Portfolio
of architecture projects by Poonam Patel
Project: Sheika Khalifa Hospital Location: Dubai, UAE Status: DD Firm: SOM Team: Nathan King Megan Przywara Nicholas Scalco
Jin-Young Song Kwong Yu Julie Song Poonam Patel Quinn Bennett Douglass Alligood Cyrus Roberts Angeline Haryono Scott Habjan Farid Iskander Rita Kwong Sumati Singh Anthony Treu Jackie Delsandro Rowan Georges John Ostlund Leah Nanpei Karen Hsu Megan Przywara David Shanks
Project: Park Lane - mix use Location: Dallas, TX | Status: Built Firm: GFF Architects Team: Joe Patti Clark Key
Poonam Patel Ronald Butler George Marquez Mike Reyes Richard Jones Xavier Spencer Drew Hayes Jay Mathison
Project: Neisner Location: San Antonio, TX Status: Built Firm: Neisner Building Team: Glenn McGuyre
Poonam Patel
Project: Shakespeare’s Theater Location: Houston, TX Status: un- built School: University of Houston Designer:
Poonam Patel
Alex Gamble Anya Bartay
THEATER
Sheika Khalifa Park Lane
Neisner
Professional
Professional
Professional
M.Arch
pg. 4
pg. 6
pg. 13
pg. 17
Contents 2
visit poonampatel.com for more projects
sheika khalifa Hospital Project: Sheika Khalifa Hospital Location: Dubai, UAE Status: DD Firm: SOM Team: Nathan King Megan Przywara Nicholas Scalco Poonam Patel Douglass Alligood Scott Habjan Rita Kwong Anthony Treu Jackie Delsandro Leah Nanpei Karen Hsu Megan Przywara David Shanks Jin-Young Song Kwong Yu Julie Song Quinn Bennett Cyrus Roberts Angeline Haryono Farid Iskander Sumati Singh Rowan Georges John Ostlund
4
Interior Rendering of the main lobby.
This is a 2.2 million SF luxury hospital in Dubai. It consists of a Children’s Hospital, Women’s Hospital, General Hospital and Royal Hospital. This project is divided up into 8 revit models and 5 supporting revit models. My role is to bring closure to the CD set along with the rest of the team.
5
Park Lane Involvement: I worked on this project for 3 years on a team that fluctuated from 4 to 10. The following are parts of the project I worked on: 33 Acre Site Plan Block C Block DF Block C exp Vehicular Bridge Pedestrian Bridge
Park Lane is a 33.5-acre mixed-use development located in Dallas that sits across from North Park Center, one of the nation’s most prominent shopping malls. At completion, Park Lane will be a 2.4 million square foot mixed-use development with more than 700,000 square feet of retail, restaurant and entertainment space, anchored by Dallas’ flagship Whole Foods. The urban village components include shopping, dining and entertainment
Designer : GFF.com Location: Dallas, TX SF: 33 acres Cost: $750 million
venues, Class-A office space, a four-star boutique hotel, an upscale fitness and spa facility, as well as luxury residential units. In the equivalent of five city blocks, this $750 million project will offer a unique urban experience and an unbeatable variety of options to the consumer.
website: http://shopsatparklane.com/
Built: yes
M
Y
Y
Rendering looking east between Block C and C expansion. G
E
Block C Grand Stair View - Night
B
A
6
A
A
C
C
D/F
C
7
site
plan
Buildings I worked on Site Plan I worked on
I kept the site plan updated and coordinated with civil engineers, landscape architects, and other architects to make sure that the buildings were not built on easements, and landscape knew where to plant potted plants. The site plan allowed civil engineers to figure out where to place their utility lines.
I managed the site plan for six months and completed Block DF, C, C expansion, the pedestrian bridge and vehicular bridge for the two and a half years after the site plan.
