MASTERPLAN
URBAN SYNERGY I CENTRAL
MTR
Revitalizing Urban Typology InjecƟng Integrated Mixed Development EXISTING BUILDINGS NEW TYPOLOGY BUILDINGS REDEVELOPED BUILDINGS TRANSFORMED
Interlacing Transit Network Chain of Mobility
ESCALATOR BICYCLE ROUTE ROADS PERVIOUS PAVEMENT
SCALE 1:2000
Ecological Nexus Eco spines and Urban Boulevard
BOULEVARD PARKS FARMING ON RETAINING WALLS EXISTING GREENS WATER RETENTION BASINS WATER BODIES BIOSWALES
Reimagining Inclusivity BeƩer CooperaƟon between Public and Private
URBAN FARMING BUILDINGS REDEVELOPED
Low Carbon Model Integrated Hub of Clean energy & Renewables ECO BUILDING RETROFIT BUILDINGS SOLAR PV
URBAN ECOLOGIES
REFRENCES
URBAN APARATUS
Density/Program
Land Economic Value
Higher accesibility generated by the con nuous movement of people (MTR exits, Tram or bus stops, electric bicycles, carparks, & pedestrian walkway).
Energy
Density 65000ppl Before 59000ppl
Livelihood (employment)
Energy Consump on
District Cooling System Amount of buildings serviced by DCS : 38% out of the total GFA of 1x1 km2.
Waste to Energy (WTE) Only 65% of the total municipal waste is combus ble (for incinera on process) out of 2.5kg/day/cap of waste by 65000ppl. Electricity generated : 120 GWh/yr
Combined Heat & Power Co-genera on plant for genera ng power in a combined process reducing transmission loast load compared to centralized plant.
Clean Energy Sources Hydropower turbines Solar PV panels
Water
: :
1200 MWh/yr 2500 MWh/yr
Retrofi ng old Buildings
PVPanel + Smart Ligh ng System + Green Appliances + GHP (CAVI Simula ons).
Clean Energy Source Transmission Lost
Raw water TreatmentPlant Rain water harvested on wet season : 2.150.000 lt on dry season : 250.000 lt Treated water used to supply for excess flushing use and Chilled water for DCS.
Nature
Water Consump on
Stormwater management Stormwater runoff collected by sqm of Bio-Reten on 8000 sqm : 2.5million liter (capacity) Biologically treated from polluted runoff water to become raw water (further treatment on the Hub to be non-potable water supply).
Environment
Water Treatment process
4.5 sqm/cap
2.7 sqm/cap
before 0.75 sqm/cap
before 0.8 sqm/cap
Walkable distance
From Conduit Rd to Connaught Rd (North-South) Regular tranporta on mode Time : 26 minutes Tariffs : 5 - 15 HK$ Con nuous walkable trail (with Regenera ve escalator) Time : 7 minutes Tariffs : 0 HK$
Vehicular use per capita GHG emission per capita