Chapter 8.0 Cost Affordable Plan “My Blimp is made of recycled plastic and a little bit of rubber. It holds 100 people and runs on the UV rays from the Sun. If it’s cloudy the blimp releases rays that it has been saving in the solar power panel on top. On board, passengers can sit down in restaurants like the Olav Garden.” Danielle Clark, 6th grade at Union Academy


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 1.0 Introduction

This page left intentionally blank

1‐2

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

8.0

Chapter 8.0 Cost Affordable Plan

COST AFFORDABLE PLAN

Using the prioritized project lists described in the preceding chapter, higher priority projects were assigned available funding within each time period and source. If a project could not be fully funded the next highest priority was considered for funding. Generally, state highways were funded by state sources and local projects were funded by local sources. If impact fee funds were available, projects within the appropriate impact fee district were considered for that funding. TRIP funding was assigned to projects serving regional travel.

8.1

DESCRIPTION OF MODES/COMPONENTS

8.1.1

Major Projects

CR 540A was recently widened to provide more capacity.

Several notable projects are funded in the Cost Affordable Plan, including:

8.2

Florida’s HSR line, which will connect Tampa with Orlando, is under development and is expected to begin operating by 2015. Consequently, it is included as a committed project. More details on the HSR project are in Section 8.2.3;

Expanded transit service to be funded by the local revenue source planned to be in place prior to 2014. Most of the new routes and enhancements to existing routes would occur shortly after that; and

The Central Polk Parkway (CPP) is a multi‐lane toll road with a western leg connecting the Polk Parkway to SR 60 and an eastern leg connecting I‐4 to SR 60. A PD&E Study is nearing completion, and a toll feasibility study is anticipated in the near future. Construction of the segment of the CPP between I‐4 and US 17/92 is included in the Cost Affordable Plan as a funded project, as is the interchange of the CPP at I‐4. Additional SIS funds, tolls and public private partnerships will be needed to help fund the remaining segments. Therefore, the remaining segments are considered illustrative projects, which are defined as projects “that may (but are not required to) be included in a financial plan for a metropolitan transportation plan, TIP, or State TIP if reasonable additional resources were to become available.”1

COST AFFORDABLE IMPROVEMENTS

Projects for which funding is expected to be available are considered cost affordable, or funded. This applies to both highway and transit projects. Specific funding sources are allocated to each project within five‐year periods. 1

Statewide Transportation Planning; Metropolitan Transportation Planning; Final Rule, 23 CFR Parts 450 and 500, 49 CFR Part 613

8‐1

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

8.2.1

Chapter 8.0 Cost Affordable Plan

Highway and Transit Project Listings by Phase and Time Period

Table 8‐1 shows all highway projects, including those that are committed (i.e., have funding committed to them in the next five years), funded (i.e., sufficient funding is available to complete them), partially funded (i.e., one or more phases cannot be funded by 2035), and unfunded. Costs are shown in both present day and YOE dollars. State roads are presented first, followed by local roads to be widened, then new local roads. Map 8‐1 shows the cost affordable and partially funded highway and road Winter Haven’s Downtown Transit Terminal represents a major capital project. projects as well as unfunded needs. Map 8‐2 presents all transit projects, including those that are committed, funded, and unfunded. Expanded transit service would be funded by the new local revenue source planned to be in place prior to 2014. Table 8‐2 lists all cost affordable transit projects and unfunded needs, both operating and capital. Table 8‐3 shows projected transit revenues, keyed to the sources in Table 8‐2. 8.2.2

Congestion Management Projects

Consistent with Policy 5.1.1 of the 2035 MVP, the TPO’s annual priority transportation projects will include a funding set‐aside or “box” of approximately $4 million per year for Congestion Management Projects, to be specified at a later date. Specific projects for the boxed funding will be identified two years prior to the date of programmed funding. For example, projects to be funded in FY 2014/15 will be identified in FY 2012/13. Eligible projects include intersection projects, FDOT resurfacing supplements, transit projects, safety projects, and strategic pedestrian and bicycle projects. The TPO will attempt to leverage available funding. In the selection of candidate projects, the TPO will give extra consideration to projects that provide an opportunity to partner with the FDOT and local governments. The TPO’s “Early and Continuing Coordination Process” will be used to identify opportunities to supplement resurfacing projects to include multi‐modal or safety features. Furthermore, the TPO will solicit candidate projects from local governments and other modal partners. The TPO will perform corridor studies to address “High Crash Corridors.” Metropolitan planning funds and other available funding sources will be used to support these corridor studies. Where applicable, study recommendations will identify candidate safety projects. Consistent with the 2035 MVP, the TPO will identify and maintain a list of the “Top Ten Candidate Projects” for bus passenger shelters, bicycle facilities, and sidewalks.

8‐2

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan

MAP 8‐1: 2035 COST AFFORDABLE HIGHWAY PLAN 8‐3

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan

(Unfunded)

Adopted by TPO December 7, 2010 MAP 8‐2: TRANSIT PLAN 2011‐2035 8‐4

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan

ID/ FPN

Project Details

Facility

PD&E

From

To

No. of Existing Lanes

1

Project Type

Cost (PDC)

Funding Source

Project Engineering 1

ROW 2

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

Projected Cost 3 Cost (PDC)

Funding Source

YOE

Construction 2

Total

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

YOE

Projected Costs Unfunded 3 5 6 Cost Funded Needs

OA

2016‐2020

20.00

20.00

OA

2021‐2025

20.00

20.00

OA

2026‐2030

22.00

22.00

OA

2031‐2035

18.00

18.00

STATE ROADWAYS CONGESTION MGMT PROJECTS CONGESTION MGMT PROJECTS CONGESTION MGMT PROJECTS CONGESTION MGMT PROJECTS

N/A

N/A

N/A

N/A

300A

CPP EAST CORRIDOR

EAST CENTRAL POLK PKWY

US 27

NEW FREEWAY

COMPLETED

2.45

OA

COMMITTED

0.00

300B

CPP EAST CORRIDOR

US 27

CR 544

NEW FREEWAY

COMPLETED

5.42

OA

COMMITTED

0.00

300C

CPP EAST CORRIDOR

CR 544

CR 580

NEW FREEWAY

COMPLETED

2.05

OA

COMMITTED

0.00

300D

CPP EAST CORRIDOR

CR 580

US 17/92

NEW FREEWAY

COMPLETED

3.39

OA

COMMITTED

0.00

+CPP EAST CORRIDOR

NEW FREEWAY

3.52

COMPLETED

0.00

13.31

OA

COMMITTED

0.00

103.66

UNFUNDED

325.04

70.40

UNFUNDED

158.34

0.00

483.38

TOTAL – PATIALLY FUNDED SEGMENTS

300E*

CPP EAST CORRIDOR

US 17/92

I‐4

NEW FREEWAY

7.87

COMPLETED

0.00

3.51

OA

COMMITTED

0.00

102.62

OA

2016‐2020

140.73

157.38

OA

2021‐2025

240.33

381.06

0.00

299A

CPP WEST CORRIDOR

POLK PARKWAY (SR540)

SR 35 (US 17)

NEW FREEWAY

COMPLETED

5.45

OA

COMMITTED

0.00

299B

CPP WEST CORRIDOR

SR 35 (US 17)

POLLARD RD

NEW FREEWAY

COMPLETED

7.53

OA

COMMITTED

0.00

299C

CPP WEST CORRIDOR

POLLARD RD

SR 60

NEW FREEWAY

COMPLETED

5.07

OA

COMMITTED

0.00

+CPP WEST CORRIDOR

NEW FREEWAY

5.77

COMPLETED

0.00

18.1

OA

COMMITTED

0.00

44.92

UNFUNDED

140.85

115.37

UNFUNDED

259.82

0.00

400.67

43

I‐4

HILLSBOROUGH COUNTY LINE

47

I‐4

@ EB EXPRESS RAMPS

RAMPS

0.16

SIS

UNFUNDED

0.29

0.48

SIS

UNFUNDED

0.88

0.00

SIS

UNFUNDED

0.00

3.17

SIS

UNFUNDED

7.13

0.00

8.31

44

I‐4

@CLARK RD/ FRONTAGE RD

INTERCHANGE

4.48

SIS

UNFUNDED

8.31

13.44

SIS

UNFUNDED

24.92

0.00

SIS

UNFUNDED

0.00

89.62

SIS

UNFUNDED

201.82

0.00

235.05

342

I‐4

@SR 33

INTERCHANGE

3.58

SIS

UNFUNDED

6.64

10.75

SIS

UNFUNDED

19.93

0.00

SIS

UNFUNDED

0.00

71.66

SIS

UNFUNDED

161.38

0.00

187.95

39

I‐4

@WB EXPRESS RAMPS

RAMPS

0.16

SIS

UNFUNDED

0.29

0.48

SIS

UNFUNDED

0.88

0.00

SIS

UNFUNDED

0.00

3.17

SIS

UNFUNDED

7.13

0.00

8.31

348

I‐4

@COUNTY LINE RD

INTERCHANGE

4.48

SIS

UNFUNDED

8.31

13.44

SIS

UNFUNDED

24.92

0.00

SIS

UNFUNDED

0.00

89.62

SIS

UNFUNDED

201.82

0.00

235.05

349

I‐4

@WILLIAMS DRI

INTERCHANGE

3.58

SIS

UNFUNDED

6.64

10.75

SIS

UNFUNDED

19.93

0.00

SIS

UNFUNDED

0.00

71.66

SIS

UNFUNDED

161.38

0.00

187.95

2

OSCEOLA COUNTY LINE

INTERSTATE

18.00

UNFUNDED

33.37

54.00

UNFUNDED

100.11

0.00

UNFUNDED

0.00

359.97

UNFUNDED

810.66

0.00

944.14

89A

SR 33

I‐4 EB RAMPS

OLD COMBEE/ DEESON POINTE

89B

SR 33

SR 659

TOMKOW RD

2

89C

SR 33

OLD COMBEE/ DEESON POINTE

SR 659

2

ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

0.34

COMMITTED

0.00

1.02

COMMITTED

0.00

0.00

COMMITTED

0.00

6.81

COMMITTED

0.00

0.00

0.00

2.60

OA

COMMITTED

0.00

2.33

OTHER

2016‐2020

2.85

0.00

0.00

15.56

OTHER

2021‐2025

23.76

26.61

0.00

0.88

IMPACT DIST E

2021‐2025

1.21

2.63

MULTIPLE SOURCES

2021‐2025

3.62

0.00

0.00

17.51

MULTIPLE 2021‐2025 SOURCES

26.74

31.56

0.00

1.63

OA

2.24

8.01

OA

12.23

1.38

4.50

IMPACT DIST E

6.87

1.00

IMPACT DIST E

5.00

OTHER

7.64

89D

SR 33

N OF I‐4/EXIT 38

OLD POLK CITY RD

2

ROADWAY

1.26

UNFUNDED

2.34

3.79

UNFUNDED

7.03

0.00

UNFUNDED

0.00

25.29

UNFUNDED

56.95

0.00

66.32

Legend:

TOTAL – PATIALLY FUNDED SEGMENTS

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

=

UNFUNDED NEED

+ 30% Design committed to all project segments (includes interchanges/overpasses as appropriate). Only partially funded segments are included in the totals for each corridor. *Project #300E includes interchange at I‐4.

8 ‐ 5

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Project Details

PD&E No. of Existing Lanes

1

Project Type WIDENING

Cost (PDC)

Funding Source

2.09

Project Engineering 1

ROW 2

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

Projected Cost 3 Cost (PDC)

Funding Source

YOE

UNFUNDED

3.88

6.28

UNFUNDED

11.65

0.00

1.46

UNFUNDED

2.70

4.38

UNFUNDED

8.11

Construction 2

Total

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

YOE

Projected Costs Unfunded 3 5 6 Cost Funded Needs

UNFUNDED

0.00

41.89

UNFUNDED

94.35

0.00

109.88

0.00

UNFUNDED

0.00

29.18

UNFUNDED

65.71

0.00

76.53

Facility

From

To

90

SR 33

OLD POLK CITY RD

ORANGE BLVD (N OF POLK CITY RD)

2

91

SR 37

CR 640 (PINECREST RD)

SR 60 (CANAL ST)

2

356

SR 540

@ REYNOLDS RD

INTERSECTION

0.12

IMPACT DIST E

2016‐2020

0.15

0.36

IMPACT DIST E

2016‐2020

0.44

0.65

IMPACT DIST E

2021‐2025

1.14

2.39

IMPACT DIST E

2021‐2025

3.66

5.38

0.00

2.09

COMPLETED

0.00

4.93

OA

COMMITTED

0.00

5.92

41.89

OA

2021‐2025

63.97

69.89

0.00

3.17

ROADWAY WIDENING ROADWAY WIDENING

SR 542 (DUNDEE RD)

BUCKEYE LOOPS RD

US 27

2

ROADWAY WIDENING

2.00

OA

2.75

3.14

UNFUNDED

5.83

9.43

UNFUNDED

17.48

12.44

UNFUNDED

39.01

62.84

UNFUNDED

141.52

0.00

203.83

0.88

TRIP

2016‐2020

1.07

2.63

OA

2016‐2020

3.20

0.57

OA

2016‐2020

0.78

17.51

OA

2016‐2020

22.72

27.77

0.00

0.44

IMPACT DIST C

2021‐2025

0.60

1.31

LOCAL OP. GAS TAX

2021‐2025

1.81

LOCAL OP. 0.29 2021‐2025 GAS TAX

13.37

16.28

0.00

5.27

56 57A 57B

SR 544 (LUCERNE PARK RD) SR 544 (LUCERNE PARK RD) SR 544 (LUCERNE PARK RD)

AVENUE T

US 27

2

US 27

SR 17

2

SR 17

30TH ST

2

ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

MULTIPLE 4.31 2016‐2020 SOURCES IMPACT 2.31 DIST D

0.50

8.75

MULTIPLE 2021‐2025 SOURCES LOCAL OP GAS TAX

3.45

3.30

OA

5.04

3.05

335

SR 559 EXTENSION

SR 655 (RECKER HWY)

DERBY AVE

0

152

SR 563 (N/S ROUTE)

W PIPKIN RD

SR 572

0

@ GATEWAY ROAD

0

@ GAPWAY RD/ BRADDOCK RD

0

339 341

SR 570 (POLK PKWY) INTERCHANGE SR 570 (POLK PKWY) INTERCHANGE

329

SR 570 (POLK PKWY)

S OF CR 546

N OF EASTERN TOLL PLAZA

2

236A

SR 572 (AIRPORT RD)

S OF POLK PKWY

DRANE FIELD RD

2

236B

SR 572 (AIRPORT RD)

N OF POLK PKWY

1 MILE N OF POLK PKWY

2 2

2.00

ENHANCE‐ MENT

0.29

OA

COMMITTED

0.00

0.86

OA

COMMITTED

0.00

1.08

OA

COMMITTED

0.00

5.76

OA

COMMITTED

0.00

0.00

0.00

1.44

IMPACT DIST E

2031‐2035

2.54

4.32

COMPLETED

0.00

4.31

COMPLETED

0.00

93.81

UNFUNDED

211.26

2.54

211.26

INTERCHANGE

3.58

UNFUNDED

6.64

10.75

UNFUNDED

19.93

0.00

UNFUNDED

0.00

71.66

UNFUNDED

161.38

0.00

187.95

INTERCHANGE

3.58

UNFUNDED

6.64

10.75

UNFUNDED

19.93

0.00

UNFUNDED

0.00

71.66

UNFUNDED

161.38

0.00

187.95

0.45

COMPLETED

0.00

1.34

COMPLETED

0.00

0.00

0.00

34.10

TURNPIKE

2021‐2025

52.07

52.07

0.00

0.21

UNFUNDED

0.39

0.63

UNFUNDED

1.16

0.02

UNFUNDED

0.07

4.18

UNFUNDED

9.42

0.00

11.04

0.49

OTHER

COMMITTED

0.00

1.46

OTHER

COMMITTED

0.00

0.05

OTHER COMMITTED

0.00

9.73

OTHER

COMMITTED

0.00

0.00

0.00

0.39

UNFUNDED

0.72

1.17

UNFUNDED

2.16

0.04

UNFUNDED

0.13

7.78

UNFUNDED

17.52

0.00

20.54

2.85

UNFUNDED

5.29

8.56

UNFUNDED

15.86

0.00

UNFUNDED

0.00

57.04

UNFUNDED

128.47

0.00

149.62

12.96

SIS

UNFUNDED

24.03

38.89

SIS

UNFUNDED

72.10

1.96

SIS

UNFUNDED

4.10

259.26

SIS

UNFUNDED

583.85

0.00

684.08

ROADWAY ‐ NEW CONSTRUCTION ROADWAY ‐ NEW CONSTRUCTION

ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

236C

SR 572 (AIRPORT RD)

1 MI N OF POLK PKWY

US 92 NEW TAMPA HWY)

93

SR 60

CR 630

OSCEOLA COUNTY LINE

2

214

SR 60

US 27

COUNTY LINE RD

4

340

SR 60

@ SR 37

INTERSECTION

0.12

SIS

UNFUNDED

0.23

0.37

SIS

UNFUNDED

0.69

1.60

SIS

UNFUNDED

5.03

2.47

SIS

UNFUNDED

5.56

0.00

11.50

351

SR 60

@ CR 676

GRADE

1.09

SIS

UNFUNDED

2.02

3.27

SIS

UNFUNDED

6.06

0.00

SIS

UNFUNDED

0.00

21.78

SIS

UNFUNDED

49.05

0.00

57.13

Legend:

Chapter 8.0 Cost Affordable Plan

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

=

UNFUNDED NEED

8 ‐ 6

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Project Details

PD&E

Facility

From

To

No. of Existing Lanes

352

SR 60

@ CR 37B (LAKELAND HIGHLANDS RD EXT)

353

SR 60

W OF CR 555

354

SR 60

E OF SR 653 EXT

355

SR 60

E OF WEST LAKE WALES RD COLLECTOR

203

SR 655 (RECKER HWY)

SPIRIT LAKE RD/42ND ST

THORNHILL RD

2

20

SR 659 (COMBEE RD)

CR 546 (SADDLE CREEK RD)

SR 33

2 4

1

Project Type SEPARATION GRADE SEPARATION GRADE SEPARATION GRADE SEPARATION GRADE SEPARATION ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

Cost (PDC)

Funding Source

1.09

Project Engineering 1

ROW 2

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

Projected Cost 3 Cost (PDC)

Funding Source

YOE

SIS

UNFUNDED

2.02

3.27

SIS

UNFUNDED

6.06

0.00

1.09

SIS

UNFUNDED

2.02

3.27

SIS

UNFUNDED

6.06

1.09

SIS

UNFUNDED

2.02

3.27

SIS

UNFUNDED

1.09

SIS

UNFUNDED

2.02

3.27

SIS

0.49

OA

UNFUNDED

0.90

1.46

1.46

UNFUNDED

2.70

4.01

UNFUNDED

1.07

OA

5.35

Construction 2

Total

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

YOE

Projected Costs Unfunded 3 5 6 Cost Funded Needs

SIS

UNFUNDED

0.00

21.78

SIS

UNFUNDED

49.05

0.00

57.13

0.00

SIS

UNFUNDED

0.00

21.78

SIS

UNFUNDED

49.05

0.00

57.13

6.06

0.00

SIS

UNFUNDED

0.00

21.78

SIS

UNFUNDED

49.05

0.00

57.13

UNFUNDED

6.06

0.00

SIS

UNFUNDED

0.00

21.78

SIS

UNFUNDED

49.05

0.00

57.13

OA

UNFUNDED

2.70

0.18

OA

UNFUNDED

0.56

9.73

OA

UNFUNDED

21.90

0.00

26.07

4.38

UNFUNDED

8.11

1.01

UNFUNDED

3.18

29.18

UNFUNDED

65.71

0.00

79.70

7.43

12.02

UNFUNDED

22.28

0.00

UNFUNDED

0.00

80.11

UNFUNDED

180.42

0.00

210.13

UNFUNDED

1.99

3.21

OA

UNFUNDED

5.96

12.36

OA

UNFUNDED

38.74

21.43

OA

UNFUNDED

48.26

0.00

94.95

IMPACT DIST C

2031‐2035

9.45

16.05

IMPACT DIST C

2031‐2035

28.34

1.14

OA

2031‐2035

3.25

106.98

OA

UNFUNDED

240.92

41.04

240.92

2.68

OA

2031‐2035

4.73

8.04

OA

2031‐2035

14.19

0.00

UNFUNDED

0.00

53.57

UNFUNDED

120.65

18.92

120.65

0.15

OA

2016‐2020

0.70

0.44

OA

2021‐2025

0.60

0.35

OA

2021‐2025

0.61

2.92

OA

2021‐2025

4.46

5.87

0.00

1.89

COMPLETED

0.00

5.66

COMPLETED

0.00

20.95

COMPLETED

0.00

25.68

SIS

COMMITTED

0.00

0.00

0.00

2.43

SIS

0.00

7.28

SIS

0.00

0.00

SIS

0.00

22.26

SIS

COMMITTED

0.00

0.00

0.00

3.42

COMMITTED

0.00

25.48

UNFUNDED

47.24

0.21

UNFUNDED

0.44

169.86

UNFUNDED

382.52

0.00

430.20

28

US 17

SR 60A CONNECTOR

EAGLE LAKE RD (ONE‐WAY PAIR)

200

US 17 (6TH ST NW)

E CENTRAL AVE

SR 544 (AVENUE T)

4

97

US 17/92

US 17/92 (HINSON AVE)

OSCEOLA COUNTY LINE

2

328

US 17/92

ROCHELLE AVE

US 27

4

96

US 17/92 (HINSON AVE)

10TH ST

17TH ST

2

108

US 27

N OF RITCHIE RD

S OF BARRY RD

4

110

US 27

S OF BARRY RD

LAKE COUNTY LINE

4

98

US 27

HIGHLANDS COUNTY LINE

N OF SR 60

4

102

US 27

@ DUNDEE ROAD (SR 542)

INTERSECTION

0.13

SIS

0.00

0.40

SIS

0.00

0.54

SIS

0.00

2.65

SIS

0.00

0.00

0.00

100

US 27

@ CYPRESS GARDENS BLVD (SR 540)

INTERSECTION

0.13

SIS

0.00

0.40

SIS

0.00

0.00

SIS

0.00

2.65

SIS

0.00

0.00

0.00

99

US 27

@ SR 60

INTERCHANGE

4.66

UNFUNDED

8.63

13.97

UNFUNDED

25.90

0.00

UNFUNDED

0.00

93.13

UNFUNDED

209.74

0.00

244.27

343

US 27

@ SR 544 (LUCERNE PARK RD)

INTERSECTION

0.13

IMPACT DIST D

2026‐2030

0.21

0.40

LOCAL AD VAL TAX

2026‐2030

0.62

3.05

2.65

5.61

9.49

0.00

1.91

1.15

TRIP

2.44

1.14

1.50

OA

3.17

344

US 27

@ CR 17

INTERSECTION

0.13

UNFUNDED

0.25

0.40

UNFUNDED

0.74

0.00

2.65

UNFUNDED

5.98

0.00

6.96

2026‐2030

0.21

0.40

IMPACT DIST D

2026‐2030

5.61

6.92

0.00

3.49

2.11

0.00

0.00

0.00

MULTIPLE 2031‐2035 SOURCES LOCAL AD 0.67 VAL TAX IMPACT 0.40 DIST C 1.07

0.00

0.62

0.22

IMPACT DIST D

2026‐2030

0.49

2.65

345

US 27

@ CR 547 (BAY ST)

INTERSECTION

0.13

IMPACT DIST D

1.65

1.00

346

US 27

@ ERNIE CALDWELL BLVD

INTERCHANGE

2.14

COMMITTED

0.00

6.43

COMMITTED

0.00

2.83

COMMITTED

0.00

42.85

Legend:

Chapter 8.0 Cost Affordable Plan

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

=

MULTIPLE 2031‐2035 SOURCES

MULTIPLE 2031‐2035 SOURCES IMPACT DIST D LOCAL AD VAL TAX

COMMITTED

UNFUNDED NEED

8 ‐ 7

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Chapter 8.0 Cost Affordable Plan

Project Details

PD&E

To

No. of Existing Lanes

Facility

From

347

US 27

@ RONALD REAGAN PKWY

4

61

US 92 (MEMORIAL BLVD)

GARY RD

SR 655 (RECKER HWY)

64

US 92 (NEW TAMPA HWY)

HILLSBOROUGH COUNTY LINE

WABASH AVE

2

237

US 98

DAUGHTERY RD W

DUFF RD

4

4

US 98 (BARTOW RD)

EDGEWOOD DR

E MAIN ST

4

5

US 98 (BARTOW RD)

EDGEWOOD DR

S OF BROOKS ST

4

6A

US 98 (BARTOW RD)

N OF SR 540

N OF CR 540A

4

6B

US 98 (BARTOW RD)

N OF CR 540A

S OF MANOR DR

4

35

US 98 (N FLORIDA AVE)

US 92 (MEMORIAL BLVD)

CR 582 (GRIFFIN RD)

4

350

SR 60

W OF US 98

W OF US 17

BAKER AVE

2

1

Project Type

Cost (PDC)

Funding Source

INTERSECTION

0.13

ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

2

YOE

Cost (PDC)

Funding Source

YOE

SIS

0.00

0.40

SIS

0.00

3.75

UNFUNDED

6.95

11.25

UNFUNDED

1.95

OA

2031‐2035

3.44

5.84

OA

0.54

UNFUNDED

0.99

1.61

1.61

OA

COMPLETED

0.00

Projected Cost 3 Cost (PDC)

Funding Source

0.04

20.86

2031‐2035

5.10

Construction 2

Total

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

YOE

Projected Costs Unfunded 3 5 6 Cost Funded Needs

SIS

0.00

2.65

SIS

0.00

0.00

0.00

0.73

UNFUNDED

2.28

75.00

UNFUNDED

168.90

0.00

199.00

10.31

0.00

OA

2031‐2035

0.00

38.90

OA

2031‐2035

82.16

95.90

0.00

UNFUNDED

2.98

0.00

UNFUNDED

0.00

10.71

UNFUNDED

24.13

0.00

28.10

OA

COMMITTED

0.00

22.33

OA

2026‐2030

49.89

32.14

MULTIPLE 2031‐2035 SOURCES

67.89

185.67

0.00

(INLCUDES

24.14

OA

51.00

8.00

IMPACT DIST E

16.89

PD&E RE‐ EVAL)

0.54

COMPLETED

0.00

1.61

COMPLETED

0.00

0.00

0.00

7.77

SIS

COMMITTED

0.00

0.00

0.00

1.35

COMPLETED

0.00

4.05

SIS

COMPLETED

0.00

2.00

SIS

COMMITTED

0.00

22.11

SIS

COMMITTED

0.00

0.00

0.00

2.00

COMPLETED

0.00

6.01

COMPLETED

0.00

0.46

COMPLETED

0.00

14.60

SIS

COMMITTED

0.00

0.00

0.00

1.07

UNFUNDED

1.99

3.21

UNFUNDED

5.96

8.13

UNFUNDED

25.48

21.43

UNFUNDED

48.26

0.00

81.68

0.12

COMPLETED

0.00

0.37

COMPLETED

0.00

0.00

COMPLETED

0.00

14.34

OA

COMMITTED

0.00

0.00

0.00

0.35

UNFUNDED

0.65

1.23

UNFUNDED

2.28

8.54

UNFUNDED

26.77

11.60

UNFUNDED

26.13

0.00

55.83

0.34

0.79

LOCAL OP. GAS TAX

2026‐2030

1.23

5.46

13.34

27.12

0.00

7.95

5.39

30.39

57.09

0.00

21.94

4.22

4.22

UNFUNDED

18.29

0.00

39.09

INTERSECTION

1

ROW

Projected 3 Cost

ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

Project Engineering

EXISTING LOCAL ROADWAYS TO BE WIDENED 285

CR 544

ROADWAY WIDENING ROADWAY WIDENING

LOCAL OP. 0.22 2026‐2030 GAS TAX

MULTIPLE 2026‐2030 SOURCES LOCAL AD VAL TAX IMPACT DIST C MULTIPLE 2026‐2030 SOURCES LOCAL AD VAL TAX IMPACT DIST A LOCAL OP. GAS TAX

212

BATES RD

US 27

US 17/92

2

3.46

2.00

209

BERKLEY RD (CR 655)

CR 559A

SR 33

2

ROADWAY WIDENING

0.43

0.67

1.53

LOCAL OP. GAS TAX

2026‐2030

2.39

10.58

7.08

2.00

1.50

9

BUCKEYE LOOP RD

SR 542 (DUNDEE RD)

SR 549 (1ST ST)

2

ROADWAY WIDENING

0.25

UNFUNDED

0.46

0.86

UNFUNDED

1.59

5.98

201

CENTRAL AVE/ LAKE ELBERT DR/ DUNDEE RD (SR 542)

SR 549 (1ST ST)

BUCKEYE LOOP RD

2

ROADWAY WIDENING

0.29

COMPLETED

0.00

1.03

COMMITTED

0.00

16.24

Legend:

30TH ST

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

=

LOCAL OP. 2026‐2030 GAS TAX

MULTIPLE 2026‐2030 SOURCES LOCAL AD VAL TAX LOCAL OP. GAS TAX MULTIPLE 2031‐2035 SOURCES LOCAL AD VAL TAX LOCAL OP. GAS TAX IMPACT DIST A

12.21

7.43

7.74

4.43

4.47

3.00

23.64

14.39

15.83

10.39

4.47

2.00

3.35

2.00

UNFUNDED

18.74

8.12

OA

2016‐2020

0.00

9.75

MULTIPLE 2026‐2030 SOURCES

17.51

17.51

0.00

7.75

LOCAL AD VAL TAX

13.92

1.00

TRIP

1.80

UNFUNDED NEED

8 ‐ 8

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Project Details

PD&E

Project Engineering

ROW

Construction

Facility

From

To

No. of Existing Lanes

337

CR 17 (POLK CITY RD)

US 27

WILBAR LN

2

11

CR 17A (BURNS AVE)

CR 17B (BUCK MOORE RD)

202

CR 17A (BURNS AVE)

BRENTWOOD DR

136

CR 17A (CHALET SUZANNE RD)

US 27

SR 17

2

2.90

2.90

135

CR 542 (LAKE HATCHINEHA RD)

SR 17

POINCIANA PKWY

2

1.06

UNFUNDED

1.97

3.74

UNFUNDED

6.93

25.95

59

CR 542 (OLD TAMPA HWY)

CLARK RD

2016‐2020

0.22

0.64

2016‐2020

0.78

4.44

232

CR 542A (GALLOWAY RD N)

US 92 (NEW TAMPA HWY)

2016‐2020

0.87

2.51

2016‐2020

3.06

17.41

204

CR 546 (SADDLE CREEK RD)

SR 659 (N COMBEE RD)

CR 655 (BERKLEY RD)

2

2021‐2025

1.08

2.76

2021‐2025

3.81

19.12

22

CR 547

US 27

US 17/92/CSX LINE

2

2016‐2020

0.27

0.79

2016‐2020

0.96

5.46

210

CR 557

US 17/92

I‐4

2

2016‐2020

1.11

3.20

2016‐2020

3.90

22.19

357

CR 580

POWER LINE RD

OSCEOLA COUNTY LINE

2

2031‐2035

0.21

0.00

0.00

0.80

49

CR 582 (KNIGHTS‐GRIFFIN RD) DETOUR RD

286

MAMMOTH GROVE RD CR 17B (BUCK MOORE RD)

SR 572/ AIRPORT RD CR 35A (KATHLEEN RD)

1

Project Type

Cost (PDC)

Funding Source

0.49

2 2

2 2

ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

YOE

Funding Source

YOE

UNFUNDED

0.91

1.72

UNFUNDED

0.27

0.59

0.11

0.24

0.37

0.84

LOCAL OP. 2026‐2030 GAS TAX IMPACT 0.07 2026‐2030 DIST B LOCAL OP. 0.24 2026‐2030 GAS TAX

0.71 0.78 0.22 0.91

2

Cost (PDC)

0.17

0.18

1

Projected 3 Cost

LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX

IMPACT DIST B IMPACT DIST B LOCAL OP. GAS TAX

LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX

Projected Cost 3 Cost (PDC)

Funding Source

3.19

11.95

2026‐2030

0.92

4.10

2026‐2030

0.37

1.64

2026‐2030

1.31

5.80

YOE

Cost (PDC)

Funding Source

1.00

IMPACT DIST D

1.80

UNFUNDED

37.47

16.25

UNFUNDED

36.59

0.00

78.16

11.68

5.57

11.76

24.63

0.00

3.66

2.23

4.00

8.15

0.00

12.97

7.89

14.17

28.82

0.00

6.49

3.99

7.17

6.48

3.90

7.00

UNFUNDED

81.37

35.28

UNFUNDED

79.45

0.00

169.71

2016‐2020

6.09

6.03

2016‐2020

7.83

14.92

0.00

2016‐2020

23.88

23.67

2021‐2025

36.15

63.95

0.00

2026‐2030

42.71

25.99

2026‐2030

46.69

94.28

0.00

2026‐2030

12.20

7.43

2026‐2030

13.34

26.77

0.00

2016‐2020

30.43

30.17

2021‐2025

46.07

81.52

0.00

2031‐2035

1.69

1.90

0.00

1.06

0.21

0.42

2031‐2035

22.55

47.50

0.00

UNFUNDED

31.36

0.00

67.00

9.80

18.41

0.00

5.58

2.11

2.11

51.96

97.61

0.00

26.62

IMPACT 2031‐2035 DIST B IMPACT 2026‐2030 DIST B MULTIPLE 2026‐2030 SOURCES IMPACT DIST C IMPACT DIST B LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX

0.00

0.00

0.12

0.50

0.10

0.20

WESTERN POLK CONNECTOR

CR 35A (KATHLEEN RD)

2

22.39

10.68

CR 542 (LAKE HATCHINEHA RD)

SR 544

2

32.12

13.93

ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

0.32

IMPACT DIST E

2031‐2035

0.57

1.13

LOCAL OP. GAS TAX

2031‐2035

2.00

7.85

LOCAL AD 2031‐2035 VAL TAX

0.42

UNFUNDED

0.78

1.48

UNFUNDED

2.74

10.24

0.14

TRIP

2026‐2030

0.22

0.49

TRIP

2026‐2030

0.76

LOCAL AD 3.41 2026‐2030 VAL TAX

DUNSON RD

US 27

WEST SIDE EXT

2

31

EWELL RD

COUNTY LINE RD

SR 37

2

ROADWAY WIDENING

0.74

1.16

2.61

LOCAL AD VAL TAX

2026‐2030

4.07

18.10

2

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

=

LOCAL OP. 2026‐2030 GAS TAX

Total

Projected 3 Cost

315

Legend:

Chapter 8.0 Cost Affordable Plan

UNFUNDED

7.63

4.64

2.64

1.00

1.00

40.42

24.60

20.32

12.60

MULTIPLE 2026‐2030 SOURCES LOCAL AD 9.10 VAL TAX

YOE

IMPACT 2031‐2035 DIST B IMPACT 2026‐2030 DIST B MULTIPLE 2026‐2030 SOURCES LOCAL AD VAL TAX IMPACT DIST B LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX LOCAL AD VAL TAX MULTIPLE SOURCES LOCAL OP. GAS TAX LOCAL AD VAL TAX ENHANCE‐ MENT LOCAL AD VAL TAX

MULTIPLE 2031‐2035 SOURCES LOCAL AD VAL TAX IMPACT DIST A LOCAL OP. GAS TAX MULTIPLE 2031‐2035 SOURCES LOCAL AD VAL TAX

Projected Costs Unfunded 3 5 6 Cost Funded Needs

UNFUNDED NEED

8 ‐ 9

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Project Details

PD&E

Project Engineering

ROW

Construction

Facility

From

To

No. of Existing Lanes

132

LAKE WILSON RD

CR 54

OSCEOLA COUNTY LINE

2

134

MARIGOLD AVE

COYOTE RD

CR 580 (CYPRESS PKWY)

2

5.75

4.00

129

MARIGOLD AVE

POINCIANA PKWY

COYOTE RD

2

0.34

IMPACT DIST C

2016‐2020

0.41

1.18

IMPACT DIST C

2016‐2020

1.44

8.19

IMPACT DIST C

2021‐2025

14.34

11.14

270

MARSHALL RD N

30TH ST EXT

BATES RD EXT

2

0.06

UNFUNDED

0.11

0.20

UNFUNDED

0.37

1.37

UNFUNDED

4.28

1.86

69

OLD POLK CITY RD

WALT WILLIAMS RD

SR 33

2

0.59

UNFUNDED

1.09

2.07

UNFUNDED

3.84

14.34

UNFUNDED

44.97

19.50

OLD POLK CITY RD

CR 582 (SOCRUM LOOP RD N)

WALT WILLIAMS RD

2

0.36

UNFUNDED

0.67

1.28

UNFUNDED

2.37

8.88

UNFUNDED

27.84

68 234

PIPKIN RD W

MEDULLA RD

PIPKIN RD S

2

235

PIPKIN RD W

PIPKIN RD S

1

Project Type

Cost (PDC)

Funding Source

ROADWAY WIDENING ROADWAY WIDENING

ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

1

2

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

Projected Cost 3 Cost (PDC)

Funding Source LOCAL OP. 9.00 GAS TAX

YOE

0.14

UNFUNDED

0.26

0.49

UNFUNDED

0.91

3.41

0.29

IMPACT DIST C

2016‐2020

0.35

1.03

IMPACT DIST C

2016‐2020

1.26

7.17

0.29

COMPLETED

0.00

1.03

COMPLETED

0.00

7.17

5.17

2.00

HARDEN BLVD/ OLD 37

2

ROADWAY WIDENING

0.18

COMPLETED

0.00

0.64

COMPLETED

0.00

4.44

2.44

2.00

130

POINCIANA PKWY

CR 542

MARIGOLD AVE

2

0.68

UNFUNDED

1.26

2.41

UNFUNDED

4.47

16.73

282

POWERLINE RD

CR 580 (JOHNSON AVE)

SOUTH BLVD

2

LOCAL OP. 2031‐2035 GAS TAX

0.67

1.33

LOCAL OP. GAS TAX

2031‐2035

2.35

9.22

6.00

2.00

1.22

295

POWERLINE ROAD

HINSON AVE

CR 580 (JOHNSON AVE)

2

ROADWAY WIDENING

0.07

0.12

0.25

LOCAL OP. GAS TAX

2031‐2035

0.44

1.71

1.00

0.71

80

REYNOLDS RD

SR 540 (WINTERLAKE RD)

FISH HATCHERY RD EXT

2

ROADWAY WIDENING

0.41

0.50

1.43

LOCAL AD VAL TAX

2016‐2020

1.74

9.90

Legend:

Chapter 8.0 Cost Affordable Plan

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

ROADWAY WIDENING ROADWAY WIDENING

0.38

=

LOCAL OP. 2031‐2035 GAS TAX

LOCAL AD 2016‐2020 VAL TAX

2

YOE

Projected 3 Cost

Cost (PDC)

20.10

12.00

UNFUNDED

10.71

4.64

LOCAL AD 2021‐2025 VAL TAX

12.55

9.75

MULTIPLE 2021‐2025 SOURCES LOCAL OP. GAS TAX IMPACT DIST E MULTIPLE 2016‐2020 SOURCES LOCAL OP. GAS TAX IMPACT DIST E

UNFUNDED

MULTIPLE 2031‐2035 SOURCES LOCAL AD VAL TAX LOCAL OP. GAS TAX IMPACT DIST C MULTIPLE 2031‐2035 SOURCES LOCAL AD VAL TAX IMPACT DIST C LOCAL AD 2021‐2025 VAL TAX

Funding Source LOCAL OP. GAS TAX

YOE

Total Projected Costs Unfunded 3 5 6 Cost Funded Needs

25.34

UNFUNDED

10.45

0.00

22.33

14.89

29.04

0.00

8.78

6.11

20.01

36.20

0.00

UNFUNDED

4.18

0.00

8.95

UNFUNDED

43.91

0.00

93.80

12.07

UNFUNDED

27.18

0.00

58.06

12.55

9.75

OTHER

2021‐2025

14.89

27.43

0.00

9.05

3.50

6.08

6.03

9.21

15.30

0.00

3.34

2.74

52.46

22.75

UNFUNDED

51.22

0.00

109.41

26.28

12.53

26.47

55.77

0.00

17.10

10.00

21.13

5.70

2.53

5.34

3.48

0.00

4.86

2.32

4.90

10.33

0.00

2.84

2.02

17.33

13.46

20.56

40.13

0.00

MULTIPLE 2021‐2025 SOURCES LOCAL AD VAL TAX IMPACT DIST C IMPACT 2026‐2030 DIST C

LOCAL OP. 2021‐2025 GAS TAX

MULTIPLE 2031‐2035 SOURCES LOCAL AD VAL TAX LOCAL OP. GAS TAX

LOCAL AD 2031‐2035 VAL TAX

LOCAL AD 2021‐2025 VAL TAX

UNFUNDED NEED

8 ‐ 10

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Chapter 8.0 Cost Affordable Plan

Project Details

PD&E

To SR 540 (WINTERLAKE RD)

No. of Existing Lanes

1

Funding Source IMPACT DIST B

1

YOE

Projected 3 Cost

Cost (PDC)

2016‐2020

0.61

1.77

Facility

From

88

SPIRIT LAKE RD

US 17

133

SPIRIT LAKE RD/ 42ND ST NW

CR 542

SR 544

2

ROADWAY WIDENING

0.24

272

TEMPLES LN

POWERLINE RD EXT

US 17/92

2

230

2

Project Type ROADWAY WIDENING

Cost (PDC)

Project Engineering

0.50

Funding Source IMPACT DIST D

ROW 2

YOE

Projected Cost 3 Cost (PDC)

Funding Projected 3 Source YOE Cost MULTIPLE 12.29 2016‐2020 16.86 SOURCES LOCAL AD 2.29 3.14 VAL TAX IMPACT 6.00 8.23 DIST D

2016‐2020

2.16

0.37

0.84

LOCAL OP. GAS TAX

2026‐2030

1.31

ROADWAY WIDENING

0.08

IMPACT DIST C

2026‐2030

0.12

0.30

IMPACT DIST C

2026‐2030

0.47

2.05

0.50

1.00

0.55

THOMPSON NURSERY RD/ ELOISE LOOP RD

CR 653 (RATTLESNAKE RD)

US 27

2

0.51

1.48

2016‐2020

1.80

10.24

113

WABASH AVE

ARIANA ST

US 92 (NEW TAMPA HWY)

2

0.23

0.54

2026‐2030

0.84

3.76

2.00

1.76

114

WABASH AVE

US 92 (MEMORIAL BLVD)

10TH ST

2

ROADWAY WIDENING

0.07

0.11

0.23

LOCAL OP. GAS TAX

2026‐2030

0.36

1.71

1.00

0.71

157

WARING RD PHASE II

WEST PIPKIN RD

DRANE FIELD RD

2

ROADWAY WIDENING

0.21

IMPACT DIST E

2021‐2025

0.29

0.74

LOCAL OP. GAS TAX

2021‐2025

1.02

5.12

3.12

2.00

316

WAVERLY BARN RD

NORTH RIDGE TR

US 27

2

ROADWAY WIDENING

0.06

UNFUNDED

0.11

0.20

UNFUNDED

0.37

1.37

ROADWAY WIDENING ROADWAY WIDENING

LOCAL OP. 2026‐2030 GAS TAX

IMPACT 2016‐2020 DIST E LOCAL OP. 0.15 2026‐2030 GAS TAX

0.42

LOCAL OP. 2026‐2030 GAS TAX

IMPACT DIST B LOCAL OP. GAS TAX

Construction

4.00

2

Cost (PDC) 16.71

Total

Funding Projected Costs Unfunded 3 5 6 Source YOE Cost Funded Needs LOCAL AD 2016‐2020 21.69 41.31 0.00 VAL TAX

5.49

12.97

7.89

14.17

28.82

0.00

6.49

3.39

6.09

6.48

2.00

3.59

0.00

2.50

4.49

2031‐2035

5.84

2.79

5.88

12.32

0.00

1.42

2.85

1.57

2021‐2025

17.93

13.93

2021‐2025

21.26

41.51

0.00

2026‐2030

8.39

5.11

2026‐2030

9.17

18.64

0.00

4.46

2.61

4.68

3.93

2.50

4.49

2026‐2030

3.81

2.32

2026‐2030

4.17

8.45

0.00

2.23

1.32

2.37

1.59

1.00

1.80

2026‐2030

11.44

6.96

2026‐2030

12.51

25.26

0.00

6.97

5.96

10.71

4.47

1.00

1.80

UNFUNDED

4.28

1.86

UNFUNDED

4.18

0.00

8.95

TRIP

MULTIPLE 2026‐2030 SOURCES LOCAL AD 2.90 VAL TAX IMPACT 2.90 DIST D 5.80

MULTIPLE SOURCES IMPACT DIST C LOCAL OP. GAS TAX LOCAL AD VAL TAX LOCAL AD VAL TAX MULTIPLE SOURCES LOCAL AD VAL TAX IMPACT DIST E MULTIPLE SOURCES IMPACT DIST E LOCAL AD VAL TAX MULTIPLE SOURCES IMPACT DIST E LOCAL AD VAL TAX

MULTIPLE 2026‐2030 SOURCES IMPACT DIST D LOCAL AD VAL TAX LOCAL OP. GAS TAX LOCAL AD 2031‐2035 VAL TAX

LOCAL AD VAL TAX MULTIPLE SOURCES IMPACT DIST E LOCAL AD VAL TAX MULTIPLE SOURCES IMPACT DIST E LOCAL AD VAL TAX MULTIPLE SOURCES IMPACT DIST E LOCAL AD VAL TAX

NEW LOCAL ROADS 224

12TH ST EXT

12TH ST

POLLARD RD EXT

0

GATEWAY

0.03

UNFUNDED

0.06

0.10

UNFUNDED

0.19

0.62

UNFUNDED

1.95

1.87

UNFUNDED

4.21

0.00

6.40

268

30TH ST EXT

BAKER AVE

MARSHALL RD N

0

NEW ARTERIAL

0.06

UNFUNDED

0.11

0.21

UNFUNDED

0.39

1.24

UNFUNDED

3.90

3.74

UNFUNDED

8.42

0.00

12.83

Legend:

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

=

UNFUNDED NEED

8 ‐ 11

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Project Details

PD&E

Facility

From

To

No. of Existing Lanes

261

ALFORD RD EXT

CR 542

CR 546

0

1

Project Type

Cost (PDC)

Funding Source

NEW ARTERIAL

0.05

Project Engineering 1

ROW 2

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

Projected Cost 3 Cost (PDC)

YOE

UNFUNDED

0.09

0.17

UNFUNDED

0.32

Funding Source

1.04

Construction 2

Total

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

YOE

Projected Costs Unfunded 3 5 6 Cost Funded Needs

UNFUNDED

3.25

3.12

UNFUNDED

7.02

0.00

10.68

260

ALMBURG RD EXT S

SR 17

LINCOLN AVE

0

NEW ARTERIAL

0.09

UNFUNDED

0.17

0.33

UNFUNDED

0.61

1.97

UNFUNDED

6.18

5.92

UNFUNDED

13.34

0.00

20.29

156

BANANA RD CONNECTOR

PARK BYRD RD

US 98

0

NEW COLLECTOR

0.07

UNFUNDED

0.13

0.24

UNFUNDED

0.44

1.45

UNFUNDED

4.55

4.36

UNFUNDED

9.83

0.00

14.95

215

BARTOW NORTHERN CONNECTOR

SR 60

US 17

0

NEW ARTERIAL

0.24

COMPLETED

0.00

0.84

IMPACT DIST B

2016‐2020

1.02

4.98

COMPLETED

0.00

14.96

19.42

20.45

0.00

9.96

12.93

5.00

6.49

0.25

0.51

LOCAL OP. GAS TAX

2031‐2035

0.90

3.01

IMPACT DIST D

2031‐2035

8.57

9.04

19.10

28.81

0.00

12.55

6.55

LOCAL OP. 0.14 2031‐2035 GAS TAX

MULTIPLE 2016‐2020 SOURCES LOCAL AD VAL TAX IMPACT DIST B MULTIPLE 2031‐2035 SOURCES LOCAL AD VAL TAX IMPACT DIST B

278

BASSETT RD EXT

BASSETT RD

CAPPS RD

0

NEW ARTERIAL

5.94

3.10

284

BATES RD EXT

MARSHALL RD

PARK RD EXT

0

NEW ARTERIAL

0.03

UNFUNDED

0.06

0.12

UNFUNDED

0.22

0.73

UNFUNDED

2.28

2.18

UNFUNDED

4.91

0.00

7.47

0

NEW ARTERIAL

0.05

UNFUNDED

0.09

0.17

UNFUNDED

0.32

1.04

UNFUNDED

3.25

3.12

UNFUNDED

7.02

0.00

10.68

0

GATEWAY

0.08

UNFUNDED

0.15

0.28

UNFUNDED

0.52

1.66

UNFUNDED

5.20

4.99

UNFUNDED

11.23

0.00

17.10

304

BEACON RD

HARDEN BLVD

308

BARTOW NORTH‐CENTRAL POLK PKWY CONNECTOR

BARTOW NORTHERN CONNECTOR

309 BRIDGEWATER CONNECTOR

PROPOSED WABASH AVE EXT CENTRAL POLK PKWY EAST‐WEST RD

WALT WILLIAMS RD

SR 33

0

NEW ARTERIAL

0.07

UNFUNDED

0.13

0.24

UNFUNDED

0.44

1.45

UNFUNDED

4.55

4.36

UNFUNDED

9.83

0.00

14.95

281

BICE GROVE RD/ JAHNA SAND MINE RD

BICE GROVE RD EXT

JAHNA SAND MINE RD EXT

0

ROADWAY WIDENING

0.34

UNFUNDED

0.63

1.18

UNFUNDED

2.19

8.19

UNFUNDED

25.69

11.14

UNFUNDED

25.09

0.00

53.60

319

BUCKINGHAM DR EXT

DUNSON RD

BUCKINGHAM DR

0

NEW COLLECTOR

0.03

UNFUNDED

0.06

0.10

UNFUNDED

0.19

0.62

UNFUNDED

1.95

1.87

UNFUNDED

4.21

0.00

6.40

15

CENTRAL POLK PKWY EAST/WEST COLLECTOR

CENTRAL POLK PKWY

US 27

0

NEW COLLECTOR

1.17

UNFUNDED

2.17

4.13

UNFUNDED

7.66

24.47

UNFUNDED

76.72

73.57

UNFUNDED

165.68

0.00

252.23

216

CHESHIRE RD EXT

CHESHIRE RD

SR 655A

0

GATEWAY

0.02

UNFUNDED

0.04

0.09

UNFUNDED

0.17

0.52

UNDERWAY

0.00

1.56

UNFUNDED

3.51

0.00

3.71

333

COLLECTOR A

CR 547

PINE TREE TR

0

NEW COLLECTOR

0.80

UNFUNDED

1.48

0.30

UNFUNDED

0.56

1.76

UNFUNDED

5.53

5.30

UNFUNDED

11.93

0.00

19.50

220

CONNECTOR A

US 17

SR 60/B PHASE II

0

CLEAR SPRINGS

0.47

UNFUNDED

0.87

1.64

UNFUNDED

3.04

9.75

UNFUNDED

30.56

29.30

UNFUNDED

65.99

0.00

100.46

223

COON LAKE RD

CR 653 (RATTLESNAKE RD)

THOMPSON NURSERY RD

0

GATEWAY

0.04

UNFUNDED

0.07

0.14

UNFUNDED

0.26

0.83

UNFUNDED

2.60

2.49

UNFUNDED

5.62

0.00

8.55

231

COUNTY LINE RD

SWINDELL RD

KNIGHTS‐STATION

0

ROADWAY WIDENING

0.15

UNFUNDED

0.28

0.52

UNFUNDED

0.96

3.11

UNFUNDED

9.75

9.35

UNFUNDED

21.06

0.00

32.06

218

CR 653 EXT

SR 60

CENTRAL POLK PKWY

0

GATEWAY

0.04

UNFUNDED

0.07

0.16

UNFUNDED

0.30

0.93

UNFUNDED

2.93

2.81

UNFUNDED

6.32

0.00

9.61

310

CREVASSE ‐ LAKELAND PARK DR CONNECTOR

UNION DR

LAKELAND PARK DR

0

NEW COLLECTOR

0.04

0.06

0.14

LOCAL AD VAL TAX

2026‐2030

0.22

LOCAL AD 0.83 2026‐2030 VAL TAX

1.85

2.49

LOCAL AD 2031‐2035 VAL TAX

5.27

7.40

0.00

307

CREWS LAKE RD EXT

CREWS LAKE DR

CREWS LAKE RD/ EF GRIFFIN CONNECT

0

NEW ARTERIAL

0.02

UNFUNDED

0.04

0.05

UNFUNDED

0.09

0.31

UNFUNDED

0.98

0.94

UNFUNDED

2.11

0.00

3.21

305

CREWS LAKE RD/ EF GRIFFIN RD CONNECTOR

CREWS LAKE RD

EF GRIFFIN RD

0

NEW COLLECTOR

0.04

UNFUNDED

0.07

0.16

UNFUNDED

0.30

0.93

UNFUNDED

2.93

2.81

UNFUNDED

6.32

0.00

9.61

327

CUNNINGHAM RD

SR 653 (RATTLESNAKE RD)

THOMPSON NURSERY RD REALIGNMENT

0

NEW COLLECTOR

0.07

UNFUNDED

0.13

0.24

UNFUNDED

0.44

1.45

UNFUNDED

4.55

4.36

UNFUNDED

9.83

0.00

14.95

155

DR BRYANT EXT

PARK BYRD RD

US 98

0

NEW COLLECTOR

0.05

UNFUNDED

0.09

0.17

UNFUNDED

0.32

1.04

UNFUNDED

3.25

3.12

UNFUNDED

7.02

0.00

10.68

DAUGHTERY RD EXT W

W DAUGHTERY RD @ GIBSONIA‐GALLOWAY RD

SLEEPY HILL RD

0

NEW COLLECTOR

0.09

UNFUNDED

0.17

0.31

UNFUNDED

0.57

1.87

UNFUNDED

5.85

5.61

UNFUNDED

12.64

0.00

19.23

25

Legend:

Chapter 8.0 Cost Affordable Plan

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

=

LOCAL AD 2026‐2030 VAL TAX

UNFUNDED NEED

8 ‐ 12

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Project Details

PD&E

Facility

From

To

No. of Existing Lanes

275

DAVIS RD EXT

MINUTE MAID RD

CODY VILLA RD

0 0

NEW COLLECTOR

0.06

IMPACT DIST A

1

Project Type

Cost (PDC)

NEW ARTERIAL

Project Engineering

Funding Source

0.01

2016‐2020

1

YOE

Projected 3 Cost

Cost (PDC)

UNFUNDED

0.02

ROW 2

Funding Source

Projected Cost 3 Cost (PDC)

YOE

0.03

UNFUNDED

0.07

0.21

IMPACT DIST A

2016‐2020

0.26

0.06

0.21

314

DUNSON RD EXT

VPCC/I‐4 CONNECTOR

CR 54 (RONALD REAGAN PKWY)

0.20

320

ERNIE CALDWELL BLVD

PINE TREE TR

US 17/92

0

NEW ARTERIAL

0.24

UNFUNDED

0.44

0.84

UNFUNDED

1.56

4.98

2031‐2035

1.11

3.73

Funding Source

2.50

TRIP

0.35

UNFUNDED

15.60

14.96

NEW COLLECTOR

0.18

COMPLETED

0.00

0.63

3.23

0.50

323

FDC GROVE RD

MASSEE RD

ERNIE CALDWELL BLVD

0

NEW COLLECTOR

0.12

COMPLETED

0.00

0.42

LOCAL OP. GAS TAX

2016‐2020

0.51

2.49

1.34

0.75

NORTH 0.40 RIDGE CRA

34

FISH HATCHERY RD EXT

REYNOLDS RD

CR 542 (MAIN ST)

0

NEW COLLECTOR

0.05

UNFUNDED

0.09

IMPACT DIST E

UNFUNDED

UNFUNDED

213

GATEWAY RD

COUNTY LINE RD

SR 570 (POLK PKWY)

0

NEW COLLECTOR

0.07

298

GATEWAY RD CONNECTOR

WILLIAMS SOUTH LOOP

BRADDOCK RD

0

NEW ARTERIAL

0.09

256

GOLFVIEW CUTOFF EXT N

GOLFVIEW CUTOFF RD

SR 60

0

NEW ARTERIAL

0.08

255

GOLFVIEW CUTOFF EXT S

BRYAN RD

LIBBY RD

0

NEW ARTERIAL

0.03

262

HL SMITH RD N EXT

WATER TANK RD

BICE GROCE RD

0

NEW ARTERIAL

0.02

266

HAINES CITY ‐ DAVENPORT EASTERN RD

HINSON AVE

BAKER DAIRY RD

0

NEW ARTERIAL

321

HOLLY HILL RD

CR 547 (BAY ST)

RIDGEWOOD LAKES BLVD.

0

325

HOLLY HILL RD

PATTERSON RD

0.17

UNFUNDED

0.32

0.13

0.26

IMPACT DIST E

UNFUNDED

0.48

1.56

0.17

0.31

UNFUNDED

0.57

1.87

0.28

UNFUNDED

0.06

0.12

UNFUNDED

0.04

0.09

0.11

UNFUNDED

0.20

NEW COLLECTOR

0.05

COMPLETED

CR 547 (BAY ST)

0

NEW COLLECTOR

0.05

NORTH 0.03 2026‐2030 RIDGE CRA 0.04

HOME RUN BLVD

FDC GROVE RD

0

NEW COLLECTOR

263

HUGHES RD EXT

EXISTING HUGHES RD

BANNON LOOP RD

0

NEW ARTERIAL

0.15

HOME RUN BLVD EXT

= COST AFFORDABLE PROJECT

UNFUNDED

317

IMPACT DIST B IMPACT DIST B

= PARTIALLY FUNDED PROJECT

=

IMPACT DIST B IMPACT DIST B

1.04

MULTIPLE 2031‐2035 SOURCES IMPACT DIST D LOCAL AD VAL TAX MULTIPLE 2016‐2020 SOURCES LOCAL AD VAL TAX TRIP

1.66

UNFUNDED

0.22

0.73

UNFUNDED

0.17

0.52

0.38

UNFUNDED

0.70

2.28

0.00

0.93

IMPACT DIST C

2016‐2020

1.13

COMPLETED

0.00

0.17

0.05

0.12

LOCAL OP. GAS TAX

0.07

0.14

Funding Source

YOE

UNFUNDED

MULTIPLE 2026‐2030 SOURCES IMPACT DIST A LOCAL AD VAL TAX

Total Projected Costs Unfunded 3 5 6 Cost Funded Needs 1.40

0.00

2.13

6.72

9.23

0.00

2.23

4.49

UNFUNDED

33.70

0.00

51.30

LOCAL AD 2031‐2035 VAL TAX

23.70

35.46

0.00

10.64

11.22

9.21

1.43

3.42

7.48

11.42

15.35

0.00

1.84

2.48

3.79

1.03

1.50

TRIP

2.29

LOCAL OP. GAS TAX

5.34

MULTIPLE 2021‐2025 SOURCES IMPACT DIST D

0.55

3.50

UNFUNDED

3.25

3.12

UNFUNDED

7.02

0.00

10.68

4.88

4.68

IMPACT DIST E

UNFUNDED

10.53

0.00

16.02

5.85

5.61

UNFUNDED

12.64

0.00

19.23

11.23

0.00

17.10

4.91

0.00

7.47

UNFUNDED

IMPACT UNFUNDED DIST B IMPACT UNFUNDED DIST B

0.52

UNFUNDED

IMPACT UNFUNDED DIST E

UNFUNDED

0.62

0.88

0

0.65

1.24

MASSEE RD

UNFUNDED

0.95

US 27

YOE

Cost (PDC)

3.74

FDC GROVE RD

2

Projected 3 Cost

2.18

322

Construction

MULTIPLE 1.24 2021‐2025 SOURCES IMPACT 0.54 DIST A LOCAL OP. 0.50 GAS TAX

IMPACT DIST D

Legend:

Chapter 8.0 Cost Affordable Plan

LOCAL AD UNFUNDED VAL TAX IMPACT UNFUNDED DIST B

5.20

4.99

2.28

2.18

UNFUNDED

1.63

1.56

UNFUNDED

3.51

0.00

5.34

UNFUNDED

7.15

6.86

UNFUNDED

15.44

0.00

23.51

5.49

IMPACT DIST C

2016‐2020

7.54

16.52

29.67

38.34

0.00

12.92

23.20

3.60

UNFUNDED

0.32

1.04

UNFUNDED

3.25

3.12

2026‐2030

0.19

LOCAL AD 0.73 2026‐2030 VAL TAX

1.62

2.18

UNFUNDED

0.26

0.83

2.60

2.49

UNFUNDED

MULTIPLE 2026‐2030 SOURCES NORTH RIDGE CRA TRIP

6.47

UNFUNDED

7.02

0.00

10.59

LOCAL AD 2026‐2030 VAL TAX

3.92

5.77

0.00

5.62

0.00

8.55

UNFUNDED

UNFUNDED NEED

8 ‐ 13

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Project Details

Facility

336 I‐4 CROSSOVER CONNECTOR

PD&E

From

To

No. of Existing Lanes

HOME RUN BLVD

I‐4 CROSSOVER

0

NEW COLLECTOR

Project Engineering

1

Project Type

Cost (PDC)

Funding Projected 3 Source YOE Cost NORTH 0.01 2031‐2035 0.02 RIDGE CRA

1

Cost (PDC)

Funding Source NORTH 0.03 RIDGE CRA

ROW

Construction

2

YOE

Projected Cost 3 Cost (PDC)

2031‐2035

0.05

Funding Projected 3 Source YOE Cost NORTH 0.21 2031‐2035 0.59 RIDGE CRA

2

Cost (PDC) 0.62

0.42

0.10

0.10

0.34

0.98

LOCAL AD VAL TAX

2016‐2020

1.19

LOCAL OP. 0.28 2016‐2020 GAS TAX

MULTIPLE 5.81 2016‐2020 SOURCES

7.96

17.46

Total

Funding Projected Costs Unfunded 3 5 6 Source YOE Cost Funded Needs MULTIPLE 2031‐2035 1.31 1.98 0.00 SOURCES NORTH 0.89 RIDGE CRA LOCAL OP. 0.21 GAS TAX TRIP

MULTIPLE 2031‐2035 SOURCES LOCAL AD VAL TAX NORTH RIDGE CRA

0.21

36.86

46.37

0.00

28.42

4.22

48

I‐4 CROSSOVER RD

FDC GROVE RD

DEEN STILL RD

0

NEW COLLECTOR

1.31

TRIP

1.79

13.46

4.50

NORTH RIDGE CRA

6.17

2.00

2.00

TRIP

4.22

2016‐2020

2016‐2020

1.62

2.30

0.00

122

INTERSTATE CROSSOVER

265

JAHNA SAND MINE RD EXT

50 259

K‐VILLE RD/ CR 542 CONNECTOR LAKE MABEL LOOP RD REALIGNMENT

CR 35A (KATHLEEN RD)

MALL HILL DR

0

NEW COLLECTOR

LOCAL OP. 0.02 2016‐2020 GAS TAX

0.02

0.07

LOCAL OP. GAS TAX

0.09

LOCAL AD 0.41 2016‐2020 VAL TAX

0.57

1.25

IMPACT DIST A

EXISTING JAHNA SAND MINE RD CR 542 (K‐VILLE RD)

HINSON AVE

0

NEW ARTERIAL

0.06

UNFUNDED

0.11

0.21

UNFUNDED

0.39

1.24

UNFUNDED

3.90

3.74

UNFUNDED

8.42

0.00

12.83

SR 655 (RECKER HWY)

0

NEW COLLECTOR

0.03

UNFUNDED

0.06

0.12

UNFUNDED

0.22

0.73

UNFUNDED

2.28

2.18

UNFUNDED

4.91

0.00

7.47

LAKE MABEL LOOP RD

HL SMITH RD S

0

NEW ARTERIAL

0.02

UNFUNDED

0.04

0.07

UNFUNDED

0.13

0.41

UNFUNDED

1.30

1.25

UNFUNDED

2.81

0.00

4.28

0

NEW ARTERIAL

0.01

UNFUNDED

0.02

0.03

UNFUNDED

0.06

0.21

UNFUNDED

0.65

0.62

UNFUNDED

1.40

0.00

2.13

0

NEW ARTERIAL

0.06

UNFUNDED

0.11

0.23

UNFUNDED

0.43

1.35

UNFUNDED

4.23

4.05

UNFUNDED

9.13

0.00

13.89

0

NEW COLLECTOR

0.04

UNFUNDED

0.07

0.16

UNFUNDED

0.30

0.93

UNFUNDED

2.93

2.81

UNFUNDED

6.32

0.00

9.61

CREWS LAKE DR

0

NEW ARTERIAL

0.17

UNFUNDED

0.32

0.61

UNFUNDED

1.13

3.63

UNFUNDED

11.38

10.91

UNFUNDED

24.57

0.00

37.40

OLD LAKE ALFRED RD OLD LAKE ALFRED RD CR 54/ LAKE WILSON RD

296

LAKE MATTIE CONNECTOR

CASS RD

297

LAKE MATTIE CONNECTOR

LAKE MATTIE RD

334

LAKE WILSON RD EXT

COLLECTOR A

53

LAKELAND HIGHLANDS RD EXT

SR 60

331

LOMA DEL SOL EXT

DUNSON RD

CR 54

0

NEW COLLECTOR

0.03

UNFUNDED

0.06

0.12

UNFUNDED

0.22

0.73

UNFUNDED

2.28

2.18

UNFUNDED

4.91

0.00

7.47

0

NEW COLLECTOR

0.02

UNFUNDED

0.04

0.09

UNFUNDED

0.17

0.52

UNFUNDED

1.63

1.56

UNFUNDED

3.51

0.00

5.34

0.04

0.07

0.14

2031‐2035

0.25

0.83

2.36

2.49

5.27

7.95

0.00

0.09

0.23

2026‐2030

0.36

3.84

4.05

8.56

12.85

0.00

0.10

0.16

58

MALL HILL RD EXT S

BELLA VISTA ST W

CR 35A (KATHLEEN RD)

60

MARCUM RD EXT

US 98

DUFF RD

0

NEW COLLECTOR

221

MT OLIVE RD EXT

PACE RD

MT OLIVE RD

0

NEW COLLECTOR

Legend:

Chapter 8.0 Cost Affordable Plan

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

LOCAL AD 2031‐2035 VAL TAX LOCAL OP. 0.06 2026‐2030 GAS TAX

=

LOCAL AD VAL TAX MULTIPLE SOURCES LOCAL OP. GAS TAX

LOCAL AD 2031‐2035 VAL TAX IMPACT 1.35 2031‐2035 DIST A

LOCAL AD 2031‐2035 VAL TAX LOCAL AD 2031‐2035 VAL TAX

UNFUNDED NEED

8 ‐ 14

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Project Details

PD&E

Project Engineering

Facility

From

To

No. of Existing Lanes

0.13

227

NEW E/W RD

EF GRIFFIN ROAD

US 98

0

SE LAKELAND/ BARTOW

0.14

UNFUNDED

0.26

0.49

217

NEW RD

CENTRAL POLK PKWY

CR 540A

0

GATEWAY

0.12

UNFUNDED

0.22

313

NORTH COLLECTOR

POITRAS RD

POLO PARK BLVD

0

NEW COLLECTOR

0.05

UNFUNDED

0.09

1

Project Type

Cost (PDC)

Funding Source

1

YOE

Projected 3 Cost

Cost (PDC)

Funding Source IMPACT DIST A

ROW 2

YOE

Projected Cost 3 Cost (PDC)

Funding Source

Construction 2

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

YOE

Total Projected Costs Unfunded 3 5 6 Cost Funded Needs

0.20

UNFUNDED

0.91

2.90

UNFUNDED

9.10

8.73

UNFUNDED

19.66

0.00

29.93

0.42

UNFUNDED

0.78

2.49

UNFUNDED

7.80

7.48

UNFUNDED

16.85

0.00

25.65

0.19

UNFUNDED

0.35

1.14

UNFUNDED

3.58

3.43

UNFUNDED

7.72

0.00

11.74

312

NORTH RIDGE TR

DEEN STILL RD

SAND MINE RD

0

NEW COLLECTOR

0.00

COMPLETED

0.00

0.00

COMPLETED

0.00

0.00

COMPLETED

0.00

20.00

COMMITTED

0.00

0.00

0.00

228

NORTH‐SOUTH COLLECTOR

HOLLY HILL/RIDGEWOOD

ERNIE CALDWELL BLVD

0

NEW ARTERIAL

0.14

UNDERWAY

0.00

0.49

OTHER

2016‐2020

0.60

2.90

OTHER

2016‐2020

3.98

8.73

OTHER

2016‐2020

11.33

15.91

0.00

66

N‐S ROUTE EXT (SR 563)

SR 37

PIPKIN RD W

0

NEW ARTERIAL

0.24

IMPACT DIST E

UNFUNDED

0.44

0.84

LOCAL AD VAL TAX

UNFUNDED

1.56

4.98

IMPACT UNFUNDED DIST E

15.60

14.96

LOCAL AD UNFUNDED VAL TAX

33.70

0.00

51.30

243

OLD STOKES RODEN EXT

OLD STOKES RODEN RD

US 27

0

NEW ARTERIAL

0.04

UNFUNDED

0.07

0.16

UNFUNDED

0.30

0.93

UNFUNDED

2.93

2.81

UNFUNDED

6.32

0.00

9.61

269

PINK APARTMENT RD EXT

BATES RD EXT

SNELL CREEK RD

0

NEW ARTERIAL

0.03

UNFUNDED

0.06

0.10

UNFUNDED

0.19

0.62

UNFUNDED

1.95

1.87

UNFUNDED

4.21

0.00

6.40

229

POINCIANA PKWY

CR 580

US 17/92

0

NEW ARTERIAL

0.99

COMPLETED

0.00

3.50

COMPLETED

0.00

20.74

COMPLETED

0.00

62.35

OTHER

2016‐2020

80.93

80.93

0.00

0.23

0.66

LOCAL AD VAL TAX

2016‐2020

0.80

LOCAL OP. 3.94 2016‐2020 GAS TAX

18.08

24.53

0.00

10.45

LOCAL AD 2016‐2020 VAL TAX

311

POLLARD RD EXT

SR 60

CSX ILC

0

NEW ARTERIAL

0.19

0

NEW COLLECTOR

0.11

0.24

LOCAL OP. GAS TAX

2026‐2030

0.37

11.85

6.85

3.00

2.00

154

POLLARD RD EXT

CSX ILC

264

POWERLINE RD EXT

BANNON ISLAND RD

HINSON AVE E

0

NEW ARTERIAL

0.17

0.30

0.59

LOCAL OP. GAS TAX

2031‐2035

1.04

1.00

271

POWERLINE RD EXT

SOUTH BLVD

TEMPLES LN

0

NEW ARTERIAL

0.25

0.49

2031‐2035

0.87

2.90

294

POWERLINE RD EXT

BANNON ISLAND RD

CR 544

0

NEW ARTERIAL

0.04

0.09

2031‐2035

0.16

219A

PROPOSED CLEAR SPRINGS RD 1

SR 60

PROPOSED CLEAR SPRINGS RD 2

0

GATEWAY

0.11

0.31

TRIP

2016‐2020

0.38

0.58

TRIP

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

LOCAL OP. 0.07 2026‐2030 GAS TAX

5.40

THOMPSON NURSERY RD REALIGNMENT

Legend:

Chapter 8.0 Cost Affordable Plan

LOCAL OP. 2031‐2035 GAS TAX

LOCAL AD 2031‐2035 VAL TAX LOCAL OP. 0.02 2031‐2035 GAS TAX LOCAL OP. 0.09 2016‐2020 GAS TAX 0.14

=

LOCAL AD VAL TAX LOCAL OP. GAS TAX

MULTIPLE 1.45 2026‐2030 SOURCES LOCAL AD 0.70 VAL TAX IMPACT 0.75 DIST D

3.25

4.36

1.57

1.86

1.68

1.00

1.50

10.05

10.60

5.77

9.10

1.43

1.00

2.85

0.50

8.28

8.73

1.48

1.56

2016‐2020

0.79

1.74

0.14

1.20

MULTIPLE 2031‐2035 SOURCES LOCAL AD 2.03 VAL TAX IMPACT 0.50 DIST C 3.53

TRIP

LOCAL AD 2031‐2035 VAL TAX LOCAL OP. 0.52 2031‐2035 GAS TAX

MULTIPLE 2021‐2025 SOURCES IMPACT DIST B TRIP

4.58

OTHER

3.05

2026‐2030

7.84

11.56

0.00

3.35

1.80

2.69

22.39

33.78

0.00

19.22

2.11

1.06

18.43

27.82

0.00

3.29

4.96

0.00

2.65

3.94

0.00

0.21

1.83

MULTIPLE SOURCES IMPACT DIST D TRIP

LOCAL AD VAL TAX MULTIPLE 2031‐2035 SOURCES LOCAL AD VAL TAX TRIP

IMPACT DIST C LOCAL AD 2031‐2035 VAL TAX LOCAL AD 2031‐2035 VAL TAX MULTIPLE 2021‐2025 SOURCES LOCAL AD VAL TAX LOCAL OP. GAS TAX

UNFUNDED NEED

8 ‐ 15

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Project Details

PD&E

Project Engineering

ROW

Construction

Facility

From

To

No. of Existing Lanes

0.40

PROPOSED CLEAR SPRINGS RD 2 PROPOSED CLEAR SPRINGS RD 1 PROPOSED CLEAR SPRINGS RD 2

POLK STATE COLLEGE CAMPUS PROPOSED CLEAR SPRINGS RD 2

PROPOSED CLEAR SPRINGS RD 1

0

GATEWAY

0.02

COMMITTED

0.00

0.06

COMMITTED

0.00

0.13

COMMITTED

0.00

0.39

CPP E/W

0

GATEWAY

0.17

UNFUNDED

0.32

0.52

UNFUNDED

0.97

1.16

UNFUNDED

3.63

3.48

GATEWAY

0.01

COMMITTED

0.00

0.03

COMMITTED

0.00

0.21

COMMITTED

0.00

0.62

0.05

0.14

LOCAL AD VAL TAX

2016‐2020

0.17

LOCAL AD 0.83 2016‐2020 VAL TAX

1.14

2.49

219B 219C 303

PROPOSED CLEAR SPRINGS RD 1 NEPTUNE RD, S OF US 92

SR 60

RECKER HWY EXT

THORNHILL RD

83

SADDLE CREEK RD (CR 546) EXT

E LAKE PARKER DR

N COMBEE RD

0

273

SANDERS RD EXT

WILBAR LN

SANDARS RD

0

SR 60

ALTURAS LOOP RD

GALLOWAY RD

84 238 239 324

SOUTHSIDE FRONTAGE RD (I‐4) TS WILSON/ KELLY ROAD N EXT TS WILSON/ KELLY ROAD S EXT THOMPSON NURSERY ROAD EXT

1

Project Type

Cost (PDC)

Funding Source

0

79

222 SOUTHERN POLLARD RD EXT

ROADWAY WIDENING ROADWAY WIDENING

0

0.04

1

2

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

YOE

LOCAL AD 2016‐2020 VAL TAX

Projected Cost 3 Cost (PDC)

Funding Source

2

YOE

Projected 3 Cost

Cost (PDC)

Funding Source IMPACT DIST D

YOE

Total Projected Costs Unfunded 3 5 6 Cost Funded Needs

0.61

COMMITTED

0.00

0.00

0.00

UNFUNDED

7.83

0.00

12.75

COMMITTED

0.00

0.00

0.00

LOCAL AD 2016‐2020 VAL TAX

3.24

4.59

0.00

0.02

UNFUNDED

0.04

0.09

UNFUNDED

0.17

0.52

UNFUNDED

1.63

1.56

UNFUNDED

3.51

0.00

5.34

NEW ARTERIAL

0.02

UNFUNDED

0.04

0.07

UNFUNDED

0.13

0.41

UNFUNDED

1.30

1.25

UNFUNDED

2.81

0.00

4.28

0

GATEWAY

0.07

UNFUNDED

0.13

0.26

UNFUNDED

0.48

1.56

UNFUNDED

4.88

4.68

UNFUNDED

10.53

0.00

16.02

MEMORIAL BLVD

0

NEW COLLECTOR

0.06

UNFUNDED

0.11

0.21

UNFUNDED

0.39

1.24

UNFUNDED

3.90

3.74

UNFUNDED

8.42

0.00

12.83

HOPSON RD

US 27

0

NEW ARTERIAL

0.06

UNFUNDED

0.11

0.21

UNFUNDED

0.39

1.24

UNFUNDED

3.90

3.74

UNFUNDED

8.42

0.00

12.83

HOPSON RD

US 27

0

NEW ARTERIAL

0.04

UNFUNDED

0.07

0.16

UNFUNDED

0.30

0.93

UNFUNDED

2.93

2.81

UNFUNDED

6.32

0.00

9.61

LOCAL OP. 12.23 2016‐2020 GAS TAX

77.69

94.47

0.00

68.40

9.29

US 17

CR 653

0

NEW ARTERIAL

0.58

COMPLETED

0.00

2.06

COMPLETED

0.00

16.78

36.79

MULTIPLE 2031‐2035 SOURCES LOCAL AD VAL TAX IMPACT DIST D

32.39

4.40

306

TILLERY RD/ YARBOROUGH LN/ CREWS LAKE RD CONNECTOR

CREWS LAKE DR

CREWS LAKE RD EXT

0

NEW COLLECTOR

0.09

UNFUNDED

0.17

0.31

UNFUNDED

0.57

1.87

UNFUNDED

5.85

5.61

UNFUNDED

12.64

0.00

19.23

CR 540A

NEW E/W ROAD

0

SE LAKELAND

0.05

UNFUNDED

0.09

0.17

UNFUNDED

0.32

1.04

UNFUNDED

3.25

3.12

UNFUNDED

7.02

0.00

10.68

NORTH SOCRUM LOOP RD

OLD POLK CITY RD

0

NEW ARTERIAL

0.05

UNFUNDED

0.09

0.19

UNFUNDED

0.35

1.14

UNFUNDED

3.58

3.43

UNFUNDED

7.72

0.00

11.74

TOM COSTINE RD (E OF RIDGEGLEN DR)

OLD POLK CITY RD

0

NEW COLLECTOR

0.04

UNFUNDED

0.07

0.13

UNFUNDED

0.24

0.76

UNFUNDED

2.37

2.28

UNFUNDED

5.12

0.00

7.81

0.16

0.45

2016‐2020

0.55

4.72

8.11

12.38

17.80

0.00

0.04

0.10

0.12

2.62

4.73

7.22

0.12

0.35

0.43

2.10

1.08

1.65

2.30

TRIP

3.51

0.08

0.17

LOCAL OP. GAS TAX

2026‐2030

0.27

2.32

3.12

IMPACT DIST E

2031‐2035

6.58

9.24

0.00

1.11

1.21

226 TILLERY RD/MCCALL RD EXT 302 94

TOM COSTINE RD CONNECTOR TOM COSTINE RD CONNECTOR

MULTIPLE 2016‐2020 SOURCES IMPACT DIST A IMPACT DIST C

MULTIPLE SOURCES IMPACT DIST A IMPACT DIST C

318

VPCC/I‐4 CONNECTOR

ERNIE CALDWELL BLVD

DUNSON RD

0

NEW COLLECTOR

0.13

0.03

0.10

115

WABASH AVE EXT

10TH ST

INTERSTATE DR

0

NEW ARTERIAL

0.05

Legend:

Chapter 8.0 Cost Affordable Plan

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

=

LOCAL OP. 2026‐2030 GAS TAX

MULTIPLE 2021‐2025 SOURCES IMPACT 1.50 DIST C NORTH 1.20 RIDGE CRA 2.70

MULTIPLE 2026‐2030 SOURCES LOCAL AD 0.50 VAL TAX LOCAL OP. 0.54 GAS TAX 1.04

MULTIPLE 2021‐2025 SOURCES IMPACT DIST C NORTH RIDGE CRA

UNFUNDED NEED

8 ‐ 16

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Project Details

PD&E

Project Engineering

Facility

From

To

No. of Existing Lanes

112

WABASH AVE EXT

NORTH‐SOUTH ROUTE

ARIANA ST

0

NEW ARTERIAL

0.13

UNDERWAY

0.00

0.47

W FROSTPROOF RD

US 27

0

NEW ARTERIAL

0.04

UNFUNDED

0.07

0.16

W FROSTPROOF RD

US 98

0

NEW ARTERIAL

0.08

UNFUNDED

0.15

W FROSTPROOF N CONNECTOR

US 27

0

NEW ARTERIAL

0.03

UNFUNDED

SR 60 (W OF LAKE WALES)

0

NEW COLLECTOR

0.10

OLD POLK CITY RD

0

NEW COLLECTOR

0.18

0

NEW ARTERIAL

0

W FROSTPROOF N CONNECTOR W FROSTPROOF N CONNECTOR EXT W FROSTPROOF S CONNECTOR

241 254 242 18

W LAKE WALES COLLECTOR CPP EAST/WEST COLLECTOR

338 WILLIAMS N/S CONNECTOR WSTN POLK CONNECTOR S/ CLARK RD EXTENSION WILLOWBROOK 326 CONNECTOR WINTER‐LAKE/ 208 RECKER CONNECTOR 207

LAKELAND E/W RD

CR 35A (KATHLEEN RD) AVENUE T/ NE BUCKEYE LOOP K‐VILLE RD/ CR 542 CONNECTOR TILLERY RD/ YARBOROUGH LN/ CREWS LAKE RD

I‐4 FRONTAGE RD N LUCERNE PARK RD (SR 544) SR 540 (WINTERLAKE RD)

2031‐2035

7.98

8.42

Funding Projected Costs Unfunded 3 5 6 Source YOE Cost Funded Needs LOCAL AD 2031‐2035 17.78 26.49 0.00 VAL TAX

2.93

2.81

UNFUNDED

6.32

0.00

9.61

0.28

UNFUNDED

0.52

1.66

UNFUNDED

5.20

4.99

UNFUNDED

11.23

0.00

17.10

0.06

0.12

UNFUNDED

0.22

0.73

UNFUNDED

2.28

2.18

UNFUNDED

4.91

0.00

7.47

UNFUNDED

0.19

0.35

UNFUNDED

0.65

2.07

UNFUNDED

6.50

6.23

UNFUNDED

14.04

0.00

21.38

UNFUNDED

0.34

0.55

UNFUNDED

1.03

2.07

UNFUNDED

4.34

3.69

UNFUNDED

8.32

0.00

14.03

0.28

UNFUNDED

0.52

0.98

UNFUNDED

1.82

5.81

UNFUNDED

18.21

17.46

UNFUNDED

39.31

0.00

59.86

NEW COLLECTOR

0.80

IMPACT DIST D

2026‐2030

1.25

0.30

IMPACT DIST D

2026‐2030

0.47

1.76

IMPACT DIST D

2031‐2035

5.02

5.30

IMPACT DIST D

2031‐2035

11.19

17.93

0.00

0

NEW COLLECTOR

0.80

UNFUNDED

1.48

0.28

UNFUNDED

0.52

1.66

UNFUNDED

5.20

4.99

UNFUNDED

11.23

0.00

18.44

0

SE LAKELAND

0.20

UNFUNDED

0.37

0.09

UNFUNDED

0.17

0.52

UNFUNDED

1.63

1.56

UNFUNDED

3.51

0.00

5.67

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.21

UNFUNDED

0.48

0.00

0.50

0.00

UNFUNDED

0.00

0.31

UNFUNDED

0.57

0.00

UNFUNDED

0.00

0.05

UNFUNDED

0.10

0.00

0.68

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.08

UNFUNDED

0.17

0.00

0.19

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.08

UNFUNDED

0.17

0.00

0.19

0.00

UNFUNDED

0.00

0.02

UNFUNDED

0.04

0.00

UNFUNDED

0.00

0.30

UNFUNDED

0.68

0.00

0.72

0.00

UNFUNDED

0.00

0.02

UNFUNDED

0.04

0.00

UNFUNDED

0.00

0.30

UNFUNDED

0.68

0.00

0.72

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.15

UNFUNDED

0.34

0.00

0.36

0.00

UNFUNDED

0.00

0.02

UNFUNDED

0.04

0.00

UNFUNDED

0.00

0.38

UNFUNDED

0.85

0.00

0.89

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.18

UNFUNDED

0.41

0.00

0.43

0.00

UNFUNDED

0.00

0.03

UNFUNDED

0.06

0.00

UNFUNDED

0.00

0.50

UNFUNDED

1.13

0.00

1.18

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.15

UNFUNDED

0.34

0.00

0.36

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.12

UNFUNDED

0.27

0.00

0.29

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.18

UNFUNDED

0.41

0.00

0.43

BANNON ISLAND RD

2

HUGHES RD E‐W

CR 546

2

WILBAR RD EXT

FDC GROVE RD

2

211 RAULERSON/DR BRYANT RD

CR 35A (KATHLEEN RD)

US 98

2

158 RAULERSON/DR BRYANT RD

CR 35A (KATHLEEN RD)

PARK BYRD RD

2

DUFF RD

2

233

GREEN RD

DAUGHTERY RD

240

TS WILSON/KELLY RD

HOPSON RD

244

OLD STOKES RODEN RD

US 98

245

DAVIS RD/TYRE RD

CR 630

CODY VILLA RD

2

246

J ZOFFRAY RD

DAVIS RD/TYRE RD

SR 17

2

247

MULLINSVILLE RD (PAVED)

SR 17

PLATT RD

2

248

PLATT RD (PAVED)

MULLINSVILLE RD

WARDLAW RD

2

YOE

Cost (PDC)

UNFUNDED

HUGHES RD EXT

= COST AFFORDABLE PROJECT

2

Projected 3 Cost

2

YOE

Funding Source IMPACT DIST E

0.93

WARNER RD

Legend:

2

Projected Cost 3 Cost (PDC)

0.30

PINK APARTMENT RD

OLD AVON PARK CUTOFF RD OLD STOKES RODEN RD EXTENSION

Funding Source IMPACT DIST E

UNFUNDED

SNELL CREEK RD

SANDERS RD

YOE

Cost (PDC)

283

293

1

Projected 3 Cost

Total

2.80

CREWS LAKE DR

288

Project Type

Funding Source

Construction

0.73

YAROBOROUGH LN EXT

BANNON LOOP RD (UNPAVED RD) HUGHES RD (UNPVED GROVE RD)

1

Cost (PDC)

ROW

2026‐2030

225

287

Chapter 8.0 Cost Affordable Plan

2 2

= PARTIALLY FUNDED PROJECT

ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

=

UNFUNDED NEED

8 ‐ 17

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

ID/ FPN

Chapter 8.0 Cost Affordable Plan

Project Details

PD&E

Facility

From

To

No. of Existing Lanes

249

WARDLAW RD (DIRT)

CR 630

PFUNDSTEIN RD

2

250

WES MANN RD W

CODY VILLA RD

HOLLISTER RD

2

251

HOLLISTER RD

WES MANN RD W

SR 17

2

LAKE PATRICK RD EXTENSION LAKE PATRICK RD EXTENSION

252

LAKE PATRICK N

MURRAY RD

253

5TH AVE/ LAKE PATRICK RD

SR 17

274

WILBAR LN

SANDERS RD EXT

CR 17

2

276

CODY VILLA RD

MINUTE MAID RD S

SR 17

2

277

CAPPS RD

SR 60

MAMMOTH GROVE RD

2

279

HL SMITH RD (SUBSTANDARD GROVE RD)

LAKE MABEL LOOP RD

WATER TANK RD E

2

280

LAKE MABEL LOOP RD

HL SMITH REALIGNMENT

CR 17A

2

290

CODY RD

LAKE PATRICK RD N

LIBBY RD

2

291

GOLFVIEW CUTFF RD

BACKBONE RD

GOLFVIEW CUTOFF RD EXT

2

332

MURRAY RD

SR 17

PFUNDSTEIN RD

2

STEWARD RD

LAKE MABEL LOOP RD

2

SR 17

STEWARD RD

2

ALMBURG RD (SUBSTANDARD GROVE RD) ALMBURG RD 289 (SUBSTANDARD GROVE RD) 258

2 2

292

LINCOLN AVE

US 27

WELSH RD EXT

2

257

BASSETT RD

BASSETT RD EXT

MAMMOTH GROVE RD

2

1

Project Type ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING ROADWAY WIDENING

Cost (PDC)

Funding Source

0.00

Project Engineering 1

ROW 2

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

Projected Cost 3 Cost (PDC)

Funding Source

YOE

UNFUNDED

0.00

0.03

UNFUNDED

0.06

0.00

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.00

UNFUNDED

0.00

0.01

0.00

UNFUNDED

0.00

0.01

0.00

UNFUNDED

0.00

0.00

UNFUNDED

0.00

0.00

Construction 2

Total

YOE

Projected 3 Cost

Cost (PDC)

Funding Source

YOE

Projected Costs Unfunded 3 5 6 Cost Funded Needs

UNFUNDED

0.00

0.50

UNFUNDED

1.13

0.00

1.18

0.00

UNFUNDED

0.00

0.15

UNFUNDED

0.34

0.00

0.36

0.02

0.00

UNFUNDED

0.00

0.09

UNFUNDED

0.20

0.00

0.22

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.18

UNFUNDED

0.41

0.00

0.43

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.11

UNFUNDED

0.24

0.00

0.26

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.09

UNFUNDED

0.20

0.00

0.22

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.15

UNFUNDED

0.34

0.00

0.36

UNFUNDED

0.00

0.02

UNFUNDED

0.04

0.00

UNFUNDED

0.00

0.36

UNFUNDED

0.82

0.00

0.86

UNFUNDED

0.00

0.02

UNFUNDED

0.04

0.00

UNFUNDED

0.00

0.38

UNFUNDED

0.85

0.00

0.89

0.00

UNFUNDED

0.00

0.04

UNFUNDED

0.07

0.00

UNFUNDED

0.00

0.76

UNFUNDED

1.71

0.00

1.78

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.01

0.00

UNFUNDED

0.00

0.02

UNFUNDED

0.03

0.00

0.05

0.00

UNFUNDED

0.00

0.02

UNFUNDED

0.04

0.00

UNFUNDED

0.00

0.39

UNFUNDED

0.89

0.00

0.92

0.00

UNFUNDED

0.00

0.02

UNFUNDED

0.04

0.00

UNFUNDED

0.00

0.33

UNFUNDED

0.75

0.00

0.79

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.08

UNFUNDED

0.17

0.00

0.19

0.00

UNFUNDED

0.00

0.01

UNFUNDED

0.02

0.00

UNFUNDED

0.00

0.15

UNFUNDED

0.34

0.00

0.36

0.00

UNFUNDED

0.00

0.00

UNFUNDED

0.00

0.00

UNFUNDED

0.00

0.05

UNFUNDED

0.10

0.00

0.11

0.00

IMPACT DIST B

2026‐2030

0.00

0.00

IMPACT DIST B

2026‐2030

0.00

0.00

0.00

0.06

IMPACT DIST B

2026‐2030

0.11

0.11

0.00

FUNDED PROJECTS

64.10

39.64

177.80

126.04 772.89

1470.17 1908.54

3207.71

2583.98

1465.43

UNFUNDED PROJECTS

104.64

187.59

330.75

613.23 280.44

873.22

2482.36

5590.18

62.50

7264.17

TOTAL

168.74

227.23

508.55

739.27 1053.3

2343.39 4390.90

8797.89

2646.48

8729.60

Notes: 1

3 4 5 6 2

In millions; shown in PDC/"constant" 2010 dollars; 20% ratio of project cost; for Other Arterials only. In millions; shown in PDC/"constant" 2010 dollars. In millions; shown in YOE or "current" dollars. Excludes completed, underway, and committed project costs. In millions; shown in PDC/"constant" 2010 dollars. Excludes completed, underway, and committed phases. In millions; shown in YOE or "current" dollars. Excludes completed, underway, committed, and unfunded project costs. In millions; shown in 2035 YOE dollars.

Legend:

= COST AFFORDABLE PROJECT

= PARTIALLY FUNDED PROJECT

=

UNFUNDED NEED

8 ‐ 18

TABLE 8‐1: FUNDED AND UNFUNDED ROAD AND HIGHWAY CAPACITY PROJECTS Adopted December 7, 2010


Chapter 8.0 Cost Affordable Plan

Route

Project ID

Route Name

Polk Transportation Planning Organization 2035 Mobility Vision Plan

2010 Annual Operating Status/ Costs Improvement (YOE $) Source

2011‐2013 Capital Costs (YOE $)

2014‐2015

Annual Operating Costs Source (YOE $) Source

Capital Costs (YOE $)

Source

2016‐2020 Annual Operating Costs (YOE $) Source

Capital Costs (YOE $)

2021‐2025

Annual Operating Costs Source (YOE $) Source

Capital Costs (YOE $)

Source

2026‐2030 Annual Operating Costs (YOE $) Source

Capital Costs (YOE $)

2031‐2035

Annual Operating Costs Source (YOE $) Source

Capital Costs (YOE $)

Source

Annual Operating Costs (YOE $)

NEEDS Unfunded Unfunded Capital Operating Needs Needs (2009 $) (2009 $)

LAMTD 10

Existing

$125,262

Existing

$340,582

Existing

$338,656

Existing

$301,284

T‐005 Route #21 Edgewood

Existing

$263,842

Route #22XL T‐006 Lakeland to Bartow

Existing

$511,552

30

T‐007 Route #30 Cleveland Heights

Existing

$253,018

31

T‐008

Existing

$734,906

Existing

$132,459

Existing

$283,036

11 12 20 21 22XL

32 33

T‐001 Route #10 Shuttle Route #11 T‐002 East Main/Combee Road Route #12 Lakeland to T‐003 Winter Haven via Auburndale Route #20 T‐004 Grove Park/Crystal Lake

Route #31 South Florida Avenue Route #32 T‐009 Medulla Loop/Lakeside Village Route #33 T‐010 South Florida/Carter Road

37

T‐011 Route #37 South Lakeland

Existing

$236,550

40

T‐012 Route #40 Ariana/Beacon

Existing

$144,701

41

T‐013 Route #41 Central Avenue

Existing

$329,854

42

T‐014 Route #42 West Memorial

Existing

$712,284

50

T‐015 Route #50 Kathleen

Existing

$329,030

51

T‐016 Route #51 Lakeland Mall

Existing

$641,717

52

Route #52 T‐017 North Florida Avenue

Existing

$636,997

53

T‐018 Route #53 Lakeside Village

Existing

$318,484

56

Route #56 T‐019 Kathleen/Mall Hill Road

Existing

$343,935

57

T‐020 Route #57 Kidron/Flightline

Existing

$162,426

11 20

Route #11 T‐501 East Main/Combee Road Route #20 T‐502 Grove Park/Crystal Lake

Span of Service $ ‐‐‐ Span of Service $ ‐‐‐

30

T‐503 Route #30 Cleveland Heights

Span of Service $ ‐‐‐

33

Route #33 T‐504 South Florida/Carter Road

Span of Service $ ‐‐‐

40

T‐505 Route #40 Ariana/Beacon

Span of Service $ ‐‐‐

42

T‐506 Route #42 West Memorial

Span of Service $ ‐‐‐

50

T‐507 Route #50 Kathleen

Span of Service $ ‐‐‐

51

T‐508 Route #51 Lakeland Mall

Span of Service $ ‐‐‐

53

T‐509 Route #53 Lakeside Village

Span of Service $ ‐‐‐

56

Route #56 T‐510 Kathleen/Mall Hill Road

Span of Service $ ‐‐‐

57

T‐511 Route #57 Kidron/Flightline

Span of Service $ ‐‐‐

10

T‐201 Route #10 Shuttle

Headway

$ ‐‐‐

$ ‐‐‐

9

$129,901

$ ‐‐‐

5

$353,196

$ ‐‐‐

5

$351,198

$ ‐‐‐

6

$312,442

$ ‐‐‐

6

$273,614

$ ‐‐‐

5

$530,498

$ ‐‐‐

5

$262,390

$ ‐‐‐

9

$762,125

$ ‐‐‐

9

$137,365

$ ‐‐‐

9

$293,519

$ ‐‐‐

4

$245,311

$ ‐‐‐

9

$150,061

$ ‐‐‐

9

$342,071

$ ‐‐‐

9

$738,665

$ ‐‐‐

9

$341,216

$ ‐‐‐

9

$665,485

$ ‐‐‐

9

$660,589

$ ‐‐‐

2

$330,280

$ ‐‐‐

2

$356,674

$ ‐‐‐

2

$168,442

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

6 6

$132,221 $ ‐‐‐ $357,470 $ ‐‐‐

$ ‐‐‐

6

$278,500

$ ‐‐‐

6

$539,971

$ ‐‐‐ 6

$775,734

$ ‐‐‐

6

$139,818

$ ‐‐‐

6

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐

6

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$ ‐‐‐ 6

$ ‐‐‐

$143,819

$587,337

6

$152,082 $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$249,692

$ ‐‐‐

$271,595

$ ‐‐‐

$306,639

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$348,180

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

6

$ ‐‐‐ $ ‐‐‐

$672,385

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

5

$393,625

$ ‐‐‐

6

$348,207

$ ‐‐‐

6

$284,074

$ ‐‐‐

6

$314,874

$ ‐‐‐

4

$ ‐‐‐

6

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$731,367 $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

5

$428,154

$ ‐‐‐

6

$378,751

$ ‐‐‐

6

$308,992

$ ‐‐‐

6

$342,494

$168,270

$ ‐‐‐

6

6

$785,941

$ ‐‐‐

$ ‐‐‐

5

$378,219

$ ‐‐‐

5

$709,085

$ ‐‐‐

6

$370,359

$ ‐‐‐

6

$397,040

$ ‐‐‐

5

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$ ‐‐‐

$ ‐‐‐

4

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐

8.1

$483,399

$ ‐‐‐

5

$549,004

$ ‐‐‐

6

$621,513

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

5

$427,623

$ ‐‐‐

5

$485,657

$ ‐‐‐

6

$549,800

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

5

$348,862

$ ‐‐‐

6

$396,208

$ ‐‐‐

6

$448,537

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

5

$386,687

$ ‐‐‐

6

$439,166

$ ‐‐‐

6

$497,169

$ ‐‐‐

$ ‐‐‐

$183,031

$ ‐‐‐

5

$206,648

$ ‐‐‐

5

$234,693

$ ‐‐‐

6

$265,690

$ ‐‐‐

$ ‐‐‐

6

$854,883

$ ‐‐‐

6

$965,191

$ ‐‐‐

6

$1,096,181

$ ‐‐‐

8.1

$1,240,960

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$411,396

$ ‐‐‐

5

$464,479

$ ‐‐‐

6

$527,516

$ ‐‐‐

6

$597,188

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

5

$771,285

$ ‐‐‐

6

$870,806

$ ‐‐‐

6

$988,987

$ ‐‐‐

5

$1,119,607

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$402,847

$ ‐‐‐

6

$454,827

$ ‐‐‐

5

$516,553

$ ‐‐‐

6

$584,777

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$431,868

$ ‐‐‐

8.1

$487,593

$ ‐‐‐

6

$553,766

$ ‐‐‐

5

$626,905

$ ‐‐‐

$ ‐‐‐

$202,684

$ ‐‐‐

6

$220,464

$ ‐‐‐

6

$248,911

$ ‐‐‐

5

$282,692

$ ‐‐‐

5

$320,028

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$567,644

4

$306,111

$ ‐‐‐

4

$347,654

$ ‐‐‐

6

$393,571

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

3

Funding Source: 1 = Federal Cash Grants (Capital Only), 2 = State Cash Grants. 3 = Federal Discretionary Grants (Capital Only), 4 = State Service Development Grants, 5 = Passenger Fares, 6 = New Local Source(s), 7 = Committed Local Sources, 8 = Roll Over from Previous Phase (Capital), 8.1 = Roll Over from Previous Phase (Operating), 9 = Ad Valorem Revenue

8‐19

TABLE 8‐2: COMMITTED, FUNDED, AND UNFUNDED TRANSIT PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Route

Project ID

12

T‐202

21

T‐203 Route #21 Edgewood

Route Name Route #12 Lakeland to Winter Haven via Auburndale

Chapter 8.0 Cost Affordable Plan

2010 Annual Operating Status/ Costs Improvement (YOE $) Source Headway

$ ‐‐‐

Headway

$ ‐‐‐

Route #22XL T‐204 Lakeland to Bartow Route #31 T‐205 South Florida Avenue Route #32 T‐206 Medulla Loop/Lakeside Village

Headway

$ ‐‐‐

Headway

$ ‐‐‐

Headway

$ ‐‐‐

37

T‐207 Route #37 South Lakeland

Headway

$ ‐‐‐

41

T‐208 Route #41 Central Avenue

Headway

$ ‐‐‐

52

Route #52 T‐209 North Florida Avenue

Headway

$ ‐‐‐

Existing

$200,299

Existing

$186,719

Existing

$186,719

Existing

$191,709

Existing

$211,875

Existing

$207,484

22XL 31 32

2011‐2013 Capital Costs (YOE $) $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

2014‐2015

Annual Operating Costs Source (YOE $) Source

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

Capital Costs (YOE $) $ ‐‐‐

2016‐2020 Annual Operating Costs (YOE $) Source

Source

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐‐‐

1

$502,770

6

$688,336

$ ‐‐‐

1

$1,508,311

6

$1,860,868

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

Capital Costs (YOE $)

2021‐2025

Annual Operating Costs Source (YOE $) Source

1

$ ‐‐‐ $502,770 $ ‐‐‐

6

$ ‐‐‐ 1

$502,770 $ ‐‐‐

8.1

$ ‐‐‐ $1,088,644 $ ‐‐‐

Capital Costs (YOE $)

1 1

Source

2026‐2030 Annual Operating Costs (YOE $) Source

Capital Costs (YOE $)

2031‐2035

Annual Operating Costs Source (YOE $) Source

Capital Costs (YOE $)

Source

$ ‐‐‐

6

$777,153

$ ‐‐‐

6

$882,624

$ ‐‐‐

8.1

$ ‐‐‐

6

$2,100,979

$ ‐‐‐

6

$2,386,112

$ ‐‐‐

$567,644

6

$1,045,757

$ ‐‐‐

6

$1,187,681

$ ‐‐‐

6

$1,229,115

$ ‐‐‐

6

$1,395,923

$567,644

6

$339,987

$ ‐‐‐

5

$ ‐‐‐

1

$644,681

NEEDS Unfunded Unfunded Capital Operating Needs Needs (2009 $) (2009 $)

Annual Operating Costs (YOE $) $999,197

$ ‐‐‐

$ ‐‐‐

6

$2,701,259

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$1,344,545

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$1,580,290

$ ‐‐‐

$ ‐‐‐

$386,128

$ ‐‐‐

5

$437,126

$ ‐‐‐

$ ‐‐‐

6

$682,888

$ ‐‐‐

6

$773,080

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$624,937

$ ‐‐‐

6

$705,574

$ ‐‐‐

6

$801,331

$ ‐‐‐

6

$907,167

$ ‐‐‐

$ ‐‐‐

$567,644

6

$1,135,255

$ ‐‐‐

6

$1,289,325

$ ‐‐‐

6

$1,459,614

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$274,653

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

1

WHAT Route #12 Winter Haven to Lakeland via Auburndale

12

T‐021

15

T‐022 Route #15 Haines City

22XW 30 40/44

Route #22XW T‐023 Bartow to Winter Haven Route #30 Eagle Ridge Mall/ T‐024 Winter Haven Route #40/44 T‐025 South/Southwest

50

T‐026 Route #50 Westside

15

T‐512 Route #15 Haines City

12

T‐210

22XW

T‐215

30

T‐211

40/44

T‐212

50

Route #12 Winter Haven to Lakeland via Auburndale Route #22XW Bartow to Winter Haven Route #30 Eagle Ridge Mall/ Winter Haven Route #40/44 South/Southwest

T‐213 Route #50 Westside

Span of Service $ ‐‐‐ Headway

$ ‐‐‐

Headway

$ ‐‐‐

Headway

$ ‐‐‐

Headway

$ ‐‐‐

Headway

$ ‐‐‐

Existing

$185,433

Existing

$215,140

Headway

$ ‐‐‐

Headway

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

$ ‐‐‐

9

$207,717

$ ‐‐‐

2

$193,635

$ ‐‐‐

9

$193,635

$ ‐‐‐

2

$198,809

$ ‐‐‐

9

$219,723

$ ‐‐‐

9

$215,168

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

1 1

$ ‐‐‐

6

$211,426

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐

6

$202,359

$ ‐‐‐

6

$223,646

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $462,224 $ ‐‐‐ $ ‐‐‐

6

6

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$208,729

$ ‐‐‐

$ ‐‐‐

$351,387

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

3 1

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ 6

$ ‐‐‐ $ ‐‐‐ $243,264

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$ ‐‐‐

$ ‐‐‐

6

$227,038

$ ‐‐‐

6

$256,334

$ ‐‐‐

6

$291,122

$ ‐‐‐

6

$329,572

$ ‐‐‐

$ ‐‐‐

$502,770

6

$407,117

$ ‐‐‐

6

$459,649

$ ‐‐‐

6

$522,029

$ ‐‐‐

6

$590,977

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$382,210

$ ‐‐‐

6

$431,528

$ ‐‐‐

6

$490,092

$ ‐‐‐

6

$554,822

$ ‐‐‐

$ ‐‐‐

$502,770

6

$594,020

$ ‐‐‐

6

$670,668

$ ‐‐‐

6

$761,687

$ ‐‐‐

6

$862,287

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

1

$644,681

6

$566,175

$ ‐‐‐

6

$640,952

$ ‐‐‐

$ ‐‐‐

$488,185

$ ‐‐‐

6

$554,439

$ ‐‐‐

6

$627,667

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$462,224

6

$397,522

$ ‐‐‐

$ ‐‐‐

6

$195,735

$ ‐‐‐

6

$ ‐‐‐

$ ‐‐‐

$432,393

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

PCTS 25 35 35 25

T‐027 Route #25 Fort Meade/Bartow Route #35 Frostproof/ T‐028 Eagle Ridge Mall Route #35 Frostproof/ T‐214 Eagle Ridge Mall T‐216 Route #25 Fort Meade/Bartow

$ ‐‐‐

6

$192,301

$ ‐‐‐

9

$223,109

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐

1

$ ‐‐‐ $462,224

$ ‐‐‐

6

$428,650

$ ‐‐‐

$ ‐‐‐

1

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$466,251

$1,005,541

6

$269,397

$ ‐‐‐

6

$1,391,288

$ ‐‐‐

$ ‐‐‐

6

$526,413

$ ‐‐‐

6

$597,854

$ ‐‐‐

6

$676,816

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

8.1

$304,158

$ ‐‐‐

5

$345,437

$ ‐‐‐

6

$391,061

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$1,570,809

$ ‐‐‐

6

$1,783,990

$ ‐‐‐

6

$2,019,611 $ ‐

$ ‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐

$405,460

$223,352

$ ‐‐‐

1

$644,681

6

$637,174

$ ‐‐‐

6

$721,329

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

1

$644,681

5

$376,702

$ ‐‐‐

5

$426,455

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$405,460

$141,139

NEW ROUTES COLLEGE SHUTTLE LAMTD 14 LAMTD 32 LAMTD 51 EXT LAMTD 57 EXT

PSC/University Of South Florida (USF) Shuttle

T‐101

T‐102 Route 14 Eastside Route 32 Medulla/ Willow Oak Extension Route 51 Extension T‐104 Banana Road/Kathleen Route 57 Extension T‐143 Kidron/Flightline T‐103

Legend:

= UNFUNDED NEED

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐ $ ‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

8

$1,386,673 $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

6

$1,279,087 $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

Funding Source: 1 = Federal Cash Grants (Capital Only), 2 = State Cash Grants. 3 = Federal Discretionary Grants (Capital Only), 4 = State Service Development Grants, 5 = Passenger Fares, 6 = New Local Source(s), 7 = Committed Local Sources, 8 = Roll Over from Previous Phase (Capital), 8.1 = Roll Over from Previous Phase (Operating), 9 = Ad Valorem Revenue

8‐20

TABLE 8‐2: COMMITTED, FUNDED, AND UNFUNDED TRANSIT PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Route

Project ID

Route Name USF Polytech ‐ Lakeland Square Mall USF to Winter Haven LAMTD B T‐106 via Highway 540

LAMTD A T‐105

Chapter 8.0 Cost Affordable Plan

2010 Annual Operating Status/ Costs Improvement (YOE $) Source New

$ ‐‐‐

New

$ ‐‐‐

LAMTD C T‐107 Lake Miriam/Bartow

New

$ ‐‐‐

Lakeland Square to LAMTD D T‐108 Kathleen via Kathleen Road

New

$ ‐‐‐

LAMTD E T‐109 Lakeland to Tampa Connection

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

Lakeside Village to Lakeland LAMTD F T‐110 Sqr via Harden & Fla Lakeside Village LAMTD G T‐111 to Proposed USF Campus USF Polytechnic LAMTD H T‐150 to Polk State College PCTS A

T‐112 Haines City to Poinciana East

New

$ ‐‐‐

PCTS B

T‐113 Haines City to Poinciana South

New

$ ‐‐‐

PCTS C

T‐114 Haines City to Davenport

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

Four Corners Park‐and‐Ride to Posner Park Lakeland to US 192 Connection with LYNX Rt 55 Mulberry to Lake Wales via Bartow Poinciana East to Poinciana South

PCTS D

T‐115

PCTS E

T‐116

PCTS F

T‐117

PCTS G

T‐118

PCTS H

T‐119 Posner Park‐SunRail Connector

PCTS I PCTS J

Celebration to Downtown T‐120 Tampa via Posner Park Route Hwy 27 Lake Wales T‐121 4 Corners Haines City

PCTS K

T‐122 Auburndale to USF

New

$ ‐‐‐

PCTS L

T‐123 Lakeland/Polk City/Auburndale

New

$ ‐‐‐

PCTS N

Haines City T‐124 Industrial Park Circulator

New

$ ‐‐‐

PCTS O

T‐125 Haines City Circulator

New

$ ‐‐‐

TBARTA 120

T‐126 TBARTA Express I‐4

New

$ ‐‐‐

TDP 1

T‐127 North Lakeland

New

$ ‐‐‐

TDP 2

Polk City to T‐128 Auburndale via SR 655

New

$ ‐‐‐

TDP 3

T‐129 East Winter Haven

New

$ ‐‐‐

TDP 3

T‐130 Winter Haven to Dundee

New

$ ‐‐‐

TDP 4

T‐131 North Haines City

New

$ ‐‐‐

TDP 5

T‐132 Posner Park‐Poinciana

New

$ ‐‐‐

T‐134 Bartow‐WHAT Terminal

New

$ ‐‐‐

T‐135 Mulberry‐Lakeland

New

$ ‐‐‐

T‐136 US 92 Lakeland‐Winter Haven

New

$ ‐‐‐

TDP PTSC 1 TDP PTSC 2 TDP PTSC 3

Legend:

= UNFUNDED NEED

2011‐2013 Capital Costs (YOE $) $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

2014‐2015

Annual Operating Costs Source (YOE $) Source

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

1

Capital Costs (YOE $) $ ‐‐‐ $ ‐‐‐

2016‐2020 Annual Operating Costs (YOE $) Source

Source

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $1,386,673

7

$614,428

$ ‐‐‐

1

$502,770

6

$252,852

$ ‐‐‐

1

$502,770

5

$356,052

$1,059,825

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$810,920

$451,970

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$810,920

$606,271

$ ‐‐‐

6

$787,855

$ ‐‐‐

6

$891,911

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$285,478

$ ‐‐‐

5

$324,221

$ ‐‐‐

5

$367,043

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$401,994

$ ‐‐‐

6

$456,550

$ ‐‐‐

6

$516,849

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$1,621,840

$762,661

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$810,920

$533,341

$1,301,539

$ ‐‐‐

7

$1,478,177

$ ‐‐‐

7

$1,673,408

$ ‐‐‐

$ ‐‐‐

7

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$810,920

$583,997

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$810,920

$558,887

$ ‐‐‐

6

$1,014,672

$ ‐‐‐

6

$1,145,598

$ ‐‐‐

6

$1,301,071

$ ‐‐‐

6

$1,472,911

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

5

$428,869

$ ‐‐‐

6

$484,207

$ ‐‐‐

5

$549,921

$ ‐‐‐

5

$622,552

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$1,216,380

$938,494

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$1,216,380

$868,910

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$810,920

$424,835

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$1,216,380

$945,260

$394,283

1

$ ‐‐‐

$693,709

$ ‐‐‐

5

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$ ‐‐‐

$1,152,792

$ ‐‐‐

$ ‐‐‐

$462,224

7

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

1

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $4,622,244 $ ‐‐‐

$ ‐‐‐ 7

$2,552,936

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$1,903,095

1

$502,770

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

1

$ ‐‐‐ $502,770

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐

7

$3,135,185

$ ‐‐‐

7

$3,560,674

$ ‐‐‐

7

$4,030,952

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$2,148,655

$ ‐‐‐

8.1

$2,440,259

$ ‐‐‐

6

$2,762,557

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

5

$462,095

$ ‐‐‐

8.1

$524,807

$ ‐‐‐

6

$594,122

$ ‐‐‐

$ ‐‐‐

$1,702,932

6

$1,222,141

$ ‐‐‐

8.1

$1,388,003

$ ‐‐‐

8.1

$1,571,324

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$405,460

$198,850

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$405,460

$161,996

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$405,460

$223,987

$437,147

$ ‐‐‐

6

$496,474

$ ‐‐‐

6

$562,046

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$405,460

$393,651

$433,178

$ ‐‐‐

6

$491,967

$ ‐‐‐

6

$556,943

$ ‐‐‐

$ ‐‐‐

1

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐

1

$567,644

5

$ ‐‐‐

$383,672

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$405,460

$370,769

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$810,920

$582,377

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$810,920

$703,469

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$810,920

$614,645

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$810,920

$564,709

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$1,216,380

$826,610

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐

6

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$409,284 $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

5

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐

8.1

$ ‐‐‐

$ ‐‐‐

$2,776,878

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

7

$2,011,082

$ ‐‐‐

$ ‐‐‐

1

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐

6

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

Funding Source: 1 = Federal Cash Grants (Capital Only), 2 = State Cash Grants. 3 = Federal Discretionary Grants (Capital Only), 4 = State Service Development Grants, 5 = Passenger Fares, 6 = New Local Source(s), 7 = Committed Local Sources, 8 = Roll Over from Previous Phase (Capital), 8.1 = Roll Over from Previous Phase (Operating), 9 = Ad Valorem Revenue

8‐21

Source

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

Capital Costs (YOE $)

NEEDS Unfunded Unfunded Capital Operating Needs Needs (2009 $) (2009 $)

Annual Operating Costs (YOE $)

$ ‐‐‐

$932,844

$ ‐‐‐

$ ‐‐‐

Source

$ ‐‐‐

Capital Costs (YOE $)

2031‐2035

Annual Operating Costs Source (YOE $) Source

$ ‐‐‐

6

Capital Costs (YOE $)

2026‐2030 Annual Operating Costs (YOE $) Source

$ ‐‐‐

$1,386,673

$ ‐‐‐

$ ‐‐‐

5

1

$1,005,541

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

3

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

Capital Costs (YOE $)

2021‐2025

Annual Operating Costs Source (YOE $) Source

TABLE 8‐2: COMMITTED, FUNDED, AND UNFUNDED TRANSIT PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Route

Project ID

Route Name

Chapter 8.0 Cost Affordable Plan

2010 Annual Operating Status/ Costs Improvement (YOE $) Source

WHAT 10 T‐137 Route 10 Northside

New

$ ‐‐‐

WHAT 20 T‐138 Route 20 PCC/Hospital

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

HSR

$ ‐‐‐

HSR

$ ‐‐‐

WHAT 40/44 EXT WHAT 50 WS

Route 40 44 Highway 60 Extension

T‐139

T‐140 Route 50 Westside

Reverse Central WHAT 98 T‐141 Winter Haven Circulator Central WHAT 99 T‐142 Winter Haven Circulator PCTS P HSR1_1 HSR1_2

T‐144 Mulberry to Bartow via SR 60 Lakeland/Lakeland Square/ T‐199 HSR Connection Winter Haven/Auburndale/ T‐198 HSR Connection

HSR1_3

T‐197 USF Poly/HSR Connection

HSR

$ ‐‐‐

HSR1_4

T‐196 Lake Alfred/HSR Connection

HSR

$ ‐‐‐

BRT

$ ‐‐‐

Rail

$ ‐‐‐

Rail

$ ‐‐‐

Rail

$ ‐‐‐

Rail

$ ‐‐‐

Rail

$ ‐‐‐

TDP BRT 1

T‐133

CR1

T‐300

CR2

T‐301

CR3

T‐302

CR4

T‐303

CR5

T‐304

BRT from LAMTD Terminal to Lakeland Square Mall Commuter Rail Osceola to Haines City Commuter Rail Haines City to Auburndale Commuter Rail Auburndale to Lakeland Commuter Rail Lakeland to Hillsborough Commuter Rail Auburndale to HSR Station Fixed Route Needs

Rapid Transit Needs

Legend:

= UNFUNDED NEED

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

Capital Costs (YOE $) $ ‐‐‐

$8,725,952

2011‐2013

2014‐2015

Annual Operating Costs Source (YOE $) Source

$ ‐‐‐

6

$363,439

$ ‐‐‐

6

$412,763

$ ‐‐‐

5

$467,278

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

8

$462,224

6

$235,966

$ ‐‐‐

6

$256,664

$ ‐‐‐

6

$289,782

$ ‐‐‐

6

$329,110

$ ‐‐‐

4

$372,577

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$405,460

$157,744

$282,360

$ ‐‐‐

6

$320,680

$ ‐‐‐

6

$363,034

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$1,216,380

$980,337

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$1,216,380

$980,337

$804,555

$ ‐‐‐

6

$913,744

$ ‐‐‐

6

$1,034,428

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$1,459,656

6

$1,057,026

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$1,216,380

$796,861

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$321,903

$ ‐‐‐

$ ‐‐‐

6

$ ‐‐‐

Source

$ ‐‐‐

$ ‐‐‐

Capital Costs (YOE $)

$295,943

$ ‐‐‐

Source

Capital Costs (YOE $)

NEEDS Unfunded Unfunded Capital Operating Needs Needs (2009 $) (2009 $)

Annual Operating Costs (YOE $)

6

$ ‐‐‐

Capital Costs (YOE $)

2031‐2035

Annual Operating Costs Source (YOE $) Source

$462,224

$ ‐‐‐

Capital Costs (YOE $)

2026‐2030 Annual Operating Costs (YOE $) Source

8

$ ‐‐‐

Source

2021‐2025

Annual Operating Costs Source (YOE $) Source

$ ‐‐‐

$ ‐‐‐

Capital Costs (YOE $)

2016‐2020 Annual Operating Costs (YOE $) Source

8

$462,224 $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$229,921 $ ‐‐‐

$ ‐‐‐

$1,005,541 $ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$712,606

5

$ ‐‐‐

6

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$405,460

$278,248

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$810,920

$551,732

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$56,761,500

$432,708

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$528,575,878

$4,630,106

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$582,405,965

$5,107,280

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$319,095,457

$3,099,738

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$287,188,400

$2,789,574

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$346,431,146

$3,058,837

$ ‐‐‐

1

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$250,090

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

6

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$9,049,135

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$12,017,834

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$11,060,94 9

$ ‐‐‐

$17,046,607

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$26,129,98 5

$ ‐‐‐

$4,541,152

$32,165,052

$2,578,726

$38,133,066

$1,459,656

$44,226,534

$22,705,760 $15,425,443

$2,120,458,34 $19,118,243 6

Facility Operations Operations Operations Park and Ride Park and Ride Park and Ride Park and Ride

Project ID

Route Name Eastern Polk Operations T‐400 Facility‐Land and Design Eastern Polk Operations T‐401 Facility‐Construction Commuter Rail Maintenance T‐421 Facility Construction

2010 Annual Operating Status/ Costs Improvement (YOE $) Source New New New

T‐402 North Socrum Loop Rd @ I‐4

New

T‐403 I‐4 & County Line Road

New

T‐404 US 98 & I‐4

New

T‐405 Polk Parkway & US 98

New

2011‐2013 Capital Costs (YOE $) $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

2014‐2015

Annual Operating Costs Source (YOE $) Source

Capital Costs (YOE $)

8

$6,603,889

8

$3,720,573

3

$ ‐‐‐

$ ‐‐‐ $766,319 $ ‐‐‐ $ ‐‐‐

2016‐2020

Annual Operating Costs Source (YOE $) Source

1

$16,187,758

Capital Costs (YOE $)

1

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $833,540

2021‐2025

Annual Operating Costs Source (YOE $) Source

3

Capital Costs (YOE $) $ ‐‐‐ $ ‐‐‐

$941,094 $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

2026‐2030

Source

Annual Operating Costs (YOE $)

Source

Capital Costs (YOE $)

2031‐2035 Annual Annual Operating Capital Operating Costs Costs Costs Source (YOE $) Source (YOE $) Source (YOE $)

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

Funding Source: 1 = Federal Cash Grants (Capital Only), 2 = State Cash Grants. 3 = Federal Discretionary Grants (Capital Only), 4 = State Service Development Grants, 5 = Passenger Fares, 6 = New Local Source(s), 7 = Committed Local Sources, 8 = Roll Over from Previous Phase (Capital), 8.1 = Roll Over from Previous Phase (Operating), 9 = Ad Valorem Revenue

8‐22

NEEDS Unfunded Unfunded Capital Operating Needs Needs (2009 $) (2009 $)

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$672,210

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐ $25,000,000

TABLE 8‐2: COMMITTED, FUNDED, AND UNFUNDED TRANSIT PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Facility Park and Ride Park and Ride Park and Ride Park and Ride Park and Ride Park and Ride Park and Ride Park and Ride

Project ID

Chapter 8.0 Cost Affordable Plan

2010 Annual Operating Status/ Costs Improvement (YOE $) Source

Route Name

T‐406 US 98 & US 17

New

T‐407 I‐4 & SR 559

New

T‐408 US 27 & SR 60

New

T‐409 US 17 & SR 544

New

T‐410 Downtown Winter Haven

New

T‐411 Frostproof Park and Ride

New

T‐422 Williams DRI Transfer Center

New

T‐412 Mulberry Park and Ride

New

Superstop

T‐413 Eagle Ridge Mall

Superstop

T‐414 North Lakeland

Superstop

2011‐2013 Capital Costs (YOE $) $ ‐‐‐

New

$ ‐‐‐

New

$ ‐‐‐

T‐415 Bartow Superstop

New

$ ‐‐‐

Superstop

Loughman ‐ T‐416 CR 54 & US 17/92

New

Superstop

T‐417 Poinciana Superstop

New

Superstop

T‐418 Haines City Superstop

New

Superstop

T‐419 Polk State College Superstop

Superstop

T‐420 VPCC Intermodal Center

2014‐2015

Annual Operating Costs Source (YOE $) Source

$ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

$ ‐‐‐ $ ‐‐‐

3

$766,319

3

$766,319 $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

Capital Costs (YOE $)

1

$833,540 $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

1

$833,540 $ ‐‐‐

Capital Costs (YOE $) $ ‐‐‐ $ ‐‐‐ $ ‐‐‐ $ ‐‐‐

3

$941,094 $ ‐‐‐ $ ‐‐‐

Source

Source

Capital Costs (YOE $)

2031‐2035 Annual Annual Operating Capital Operating Costs Costs Costs Source (YOE $) Source (YOE $) Source (YOE $)

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

1

$1,068,814

$ ‐‐‐

NEEDS Unfunded Unfunded Capital Operating Needs Needs (2009 $) (2009 $)

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$672,210

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

3

$103,520

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

3

$84,295

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

3

$84,295

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$73,943

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

3

$103,520

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

3

$84,295

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

New

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$73,943

New

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

3

$117,570

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$1,186,383

$18,688,379

$ ‐‐‐

2026‐2030 Annual Operating Costs (YOE $)

$766,319

$13,642,626

$ ‐‐‐

2021‐2025

Annual Operating Costs Source (YOE $) Source

8

$ ‐‐‐

Capital Costs (YOE $)

2016‐2020

Annual Operating Costs Source (YOE $) Source

$2,089,229

$26,492,306

Spare and Replacement Fleet 2010

2011‐2013

Cost

Source

$ ‐‐‐

2014‐2015

Cost

Source

1

$638,940

4

$27,242

5

$14,991

2016‐2020

Cost

1

Source

$11,178,983

$681,173

2021‐2025

Cost

Source

2026‐2030

Cost

1

$20,866,950

1

$38,325,066

1

$739,933

3

$547,136

1

$447,657

3

$855,250

6

$ ‐‐‐

$11,178,983

$22,461,733

Source

2031‐2035

Cost

Source

Cost

1

$36,870,664

1

$29,870,028

3

$3,105,552

1

$2,519,469

$39,319,859

$39,976,216

$32,389,496

Paratransit 2010

2011‐2013

Cost

Source

$6,980,762 $6,980,762

2

Cost

2014‐2015 Source

$1,680,785

2

6

$1,819,215

$3,500,000

2016‐2020

Cost

Source

$1,772,878

2

6

$10,159,747

$11,932,625

2021‐2025

Cost

Source

$3,302,072

2

6

$14,988,917

6

$18,290,989

2026‐2030

Cost

Source

$3,280,835

2

$16,018,196 $19,299,031

2031‐2035

Cost

Source

Cost

$3,946,772

2

$4,272,990

6

$18,933,067

6

$17,840,277

$22,879,839

$22,113,267

Funding Source: 1 = Federal Cash Grants (Capital Only), 2 = State Cash Grants. 3 = Federal Discretionary Grants (Capital Only), 4 = State Service Development Grants, 5 = Passenger Fares, 6 = New Local Source(s), 7 = Committed Local Sources, 8 = Roll Over from Previous Phase (Capital), 8.1 = Roll Over from Previous Phase (Operating), 9 = Ad Valorem Revenue

8‐23

TABLE 8‐2: COMMITTED, FUNDED, AND UNFUNDED TRANSIT PROJECTS Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan

Summary of Transit Projects Cost Affordable Transit Plan

Fixed Route Annual Operating Cost (YOE $)

Fixed Route Phase Operating Cost (YOE $)

Paratransit Phase Operating Cost (YOE $)

Unfunded Needs

Phase Capital Cost for New/Improved Routes (YOE $)

Total Phase Operating Cost (YOE $)

Phase Capital Cost for Fleet Replacement (YOE $)

Phase Capital Cost for Transit Facilities (YOE $)

Total Phase Capital Cost (YOE $)

Phase

Years in Phase

2010

1

$ 8,725,952

$ 8,725,952

$ 6,980,762

$ 15,706,714

$ ‐

2011‐2013

3

$ 9,049,135

$ 27,147,406

$ 10,500,000

$ 37,647,406

$ ‐

2014‐2015

2

$ 17,046,607

$ 34,093,213

$ 23,865,249

$ 57,958,463

$ 12,017,834

$ 11,178,983

$ 13,642,626

$ 36,839,443

$ 94,797,905

2016‐2020

5

$ 26,129,985

$ 130,649,923

$ 91,454,946

$ 222,104,870

$ 11,060,949

$ 22,461,733

$ 18,688,379

$ 52,211,061

$ 274,315,931

2021‐2025

5

$ 32,165,052

$ 160,825,260

$ 96,495,156

$ 257,320,416

$ 4,541,152

$ 39,319,859

$ 2,089,229

$ 45,950,240

$ 303,270,656

2026‐2030

5

$ 38,133,066

$ 190,665,328

$ 114,399,197

$ 305,064,525

$ 2,578,726

$ 39,976,216

$ 1,186,383

$ 43,741,325

$ 348,805,850

2031‐2035

5

$ 44,226,534

$ 221,132,672

$ 110,566,336

$ 331,699,007

$ 1,459,656

$ 32,389,496

$ 33,849,152

$ 365,548,160

$ 773,239,755

$ 454,261,646

$ 1,227,501,401

$ 31,658,317

$ 146,007,460

$ 213,272,394

$ 1,440,773,794

TOTAL UNFUNDED TOTALS IN YOE $

$ ‐ $ 681,173

$ ‐ $ ‐

$ ‐ $ 35,606,617

$ ‐ $ 681,173

Total Phase Cost (YOE $)

