TEMPLE AIRPORT LAND USE PLAN
City of Temple, Texas October 2022
100% PLAN SET
ILE 2M
CH AR SE RE AY W RK PA
CORPORATE CAMPUS (MASTERPLAN IN PROGRESS)
1M ILE
DRAUGHON-MILLER CENTRAL TEXAS REGIONAL AIRPORT (FOCUS AREA) CROSSROADS PARK (MASTERPLAN ADOPTED)
AD RO T OR
P
AIR
TEMPLE AIRPORT LAND USE PLAN | focus area
WES TFIE
LD B OUL
EVAR
D
Temple, Texas 10.17.2022
02
’B
30
Disclaimer Note: Sight visibility triangle shown and design intent recommendations in this Landuse Plan are schematic in nature. Final design, layout, and construction to adhere to all Airport Design and Engineering Standards provided by the Federal Aviation Administration.
RL
’B
30 RL
reference page 14
30’ BRL reference page 13
30’ BRL
30’ BRL
reference page 10
reference page 04
reference page 11
30’ BRL
RL ’B
30
RL ’B
30
TX HIGHWAY 36
AIRPORT ROAD
TEMPLE AIRPORT LAND USE PLAN | reference plan
Temple, Texas 10.17.2022
03
Infrastructure 10 T-Hangar Facility Expansions 42’ Door Openings, 33’ Unit Depth Min.
6 Box Hangar Facilities 50’ X 45’ Unit Size Min.
4 Conventional Hangar 50’ X 45’ Unit Size Min.
8 Executive Hangar Facilities 80’ X 80’ Unit Size Min.
4 Tie-Down Shelters 50’ Unit Depth Min.
Maintenance Facility Expansion Temple Commercial Expansion Area
Area 66,000 s.f. 24,000 s.f. 32,000 s.f. 117,100 s.f. 67,500 s.f. 7,600 s.f.
TIE DOWN AREA, 100’ DEPTH MINIMUM
110,000 s.f.
Non Aviation Revenue Area
14.4 acres
Airfield Pavement
73,300 square yards
Vehicular Drive and Parking
5,800 square yards
REVISED STRIPING WITH FBO/ARFF PROJECT
30’ BRL FBO / ARFF PROJECT (IN PROGRESS)
Disclaimer Note: Sight visibility triangle shown and design intent recommendations in this Landuse Plan are schematic in nature. Final design, layout, and construction to adhere to all Airport Design and Engineering Standards provided by the Federal Aviation Administration.
FUEL FACILITY
POTENTIAL RE-PURPOSE
CONVENTIONAL HANGAR INFILL TEMPLE COMMERCIAL FACILITIES
TEMPLE COMMERCIAL EXPANSION AREA
L
TEMPLE COMMERCIAL EXPANSION AREA
T-HANGAR FACILITY EXPANSIONS
FUEL FACILITY
’ BR
PROPOSED SHELTERED TIE-DOWN AREA
MAINTENANCE FACILITY EXPANSION
30
TEMPLE COMMERCIAL PARKING
BOX HANGAR FACILITIES NON-AVIATION REVENUE AREA (REFERENCE PAGE 09)
EXECUTIVE HANGAR FACILITIES
AIRPORT ROAD
TX HIGHWAY 36
TEMPLE AIRPORT LAND USE PLAN | core plan area
Temple, Texas 10.17.2022
04
TEMPLE COMMERCIAL EXPANSION AREA
EXISTING TEMPLE COMMERCIAL FACILITIES PARKING
EXISTING MAINTENANCE YARD
NEW GATED ENTRY
CONSOLIDATED GATED ENTRY TEMPLE COMMERCIAL EXPANSION AREA PROPOSED BOUTIQUE HOTEL
PROPOSED RETAIL / RESTAURANT
SECONDARY ENTRY
PROPOSED TAP HOUSE / RESTAURANT
AVIATION PLAZA
EXISTING ENTRY
AIRPORT ROAD
EXISTING ENTRY
TX HIGHWAY 36
TEMPLE AIRPORT LAND USE PLAN | non-aviation revenue support area
Temple, Texas 10.17.2022
09
Disclaimer Note: Sight visibility triangle shown and design intent recommendations in this Landuse Plan are schematic in nature. Final design, layout, and construction to adhere to all Airport Design and Engineering Standards provided by the Federal Aviation Administration.
FUEL FACILITY
BOX HANGAR AREA
INDIVIDUAL EXECUTIVE HANGAR AREA
SHARED EXECUTIVE HANGAR AREA
30’ BRL Infrastructure
Area
4 Shared Executive Hangar
AVIONICS HANGAR
Facilities
116,000 s.f.
80’ X 120’ Unit Size Min.
8 Individual Executive Hangar Facilities
FLIGHT SIMULATION FACILITY
117,104 s.f.
