2ND TERM ACTIVITIES As you know, 2nd TERM is coming full of activities and new challenges FOR BOTH, 4TH AND 5TH YEARS. The first thing we would like to let you know is that during this 2nd TERM, tutor’s team becomes bigger (and better) to assist 4th years in their Design Realization Report. They will be: -
UNIT22 practice tutors: Richard Hyams from AA studio (helped by George Brennan and Max Rengifo). We have 6 sessions with them, already
-
UNIT22 Structure consultant: Roberto Marín, the most amazing structure engineer we have in Spain. As part of his CV we can extract the supervision, calculations and design supervisor of the Castillo de Garcimuñoz structures. We have 2 sessions with him, already scheduled.
scheduled.
The second message is that 2nd TERM is full of important dates, IN ORDER TO LET YOU CHECK THE IMPORTANT EVENTS, I’ve prepare an AUTOCAD-presentcalendar, please, use this calendar to juxtapose your working schedules and working pits stops (the calendar information is also updated at the unit22 calendar). As always, we are going to do an special emphasis in your working schedule, ALL 4TH AND 5TH YEAR PROBLEMS REGARDING PROJECT DEVELOPMENT ARE COMING FOR A MISMANAGEMENT OF TIME, we have had sad experiences last year. This won’t happen again. In every hand in, we will ask for the updated individual calendar till the end of the year. Scarlett O’Hara’s quote: “As God is my witness, as God is my witness they're not going to misunderstood me. I won’t live through this time mismanagement any more and when 2nd and 3rd TERM are all over, I'll never be late again. No, nor any of my folk. If I have to foresee , optimize , work hard or anticipate. As God is my witness, I'll never be late again”. Third and last introductory information is that 4th and 5th years are going to have a parallel design schedule, but 4th year design and DR information production it is going to be much more specific (this year DR has two hand in, the first one, that has been scheduled on Monday the 19th of March, demands 4th years to finish the overall DR to receive the proper feedback before Easter - off term). So, without any further delay we describe the 2nd TERM activities: