REX Aug 2019

Page 11

ACT

NEWS

ACT scoping Woden redevelopment ahead of light rail build create a new, modern, purpose-built campus and be a major anchor for the revitalisation of Woden. “CIT is the premier [skills] provider in the Canberra region; delivering world class vocational education and training to more than 20,000 students every year,” Fitzharris said. “Positioning CIT with a major presence in the heart of Woden has the potential to enhance the Town Centre and create an energy around a new campus that will open up a range of opportunities for CIT staff and students, local businesses, industry and the broader community.” Community services and facilities

One of Canberra’s new LRVs. RAIL GALLERY

LIGHT RAIL WON’T CARRY passengers to the south Canberra district of Woden for several years, but it’s already driving change, with the ACT Government scoping the relocation of a key training campus to align with the transport project. ACT transport minister and minister for vocational education and skills Meegan Fitzharris said in June – just before she announced she was stepping away from politics – that the Government was investigating a major investment which would relocate the Canberra Institute of Technology (CIT)’s Reid campus to Wen Town Centre. Fitzharris said the project would help

minister Chris Steel added: “A revitalised town centre is being supported by the ongoing investment in light rail, funding to redevelop the Woden Bus Interchange, planning and design for a new Woden Community Centre, as well as the ongoing investments in the Canberra Hospital, the new Woden bus depot and the popular Woden Experiment.”


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Message from the RTAA

2min
pages 62-64

Message from the ARA

5min
pages 58-60

Message from the ALC

2min
page 61

Message from RISSB

2min
page 57

tm stagetec’s tech improving passenger experience

5min
pages 52-53

Wankmuller provides project update

6min
pages 34-35

SKF Australia focused on condition-based monitoring

4min
pages 50-51

Scheduling smarter with Rail Movement Planner

5min
pages 54-56

Innovative steel for Inland Rail track

3min
pages 36-37

Western Sydney Airport setting fast rail back?

4min
pages 44-45

Fresh work keeping Dandenong busy

5min
pages 46-49

Australia’s mid-level contractors urge more focus

7min
pages 41-43

Aldridge’s fresh approach to rural crossings

6min
pages 32-33

IRSC brings world of safety to Perth

4min
pages 30-31

From the Editor

3min
pages 4-5

New South Wales & ACT

11min
pages 11-16

South Australia

2min
page 23

New Zealand

8min
pages 26-29

Queensland

7min
pages 17-19

Western Australia

3min
pages 24-25

National

13min
pages 6-10

Victoria

6min
pages 20-22
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.