefits plus the advantage of competitive labour and material pricing, ensures a superior service for you and your customers.
Reliability Operating a proven work order management system and leading edge mobile solution, with back office support structures designed for a fixed KPI environment ensures prompt reliable services.
Performance & Reporting Clear & easy to understand invoicing & comprehensive Completion Reports with every job providing you piece of mind. Real Time Performance visibility and asset summary / history reporting capabilities.
Quality Workmanship All works are delivered by qualified & Police Cleared tradespeople backed by a robust internal Quality Assurance process.
One Stop Shop We provide multiple trades via one easy point of contact.
Communication With a well-established communication process, we can provide our customers with status updates at key stages in the lifecycle either electronically or in person.
Our Business Systems Pindan Asset Management is passionate about operating in a sustainable paperless maintenance and warehouse environment and is constantly looking at new tools and technology to help us stay ahead of the curve, to support this aim we currently operate the following key systems and tools: IFS is an Asset Management software system the business uses as the basis for our Work Order (WO) Management, this includes scheduling, issuing, completion, RCTI and reporting of all works. QlikView is a reporting and performance monitoring tool that draws data from IFS and gives us and our customers real-time visibility of Work Order’s status. iAuditor is a fully customisable mobile audit tool. We efficiently record Quality Audits, Incident Reporting, Site Inspections, Nonconformances, Manual Work Orders & Vehicle Pre-start Inspections via the tool. App/WEB-enabled Service Requests, we are able to receive service requests in many different ways including via a web portal and Customer APP.
Fund BUILD Manage
April 2019 Perth 191 Great Eastern Highway Belmont, WA 6104 T +61 (08) 9471 5300 pindan@pindan.com.au Regional WA Karratha Port Hedland Newman Geraldton Carnarvon Busselton pindan.com.au
Sydney Level 13 1 Castlereagh Street Sydney, NSW 2000 T +61 (02) 9247 9255 info@pindancapital.com
Brisbane 66 Peel Street South Brisbane, QLD 4101 T +61 (08) 9471 5300 pindan@pindan.com.au