ARRHOV FRICK
PORTO ACADEMY FAUP
2019 19–26 JULY 1
INDEX
03 05 19 25 43 61 65 89
Seven notes in Porto We try to optimize structures We try to understand building components We try to understand the consequences of a decision We try to manage resources We try to understand adaption We try to make open-ended systems We try to be free
ARRHOV FRICK
Seven notes in Porto Seven notes make the starting point for seven exercises. Each one is important independently. They become strong together. We like questions but don’t look for complete answers. We like to discover the potential in constructions precisely in terms of capacity and economy. If we decide to add something, we need to understand. The ambition is not new ideas about architecture, rather to think about the components that can become architecture. Pillar, primary beams, secondary beams. We like to learn from history in terms of methods. No program. No moral. No right or wrong. We want you to think about economic constructions. Prefab components. Knowledge in the proposal. Open- ended systems. When you understand this. You will be free. We try to optimize structures We want to discover optimized structures. We would like to see the largest space (m3) possibly made from one 1 m 2x2mm wooden stick. The stick can be cut. A model, lots of models, with the stability to stand on its own. We try to understand building components For this research glue laminated timber is the building component. We will discover building components and connection methods. Connection to ground. Primary structure/ secondary structure. Bolted connections. Steel brackets. Connections without metal additions. We try to understand the consequences of a decision We will think about capacity and economy. To start calculating structures in terms of loads and costs. A structure is complex, full of coworking, undetermined horizontal / vertical loads etc. We strip this down to the capacity of the components. A decision of a certain shape has consequences as a result. Consequences of the capacity as well as budget. We try to manage resources We turn the question around and try to build as much floor area with a roof out of 20000€. By now we understand ideas about structures, components and consequences. Be smart and develop the best solution out of the amount of budget. We try to understand adaption Adaption to conditions. To learn, respect and absorb the qualities of a context. Observe and take into consideration what is important. Making the site a component itself. Discover what you can or cannot do. Don’t touch nature or urban space if you don’t have to. Or do, make a decision. Be clear. Be radical. Draw a structure with the capacity 5kN/m2, adapted to the conditions of a site. We try to make open-ended systems Who knows about the future, who knows about climate, who knows about cars, who knows about housing, who knows about nature, who knows about architecture? We try to be free
3
ARRHOV FRICK
WE TRY TO OPTIMIZE
5
ARRHOV FRICK
7
Volume: 567cm3
Volume 587 cm3
ARRHOV FRICK
Volume: 834cm3
Volume 5054 cm3
9
Volume: 144cm3
Volume 144 cm3
ARRHOV FRICK
Volume: 578cm3
11
Volume: 546cm3
ARRHOV FRICK
Volume: 592cm3
13
Volume: 460cm3
ARRHOV FRICK
Volume: 325m3
15
Volume: 624cm3
V 624 cm3
GSPublisherVersion 0.11.100.100
ARRHOV FRICK
Volume: 624cm3
17
ARRHOV FRICK
WE TRY TO UNDERSTAND BUILDING
19
ARRHOV FRICK
21
ARRHOV FRICK
GSPublisherVersion 0.33.100.100
23
ARRHOV FRICK
WE TRY TO UNDERSTAND THE CONSEQUENCES OF A DECISION
25
Scanned with CamScanner
ARRHOV FRICK
Scanned with CamScanner
27
ARRHOV FRICK
GSPublisherVersion 0.11.100.100
29
ARRHOV FRICK
31
ARRHOV FRICK
33
ARRHOV FRICK
35
ARRHOV FRICK
37
ARRHOV FRICK
39
ARRHOV FRICK
41
ARRHOV FRICK
WE TRY TO MANAGE RE-
43
ARRHOV FRICK
Size: 100m2 Volume: 624m3 Primary beam: 115x270mm Secondary beam: 115x270mm Pillar: 115x115, 115x270mm Capacity: 5kN/m2 Total cost: 18618€
SPublisherVersion 0.11.100.100
45
ARRHOV FRICK
Size: 81m2 Volume: 729m3 Primary beam: 115x270mm Secondary beam: 115x270mm Pillar: 115x115, 115x270mm, 115x450mm Capacity: 5kN/m2 Total cost: 16908â‚Ź
47
ARRHOV FRICK
Size: 108m2 Volume: 972m3 Primary beam: 115x270mm Secondary beam: 115x270mm Pillar: 115x115, 115x270mm, 115x450mm Capacity: 5kN/m2 Total cost: 22200â‚Ź
49
ARRHOV FRICK
Size: 117m2 Volume: 1053m3 Primary beam: 115x270mm Secondary beam: 115x270mm Pillar: 115x115, 115x270mm, 115x450mm Capacity: 5kN/m2 Total cost: 22628â‚Ź
51
ARRHOV FRICK
Size: 100m2 Volume: 450m3 Primary beam: 115x900mm Secondary beam: 115x900mm Pillar: 115x115, 115x270mm Capacity: 5kN/m2 Total cost: 20046â‚Ź
53
ARRHOV FRICK
Size: 100m2 Volume: 450m3 Primary beam: 115x900mm Secondary beam: 115x900mm Pillar: 115x115, 115x270mm Capacity: 5kN/m2 Total cost: 19955â‚Ź
55
ARRHOV FRICK
Size: 80m2 Volume: 360m3 Primary beam: 115x450mm Secondary beam: 115x270mm Pillar: 115x115, 115x270mm Capacity: 5kN/m2 Total cost: 21360â‚Ź
57
ARRHOV FRICK
Size: 86m2 Volume: 576m3 Primary beam: 115x450mm, 115x270mm Secondary beam: 115x270mm Pillar: 115x115, 115x270mm Capacity: 5kN/m2 Total cost: 18843â‚Ź
59
ARRHOV FRICK
WE TRY TO UNDERSTAND ADAPTA-
61
ARRHOV FRICK
63
ARRHOV FRICK
WE TRY TO MAKE OPEN-ENDED
65
ARRHOV FRICK
GSPublisherVersion 0.10.100.100
67
ARRHOV FRICK
69
ARRHOV FRICK
71
ARRHOV FRICK
73
ARRHOV FRICK
75
ARRHOV FRICK
77
ARRHOV FRICK
79
ARRHOV FRICK
81
ARRHOV FRICK
83
ARRHOV FRICK
85
ARRHOV FRICK
87
ARRHOV FRICK
WE TRY TO BE FREE
89
ARRHOV FRICK
ANA LÍA RIJO CHRISTINA FOTIADOU DÁVID ENGERT EMMA SVENSSON FEDERICO TAVERNA GILBERTO HERNÁNDEZ HELENA OBERHOLZER HENRIK FRICK HLIN BLONDAL HUGO LINDBERG JOANNA SIERADZKA JOHAN ARRHOV JOSÉ PEDRO LIMA JOSEPHINE HAROLD JUSTUS SCHWEER KLÁRA WALTEROVÁ KOK SENG CHEE KRISTIANE FENGER KRISTOFFER KOEFOED-HANSEN LAROSLAVA KOMISSAROVA LEONARDO TEIXEIRA LUCIA MACHADO DIBO MARIA TERESA RODRIGUEZ GONZALEZ RODRIGO MENGUE ROCHA STINE MÜLLER THERESA HOLL
Organization & Production
Co-Organization
Sponsor
ARRHOV FRICK
Partners
Support ivo tavares studio.