International Workshop
Telychka - A Place to Care designing an adaptive master plan
Last year at CANactions 2014
to explore the site
This year at CANactions 2015
to develop the area
economic crisis
the world is watching
insecurity
premanant friction
changing soceity
How to design in this circumstances?
No Master Plan!
Make no little plans! Daniel Burnham (1907)
They have no magic to stir men’s blood and probably themselves will not be realized. Make big plans; aim high in hope and work, remembering that a noble, logical diagram once recorded will not die, but long after we are gone be a living thing, asserting itself with ever-growing insistence. Remember that our sons and our grandsons are going to do things that would stagger us. Let your watchword be order and your beacon beauty.
The future city is the existing city In the workshop we seek clues in the existing city. With programmatic adjustments, architectural improvements and good urban embeddings we propose a careful and sustainable improvement of the city. Existing environments can be part of the history and future of the city.
Adaptive Master Plan Incorporate circumstances Best solutions in time Smart solutions for a place Start now Dynamic development Small initiatives with great effects Great ideas with easy starts
approach Open space Area Coincidence Experiment Temporary
Public space Plots Address Location Permanent
What? Software
Where? Hardware
How? Orgware
What? Software
TELYCHKA
HISTORICAL AREA
TELYCHKA
TELYCHKA FOR THE CITY
FROZEN TERRITORY
TRANSPORT HUB UNKNOWN RIVER BANK
BETWEEN HIGH-WAYS
FOR CITIZENS UNINTRODUCED ART-EVENTS / FESTIVALS CLOSED / UNREACHABLE
INDUSTRIAL ZONE DEPRESSIVE / MARGINALIZED
FROZEN TERRITORY
FOR CITIZENS UNINTRODUCED
TRANSPORT HUB
ART-EVENTS / FESTIVALS CLOSED / UNREACHABLE
UNKNOWN
INDUSTRIAL ZONE
RIVER BANK
BETWEEN HIGH-WAYS
DEPRESSIVE / MARGINALIZED
FOR DEVELOPERS & GOVERNMENT INDUSTRY SOURCE OF PRODUCED GOODS
A CONFLICTED AREA
KOVALSKA
TELYCHKA FOR ITSELF
WE DON’T NEED A MASTERPLAN! ДПТ від ЦМА
• 25 YEARS GOAL DO NOT RESPOND TO CONSTANTLY CHANGING CONDITIONS
ADAPTIVE MASTERPLAN
GOVERNMENT DEVELOPERS
WHAT WE ARE AFRAID OF?
WORST CASE SCENARIO
WHAT WE MAY LOSE? INDUSTRIAL HERITAGE
RIVER POTENTIAL LOCAL COMMUNITIES
ATMOSPHERE
KEEP+TRANSFORM
KEEP THE HERITAGE
KEEP+TRANSFORM
TRANSFORM
?
TO KEEP+TRANSFORM WE NEED TO...
CREATE COMMUNITIES
KEEP+TRANSFORM
ESTABLISH THE CONDITIONS
ACTIVATE THE AREA USE THE EXISTING ANCHORS
ACCESS TO THE RIVER EDUCATIONAL/ ART HUB
WOODEN PRODUCTION
ACTIVATE THE AREA SPREADING OF INFLUENCES
ACCES TO THE RIVER EDUCATIONAL/ ART HUB
WOODEN PRODUCTION
ACTIVATE THE AREA
INTERSECTION OF ACTIVITIES AND CREATION OF NEW FUNCTIONS
ACCESS TO THE RIVER EDUCATIONAL/ ART HUB
WOODEN PRODUCTION
COMPETITIVE POSITION
PROVIDE EXPERIENCE
STAGE FAIR DESIGN EXPERIENCES
DELIVER SHOP FURNITURE SERVICES MAKE CHAIR GOODS EXTRACT COMMODITIES PRICING
1ST STEP IS DONE
EDUCATION/ ART HUB
I LIKE TO COME HERE
EDUCATION/ ART HUB CANACTIONS
QUIET MOVE
GOGOLFEST
STREET DANCE ART
COMPETITIVE POSITION
ART / EDUCATION HUB
STAGE EXPERIENCES
DELIVER SERVICES MAKE GOODS EXTRACT COMMODITIES PRICING
WOOD PRODUCTION
COMPETITIVE POSITION
WOOD PRODUCTION
DESIGN FAIR
FURNITURE SHOP CHAIR WOOD
PRICING
COMPETITIVE POSITION
DESIGN FAIR
FURNITURE SHOP CHAIR WOOD
PRICING
COMPETITIVE POSITION
DESIGN FAIR
FURNITURE SHOP SHOP FURNITURE
CHAIR WOOD
PRICING
COMPETITIVE POSITION
DESIGN FAIR DESIGN FESTIVAL
FURNITURE SHOP SHOP FURNITURE
CHAIR WOOD
PRICING
CONNECT WITH THE CITY
connection Telychka with the main pedestrian touristic path
GREEN BELT
PU
BL
PU
BL
IC
IC
ZO
NE ACCESS TO THE RIVER-BANK
ZO
NE
ACCESS TO THE BOAT BAY
EVALUATIVE STRATEGY
FINAL GOAL
LONG TERM ADAPTIVE STRATEGY
?
PRODUCTION
RESIDENTIAL
INTERACTING COMMUNITIES COMMERTIAL
EDUCATION
PUBLIC
PRODUCTION INDUSTRY SMALL WORKSHOPS
TEMPORARY HOUSING/DORMITORY RESIDENTIAL CLUSTER HOSTEL
INTERACTING COMMUNITIES
MARKET FOR
PEASANT SHOPS CAFES RIVER BANK WALKING AREA BOAT STATION FESTIVALS
SUMMER SCHOOL INTERNSHIP WORKSHOP INFORMAL EDUCATION FORMAL EDUCATION
Where? Hardware
RESOURCES OF EXISTING SITUATION
roads
buildings and structures
Ì
Ì
Ì
Ì
Этаж
green stripe local community
wooden industry enterprise college boat station art&education hub transportation hub Ì
nonworking metro station
ANCHOR POINTS
METHODOLOGY
1 big problem
METHODOLOGY
separation into 5 smaller problems
METHODOLOGY
public space connection
METHODOLOGY
program fields
SMART DYNAMIC PLAN from post-industrial to city-center life
TIME
SMART DYNAMIC PLAN one of the possible way of developing
TIME
PHASE 1 local community
art&education hub transportation hub
supermarket
ĂŒ
PHASE 2 local community
1
recreation
art&education hub transportation hub
supermarket
public space
ĂŒ
6
1
PHASE 3 local community recreation cafe
art&education hub transportation hub
3
non-formal education supermarket light industry public space
2
ĂŒ
festival
2
7
2
PHASE 4 local community recreation
4
cafe sport fasilities
open air scene
non-formal education showroom hotel art&education hub transportation hub non-formal education supermarket light industry public space festival workshop
ĂŒ
3
4
PHASE 5 local community recreation cafe sport fasilities housing education for children open air scene dormitory cultural center conference hall
non-formal education showroom hotel art&education hub transportation hub non-formal education
6,7
supermarket light industry offices public space
5
festival workshop light industr
ĂŒ
5
How? Orgware
Summary Workshop:
Summary Workshop: We create a platform to establish communities with an adaptive master plan
Next step:
Next step: Establishing School of Urban Studies on Telychka The school facilitate the Platform Telychka