Polk Transportation Planning Organization (TPO) Adopted 2014 Priority Transportation Projects
Project Status FPN
Priority
Project
Project Description PD&E
Design
ROW
CST
Complete
Complete
Partially Funded
2014 Priority Funding Fiscal Year Project Cost Request Source Requested ($1,000) (Phase) Requested
Candidate Transportation Regional Incentive Program (TRIP) and County Incentive Grant Program (CIGP) Projects 4313521
1
Bartow Northern Connector Phase II
New 4‐lane road between US 17 and State Road 60.
Complete
Construction
FY 2016/17
TRIP/Other State funds
$15,400
Set‐aside of funds
FY 2019/20
TMA SU (4125301)
$6,100*
Design
FY 2016/17
$750*
Design
FY 2016/17
Design
FY 2016/17
Design
FY 2017/18
Construction
FY 2017/18
TMA SU (4125301) TMA SU (4125301) TMA SU (4125301) TMA SU (4125301) TMA SU (4125301)
Construction
FY 2017/18
TMA SU (4125301)
$1,000
Construction
FY 2018/19
TMA SU (4125301)
$1,500*
FY 17/18
NA
NA
NA
Construction
FY 2017/18 ‐ 2019/20
STP/other State funds
$23,562 (funded) $46,407
Construction
FY 2019/20
Construction
FY 2019/20
STP/other State funds STP/other State funds STP/other State funds STP/other State funds
Candidate Surface Transportation Program Projects ‐ Lakeland and Winter Haven TMA SU Funds 4125301
2
Lakeland/Winter Haven TMA SU Funds
Set‐aside of funds in new fifth year for candidate complete street, congestion management, resurfacing supplement, multi‐use trail and safety projects.
Set‐aside of funds. Candidiate projects will be determined as part of future priority setting process.
4332681
3
Fort Fraser Trail Crossing
Multi‐use trail crossing of State Road 570 (Polk Parkway).
FY 2013/14
4350701 4350702 4353911 4350701
4 5 6 7
Complete Street Corridors High Crash Corridors Old Dixie Trail Complete Street Corridors
4350702
8
High Crash Corridors
4332681
9
Fort Fraser Trail Crossing
Complete Street improvements for select corridors. Complete Street improvements for select corridors. Regional multi‐use trail corridor between Auburndale and Haines City. Complete Street improvements for select corridors. Complete Street improvements for select corridors. Multi‐use trail crossing of State Road 570 (Polk Parkway).
FY 2014/15 FY 2014/15 FY 2016/17 FY 2014/15 FY 2014/15 FY 2013/14
Candidate Priority FY 16/17 Candidate Priority FY 16/17 Candidate Priority FY 16/17
$750* $750* $750* $1,000
Candidate Priority Road Projects (Non‐SIS Roads) ‐ State Funds and other Surface Transportation Program Funds 4106662
10
4106663
11
1975624
12
US 98
4301851
13
State Road 33
4313511
14
US 17/92 (Hinson Avenue)
4313511
15
US 92 (New Tampa Highway)
State Road 542 (Dundee Road) Phase I 2 to 4‐lane widening from SR 549 (1st Street) and Buckeye Loop Road. State Road 542 (Dundee Road) Phase II 2 to 4‐lane widening from Buckeye Loop Road to US 27.
FY 14/15 15/16 FY 15/16 16/17 FY 17/18 18/19 FY 18/19
Complete
Complete
Complete
Complete
4 to 6‐lane widening from Edgewood Drive to E Main Underway Street. 2 to 4‐lane widening from Old Combee Road to Tomkow Underway Road. FY 15/16 2 to 4‐lane widening from 10th Street to 17th Street.
Underway
FY 18/19
Right‐of‐way
FY 2019/20
2 to 4‐lane widening from Hillsborough County Line to Wabash Avenue.
FY 18/19
Right‐of‐way
FY 2019/20
Design/ Construction
FY 2015/16 ‐ 2017/18
Other State Funds
$1,000
Design/ Construction Design/ Construction Design/ Construction
FY 2015/16 ‐ 2019/20 FY 2015/16 ‐ 2019/20 FY 2015/16 ‐ 2019/20
Other State Funds Other State Funds Other State Funds
$5,000
Underway
FY 13/14
$36,314 $77,240** $610** $3,830**
Candidate Short Term Rail Improvements ‐ Other State Funds NA
16
NA
17
NA
18
NA
19
FDOT Polk Rail Study ‐ Short Term Improvements
ITS Motorist Bypass System ‐ Operational and motorist advisory message board improvements in Central Lakeland Kentucky Avenue Pedestrian Overpass New York Avenue Bike/Ped Underpass Lake Mirror Pedestrian Overpass (new AMTRAK Station)
$4,500 $4,600
Total Project Cost: $207,501 * Cost estimate ** Cost estimate derived from the TPO's Adopted 2035 Mobility Vision Plan
ADOPTED
JUNE 12, 2014
Polk Transportation Planning Organization (TPO) Adopted 2014 Priority Transportation Projects Strategic Intermodal System (SIS) Project Status FPN
Priority
Project
Project Description
PD&E
Design
ROW
Complete
30% Design Underway/ Committed
CST
2014 Priority Request (Phase)
Fiscal Year Requested
Funding Project Cost Source ($1,000) Requested
Candidate Florida Strategic Intermodal System (SIS) 4316411 4316412 4316413 4316414 4316415 4316416 4316417 4316418
1
Central Polk Parkway
New 6‐lane highway between State Road 570 (Polk Parkway) and State Road 60 (western segment), and from State Road 60 to Interstate 4 (eastern segment).
Additional FY 2015/16 ‐ Project Phases 2019/20 ***
SIS
TBD
Total Project Cost: To Be Determined
*** The Polk TPO requests the Central Polk Parkway be added to Florida's Stategic Intermodal System (SIS).
ADOPTED
JUNE 12, 2014