This 33 acre site plan holds 7 large buildings and 2 bridges. A Development By
Block Cex
Block C P. Bridge Block DF
8
V. Bridge
LEVEL LV. 6 LV. 5 LV. 4 LV. 3 ENTRY FROM 75 LV. 2 LV. 1
2. ALL STOREFRONT, EXCEPT THE SOUTH TENANT, SHALL BE PROVDIED
3. REFERENCE SHEET D-A202 FOR INFORMATION REGARDING PRECAST CONC. PANELS. 4. ALL WALLS ARE 1 HR RATED MIN. U.N.O. D-A202.0
D-A201.0
2
27' - 4 5/8"
26
18' - 0"
29' - 0"
25' - 6" 22' - 0 5/8"
4' - 4"
4' - 4"
24
27' - 0"
24' - 8"
12' - 0"
4' - 4"
8' - 8"
2' - 5"
2' - 5"
25 4' - 4"
12' - 0" 5' - 4" 2' - 2" 7' - 3 1/2"
8 1/2"
27' - 0"
22' - 8"
2' - 2"
8 1/2" 7' - 3 1/2"
22
27' - 0"
22' - 8"
5' - 4"
5' - 4"
4' - 4"
12' - 0"
4' - 4"
6' - 3 1/2"
2' - 2"
8 1/2"
2
3
5
D-A313.0
D-A313.0
D-A313.0
4' - 4"
2' - 2" 2' - 2"
4
D124
5' - 7"
4 D-A502.0
AUTOMATIC SLIDING DOORS
31' - 0"
4' - 4"
3 D-A314.0
D-A403.6
D-A403.6
11' - 6"
1' - 2"
5
6 D-A314.0
2' - 0"
27' - 0" 11' - 6"
9' - 4"
9' - 4"
1' - 0" 1' - 2"
1' - 0" 1' - 2"
2' - 0"
7' - 11"
6' - 0"
7' - 11"
1' - 2"
5' - 2"
3' - 0"
LA LUZ STREET CENTERLINE PLANTER -- REF. LANDSCAPE PLANS CURB RE: CIVIL
7
A 3 D-A503.0
2 D-A503.0
13 D-A503.0
O.H.
4 D-A301.0
7
F.D. D-A403.6
15' - 4"
R.O.
15' - 2"
A.7
2' - 5"
D120
2' -9" C.I.P. CONCRETE WALL, REF. STRUCT.
1' - 9"
9 D-A311.0 9' - 0"
CAST IN PLACE CONCRETE RETAINING WALL, REF. STRUCTURAL
3 D-A305.0
9' - 0"
5
1
D-A311.0
D-A302.0
2" EXP. JT.
8 4
D-A311.0
D-A311.0
165.1°
7
6 D-A311.0
104 .9°
7' - 0"
4" PAINTED STRIPING TYP.
9
E 1
STL. COL BELOW
D-A301.0
BOLLARDS
G
22' - 3"
6' - 0"
D-A202.0
21' - 0"
148' - 2" 1
LEGEND
D-A305.0
28
27.5
27
26
25
24
23
D-A305.0
22
21
20.3 20
19
3 D-A301.0
DOCK DRAINS, REF. CIVIL
ONE WAY
4' - 8 3/8"
5
3
563.35'
4' - 0" 2' - 1"
D-A305.0
5
2"
D 12' - 4" R.O.
563.45'
8 D-A404.2 AIR INTAKE/RELIEF ABOVE -REF. MEP
4" PAINTED STRIPING TYP.
D-A311.0
2
563.69' AUDIO INSTALLATION -BELOW D120h D120f 563.39'
DN
45' - 4"
202' - 7"
4
6' - 6"
17' - 10" 5' - 8"
REF. CIVIL FOR DOCK AREA DRAINAGE
D-A311.0
DN
23' - 10"
0"
3' - 4" M.O.
7' - 7" 8' - 8"
6 D-A501.0
D101
40' -
564.0'
BOLLARD TYP.
2 D-A301.0
D120j 573.00
1' - 4"
BOLLARD
WEST SERVICE DRIVE
STONE VENEER TO WRAP ONE WAY CORNER
DOCK EQUIP. REF. TO SPECS, TYP.
D140b D150e
REQ'D EXIT
563.49'
D120g
565.0 '
ELEV. CLR
8' - 10 1/2"
1' - 3 1/2"
22' - 6" 5' - 5"
48' - 4"
568.0'
75 .0 °
1' - 7"
571. 0'
E.3
2' - 0"
20' - 9"
+/- 21' - 0" 2' - 0"
4' - 0"
1' - 11 1/4" 572. 0'
573. 0'
574. 0'
7 DOUBLE VOLUME
569. 0'
24' - 10" 8' - 4"
16' - 6"
13' - 4" 2' - 10"
7' - 10"
575. 0'
576. 0'
E.4
1' - 3 3/8" 3' - 0" M.O. 12' - 5"
7 CONC. FILLED METAL PAN DOCK LEVELER, STAIR PIT, REF. SPEC'S.TYP. D120d
COMPACTOR, N.I.C.
3' - 10"
0"
DN D120b
8 569.0'
40' -
COMPACTOR DOOR WITH 3'-4" X 3'-4" R.O. LOCATED 4'-0" A.F.F., TYP.
8' - 4"
2'-9" C.I.P. CONCRETE WALL, REF. STRUCT.
8' - 0 1/2"
5' - 1 1/8" DOCK LEVELER, EQUIP, REF. SPEC'S. TYP.
D105g
D120c
569.0'
1"
15.0°
PAINTED 6" CONCRETE FILLED STEEL PIPE BOLLARD. REF. TO GENERAL DETAILS, TYP.
3B
DOCK ACCESS DOOR 3' - 4"
C
6 3/4" REQ'D EXIT/RECEIVING DOOR
D120e
CONC. FILLED METAL PAN STAIR
ELEC. PANEL STUB COL. LOCATION -REF. MEP
2' - 2" 13' - 0"
15' -
3B
D118
D105f
F.O. 8' - 0"
4" PAINTED STRIPING, TYP.
F.O. 8' - 0"
576.51
1 D-A402.0
COMPACTOR, N.I.C.
2 D-A203.0
5' - 0"
12" C.M.U. WALL, 2 HR. RATED
7
2' - 10 3/8"
EMER. GEN.-REF. MEP
3 D-A301.0
CLR
C.8
8' - 8" 3' - 4"
40' - 0"
UP
3B STAIR #2
13' - 11 1/8"
C.6
D105e
8
3' - 1"
C.9
D117a
ELEV. # 6 FUTURE CMU WALLS (NIC) PROVIDE AS ADD ALTERNATE ELEVATOR PIT, COORD. EXACT PIT AND SHAFT REQUIREMENTS WITH ELEVATOR SELECTED. COORD. FINAL LOCATION WITH ARCHITECT
2' - 1"
569.0'
DOCK ACCESS DOOR
D105d
D117
1/2" 4' - 0 1/2" 6' - 5
3' - 4"
3' - 4"
32' - 4"
ELEC RM
D118a
" 0 1/4
D116 576.00
D116a
6"
SLOPE @ MIN. 1.5% TO DRAIN AWAY FROM BLDG.
1' - 0" 575.00
FIRE RISER
D115a
PROVIDE ELEVATOR PER TENANT NATIONAL ACCOUNT VENDOR
COMPACTOR DOOR WITH 3'-4" X 3'-4" R.O. LOCATED 4'-0" A.F.F., TYP.
8
6' - 4" M.O.
8
8
ELEV. # 5
7"
3' - 4"
D115
8' - 8"
13' - 0"
D105c
1
1
30615 SQ.FT. FIN. FLR. = 100.0'
ELEVATOR PIT, COORD. EXACT PIT AND SHAFT REQUIREMENTS WITH ELEVATOR SELECTED. COORD. FINAL LOCATION WITH ARCHITECT
D105b
CONDENSER/PUMP RM
D-A312.0
CIRCUIT CITY
8
EDGE OF DECK ABOVE
CLR
6' - 1"
5' - 8"
576.00
RAMP UP
40' - 0"
D-A301.0
2" EXP. JT. ABOVE
PROVIDE ESCALATORS PER TENANT NATIONAL ACCOUNT VENDOR TYP.
PROVIDE ELEVATOR PER TENANT NATIONAL ACCOUNT VENDOR
6' - 8"
RAMP UP
2F
2F
R.O.
CLR
5' - 5"
3' - 5"
2
D-A301.0
5' - 8"
B CONCRETE COLUMN, REF. STRUCTURAL, TYP.
8
575.50
RADIUS CL
20.4
14' - 6"
D105
16' - 1"
6' - 8"
17' - 0"
ESCALATOR # 4
72,379 SQ.FT. FIN. FLR. = 100.0'
17' - 5"
249' - 7"
13' - 9"
D125
4 D-A503.0
OPEN TO ABOVE
3 D-A312.0
PUMP/MECH RM
1 D-A403.0
FURR DOWN ABOVE TO CONCEAL ESCALATORS. 1 HR RATED GYP. ASSEMBLY REQ'D
DICKS SPORTING GOODS 1' - 5"
19 D-A502.0
A.5
566.0'
3' - 1 1/2" 5' - 3"
CONC. LEAVE OUT
18' - 0"
32
567.0 '
OPEN TO ABOVE 8
1' - 0 1/2"
1' - 0 1/2"
G 2' - 9"
2' - 0"
22' - 8"
D120k 1 D-A503.0
3 V#2 # 1 ELE
ESCALATOR # 3
5' - 3"
2' - 6"
3' - 1 1/2"
2' - 10"
5' - 4"
1
H
27' - 0"
25' - 0"
1' - 2"
D-A314.0
4 D-A314.0
33.5°
6' - 11"
14' - 6"
R.O.
