0334386_Pak Mei Kei_AIAD II_Portfolio

Page 1

BA (HONS) INTERIOR ARCHITECTURE SEMESTER 07 MARCH - JULY 2022

ARC 60808 ADVANCED INTERIOR ARCHITECTURE DESIGN II E-PORTFOLIO

PAK MEI KEI | 0334386


TABLE OF

CONTENT

01 02

1.0 PHASE 01 1.1 Narrative Programming 1.2 Progression Semester 06

2.0 PHASE 02 2.1 Design Development Progression from Tutorials (Miro) 2.2 Design Development Progression from Semester 06 2.3. Final Design Development

03 04

3.0 PHASE 03 3.1 Working Drawing Progression from Tutorials (Screenshots) 3.2 Final Working Drawing

4.0 PHASE 04 4.1 Final Presentation Screenshot (Miro) 4.2 Final Presentation Links




Phase 01 (20%)

COMPLETION OF NARRATIVE + ACTIVITIES WEEK 01 - WEEK 03 Submission of a personal brief is vital to project goals and development. Although some of the suggested proposals are clearly hypothetical, the solutions must demonstrate serious thought in the resolution of the design challenge. There should be clear intentions and objectives to demonstrate appropriate design theme, logical structural systems and the expression of spatial relationships. The completion of the design narrative and the approval of it (dependent on student’s progression rate and timeframe) will be confirmed by the respective tutors of each unit.


1.1 NARRATIVE PROGRAMMING

Narrative My topic interest is about the IsraeliPalestinian conflict that had gone viral in the beginning of 2021. I’ve researched on the topic and focuses on the social aspects of Palestinians. From my studies, Palestinians were facing issues such as famine, poverty, poor access to healthcare etc. Most of the Palestinians became refugees because of invasions from the Israelis whom are desperate with taking over Palestine. Apart from that, I decided to focus on the well-being of refugee children in Palestine. Particularly focusing on children, I realized they’d grown up in harsh conditions with the lack of educational facilities that were destroyed by air forces. Henceforth, most of the refugee children of Palestine have traumatic childhood as they witness the negative impacts of war.

That said, children are the hopes of a country. For this project, I am proposing an educational shelter to take in a number of refugee children for them to learn and accommodate in the shelter. My chosen site is The Investcorp Building at Oxford, UK. Which has an area of 1127sqm. It is also sited inside St Antony’s College, serves as the University of Oxford’s facility for research and teaching on the Arab World, Iran, Israel, Turkey, etc. Therefore, it is also known as a middle east centre in UK. From my research, the UK is able to take in refugee families from Palestine. Therefore, it is possible for the refugee families to send in their children, handicapped with mental or psychological issues, to the educational shelter to seek recovery. The main objectives of the educational shelter are to provide a place to stay, play, study and grow. Speaking of which, children are playful beings, they learn from engaging with the environment, talking to their peers, and making mistakes.


Programming Children should always play in groups to improve their learning and social abilities, supervised by adults to ensure their safety. On the contrary, studies have shown that refugee children from Palestine have really low physical activity because they spent most of their time hiding, taking cover from Israeli’s invasions. Moving on, basic education is necessary for children to communicate or following simple instructions. Most importantly, knowledge can help the children to become more diligent and have better opportunities in the future. Lastly, children should be given freedom to grow. For example, children can learn how to pick up necessary skills, according to their own preferences. Children of different abilities can come around and work together to achieve a stable community.

Now that you’ve understood the basic objectives of the educational shelter, I will now explain about the program concept which are learn, play, rest and social. Based on the 4 main concepts, each concept consists of different type of experiences and qualities for the refugee children to explore. In short, the ‘Learn’ concept is fun, interactive, has reading, and promotes discipline. The ‘Play’ concept focuses on the physical health of children, for them to be active, stay fit, to explore interests and hobbies. The ‘rest’ concept is to ensure the children’s safety, health, and for them to have enough rest and comfort. Lastly will be social as it is important for children to play, work and learn together, while staying independent, developing leadership qualities and to be caring towards their peers.


First and foremost, the target audience of the educational shelter will be age 4 to 15. I will be explaining about the space programming that I think it is suitable for an educational shelter as such. The program flow, is a basic understanding of how the areas are being arranged and in short, the lower ground floor, first floor and mezzanine floor is exclusively for refugee children while ground floor being the only public space and also the main entrance of the facility. Moving on to space programming, Restful & learn, is a combination of sleeping and learning area. It is secluded from the public spaces for more privacy as refugee children are sensitive to public attention. Next will be the Market gallery, where the public is introduced to the feelings of refugee children via facilities provided. It also sells a series of hand-crafted products made by the children. Calm minds is a place where children can meditate to practice mindfulness, boosts the chances of recovering from childhood trauma. It also helps them keep fit and release tension from daily activities.

Care Share acts as a community service activity whereby children who receive donation are required to provide labour service in return, such as cleaning the facility or campus, etc. Basically, it teaches children to be grateful and thankful for the donation. Foodtastic is a canteen where children, and facility workers can eat their meals together. Play to-gather is a playground, designed for young children and teens to exercise and increase their physical activity. Playing together is proven to be healthy and it encourages children to get along with each other. The final space would be health healing, and as obvious as it sounds, it is a small infirmary where children can be examined when they are not feeling well. Children can be treated or receive counselling at Health Healing.