80’ X 80’ Unit Size Min. PAINT & INTERIOR HANGAR T - HANGAR AREA
Avionics Hangar 100’ X 200’ Unit Size Min.
Paint & Interior Hangar 150’ X 200’ Unit Size Min.
Flight Simulation Facility 120’ X 150’ Unit Size Min.
T - Hangar Area 42’ Door Openings, 33’ Unit Depth Min.
32 Box Hangar Facilities 50’ X 45’ Unit Size Min.
AIRPORT ROAD
TEMPLE AIRPORT LAND USE PLAN | northwest plan area
20,000 s.f. 30,000 s.f. 18,000 s.f. 66,250 s.f. 128,000 s.f.
Airfield Pavement
136,000 square yards
Vehicular Drive and Parking
52,000square yards
Temple, Texas 10.17.2022
10
Disclaimer Note: Sight visibility triangle shown and design intent recommendations in this Landuse Plan are schematic in nature. Final design, layout, and construction to adhere to all Airport Design and Engineering Standards provided by the Federal Aviation Administration.
TAXI-WAY EXPANSION
Note: Reference page 12 for recommended phasing of Public Safety Training Facility and adjacent improvements.
FUEL FACILITY
Infrastructure
Area
3 Shared Executive Hangar Facilities
SHARED EXECUTIVE HANGAR AREA
80,000 s.f.
80’ X 120’ Unit Size Min.
Vehicular Drive and Parking
20,000 square yards
ACCESS GATE FOR FIRE STATION TRAINING GROUNDS
’ BR
65,000 square yards
30
Airfield Pavement
L
FUTURE TRAINING GROUND EXPANSION
TEMPLE FIRE STATION 8
TX HIGHWAY 36 ACCESS AND EXPANSION TO COORDINATE WITH PUBLIC SAFETY TRAINING FACILITY PLANS & STUDY REPORT
TEMPLE AIRPORT LAND USE PLAN | southwest plan area
Temple, Texas 10.17.2022
11
Disclaimer Note: Sight visibility triangle shown and design intent recommendations in this Landuse Plan are schematic in nature. Final design, layout, and construction to adhere to all Airport Design and Engineering Standards provided by the Federal Aviation Administration.
C Area
A B C
Phase A Phase B Phase C
Description
A
Provide access to runway from Fire Department training grounds with controlled gated access point. Improvements implemented from Temple Public Safety Training Facility Master Plan and Study Report. Proposed aviation infrastructure in Land Use Plan to coordinate and be built after completion of Phases A & B.
B
TEMPLE AIRPORT LAND USE PLAN | southwest plan area phasing diagram
Temple, Texas 10.17.2022
12
Disclaimer Note: Sight visibility triangle shown and design intent recommendations in this Landuse Plan are schematic in nature. Final design, layout, and construction to adhere to all Airport Design and Engineering Standards provided by the Federal Aviation Administration.
COORDINATE ENTRY WITH FUTURE CORPORATE CAMPUS ROAD CIRCULATION
Infrastructure
Area
2 Shared Executive Hangar Facilities
58,000 s.f.
80’ X 120’ Unit Size Min.
T - Hangar Area 42’ Door Openings, 33’ Unit Depth Min.
Box Hangar Area 50’ X 45’ Unit Size Min.
60,000 s.f.
SHARED EXECUTIVE HANGAR AREA
FUEL FACILITY
62,400 s.f.
Airfield Pavement
113,987 square yards
Vehicular Drive and Parking
30,243 square yards
BOX HANGAR FACILITIES T-HANGAR FACILITY AREA
TEMPLE AIRPORT LAND USE PLAN | southeast plan area
Temple, Texas 10.17.2022
13
Disclaimer Note: Sight visibility triangle shown and design intent recommendations in this Landuse Plan are schematic in nature. Final design, layout, and construction to adhere to all Airport Design and Engineering Standards provided by the Federal Aviation Administration.
INDIVIDUAL EXECUTIVE HANGAR AREA
SHARED EXECUTIVE HANGAR AREA
INDIVIDUAL EXECUTIVE HANGAR AREA
SHARED EXECUTIVE HANGAR AREA
BOX HANGAR AREA
Infrastructure
Area
9 Shared Executive Hangar Facilities
261,000 s.f.
80’ X 120’ Unit Size Min. FUEL FACILITY
24 Individual Executive Hangar Facilities
351,312 s.f.
80’ X 80’ Unit Size Min.
42 Box Hangar Facilities 50’ X 45’ Unit Size Min.
TEMPLE AIRPORT LAND USE PLAN | northeast plan area
163,800 s.f.
Airfield Pavement
170,142 square yards
Vehicular Drive and Parking
49,799 square yards
Temple, Texas 10.17.2022
14