LA SOMBRA STREET CENTERLINE
2' - 2"
4' - 4" 11' - 6"
40' - 10"
40' - 10" 25' - 0" 4' - 4" 11' - 6" 4' - 4"
20' - 2"
2' - 0"
6 1/4"
1' - 5"
R.O.
4' - 4"
62' - 0"
4
ELEV
14' - 10 1/8"
8
5' - 4"
F.O. 3' - 0"
4' - 4"
2 D-A314.0
2 D-A403.5
A.7
8
570. 0'
61' - 0"
14' - 5" 8' - 8"
38' - 11"
8 1/2" 2' - 5"
2' - 6"
1' - 0"
4' - 4"
14' - 5"
2' - 2" 8 1/2"
5 D-A312.0
10' -
11' - 10"
9' - 4"
CE FA
D-A312.0
576.00
24' - 6"
27' - 0" 11' - 6"
1' - 0" 1' - 2"
E
CONC. LEAVE OUT
D
25' - 2"
2' - 0"
9' - 4" 1' - 0" 1' - 2"
D120a
2
2 5/8"
A.5 4
SIDEWALK-REF. TO CIVIL AND HARDSCAPE PACKAGE
13' - 4"
D-A314.0
D105h
20 D-A502.0
32' - 7 1/4"
1' - 2"
12' - 0"
25' - 6"
4
4' - 4"
32' - 9"
11' - 6"
14
1 3
8 D-A502.0
1 D-A502.0
12 D-A502.0
5' - 5"
29' - 11"
1
D-A403.3
D-A403.6 D-A403.4
7
2
E
7
2' - 0"
1' - 2"
15
10
STAIR # 3
D-A403.4
6 D-A313.0
ESCALATORS
D-A312.0
D-A312.0
D.5
1
16
27' - 0"
23' - 0"
7' - 11" 6' - 0" 7' - 11"
9"
C
27' - 0"
5' - 4"
1' - 6"
D-A302.0
17
'-
D-A202.0 1
18
32' - 0" 2' - 2" 4' - 6" 4' - 6" 49' - 6"
13' - 2" 2' - 2"
SID IN LL TO WA OF
B.7
15' - 4"
1' - 4"
D-A313.0
D-A301.0
D-A200.0 4
19
3' - 0"
19' - 2 1/4"
D-A202.0 7
20
1
16 D-A502.0
A
20.4 20.3
27' - 0" 20' - 6"
8 1/2" 6' - 3 1/2"
SIDEWALK-REF. CIVIL AND HARDSCAPE PACKAGE
1
27' - 0"
22' - 8" 8' - 8"
2' - 2"
D-A313.0
21
27' - 0"
22' - 8"
5' - 4"
2' - 2"
2' - 2"
1
23
ESCALATOR # 2
27
ESCALATOR # 1
28
B
18
17
16
15
D-A200.0
14
Enlarged Floor Plan
INDICATES PLAZA DECK FLOOR SLAB (TOPPING SLAB ON RIGID INSULATION ON WATERPROOF MEMBRANE ON STRUCTURAL SLAB). RE: SPECIFICATIONS. 4" PAINTED STRIPING @ 2'-0" O.C. AT 45 DEG. WITH 9' 0" RADIUS TYP. U.N.O. CONC. LEAVE OUT
FLOOR DRAIN WITH OVERFLOW DRAIN (F.D.) L.P.
LIGHT POLE ON STUB COLUMN
W.P.
WALL PACK
ENLARGED LEVELS KEYL1.1 - North Plan
“God is in the details.” Mies Van der Rohe
Specifying materials, their size, color, dimensions and location were key in construction. In addition to building materials, other construction logistics, like expansion joints and construction joints were necessary for building stability.