Fixed Route Operating Needs (PDC)

Fixed Route Capital Needs (PDC)

Rapid Transit Operating Needs (PDC)

Rapid Transit Capital Needs (PDC)

Transit Facilities Needs (PDC)

TOTAL UNFUNDED NEEDS (PDC)

$ 15,706,714 $ 38,328,579

PHASING N/A

$ 15,425,443

$ 22,705,760

$ 19,118,243

$ 2,120,458,346

$ 26,492,306

$ 2,204,200,098

$ 27,457,288

$ 40,416,253

$ 34,030,473

$ 3,774,415,856

$ 47,156,305

$ 3,923,476,175

Funding Source: 1 = Federal Cash Grants (Capital Only), 2 = State Cash Grants. 3 = Federal Discretionary Grants (Capital Only), 4 = State Service Development Grants, 5 = Passenger Fares, 6 = New Local Source(s), 7 = Committed Local Sources, 8 = Roll Over from Previous Phase (Capital), 8.1 = Roll Over from Previous Phase (Operating), 9 = Ad Valorem Revenue

TABLE 8‐2: COMMITTED, FUNDED, AND UNFUNDED TRANSIT PROJECTS (CONTINUED) 8‐24

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan

2011‐2013 Ref #

Source 2010 Available Capital Federal Cash Grants 1 $7,486,779 $23,421,167 (Capital Only) 2 State Cash Grants Federal Discretionary 3 Grants (Capital Only) State Service 4 Development Grants

$2,808,480

2014‐2015

Remaining Operating Balance $511,152

Available $22,910,01 $ ‐‐‐ 5

$8,785,871 $ ‐‐‐ $8,785,871

$16,448,994 $16,338,777 $6,170,433

$ ‐‐‐ $3,128,337

$250,000

$735,934

$18,908

$549,268

$14,991 $4,491,846

$10,406

$4,764,387

$782,084

$27,242

$1,409,751 $4,517,242

6 New Local Sources

$ ‐‐‐ $8,000,000 $127,788 $7,792,716

Total

Operating

$1,000,000 $3,128,337 $ ‐‐‐

5 Passenger Fares

Committed 7 Local Sources Roll Over from 8 Previous Phase (Capital) Roll Over from 8.1 Previous Phase (Operating) Ad Valorem 9 Revenue

$1

Capital

2016‐2020 Remaining Balance $ ‐‐‐

$ ‐‐‐ $3,545,756

$2,197,072 $2,041,475

$ ‐‐‐

Available

Capital

$2,624,678 $16,510,405

$155,597

$5,878,769 $1,890,849

$336,541

$212,727

$1,469,692

$ ‐‐‐ $3,367,226

$1,397,161 $16,983,077

$ ‐‐‐

$ ‐‐‐ $16,510,361

$ ‐‐‐

$ ‐‐‐

Available

Capital

$4,135,044 $48,360,848 $34,196,985 $43 $18,141,376

$ ‐‐‐

$3,987,920

$1,357,973

$111,719

$ ‐‐‐ $15,040,355

Operating

2026‐2030 Remaining Balance

$ ‐‐‐

$0

$7,225,522

$ ‐‐‐ $7,225,522

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$0 $26,038,351 $13,864,128

$ ‐‐‐ $12,174,223

$ ‐‐‐

$ ‐‐‐ $ ‐‐‐

$ ‐‐‐

$0

$89,902

$ ‐‐‐

$ ‐‐‐

$4,257,721 $15,877,487 $ ‐‐‐ $15,841,040

$36,447

$ ‐‐‐

$ ‐‐‐

$135,029,889 $36,839,443 $57,958,463

$0 $19,648,349 $265,815

$89,902 $27,579,219 $ ‐‐‐

$ ‐‐‐ $19,648,349

Available

Capital

Operating

$ ‐‐‐ $14,163,864 $52,688,229 $34,899,004

$3,896,293

$7,037,503

$94,056

$ ‐‐‐

$6,943,447

$84,322

$1,759,376

$ ‐‐‐

$1,738,271

$21,105

$ ‐‐‐

$1,530,553

$1,942,721 $18,667,887

$ ‐‐‐

$18,548,045

$8,122,964

$ ‐‐‐

$ ‐‐‐

$8,122,964 $18,060,157

$ ‐‐‐ $12,640,160 $14,939,059 $40,805,842

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$323,622,271 $52,211,061 $222,104,870

$265,815

$ ‐‐‐

$6,375,754 $34,430,088 $45,068,092 $ ‐‐‐

$374,606,189 $45,950,240 $257,320,416

$ ‐‐‐ $19,733,861

$ ‐‐‐ $20,255,037

$8,780,961 $229,062,607 $8,748,265 $216,377,758 $0 $25,194,253

$ ‐‐‐

$0 $22,183,619

$119,842 $20,338,310

$ ‐‐‐

Operating

$ ‐‐‐ $17,789,224 $56,954,179 $25,911,597

$ ‐‐‐

$22,183,619

$ ‐‐‐

Capital

$6,459,500 $2,563,207

$ ‐‐‐

$ ‐‐‐

Available

$16,404,177

$1,614,875

$1,737,200 $19,764,686

2031‐2035 Remaining Balance

$ ‐‐‐

$79,496 $71,545,959 $4,595,063 $43,483,418 $23,467,478 $191,273,902 $10,442,212 $156,907,671 $23,924,019 $210,249,277 $9,190,048 $192,278,268

$ ‐‐‐ $ ‐‐‐

$64,512,188 $681,173 $37,647,406

Operating

$110,217 $44,013,044 $39,878,000

$ ‐‐‐

2021‐2025 Remaining Balance

$ ‐‐‐ $25,194,253

$30,825 $21,364,952

Remaining Balance $ ‐‐‐

$ ‐‐‐

$21,364,951

$7,607,301

$ ‐‐‐

$ ‐‐‐

$1,901,825

$ ‐‐‐

$1,862,886

$83,273 $21,985,020

$ ‐‐‐

$21,934,977

$3,936,585 $247,608,869 $7,937,555 $238,956,996 $0 $28,521,796

$ ‐‐‐

$28,521,796

$ ‐‐‐ $18,060,157 $24,732,672

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐ $21,765,344 $23,302,747 $27,353,430

$ ‐‐‐

$19,057,401

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$ ‐‐‐

$418,973,213 $43,741,325 $305,064,525

$ ‐‐‐

$438,030,043 $33,849,152 $331,699,007

TABLE 8‐3: TRANSIT REVENUES

8‐25


Polk Transportation Planning Organization 2035 Mobility Vision Plan

8.2.3

Chapter 8.0 Cost Affordable Plan

Florida’s HSR Program

Florida has been a strong candidate for HSR development since the 1980s. Our flat terrain, high growth rates, large number of tourists, and distances between our major cities make Florida an ideal place for HSR implementation. In 1992, President Bush selected Tampa‐Orlando‐Miami as one of the nation’s first federally designated HSR corridors. On January 28, 2010, President Obama announced a $1.25 billion award to Florida in American Recovery and Reinvestment Act (ARRA) funds to start construction of the Tampa‐Orlando leg of the designated Tampa‐Orlando‐Miami HSR corridor.

Tampa‐Orlando‐Miami HSR showing options for Orlando to Miami.

8.2.3.1 Tampa‐Orlando on Track to be America’s First HSR Express Corridor The Tampa‐Orlando line will run 84 miles from downtown Tampa to Orlando International Airport. The project will be built for the most part in the median of I‐4 where a 44‐foot envelope has been preserved for this purpose. Bridges were also built higher and wider to accommodate high‐speed trains. Other portions of the project outside of I‐4 will primarily follow existing public ROWs. The project is expected to cost $2.65 billion to build. Trains will operate at speeds of up to 168 mph. Florida is planning five stations along this corridor. Travel time between downtown Tampa and Orlando International Airport (OIA), including stops at all intermediate stations, is projected to be under an hour. The system will be designed to allow the operator to set schedules to maximize ridership and satisfy market demand including the operation of non‐stop trains between Tampa and Orlando.

8‐26

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

8.2.3.2

Chapter 8.0 Cost Affordable Plan

Stations and Connectivity

The Tampa‐Orlando line will have strong connections with existing road, bus, and transit systems. Plans at OIA call for HSR to stop at a new southern terminal, which it would share with a proposed extension of the SunRail commuter system. The Convention Center stop will be served by both the I‐Ride Trolley and LYNX. The Tampa station is at the north end of the HART OIA proposed new southern terminal. bus transit mall. Proposed light rail service in Tampa would run directly to the HSR station. All stations will feature parking and rental car facilities and will have a full set of rail passenger services available. 8.2.3.3

Funding HSR ‐ Capital and Operations

In 2009, FDOT estimated that total project costs were approximately $2.65 billion, excluding the cost of ROW already acquired. The cost of the ROW, estimated at $572.5 million, was included as an “in‐kind” contribution in the 2009 ARRA application. The federal government is the principal funding source for the project. The Florida Rail Enterprise (FRE) has been awarded $1.25 billion of ARRA funding from the Federal Railroad Administration (FRA), and the FRA is responsible for administering the funds through the High‐Speed Intercity Passenger Rail (HSIPR) program. The approximately $1.40 billion net cost remaining after ARRA funding is the basis for FRE’s funding request made in August 2010 for HSIPR funds made available through the Passenger Rail Investment and Improvement Act (PRIIA) of 2008. Based on the Notice of Funding Availability (NOFA) requirement that the federal share shall not exceed 80 percent of project costs, FRE requested FRA funding in the amount of $1.12 billion, which results in a 20 percent non‐federal match of approximately $280.9 million that comes from the FRE fund established by the Florida Legislature in special session in 2009. FDOT projects that operating revenues will cover operating costs, based upon two independent ridership forecasts. While the principal source of funding for the project comes from federal grant sources, the finance plan also calls for approximately $347 million (excluding capitalized interest and fees) to be raised through private finance by the Concessionaire to meet the non‐federal 20 percent match requirement. FRE anticipates that additional private sector investment in the system will result in a capital match greater than 20 percent. A Design, Build, Operate, Maintain, and Finance structure provides the flexibility to have the private sector finance the non‐federal match. The Concessionaire may utilize a variety of financing instruments, including private activity bonds, Transportation Infrastructure Finance and Innovation Act loans, bank loans, and/or equity to provide matching funds. It is envisioned that these funds would be spent in conjunction with the 2010 FRA HSIPR funds during construction. FRE may then use a series of predetermined payments over the term of the concession and commencing once construction is

8‐27

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan

complete (commonly referred to as “availability payments”) to compensate the Concessionaire for funding the non‐federal match. 8.2.3.4

HSR Project Development

FDOT is responsible for building the project with oversight by the FRA. Florida received $66.7 million in ARRA funds in May 2010, the largest award in the nation. This allows FDOT to take the project to 30 percent design, update ridership projections, and prepare for issuance of bid documents in early 2011. Project construction will likely occur in two phases. The first phase is a proposed Early Works Safety Project which will involve elimination of median obstacles on I‐4 and construction of at‐grade permanent safety barriers. This work is expected to begin in early 2011. Private vendors will be asked to submit bids to complete the design of the system, then build, operate and maintain it. FDOT’s goal is to secure firm construction bids and have the private sector cover operating costs. FDOT expects to select a vendor in 2011. Construction is projected to start in 2012 with system operation beginning in 2015. FDOT is investing an additional $2 million to begin evaluating the costs and environmental impacts of various alignments in the Orlando‐Miami corridor, which is the first step to move forward with Phase 2 of the program. FDOT has applied for $8 million in PRIIA funding to match its investment in this corridor and further advance this work. Recently, USDOT awarded the state of Florida an additional $800 million for subsequent phases of the HSR. Current project updates can be obtained from the following website: http://www.floridahighspeedrail.org/. On February 16, 2011 Governor Scott rejected the federal funds for the high speed rail project. Presently the project is unfunded.

8.3

HOW DOES THE COST AFFORDABLE NETWORK PERFORM?

The highway, transit, sidewalk, bicycle, and trail projects were approved by the TPO Board as the 2035 MVP Cost Affordable Plan. Transit and highway capacity projects were tested using the Polk transportation model and the 2035 socio‐economic forecast for 2035. The model quantifies the effectiveness of the cost affordable network in satisfying the travel demand and other objectives of the 2035 MVP. 8.3.1

Model Results

The model shows that the Cost Affordable Network is effective in reducing vehicle miles and hours of travel, and results in higher travel speeds and transit ridership when compared to the E+C network (Table 8‐5). However, even assuming the improvements to the

8‐28

US 92 in Lake Alfred is forecast to be deficient in the 2035 Cost Affordable network. Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan

overall highway and transit networks are completed, the model forecasts that some road segments will still be deficient. This pertains particularly to the US 27 corridor in the vicinity of Davenport, Haines City, and Lake Wales. Other corridors with deficiencies include: •

CR 557 north of Winter Haven;

US 98 between Lakeland and Bartow;

SR 37 south of Lakeland; and

US 92 in Lake Alfred.

Map 8‐3 portrays those segments when measured by a V/C ratio greater than 1.25.

8‐29

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan

MAP 8‐3: 2035 COST FEASIBLE NETWORK VOLUME TO CAPACITY RATIO GREATER THAN 1.25

8‐30

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8 Cost Affordable Plan

TABLE 8‐5: SUMMARY OF MODEL RESULTS 2007 Base Year 2035 2035 Model Results Network1 E+C Network2 Needs Network3 Vehicle Miles of Travel (All Links) 16,802,690 34,139,064 33,444,176 Vehicle Hours of Travel (All Links)

4,261,982

1,709,535

2,674,737

Daily Transit Boardings

8,211

4

7,405

16,3236

11,338

Congested Speed (mph)

33.80

26.30

32.20

28.11

Crashes (Daily) 1

3 4 5 6 7 2

536,649

2035 Cost Affordable Network7 33,688,882

45

5

201

6

189

6

1986

Gannett Fleming, Summary file for 2007 Model Validation Output. Gannett Fleming, Summary files for E+C model run, November 2010. Gannett Fleming, Summary files for Needs Assessment model run, November 2010. National Transit Database, 2006. Polk Crash Database (2006‐2008). Gannett Fleming, MOE Accident Summaries for Needs and E+C model runs, May, June and November 2010. Gannett Fleming, Summary files for Cost Affordable Plan model run, November 2010.

8.4

REGIONAL NETWORK NEEDS AND FUNDED PROJECTS

As a member of both the CCC and the CFMPOA, the Polk TPO proactively coordinates its plans and priorities with those of its planning partners in the Tampa Bay and Orlando urbanized areas. The point of this coordination is to ensure that consistent assumptions are used and continuity is achieved on the regional transportation network. Map 8‐4 shows funded projects and unfunded needs on the regional highway network for Polk County. Map 8‐5 shows funded and unfunded regional transit projects, while Map 8‐6 depicts needs on the regional multi‐use trails network.

8.5

Situated between Tampa and Orlando, Polk County collaborates with both metropolitan areas on regional priorities.

REVIEW BY ENVIRONMENTAL TECHNICAL ADVISORY TEAM

All projects proposed as part of the 2035 MVP will be uploaded to the EST for evaluation. The environmental evaluation that will be conducted serves as a broad screening or analysis of potential project effects to environmental resources. Projects considered to be: (1) “major capacity improvements” (primarily defined as roadway widenings, new roadways, new fixed‐guideway transit facilities, etc.), and (2) anticipated to be funded by state or federal dollars, will go through a more detailed environmental analysis. These projects to be released to the (Environmental Technical Advisory Team (ETAT) for review and comment through a formal ETDM screening. Table 8‐6 presents the 2035 MVP projects to be screened. It should be noted that projects included in the 2030 TRIP were previously screened through the ETDM process. Most of these projects have complete PD&E Studies and were not re‐screened as part of the 2035 MVP.

8‐31

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan

MAP 8‐4: COST AFFORDABLE HIGHWAY PROJECTS AND REGIONAL ROAD NETWORK

8‐32

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan MAP 8‐5: REGIONAL TRANSIT SERVICE

(unfunded)

8‐33

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan MAP 8‐6: REGIONAL MULTI‐USE TRAIL NETWORK

8‐34

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan TABLE 8‐6: POLK COUNTY PROJECTS FOR 2011 ETDM SCREENING

ETDM No.

ID/ FPN

Project Name

Funding Source

County

To

Description

300B CPP East Corridor

US 17/92

I‐4

Interstate

DSB (State)

Polk

Identified to‐date; part of larger PD&E project (#8487) previously screened; Underway may include two alternatives

Y

300C CPP East Corridor

@ US 17/92

N/A

Interchange

DSB (State)

Polk

PD&E Include as part of Project 300B Underway screening.

5873

Notes

89B

SR33

SR 659

Tomkow Rd

Roadway Widening

OA, Other

Polk

PD&E Identified to‐date. Committed

Y

89C

SR 33

Old Combee Rd/ Deeson Pointe Blvd

SR 659

Roadway Widening

Impact Fee District E, OA

Polk

PD&E in Identified to‐date; to be included as 2021‐2025 part of the Project 89B screening.

57A

SR 544 (Lucerne Park Rd)

US 27

SR 17

Roadway Widening

TRIP, OA

Polk

Identified to‐date as an "on‐hold" project.

Y

Roadway Widening

Impact Fee District C, Local Option Gas Tax, OA

Polk

Identified previously from Avenue T to 30th St; never screened.

Y

Status

Screen (Y/N)

From

57B

SR 544 (Lucerne Park Rd)

SR 17

30th St

8‐35

Adopted December 7, 2010


Polk Transportation Planning Organization 2035 Mobility Vision Plan

Chapter 8.0 Cost Affordable Plan MAP 8‐7: CENTRAL POLK PARKWAY