SHIP TO SHORE CONTAINER CRANE ASSEMBLY Universal Cranes provided equipment transportation, manned crane hire, and lift engineering for the assembly of two Ship to Shore Container Cranes. IN EARLY 2021 UNIVERSAL CRANES completed a project for client Wm. O’Brien and Liebherr Container Cranes. The Project involved Ship to Shore Crane Assembly at Port of Brisbane and Port of Townsville. The scope of the Project included: • Transport equipment • Manned crane hire + riggers

• •

Supply of miscellaneous equipment (temp rails etc). Lift Supervisor on site for duration of project

OVERVIEW: The Ship to Shore (STS) container crane assembly was completed in early 2021. Components were shipped from

Liebherr Container Cranes factory in Ireland for assembly on site. Universal Cranes received the components under hook and transported them to the designated area behind the operational wharf for assembly. The assembly sequence required a number of dual lifts at a height of 50-75m from ground level. Due to the complexity, several of

Universal Cranes provided equipment transportation, manned crane hire, and lift engineering for the Ship to Shore Crane Assembly.

www.cranesandlifting.com.au

January 2022 CAL / 125


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Townsville Cranes locomotive lift

2min
pages 168-169

Lift of the Month

1min
pages 170-172

Bridge lift project

4min
pages 166-167

“One Tadano” brand alignment

4min
pages 140-141

Cranes and Lifting SHOWCASE

2min
pages 137-139

Zoomlion’s Super-Duty crawler headed for Turkey

5min
pages 134-136

LCR driving precast constructability

3min
pages 128-131

Intelligent lifting solutions

4min
pages 122-124

Investing in the future

6min
pages 132-133

Universal’s Ship to Shore capabilities

3min
pages 125-127

Potain launches two new MCT 385A cranes

3min
pages 119-121

Comansa overcomes the logistical challenges for the Indian railway project

3min
pages 114-118

Preston Hire’s new Head of Cranes

6min
pages 110-113

Hydraulic loading decks gain immediate acceptance

8min
pages 100-103

Rigging sector is in for a lift

5min
pages 108-109

New bi-levelling multi loader platforms hit the market

8min
pages 104-107

Johnson & Young Cranes (JYC) heavy lift on West Gate Tunnel Project

2min
pages 94-96

TRT Australia planning for the future

7min
pages 97-99

New Humma to Tasmanian contractor

7min
pages 86-89

Bridge building with telescopic crawler

9min
pages 90-93

The Crane Connection marches on

6min
pages 82-85

Tutt Bryant Equipment crane team

2min
pages 80-81

Crane rental goes digital

5min
pages 77-79

Hydraulic jib manufactured for SPT mini crawler

6min
pages 73-76

MCT Equipment and Magni

6min
pages 66-69

Dressed to lift and shift

5min
pages 70-72

Operating Katos over the years

7min
pages 58-61

Wise heads and young blood are keys to growth

11min
pages 54-57

Maeda Searcher Hook, key to lift installation

6min
pages 62-65

Test driving the SANY rough terrain

5min
pages 51-53

First Grove long boom in New Zealand

6min
pages 43-45

Milestone celebration for Terex Franna

13min
pages 34-37

Investing in our capital

9min
pages 38-42

Empire on the rise

7min
pages 46-50

Business built on strong ties and business values

6min
pages 31-33

Bridon Bekaert’s team

7min
pages 26-30

CICA Member Profile

8min
pages 16-19

CICA President’s Report

5min
pages 14-15

CICA Well Being

2min
pages 24-25

Up front

6min
pages 10-13

CICA Industry Days

2min
pages 20-21

CICA Tech Corner

5min
pages 22-23

Industry news

5min
pages 6-9
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.