CIV 633 623 613 593 582 579 573
1. PROVIDE 1/2" DIA. GALVANIZED STEEL CABLE GUARDRAIL, MAX. 4" O AT MIN. 42" A.F.F. AT ALL LOCATIONS WITH A 30" DROP OR MORE. U.N.O.
46
drawings
ARCH 160.0' 150.0' 140.0' 120.0' 109.0' 106.0' 100.0'
GENERAL NOTES:
R
detail
PR # 19 NOTES : 1. NORTH CORE ELEVATOR MACHINE ROOM TO BE RELOCATED TO LV. 6. G.C. COORD. UTILITY RELOCATION WITH ELEV. MFG. 2. DELETE DOOR, DOOR HARDWARE AND CMU INFILL WALL FOR ELEV. MECHINE ROOM. NO LONGER REQUIRED ON LV. 1
Overall Floor Plan 9
Wall Section Detail
Detailing has allowed me to see how materials go together. 10
Wall Section
construction plan
Built
M
Y
Y
G
E
Street View - Looking South
3DS Max Rendering
B A
A
A
C C D/F
C
Construction 11
1
2
3
4
5
6
7
8
9
site aerial images showing the progress of construction 12
Neisner
Designer: Epstein and Sons International Location: San Antonio, TX SF: 9 Story mix use Status: Built Team: Poonam Patel Alex Gamble Anya Bartay Glen McGuyre
This is an Auto CAD ADT model of the entire retail/ condo tower.
The Neisner project was an existing shell building to be renovated into retail on the first floor and condos on the remaining floors. The basement levels were for parking and the upper levels for penthouses, and ammenities like the fitness center.
13
3d
rendering
The first floor consists of retail space.
The second floor - eighth floor consists of condos.
This project allowed me the insight of how buildings are put together and the genral process of getting a building built. I assisted the architect in creating the above 3D image of the construction document set while also updating the CD set by picking up redlines.
14
plans floor
B2
B1
1
2
3-8
9 15
Shakespeare’s Theater Designer: Poonam Patel Instructor: Bruce Webb School: University of Houston
Shakespeare’s plays were outcast and considered rebellious when the plays first came about. Plays are an expression of the self , which during the existence of the Globe, was prohibited by the King as citizen were supposed to do what they were told. Plays were a rebellious act since
they were a reflection of self and individuality which placed the original Shakespeare’s Globe on the outskirts of the city where brothels were located to emphasize the disapproval of the theater.
R ecognition: display in University of Houston Student Suite as best project in the Graduate program and published in the University of Houston’s Collective Works vol. 2 publication. 16
view looking at oudoor theater
view looking at the NE corner of building
17
structure
vertical circulation Section showing spacial relationships
It is more useful in architecture to rely on method than on style.
Drama
tragedy comedy romance William Shakespeare
Shakespeare plays were full of drama from plays featuring tragedy, comedy & romance. The building begins to take on a dramatic pallet of angles compared to the adjacent buildings that are orthogonal to resemble the drama inherent in the plays.
The Original Globe in England The Globe had features that were
worth keeping in the modern theater, like the openness to the sky.
19
detail
solar gain
solar panels conc. column glazing stl. truss 7
WEST ELEVATION 1" = 30'-0"
6
NORTH ELEVATION 1" = 30'-0"
3
EAST ELEVATION 1" = 30'-0"
conc. deck
conc. framing
9
LIBRARY
10
INTERMISSION
8
LOUNGE
12PM 2PM
conc. foundation wall
wall section 12
20
theater 1
Above: View of SE side of building. The solar panels are on the south facade. Right: A diagram showing solar orientation 11
SKELETON
4PM
10AM
8AM
6PM
6AM 1
South- SOLAR STUDY 1" = 30'-0"
view
rendering
Above: View of Outdoor theater canopied by the sloping seating of the indoor theater. Bottom Left: Entrance of Building showing the lobby, stairs to the theater, and window beyond with a view of outdoor theater seating.
21
Program
H. Concessions J. Balcony K. Boutique L. Plaza M. Lobby N. Outdoor Theater (seats 312 + lawn seating) O. Building Shop and Costume Shop P. Storage
A. Roof Lounge B. Conference Rooms C. Office Rooms D. Lounge E. Roof Top Terrace F. Library G. Main Theater (seats 220)
A B C E
D F
H
J
G
K
L
M O
N
P
section 22
structure 23
detail plans
Building up 24
section perspective 25