1.2 PROGRESSION SEMESTER 06

Narrative

Programming



Phase 02 (15%)

DESIGN DEVELOPMENT WEEK 03 - WEEK 05

With Phase 1 completed, we now move to the next phasing of the checkpoint which is Phase 2. In Phase 2, we will be looking into the completion of all the requirements to complete the design phase. Upon finishing Phase 2, there will be no further discussions on the design development and ideation. This is to reiterate that the designing phase will stop at Phase 2 before other elements of working drawings begin to take place in Phase 3.


2.1 DESIGN DEVELOPMENT PROGRESSION FROM TUTORIALS (MIRO)


2.1 DESIGN DEVELOPMENT PROGRESSION FROM TUTORIALS (MIRO)


2.2 DESIGN DEVELOPMENT PROGRESSION FROM SEMESTER 06

Bespoke Design Presentation

https://youtu.be/YccsEptyee0



2.3 FINAL DESIGN DEVELOPMENT

For the following part, I will be explaining about my floor plans, section drawings, axonometric and also the perspectives for the proposed educational shelter. To start off, here’s a cover illustration that I made from how I understand the refugee crisis. As you can see, there are signs of struggle, stress, suffocation and that the butterflies are a symbol of hope and change. I am hoping that the educational shelter can be a sign of hope for the refugees. Small talk aside, I am going to explain some of the material selection chosen for the target spaces via the axonometric drawing. Starting from the very top, mezzanine floor is a working space equipped with durable PVC tables and chairs for office use. Play to-gather on the first floor uses neoprene flooring as an anti-slip rubber material to prevent children from falling down. Oak laminate in foodtastic gives a fresh and nature touch for anyone who is enjoying their meals. Brushed metallic finish is used for the display shelf in Market Gallery as it is long-lasting and low maintenance. The spring mattress is used in the Health Healing which is the infirmary. Vinyl Wood finish is used as flooring in Calm Minds for more natural approach. Lastly, restful learning is painted colorfully to brighten the mood of the children.

Then, I will briefly go through my floor plans starting from the mezzanine floor which has Care Share, and a staff office. Children can read, draw, study under the workers’ supervision. Moving down, this is Foodtastic’s kitchen area, where workers and children can order their food here. The food is then sent down via the dumbwaiter over here. Number 2 is play to-gather. The playground is separated into the young children area and also the younger teens. Both have different facilities to play with. And number three will be the Care Share’s office, where donation items are sorted there. Next will be ground floor, the foodtastic’s canteen is located right under the kitchen and the food is received from the dumbwaiter here, and that number 2 and 3 are market gallery and care share respectively. Lastly will be the lower ground floor, where number 1 here is restful learning, and this part is the learning corner while the other side is the sleeping pods. Number 2 is calm minds, the meditation area. And number three is health healing, the infirmary bay. There is also a shower room and toilets in the lower ground floor.


2.3 FINAL DESIGN DEVELOPMENT

The section drawings can clearly show the space programming of the educational shelter. To briefly repeat, here is foodtastic, kitchen and canteen. This is play to-gather, and number three is careshare, offices and work space. Then number 4 is market gallery, 5 is health healing and 6 will be calm minds. Section B is able to show the other side of lower ground floor, which is number 3, restful learning. Without further ado, let’s move on to the perspectives. To further recap I will be starting from lower ground floor. This is restful learning’s reading and learning corner. This part is where the children reads and there is a collection of toys to be brought inside the learning space. As you can see, this is the corridor of the sleeping pods and this is the entrance of restful learning. Children can walk down further to reach the reading corner. The design development of the learning corner is equipped with various of fun elements. For example, there are puzzle and throwing games that are educational related. A place to read books quietly, and there is also a set of stairs behind for the children to climb through the interactive tunnel to the auditory room, where it has a hammock floor.

The auditory room is equipped with headphones and a projector for the children to watch and learn. As mentioned, this will be the reading corner, and behind this wall is also a resting space for the children to read. In short, this facility is designed to cater for kinesthetic, auditory and visual learners. Quickly moving on, health healing is located outside of restful learning as it is more convenient for the workers to check the health condition of children. As mentioned, children can also voluntarily visit the infirmary when they are feeling under the weather or in seek of counselling. On the other side, calm minds is a meditation room for children to increase their physical activity and also improve mental health. There is also greenery to improve the mood of the children. Now we are onto ground floor, where the market gallery Is located. The carousel is a display of musical photo frames that plays the stories of the refugee children. Infront of the market gallery is a donation area where it has a fortune wheel for the donor to win a prize from the shelf. The donation items are then transported via high velocity and pressure through the pipe, travelling through the ceiling and up to the care share’s sorting office. This area is also part of the sensory experience, where the visitors can feel the physical emotions of the Palestine’s refugee children by reaching their hands inside the hole.


2.3 FINAL DESIGN DEVELOPMENT

Onto the first floor, it will be play togather, a playground for the children to enjoy with their peers. There is seating available around the playground for the adults to supervise the children. In the middle of Play to-gather, it has a ball pool and also a slide for the young children. From this perspective, the left side will be the young teen’s area and the right side for the young children. As mentioned, the children area has books, drawing equipment and also a platform for the children to play with their toys. On the other hand, young teens will preferably to play here as there is a climbing zone, rope swinging, and trampoline. These activities are proven to be helpful to increase their physical strength. The design development of the climbing zone is as shown, where the platforms are connected to the steel structure, attached from floor to ceiling and then there will be safety netting around the climbing zone to ensure safety.

For the final part, let’s move on to Foodtastic which is on the ground and first floor. The food trays are colourcoded differently and children, teen and adults are assigned for a different colour. This way, it eases the food preparation as there is a standard menu for all age groups. This would be the canteen, where people can enjoy the view outside as well. Last but not least, care share on the first and mezzanine floor. The first floor of care share acts as a sorting office while the mezzanine floor is a working space where children can read or have study groups here. The children can also have a great view of the outside too.




Phase 03 (15%)

WORKING DRAWINGS WEEK 05 - WEEK 09 1. Working Drawings (with gridlines, context, and title block) i. Demolition + Changes Planning (Floor Plans only) ii. Floor Finishes Plan iii. Section (structural footing, context, services) iv. Blow up Detailing (Minimum of 3 chosen components)


3.1 WORKING DRAWING PROGRESSION FROM TUTORIALS (SCREENSHOTS)

01

04

02

05

03

06


3.1 WORKING DRAWING PROGRESSION FROM TUTORIALS (SCREENSHOTS)

07 08


LIST OF DRAWINGS PROJECT: FROM CHAOS COMES ORDER DOCUMENTED BY: PAK MEI KEI

ITEM

DESCRIPTION OF DRAWING

DRAWING NO.

REF NO: DWG_AIA_PMK DATE: 20 MAY 2022

DATE DATE TARGET DISTRIBUTED REVISION TARGET APPROVED DISTRIBUTED RECEIVED TO DATE NO. DATE

EXISTING PLAN

1

LG - EXISTING PLAN GF - EXISTING PLAN FF - EXISTING PLAN MF - EXISTING PLAN

DWG_AIA_PMK_EP_001 DWG_AIA_PMK_EP_002 DWG_AIA_PMK_EP_003 DWG_AIA_PMK_EP_004

2 2 2 2

20 MAY 2022 20 MAY 2022 20 MAY 2022 20 MAY 2022

14 JUNE 2022 14 JUNE 2022 14 JUNE 2022 14 JUNE 2022

20 MAY 2022 20 MAY 2022 20 MAY 2022 20 MAY 2022

20 MAY 2022 20 MAY 2022 20 MAY 2022 20 MAY 2022

MR. VICKRAM MR. VICKRAM MR. VICKRAM MR. VICKRAM

DWG_AIA_PMK_SOP_001 DWG_AIA_PMK_SOP_002 DWG_AIA_PMK_SOP_003

2 2 2

20 MAY 2022 20 MAY 2022 20 MAY 2022

14 JUNE 2022 14 JUNE 2022 14 JUNE 2022

20 MAY 2022 20 MAY 2022 20 MAY 2022

20 MAY 2022 20 MAY 2022 20 MAY 2022

MR. VICKRAM MR. VICKRAM MR. VICKRAM

DWG_AIA_PMK_LP_001 DWG_AIA_PMK_LP_002 DWG_AIA_PMK_LP_003 DWG_AIA_PMK_LP_004

2 2 2 2

20 MAY 2022 20 MAY 2022 20 MAY 2022 20 MAY 2022

14 JUNE 2022 14 JUNE 2022 14 JUNE 2022 14 JUNE 2022

20 MAY 2022 20 MAY 2022 20 MAY 2022 20 MAY 2022

20 MAY 2022 20 MAY 2022 20 MAY 2022 20 MAY 2022

MR. VICKRAM MR. VICKRAM MR. VICKRAM MR. VICKRAM

DWG_AIA_PMK_FFP_001 DWG_AIA_PMK_FFP_002 DWG_AIA_PMK_FFP_003 DWG_AIA_PMK_FFP_004

2 2 2 2

20 MAY 2022 20 MAY 2022 20 MAY 2022 20 MAY 2022

14 JUNE 2022 14 JUNE 2022 14 JUNE 2022 14 JUNE 2022

20 MAY 2022 20 MAY 2022 20 MAY 2022 20 MAY 2022

20 MAY 2022 20 MAY 2022 20 MAY 2022 20 MAY 2022

MR. VICKRAM MR. VICKRAM MR. VICKRAM MR. VICKRAM

DWG_AIA_PMK_COM_001 DWG_AIA_PMK_COM_002 DWG_AIA_PMK_COM_003

2 2 2

20 MAY 2022 20 MAY 2022 20 MAY 2022

14 JUNE 2022 14 JUNE 2022 14 JUNE 2022

20 MAY 2022 20 MAY 2022 20 MAY 2022

20 MAY 2022 20 MAY 2022 20 MAY 2022

MR. VICKRAM MR. VICKRAM MR. VICKRAM

DWG_AIA_PMK_SEC_001 DWG_AIA_PMK_SEC_002

2 2

20 MAY 2022 20 MAY 2022

14 JUNE 2022 14 JUNE 2022

20 MAY 2022 20 MAY 2022

20 MAY 2022 20 MAY 2022

MR. VICKRAM MR. VICKRAM

BASE WORK

2

LG - SETTING OUT PLAN GF - SETTING OUT PLAN FF - SETTING OUT PLAN

LAYOUT PLAN

3

LG - LAYOUT PLAN GF - LAYOUT PLAN FF - LAYOUT PLAN MF - LAYOUT PLAN FLOOR FINISHES

4

LG - FLOOR FINISH PLAN GF - FLOOR FINISH PLAN FF - FLOOR FINISH PLAN MF - FLOOR FINISH PLAN COMPONENTS

5

COMPONENT 1 DETAILS COMPONENG 2 DETAILS COMPONENT 3 DETAILS

SECTIONS

6

SECTION A-A SECTION B-B

STATUS

REMARKS


A

D

C

B

G H

K

I

37975 4965

13020

4125

7495

1455

2280

4640

14 3375

A

4770

13

7

2155

B

2205

8

B

2510

9

24030

11

3075

1980

12

3960

6 5 EP 001

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

LG - EXISTING PLAN

A

1:150

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

LG - EXISTING PLAN DRAWING NUMBER:

DWG_AIA_PMK_EP_001


1

2

4

3

4a

7

4b 4c

8

10

36185 8210

2610

1475

3755

2720

1800

18785

10510

2205

2900

B 4125

C

A

A

1320

E

5455

18355

D

3495

F

2280

H

UP

3005

I B

J EP 002

GF - EXISTING PLAN 1:150

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

GF - EXISTING PLAN DRAWING NUMBER:

DWG_AIA_PMK_EP_002


1

2

3

4

4a

4b

7

4d

8

10

36185 8210

2610

1475

3755

2720

4610 18785

7700

2205

2900

B 4125

C

4135

D

19990

F

2280

H

3495

1320

E

A

A

3005

I 1635

J K

B

EP 003

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

FF - EXISTING PLAN 1:150

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

FF - EXISTING PLAN DRAWING NUMBER:

DWG_AIA_PMK_EP_003


1

3

7

5a

8

10

36185 10820

16220

4040

2205

2900

B 4125

C

5455

A

A

3495

21240

D

2280

H I

5885

B

L EP 004

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

MF - EXISTING PLAN 1:150

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

MF - EXISTING PLAN DRAWING NUMBER:

DWG_AIA_PMK_EP_004


A

D

C

B

G H

K

I

37975 4965

13020

4125

7495

1455

2280

4640

14 3375

A

TAG

DEMOLITION

13 2175

VEGETATION (GREENERY)

W1

SHOWER ROOM

2000

0.05

800 915

615 615

915

915

915

1515

915

900

3075

255

D1

12mm (THK) x 800mm (W) x 2200mm (H) SINGLE LEAF CLEAR TEMPERED GLASS DOOR

D2

35mm (THK) x 850mm (W) x 2200mm (H) SINGLE LEAF GYPSUM PLASTERBOARD HOLLOW CORE DOOR

D4

50mm (THK) x 850mm (W) x 1200mm (H) SINGLE LEAF GYPSUM PLASTERBOARD HOLLOW CORE DOOR

D5

50mm (THK) x 700mm (W) x 2200mm (H) SINGLE LEAF GYPSUM PLASTERBOARD HOLLOW CORE DOOR C/W WATER RESISTANT LAMINATE

B

PLANT ROOM 2285

1865

W2

3335

EQUIPMENT ROOM

PLANT ROOM

UP

B

850

945

STORAGE ROOM

D4

HEALTH HEALING (INFIRMARY)

RESTFUL LEARNING (READING CORNER)

3035

3910

1710

UP

D1

3445

2055

W3

2205

2155

DESCRIPTION DOOR

1220

W2 WALL/ PARTITION/ RISER PLATFORM LOBBY

W4

0.05

1575

24030

TAG

CALM MINDS (MEDITATION ROOM)

2510

7

W2

D1

1980

11

8

PROPOSED STRUCTURE

D5 0.05

4765

4770

ELECTRICAL SUBSTATION

1000

12

9

DESCRIPTION

RESTFUL LEARNING (SLEEP AREA) DN

0.05

UP

6

W1

12mm (THK) x 1200mm (W) FULL HEIGHT CLEAR TEMPERED GLASS PANEL

W2

60mm (THK) x 2200mm (HT) YELLOW GYPSUM PLASTERBOARD PARTITION WALL IN PAINT FINISH C/W WATERPROOF FINISH

W3

50mm (THK) SQUARE STEEL HOLLOW CORE PARTITION IN BEECH WOOD VENEER FINISH

W4

80mm (THK) FULL HEIGHT GYPSUM PLASTERBOARD PARTITION WALL IN PAINT FINISH C/W SQUARE HOLLOW STEEL BEAM AS SUPPORT

3960

TOILET 0.05

5 SOP 001

LG - SETTING OUT PLAN

1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

0.05

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

ARCHITECT:

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

0.05

A

1:150

NOTE:

0.05

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

LG - SETTING OUT PLAN DRAWING NUMBER:

DWG_AIA_PMK_SOP_001


1

2

3

4

4a

7

4b 4c

8

10

36185 8210

2610

1475

3755

2720

1800

10510

2205

2900

B 4125

C

TAG

DESCRIPTION DEMOLITION

990 845

W5

W6

TAG

MARKET GALLERY (SENSORY TOUCH)

183

5

WALL/ PARTITION/ RISER PLATFORM UP CARE SHARE (AUTOMATED DONATION MACHINE)

W5

100mm (THK) FULL HEIGHT V-CUT FLEXIBLE PLASTERBOARD IN WALLPAPER FINISH TO INTERIOR DESIGNER DETAIL

W6

570mm (THK) DAWN PINK LAMINATED VINYL RISER PLATFORM TO BE INSTALLED W/ S.STEEL POLE IN MATTE SANDBLASTING FINISH

2280

H

DESCRIPTION

ENTRANCE

40

1320

DUMBWAITER

1775

5455

220

3495

18355

6385

0

FOODTASTIC (CAFETERIA)

A UP

2925

F

A

2700

MARKET GALLERY (SURROUND DISPLAY)

57

STAFF PANTRY

E

PROPOSED STRUCTURE

STORE

13

D

3005

I B

J GF - SETTING OUT PLAN

SOP 002

1:150

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

GF - SETTING OUT PLAN DRAWING NUMBER:

DWG_AIA_PMK_SOP_002


1

2

3

4

4a

4b

7

4d

8

10

36185 8210

2610

1475

3755

2720

4610

7700

2205

2900

B 4125

C

TAG

DESCRIPTION DEMOLITION

950

3495

A

2050

1215

980

TAG

645

R1600

1410

W7

1070

DOOR

UP

65 25

UP

D3 925

PLAY TO-GATHER (CLIMBING ZONE)

12mm (THK) x 800mm (W) x 2200mm (H) SINGLE LEAF CLEAR TEMPERED GLASS DOOR

0.05

565

5

955

UP

WALL/ PARTITION/ RISER PLATFORM

2280

W9

3005

I

W7

GYPSUM PLASTERBOARD RISER PLATFORM C/W FOAM ROLLS TO BE INSTALLED WITH STAIRS TO INTERIOR DESIGNERS DETAIL

W8

150mm (THK) FULL HEIGHT BRICK WALL IN PAINT FINISH C/W WALLPAPER

W9

360mm (W) x 300 mm (L) ALUMINIUM STRUCTURE SUPPORT IN MATTE FINISH

B

1635

J K

DESCRIPTION

D3

1105

1320

D3 PLAY TO-GATHER (CHILDREN D.I.Y AREA)

5

25

35

0 10

19990

W10

308

4450

W8 227 0

1045

1000

1335

6000

PROPOSED STRUCTURE CARE SHARE (SORTING OFFICE)

W8

265

3655

F H

FOODTASTIC (KITCHEN)

A

UP

2385

E

1280

UP

65 26

4135

5850

0 218

D

W10

SOP 003

FF - SETTING OUT PLAN 1:150

NOTE: 1.

2.

3.

900mm (HT) x 600mm (W) x 6000mm (L) ALUMINIUM COUNTER TABLE TOP C/W 12mm (THK) FULL HEIGHT GLASS PARTITION

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

FF - SETTING OUT PLAN DRAWING NUMBER:

DWG_AIA_PMK_SOP_003


A

D

C

B

G H

K

I

37975 4965

13020

4125

7495

1455

2280

4640

14 3375

A

13 4770

ELECTRICAL SUBSTATION

0.05 VEGETATION (GREENERY)

SHOWER ROOM 0.05

3075 2155

PLANT ROOM

UP

B

B STORAGE ROOM HEALTH HEALING (INFIRMARY)

2205

7

EQUIPMENT ROOM PLANT ROOM

UP

RESTFUL LEARNING (READING CORNER) LOBBY 0.05

2510

8

24030

11 9

CALM MINDS (MEDITATION ROOM

1980

12

RESTFUL LEARNING (SLEEP AREA) DN

0.05

UP

6 3960

TOILET 0.05

COMPONENT 1 DWG_AIA_PMK_COM_001

0.05

0.05

0.05

5 A LP 001

LG - LAYOUT PLAN 1:150

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

LG - LAYOUT PLAN DRAWING NUMBER:

DWG_AIA_PMK_LP_001


1

2

3

4

4a

7

4b 4c

8

10

36185 8210

2610

1475

3755

2720

1800

10510

2205

2900

B 4125

C D

STORE

5455

A

UP

DUMBWAITER

ENTRANCE

UP CARE SHARE (AUTOMATED DONATION MACHINE)

2280

H

A

MARKET GALLERY (SENSORY TOUCH)

3495

F

MARKET GALLERY (SURROUND DISPLAY)

FOODTASTIC (CAFETERIA)

1320

E

18355

STAFF PANTRY

COMPONENT 2 DWG_AIA_PMK_COM_002

3005

I B

J LP GF - LAYOUT 002 1:150

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

PLAN

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

GF - LAYOUT PLAN DRAWING NUMBER:

DWG_AIA_PMK_LP_002


1

2

3

4

4a

4b

7

4d

8

10

36185 8210

2610

1475

3755

2720

4610

7700

2205

2900

B 4125

C D UP

4135

UP

FOODTASTIC (KITCHEN)

A

A

1320

E F

CARE SHARE (SORTING OFFICE)

PLAY TO-GATHER (CHILDREN D.I.Y AREA)

19990

3495

UP

H

UP

UP

2280

0.05

PLAY TO-GATHER (CLIMBING ZONE)

3005

I B

1635

J K

COMPONENT 3 DWG_AIA_PMK_COM_003

LP 003

FF - LAYOUT PLAN 1:150

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

FF - LAYOUT PLAN DRAWING NUMBER:

DWG_AIA_PMK_LP_003


1

3

7

5a

8

10

36185 10820

16220

4040

2205

2900

B 4125

C

21240

5455

D A

CARE SHARE (WORKSPACE)

A

3495

STAFF OFFICE

2280

H

UP

I 5885

B

L LP MF 004 1:150

LAYOUT PLAN

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

MF - LAYOUT PLAN DRAWING NUMBER:

DWG_AIA_PMK_LP_004


A

D

C

B

G H

K

I

37975 4965

13020

4125

7495

1455

2280

4640

14 3375

A TAG

13 F4

4770

ELECTRICAL SUBSTATION

0.05

0.05

7

1980 3075

EQUIPMENT ROOM

F1

8mm (THK) x 1200mm (W) x 1200mm (L) LIGHT BEIGE HOMOGENOUS TILE IN POLISHED FINISH

F3

4mm (THK) x 180mm (W) x 1220mm (L) CINNAMON CHERRY VINYL LAMINATE IN POLISHED FINISH

F4

18mm (THK) x 95mm (W) x 2400mm (L) BALAU WOOD SOLID TIMBER PLANK IN OIL FINISH C/W WATERPROOF COATING

F5

3mm (THK) x 100mm (W) x 100mm (L) LIGHT BEIGE POLYESTER CARPET TILES

F6

8mm (THK) x 550mm(W) x 600mm (L) LIGHT BEIGE HOMOGENOUS HEXAGONAL TILE IN MATTE FINISH

F13

PLANT ROOM

2155

F2

F1

PLANT ROOM

F13

12mm (THK) ANTI-SLIP NON-TOXIC FOAM FLOORING ROLL

UP STORAGE ROOM

B

B

F1 HEALTH HEALING (INFIRMARY)

2205

8

8mm (THK) x 600mm (W) x 600mm (L) LIGHT BEIGE HOMOGENOUS TILE IN POLISHED FINISH

CALM MINDS (MEDITATION ROOM)

UP

F2

RESTFUL LEARNING (READING CORNER)

F5

LOBBY 0.05

2510

9

24030

11

F1

SHOWER ROOM

VEGETATION (GREENERY)

F3

12

DESCRIPTION

RESTFUL LEARNING (SLEEP AREA) DN

0.05

UP

6

F6

3960

TOILET 0.05

0.05

0.05

0.05

5 A FFP 001

LG - FLOOR FINISH PLAN 1:150

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

LGF - FLOOR FINISH PLAN DRAWING NUMBER:

DWG_AIA_PMK_FFP_001


1

2

4

3

4a

7

4b 4c

8

10

36185 8210

2610

1475

3755

2720

1800

10510

2205

2900

B 4125

C STORE

D 5455

FOODTASTIC (CAFETERIA)

F1

F1

MARKET GALLERY (SURROUND DISPLAY)

A

DUMBWAITER

MARKET GALLERY (SENSORY TOUCH) ENTRANCE

F10

TAG F9

F8

F11

F7

3005

I B

J FFP 002

2.

3.

F1

8mm (THK) x 600mm (W) x 600mm (L) LIGHT BEIGE HOMOGENOUS TILE IN POLISHED FINISH

F2

8mm (THK) x 1200mm (W) x 1200mm (L) LIGHT BEIGE HOMOGENOUS TILE IN POLISHED FINISH

F7

2mm (THK) MIST BLUE EA4 EPOXY FLOOR PAINT FINISH C/W HARDENER PAINT

F8

2mm (THK) YELLOW EA4 EPOXY FLOOR PAINT FINISH C/W HARDENER PAINT

F9

2mm (THK) ORANGE EA4 EPOXY FLOOR PAINT FINISH C/W HARDENER PAINT

F10

2mm (THK) DAWN PINK EA4 EPOXY FLOOR PAINT FINISH C/W HARDENER PAINT

F11

2mm (THK) NAVY BLUE EA4 EPOXY FLOOR PAINT FINISH C/W HARDENER PAINT

GF - FLOOR FINISH PLAN 1:150

NOTE: 1.

DESCRIPTION

UP CARE SHARE (AUTOMATED DONATION MACHINE)

2280

H

UP

F2

3495

F

A

1320

E

18355

STAFF PANTRY

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

GF - FLOOR FINISH PLAN DRAWING NUMBER:

DWG_AIA_PMK_FFP_002


1

2

4

3

4a

4b

7

4d

8

10

36185 8210

2610

1475

3755

2720

4610

7700

2205

2900

B

C

F8

F9

F10

TAG

F11

4125

F12

D 4135

E

8mm (THK) x 600mm (W) x 600mm (L) LIGHT BEIGE HOMOGENOUS TILE IN POLISHED FINISH

F2

8mm (THK) x 1200mm (W) x 1200mm (L) LIGHT BEIGE HOMOGENOUS TILE IN POLISHED FINISH

UP

F1

A

CARE SHARE (SORTING OFFICE)

F5

3mm (THK) x 100mm (W) x 100mm (L) LIGHT BEIGE POLYESTER CARPET TILES

FOODTASTIC (KITCHEN)

F6

8mm (THK) x 550mm(W) x 600mm (L) LIGHT BEIGE HOMOGENOUS HEXAGONAL TILE IN MATTE FINISH

A

F7

2mm (THK) MIST BLUE EA4 EPOXY FLOOR PAINT FINISH C/W HARDENER PAINT

F8

2mm (THK) YELLOW EA4 EPOXY FLOOR PAINT FINISH C/W HARDENER PAINT

F9

2mm (THK) ORANGE EA4 EPOXY FLOOR PAINT FINISH C/W HARDENER PAINT

1320

F9

F

PLAY TO-GATHER (CHILDREN D.I.Y AREA)

F13

F7

3495

F2

UP

F10

F14

2280

19990

UP

UP

0.05

F6

PLAY TO-GATHER (CLIMBING ZONE)

3005

I B

1635

J K

F1

F5 UP

H

DESCRIPTION

FFP 003

2.

3.

2mm (THK) DAWN PINK EA4 EPOXY FLOOR PAINT FINISH C/W HARDENER PAINT

F11

2mm (THK) NAVY BLUE EA4 EPOXY FLOOR PAINT FINISH C/W HARDENER PAINT

F12

2mm (THK) TURQUOISE EA4 EPOXY FLOOR PAINT FINISH C/W HARDENER PAINT

F13

12mm (THK) ANTI-SLIP NON-TOXIC FOAM FLOORING ROLL

F14

TRAMPOLINE FLOOR FINISH REFER TO ENGINEER DETAIL

FF - FLOOR FINISH PLAN 1:150

NOTE: 1.

F10

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

FF - FLOOR FINISH PLAN DRAWING NUMBER:

DWG_AIA_PMK_FFP_003


1

3

7

5a

8

10

36185 10820

16220

4040

2205

2900

B 4125

C CARE SHARE (WORKSPACE)

D 5455

21240

F5

A

A

STAFF OFFICE

3495

F2 UP

DESCRIPTION

F2

8mm (THK) x 1200mm (W) x 1200mm (L) LIGHT BEIGE HOMOGENOUS TILE IN POLISHED FINISH

F5

3mm (THK) x 100mm (W) x 100mm (L) LIGHT BEIGE POLYESTER CARPET TILES

2280

H

TAG

F5

I 5885

B

L FFP 004

MF - FLOOR FINISH PLAN 1:150

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

MFP - FLOOR FINISH PLAN DRAWING NUMBER:

DWG_AIA_PMK_FFP_004


A 5980 360

770

1065

620

2390

1005

770

995

715

1675

215

440

980

990

100mm (THK) MDF BOARD WITH YELLOW COLOR LAMINATE FINISH

A 360

3000mm (L) x 600mm (W) COTTON ROPE FOR HAMMOCK FLOOR NETTING

4185

COM COMPONENT 1 ISOMETRIC 001 1:30 (A1) 5mm (THK) CLEAR TEMPERED GLASS

30 50 30

2625

30mm (THK) x 920mm (HT) x 985mm (L) WALL MOUNTED WHITE BOARD

DETAIL 1 30mm (THK) x 295mm (HT) x 1020mm (L) WALL MOUNTED LED TIMER

100mm (THK) BLUE POLYESTER CUSHION BACK REST

1070mm (HT) x 700mm (W) DETACHABLE EVA FOAM PUZZLE MAT

155

100 30

SC SECTION A-A 001 1:30

155mm (HT) x130mm (W) x 985mm (L) STATIONERY HOLDER

DT DETAIL 1 01 1:10 NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

COMPONENT 1 DETAILS DRAWING NUMBER:

DWG_AIA_PMK_COM_001


3325 430

1445

330

250

B

1120

170

50mm (THK) PINK MELAMINE BOARD C/W HANGER WIRE

550

170mm (HT) x 90mm (W) STEEL FRAME ENCASED LIGHT BULB R20mm x 1920mm (HT) NAVY BLUE S.STEEL POLE IN SANDBLASTED FINISH

B

20mm (THK) NAVY BLUE MELAMINE BOARD

1000

2750

COM COMPONENT 2 ISOMETRIC 001 1:50

DETAIL 1

200

280mm (HT) x 580mm (L) x 240mm (W) GLASS CASING C/W ORANGE STEEL FRAME IN SANDBLASTED FINISH

20

30

30mm FINGER GROOVE

15 30

10

5 10

50mm (THK) x 580mm (HT) x 3660 (L) x 4055mm (W) PINK LAMINATED PINEWOOD BOARD

580

40

R20mm x 1920mm (HT) NAVY BLUE S.STEEL POLE IN SANDBLASTED FINISH

30mm (THK) VERTICAL SWING PANEL C/W HINGE

SC SECTION B-B 001 1:20

DT DETAIL 1 01 1:5 NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

COMPONENT 2 DETAILS DRAWING NUMBER:

DWG_AIA_PMK_COM_002


6355 380

440

1395

360

950

605

1405

815

C

1605

10mm (THK) COTTON ROPE C/W S.STEEL CEILING HOOK

295

C

1250mm (W) x 1600mm (L) LEATHER COVERED MDF BOARD

940

COM COMPONENT 3 ISOMETRIC 001 1:30 (A1)

DETAIL 1

640

5490

360mm (W) x 300 mm (L) ALUMINIUM STRUCTURE SUPPORT IN MATTE FINISH TO CEILING HEIGHT

655

R5mm PUNCTURED HOLE C/W S.STEEL WIRE ROPE CLIP FOR NETTING

20

ALUMINIUM STRUCTURE RIVETED W/ S.STEEL ARM

695

50

20

50

655

S.STEEL ARM C/W DECK SIDE PLATE

DT DETAIL 1 01 1:10

SC SECTION C-C 001 1:30 NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

COMPONENT 3 DETAILS DRAWING NUMBER:

DWG_AIA_PMK_COM_003


1

2

3

4

5

7

6

8

9 10 11 12

13

45265 8210

2610

1475

12315

3960

2510

2205

2155 745 2330

1980

4770

CH 5300

CARE SHARE (WORKSPACE)

MF

CH 1500

PLAY TO-GATHER

CH 2600

CH 3000

CARE SHARE (SORTING OFFICE)

CH 2500

FOODTASTIC (KITCHEN)

750

FF

CH 2400

CH 2750

DUMBWAITER

FOODTASTIC (CAFETERIA)

MARKET GALLERY

360

GF

CH 3800 EQUIPMENT ROOM LOBBY

CALM MINDS

HEALTH HEALING

LG

SEC SECTION 001 1:150

A-A

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

SECTION A-A DRAWING NUMBER:

DWG_AIA_PMK_SEC_001


A

C

B

D

E F G H

I

33335 4965

13020

4125

4130

1325 2040 1455

2280

CH 1950

CH 2850 CARE SHARE (WORKSPACE)

STAFF OFFICE

MF

CARE SHARE (SORTING OFFICE)

CH 2500

TOILET

FF

CH 2400 ENTRANCE

GF

CH 3700 STORAGE ROOM

CH 4150

RESTFUL LEARNING (SLEEP AREA)

HEALTH HEALING (INFIRMARY)

RESTFUL LEARNING (READING CORNER)

CORRIDOR

1065 LG

SEC SECTION 002 1:150

B-B

NOTE: 1.

2.

3.

CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCING WORKS.

NO.

DATE

REVISED

CLIENT:

INTERIOR DESIGNER:

LOGO

St Antony's College, Oxford OX2 6HR, United Kingdom. antonyscollege@gmail.com

LOGO

Jalan Taylor's, Bandar Sunway, 46150, Subang Jaya, Selangor. meikeipak@gmail.com

FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE, THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL INCORRECT WORKS.

ARCHITECT:

CONTRACTOR:

THE ARCH FIRM LOGO

No. 9, Jalan Architect, 47130, Puchong, Selangor architect@gmail.com

PROJECT TITLE:

DRAWN BY: PAK MEI KEI

CHECKED BY: MR VICKRAM

DATE: 20/05/2022

SCALE: AS SHOWN

PAK MEI KEI

ST ANTONY'S COLLEGE

THE CONT FIRM LOGO

No. 8, Jalan Contractor, 47120, Puchong, Selangor contractor@gmail.com

PROPOSED INTERIOR DESIGN FOR PROJECT FROM CHAOS COMES ORDER AT THE INVESTCORP BUILDING. ST ANTONY'S COLLEGE, OXFORD OX2 6HR, UNITED KINGDOM

DRAWING TITLE:

SECTION B-B DRAWING NUMBER:

DWG_AIA_PMK_SEC_002




Phase 04 (40%)

EXHIBITION (PREPARATION) + FINAL PRESENTATION WEEK 10 - WEEK 14

Crafting the design outcomes towards a final virtual exhibition production will require the synergy of various teams in terms of exhibition curation and ideation. By this phase, all design production and outcome has been completed, submitted and is no longer at the development stage. This phase focuses solely on the production of the virtual exhibition and methods for the dissemination should be considered by now. Effective visual communication and ease of access to members of the public should also be considered during this phase towards the final outcome.


4.1 FINAL PRESENTATION SCREENSHOT (MIRO)


4.2 FINAL PRESENTATION LINKS

Topic Research

https://issuu.com/pmksem3mnfportfolio/docs/033438 6_pakmeikei_dp_finalsubmission

Final Presentation Video

https://youtu.be/_2GYPETwu58

360 Panorama @ kuula.com https://youtu.be/https://kuula.co/share/collection/7vn0Z? logo=1&info=1&fs=1&vr=0&sd=1&thumbs=1&utm_sour ce=canva&utm_medium=iframely


REFLECTION Stuck in a pandemic, everything we do eventually became online and submissions are in softcopies. I saved a lot of money from travelling, printing, model-making etc. However, the hardest part of online production is the isolation. I don't get many opportunities interacting with the lecturers and my peers, and it's very easy to lose focus when working from home. Our final year project is also done online, but thankfully schools and universities were opened for operations. Therefore we get to spend some time at the university. Eventually, the final exhibition is online as 80% of our works were forged online. Another challenging issue is the topic that I'd chosen as the lecturers advised me refugees, wars etc are really sensitive topics. I was given many feedback on how to tackle this topic and I still have a lot to learn. The jury advised me that I should interview the refugees to really know how they feel and to make site visits to schools that are catered for PTSD children etc. I do feel like there is a lot of room for improvement. Overall, I believe that much more can be done to fully support the refugee children, not only providing them a place as a shelter.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.