1 minute read

Support bar package

7. Position the heat shields, with the sealing rings in place (step 2), onto the burners and screw them into position with the screws provided. 8. With the wok (stir fry) burner make certain that the V-shaped opening is aligned with the axis of the burner. Fasten the heat shield with the three screws provided. 75 mm

9. Measure the distance between the front of the unit and the countertop framing or uppermost front cabinet panel. This distance must be 75 mm.

10. Attention: do not yet remove the adhesive strip at the bottom of the control knob mounting disc.

13. Correctly centered gas valve stems. 11. Carefully slide the unit into position: make sure that the valve stems are centered vertically within the cutouts in the countertop framing or cabinet panel. 12. Tighten all the screws from back to front until the valve stems are centered in the cutouts. Check if all screws have been tightened.

75 mm

14. Recheck the measurement of the distance between the front side of the cooking unit and the countertop framing or upper front cabinet panel. This measurement must be 75 mm. 15. Remove the adhesive strip from the control knob mounting disc. Press the knob and mounting disc together as one unit over the gas valve stem in such a way that it is centered and aligned.

This article is from: