REGIONAL WORKSHOP ABOUT AUTHORITIES RESPONSIBLE FOR URBAN MOBILITY

20.10.2011, Barcelona


ABOUT ISTANBUL

2


With a history of 8.500 years, Istanbul’s location is strategically important between Europe, Asia, and Africa.

3


CITY OF ISTANBUL

The area of İstanbul which İstanbul Metropolitan Municipality (IMM) governs is 5.343 km2. The distance between north–south edges of

the city is 45 km, and east-west edges of the city is 165 km. 4


THE LARGEST METROPOLIS OF TURKEY Turkish Cities

European Countries

Istanbul is larger than 23 European countries with its land and population. 5


A CITY ON THE WORLD’S AGENDA * LONDON SCHOOL OF ECONOMICS * BROOKINGS INSTITUTE * DEUTSCHE BANK SURVEY

Istanbul ranked “number one developing city” according to a survey* done among 150 great metropolises. 6


ISTANBUL: EUROPEAN CAPITAL OF CULTURE 2010

Istanbul hosted many events in 2010 within the scope of “European Capital of Culture 2010”. 7


ISTANBUL: EUROPEAN CAPITAL OF SPORT 2012

Istanbul has been announced “European Capital of Sport 2012”

8


İSTANBUL IS THE ADRESS OF INTERNATIONAL CONGRESSES

Istanbul ranked 49th in congress tourism in 1998, today it ranks 15th.

We host 84

congresses today while it was only 37 in 2004.

9


$29 BILLIONS OF INVESTMENT IN LAST 7 YEARS

$14,5 billions, 53% of all investments, are made in transportation 10


OUR TRANSPORTATION VISION

11


Main reason of transportation problem was unplanned urbanization. In order to prevent this issue, we have prepared general master plan of the city, scaled

1/100.000. “Transportation Master Plan� is prepared based on this plan.

12


URBAN MOBILITY RATES In 2004

In 2011

11 MILLION

23 MILLION

DAILY

DAILY

TRIP

TRIP

13


TRANSPORTATION DATA FOR ISTANBUL

2.8

600

MILLION

NEW

VEHICLES

CARS

VEHICLES

VEHICLES

PER 1000

PER 1000

ADDED

PEOPLE

PEOPLE

224

133

EACH DAY

14


WE HAVE REDUCED AVERAGE TRIP TIME

2.830.000 2.050.000

FROM

53

MINUTES

49 TO

MINUTES

15


PUBLIC TRANSPORTATION TRIP RATES

Rates of railway systems will increase to 31% in 2014 and road based systems will decrease to 66%

16


RAILWAY SYSTEMS

17


BEFORE 2004

Commuter Rail (Government)

Before 2004, length of railway by Municipality was 45

km 18


2011

After 2004, 36

Km new railway lines has been added.

19


INCREASE IN RAILWAY SYSTEMS KM

80% TOTAL:

81 Km

20


UNDER CONSTRUCTION

52,5 Km new metro lines are under construction 21


5 million passengers will be carried in 2014 with a rail system of 230 Km 22


TARGET : 641 km railway system will be in service more than 60% of all public transportation 23


MARMARAY WORLD’S DEEPEST IMMERSED TUBE TUNNEL INTEGRATION WITH ISTANBUL RAILWAY ÜSKÜ DAR ÜMRA KADI NİYE KÖYKART AL

MAR MAR AY

MARMARAY IN NUMBERS

Length

Tube Tunnel: 13,5 Km Total: 77 Km

Passenger Capacity

150.000 Pass./ Hour

Depth of Immersion

56 m.

Cost

2,8 Billion $

24


MARMARAY PROJECT

Marmaray will integrate with Istanbul’s railway systems at 10 points 25


MONORAIL PROJECTS

We are planning 47,8 km monorail systems in 8 lines 26


Finance Model: Land Use For Seyrantepe Stadium

TOKİ

INVESTOR

OLD STADIUM

NEW STADIUM

SHARE :INCOME

27


Finance Model •The IBB have received positive ratings from International rating agencies , We did not have any difficulty for investment with strong financial structure, and the financials. •Including Commercial or investment banks did not claim any guarantee or even the Treasury Guarantee for credit for our projects.

28


Finance: Problem •But the problem is : •Environment-friendly organizations like UNESCO and similar , extremely sensitive in some subjects. This issues extends the duration of the credit aproval process, •Sometimes it may cause contract cancellations due to unused credits on time

• In short, credit institutions do not want to check credit process which have trouble with above mentioned organizations. 29


Finance Model : Some Projects 1 TAKSĠM-YENĠKAPI METRO PROJECT

276.495.676 $

T. İş Bankası (Ticari Kredi)

66.922.029

Standart Charter (Ticari Kredi)

19.000.427

AKA (İhracat Kredi)

84.680.220

Kore Exim Bank (İhracat Kredi)

70.893.000

ECO Bank (Ticari Kredi)

35.000.000


Finance Model 2

68 Metro Vehicle Purchase

Calyon - Socıete Generale (Ticari Kredi)

3

4 LEVENT-AYAZAĞA VE ÜSKÜDAR- ÜMRANĠYE METRO PROJECT

78.132.000 €

78.132.000

820.000.000 €

AFD (French Investment Bank)

120.000.000

EIB (European Investment Bank)

700.000.000


Finance Model 4 KADIKÖY-KARTAL METRO PROJECT

695.500.000 €

Calyon Bank ( İhracat Kredi)

219.500.000

Fortis-Westlb İle Toplam 11 Banka (Ticari Kredi)

476.000.000

5 Purchase 120 METRO Vehicles Fortis-Bnp( İhracat Kredi)

Fortis-Bnp (Ticari Kredi)

148.614.761 €

127.803.907

20.810.854


Finance Model

6 HALĠÇ METRO CROSSĠNG BRĠDGE PROJECT

WEST LB (İhracat Kredi)

WEST LB (Ticari Kredi)

7 KARTAL-KAYNARCA METRO PROJECT

WEST LB (Ticari Kredi)

150.722.828 €

49.814.958

100.907.871

242.743.818 €

242.743.818


Finance Model DENĠZ ULAġIM ARAÇLARI PROJELERĠ 1 PURCHASE 2 FERRY

107.180.000 $

KFW (İhracat Kredisi)

85.744.000

EIB (Ticari Kredi)

21.436.000

2 PURCHASE 5 SEABUS ABN AMRO (İhracat Kredi) ABN AMRO (Ticari Kredi)

39.510.000 $ 32.010.000 7.500.000


Raylı Sistem Müdürlüğü

FOCUS ON:

ĠSTANBUL METROSU III. PHASE 4.LEVENT – AYAZAĞA – HACIOSMAN METRO PROJECT (SEYRANTEPE)


Raylı Sistem Müdürlüğü

Ġstanbul Metro Plan

BLACK LİNE: NEW


Raylı Sistem Müdürlüğü

Ġstanbul Metrosu 3. AĢama Proje Güzergahı Uydu Görüntüsü


Raylı Sistem Müdürlüğü

PROJE CT BRIEF INFORMATION IV. Levent - Ayazağa - Hacıosman Part ( Double Line) Line lenght

:6.922 m.

Sanayi Ġstasyonu - Seyrantepe Depo Bağlantı Hatları (Tek Hat) Connect Line-1

:1.636 m.

Connect Line-2

:366 m.

Connect Line-3

:708 m.

Stadium Connect Tunnels (3 )

:369 m.

Total Lenght Of Connect Line

:3.079 m.

Station Names (6 ) Sanayi, İTÜ-Ayazağa, Atatürk Oto Sanayi, Darüşşafaka, Hacıosman, Seyrantepe


Raylı Sistem Müdürlüğü

PROJECT CONTRUCTION : 2 PHASE Project have 2 phase •

1. Phase: Main Construction (Finance : Equity ):

-

4.Levent-Atatürk Oto Sanayi Kesimi and Seyrantepe Connection Tunnels

-

Sanayi, İ.T.Ü.-Ayazağa Ve Atatürk Oto Sanayi Stations

-

Seyrantepe Station Transfer Center and Triage areas

2. Phase: Secondary Construction and Electro-mechanical parts

Finance :External Credit.

-

Atatürk Oto Sanayi-Hacıosman Part Tunnels

-

Darüşşafaka Station, Hacıosman Station Seyrantepe Station, Transfer Center and Triage areas

-

Whole projects detail works and Electro-mechanical systems


Raylı Sistem Müdürlüğü

PROJECT BUDGET BRIEF INFORMATION

Main Construction

:167.141.435 €

Electro Mechanical And Secondary construction

:340.435.448 €

Total Budget

:507.582.883 €


Raylı Sistem Müdürlüğü

PROJECT FINANCE

1) First phase of project made with EQUITY

2) Electro Mechanical Part and Detail Construction works financed 2 part below: Part 1 120 .000.000 € : Credit from French Investment t Bank (AFD) Part 2 220,000.000 € : Credit from European Investment Bank (EIB)


Raylı Sistem Müdürlüğü

MORE DETAILS


SEYRANTEPE STATION, TRANSFER CENTRE AND TRIAGE AREA • Transfer Centre and Parks

• Seyrantepe Station • Stadium and Hospital pedestrian connection tunnels and collector structure • Triage (Metro Vehicles Storage and Maintenance) Area • İstanbul Metro System (Yenikapı–Hacıosman) Control Centre • Future planned high-rise building


Seyrantepe Station, Transfer Centre and Triage Area Satellite Image


Seyrantepe Station, Transfer Centre and Triage Area Typical Cross-Section


Seyrantepe Transfer Centre General Information •

Structure Consolidation Area : 62.500 m2, Total Closed Area: 218.150 m2

• Park and ride system is going to be applied on Seyrantepe Transfer Centre . Underground park that is 3 staired was built in structure. • Total construction area of parks: 135.913 m2 • Park capacities of stairs; 1.Ground Floor: 815, 2.Ground Floor:794 and 3.Ground Floor:679 and The Total: 2288 • The aim is directly access by parks to station,to stadium pedestrian tunnels and to future planned shopping centre.

• Minibus and taxi passing places is projected around the transfer centre. • The rough works of parks is completed but trim works and electromechanic works of park is not completed yet.

Total cost of complex is 126.807.079 Euro.


Seyrantepe Station, Transfer Centre and Triage Area Vision


Seyrantepe Station General Information •

There are 7 items of in-out door in station.

Total construction area of the station is 15.415 m2.

The perrons are (by İbrahim Karaoğlanoğlu Main Street) 17.43 m underground.

There are 14 item of escalator ,7 item of disabled lift on the station.

3 Pedestrian connection that is 123 m length is built by station to Aslantepe Stadium and by under TEM Highway to planned hospital.

4 belt conveyors is set up by Aslantepe Pedestrian Tunnells to the hospital side tunnel Hastane Tarafındaki Tünele 4 Adet Yürüyen Bant Monte Edilmiştir.

Perron disconnector door system is going to be used.

Test drive in station was done on November 2009.

Station is opened to operate on November 2010.


Seyrantepe Station Vision


Seyrantepe Station Stadyium Pedestrian Connection Tunnels


Seyrantepe Station-Stadium Pedestrian Connection Tunnel with belt conveyor


Seyrantepe Triage Area General Information •

Metro Vehicles Repair and Maintenance Area :42.312 m2

Metro ıVehicles Park ve Storage Area

Triage Area Maintenance Capacity 4 train.

Triage Area Storage Capasity series of 4 train.

Vehicle Wash Capasity

İstanbul Metro System (Yenikapı–Hacıosman) Signalisation Control Centre is set up in Triage Building.

İstanbul Metro System (Yenikapı–Hacıosman) Management Centre is built up in Triage Building.

• • •

Seyrantepe Transfer Centre and Triage Area Major Production Quantities Concrete Sum :219.000 m3 - Rail Sum :5.866 mt Switch Sum :22 adet - Reinforcement Sum :29.584 ton

:44.510 m2 :2 items series of 8 train and 3 items series of

:9 items series of 8 train and items :1 item series of 8 train.


Seyrantepe Triage Area Vision


Seyrantepe Triage Area Vision


General Information About High-Rise Building That Planning To Construct Above Seyrantepe Transfer Centre • The mentioned area’s Zonning Plan was not be prepared yet in 2005 which year is starting construction of Storage and Triage Area. • As the result of project revision for designing under of the area as triage area,station,transfer centre and above of the area as office and shopping centre; • Above the completed structure with 4 stairs; • 30.300 m2 area and 2 storey building above it, • 24.300 m2 area and 10 storey building above it, • 5.250 m2 area and high-rised building above it, • have ability to build.


Designed Building Plan Above Transfer Centre


Designed Building Typical Section Of Above Transfer Centre


IBB Seyrantepe Service Building Typical Section


IBB Seyrantepe Service Building Plan



KADIKÖY – KARTAL METRO LINE STATION ITEM

: 16

LINE LENGTH

: 22 km.

PROJECT BID

: 1.5 BILLION USD

KARTAL KM: 21+759

KADIKÖY KM: 0+000


KADIKÖY – KARTAL METRO LINE DELIVERY OF AREA DATE

: 25 March 2008

OPERATING DATE

: 31 December 2011

CONSTRUCTING PERIOD

: 45 Months

“The fastest constructed metro of the world”


KARTAL – KAYNARCA ADDITION STATION WORK STATION ITEM

:3

LINE LENGTH

: 4,5 km. KARTAL

KADIKÖY

KAYNARCA


KADIKÖY-KARTAL GENERAL CONSTRUCTION REPORT 12.01.2011 PROJECT VALUE

NATM (m)

ALREADY CONSTRUCTED

NOT CONSTRUCTED YET

34.152,50

1.241,9

35.394,50

(m)

( 100,00% )

NATM (m)

(m)

36.588,19

(

2. İŞİN KAPSAMI ( 96,60% )

(

( 100,00% )

(

0,00%

)

0

12.331,15 (

42.624,10

( 100,00% )

( 97,08% )

0,00%

)

0

19.560,75

NATM (m)

(

0,00%

)

1.241,9 (

2,91%

)

0

13.524,84

13.524,84 ( 100,00% )

TOTAL (m)

3,39% )

0

7.229,60

41.382,20 GENERAL SUM

)

7.229,60

19.560,75

(m)

0,00%

1.241,9

35.346,19

( 100,00% )

TBM

)

0

12.331,15 TBM

3,51%

1.193,69

TOTAL (m)

ANATOLIA RAIL

(

1.193,69 TBM

TOTAL (m)

EURASIA

( 96,49% )

56.148,94

(

)

1.241,9

54.907,03 ( 97,78% )

0,00%

(

2,22%

)







S1C SHAFT - KADIKÖY


S18A&B SHAFT RAIL MONTAGE


SPECIAL DAYS


THANK YOU Prof.Dr.Mustafa ILICALI İstanbul Metropolitan Municipality Phone: (+90 212) 449 41 35 E-mail: mustafa.ilicali@ibb.gov.tr Bahçeşehir University Phone: (+90 212) 381 09 76 E-mail: mustafa.ilicali@bahcesehir.edu.tr