Portfolio 2020 - Urban Design / Landscape

Page 1

pierre-jean blumberger

PORTFOLIO urban design / landscape



TABLE OF CONTENTS curriculum vitae

4

professional work

6 La Côte-des-Roses Internship at UN1ON

8 Westmount Square Entrance Lobby Internship at Fauteux & Associates

9 Paul-Bruchési Schoolyard

Internship at Fauteux & Associates

10 Community Center Internship at LPAA

academic projects

12 Upside-Down Continuum

Transit Infrastructure Renewal - Master Thesis

16 Devenir un Quartier

Urban Strategy - Undergraduate 3

18 Outdoor Stage

Structural Design / Details Drawings - Undergraduate 3

20 Couper à Travers Champs

Landscape / Urban Design - Master 1

24 Vertical Deceleration

Mixed Used Building - Master 2

co-curricular activities

28 La Fabricasens #4 & #5 Workshops Organisation


PIERRE-JEAN BLUMBERGER Throughout my studies and work experience, I have been exposed to a variety of projects. I have worked across various scales, ranging from housing projects and public facilities, to the design of public spaces and urban design.


education

École Nationale Supérieure d’Architecture - Strasbourg

Master Degree in Architecture with honours - mention in Urban Design - 2019 Bachelor in Architecture with honours - 2016

Lycée Jean-Batiste Schwilgué - Sélestat

Scientific Baccalaureate (high school certificate equivalent) with honors Specialization in Mathematics and Engineering Science - English European section ( mathematics )

professional experience

TACT Architecture - Toronto CA

Junior Architectural Designer - March 2020 to Present Analyzed potential development sites including a Transportation Master Plan around a future SmartTrack Station Produced initial design concepts for a high rise 30 story residential building

Fauteux & Associates - Montreal CA

Internship - Landscape Design Studio - August 2018 to February 2019 - 2nd year of master Designed several school yard projects in collaboration with the scholarship commission of Montreal (CSDM) Designed a parking lot for a retail center Developed layout plan for entrance lobby planting Produced detail drawings, 3D models, and renderings for various projects

UN1ON - Strasbourg FR

Internship - Architecture and Urban Design Studio - February to July 2018 - 2nd year of master Assisted in the development of the master plan for the urban renewal project for the National Agency of Urban Renewal (ANRU) neighbourhood of Thionville Produced graphic documents for a social housing competition in Strasbourg Met regularly with landscape architects, engineers, developers and clients during all phases

LPAA - Riedisheim FR

Internship - Architecture Studio - July to September 2017 - 1st year of master Assisted in the production of material for a competition for the municipal hall and a sport shooting center in Riedisheim Produced concept drawings, renderings, and technical documents for various projects

WEBER+KEILING architects - Strasbourg FR

Internship - Architecture Firm - September 2016 - 3rd year of bachelor Aided in the design and modeling for a mixed-use building in Strasbourg Prepared documents and 3D model for the competition of a city hall extension in Strasbourg

DENU&PARADON architects - Strasbourg FR

Internship - Architecture Firm - July 2015 - 2nd year of bachelor Worked with a team to produce drawings for a competition of an archive center Assisted employees on various projects during all phases of projects including conceptualization, design, documentation, and client meetings

Sengler Carpentry - Châtenois FR

Internship to Discover a Construction Site Environment - July 2014 - 1st year of bachelor Assisted in the production of made-to-measure wooden furniture Installed custom furniture at numerous client sites

writing

The Plurality of Imaginaries of the New-Town of Marne-la-Vallée. The Stories and Representations of the City Serving the Conception and the Modulation of its Image. Master thesis defended/presented in January 2018 with the highest honours from the jury

extra-curricular activities

Graduation Gala

Vice-Accountant and Member of the Design Team - February to September 2019

La Fabricasens #4 and #5

Communication Team Manager - Organisation of a Student Workshop - year 2017 and 2018

skills

software

BIM/Drafting - Revit, Autocad, Archicad 3D Modeling - Sketchup, Rhino, Blender Visualization - V-Ray, Enscape, Artlantis, Lumion, Twinmotion Adobe Suite - Photoshop, Illustrator, InDesign OS - Windows and MacOS Mapping - QGIS

languages

English - B1 Cambridge Certification / B2 CLES certification French - native speaker German & Spanish - basic

interests

Sports - running (road - marathon - and trail) / skiing / Crossfit Travelling - visiting and backpacking experiences (Interrail - global train pass in Europe -, road trips) Theme park and roller coaster enthusiast


ÉTUDE DE RENOUVELLEMENT URBAIN DE LA CÔTE DES ROSES PHASE 3 - ZOOM PAR SECTEURS ET FICHES D’ACTION

project - urban study

LA CÔTE-DES-ROSES THIONVILLE - FRANCE

Master plan for the urban renewal of a high priority neighbourhood Internship at UN1ON - 2018 - Strasbourg, France

La Côte-Des-Roses is a neighbourhood built in the 60’s and classified as a high priority neighbourhood by the ANRU since 1996. This urban study aims to give new perspectives to La Côte-Des-Roses by renovating and diversifying the housing supply, adding public amenities, preserving the landscape and giving character to public spaces. New developments and existing ones are linked through a succession of public spaces that have different atmospheres and purpose, from more urban to more natural and playful ones. main pathway and public spacesGROUPEMENT UN1ON -

LOTISSEMENT MOSELIS 16 Maisons individuelles 9 Maisons accollées 1 Collectif

Rue du

Moselis

LOT 00 PLACE HAUTE

Hibo ux

Barre du Cheuvre

uil

uvre

Che

Sanglier

LOT 03 : LE CHEMIN - 1 606 m² 9 Maisons en bande (T4 duplex 90 m² - Sdp 810 m²)

LOT 01

Impa sse du

du Rue

LOT 01 : LA LISIÈRE - 3 936 m² 16 Maisons en bande (T4 duplex 90 m² - Sdp 1 440 m²)

uil

de Sa inte -Ann e

Rue du Cheuvreuil

LOT 02 : LE PARC - 4 339 m² 12 Maisons groupées (T4 duplex 90 m² - Sdp 1 080 m²)

nne nte-A

de Sai

LOT 02

du Fa isa n

in Chem

LOT 03

Ru e

min

Barre du Renard/

Che

MAIL

Rue de la Caille Barre de la Caille

LOT 04-b

LOT 05 : PARKING 265 places de stationnements

LOT 04 a&b : SAINTE-ANNE Programmation Linkcity

LOT 06

Rue du Fris

PLACE BASSE

in

du

Co tea u

LOT 04-a

caty

Rue de la Perdrix

Sa inte -B

arb

e

Barre de la Perdrix

Allée Bel-A ir

Ch em

Barre du Faisan

CHR

Rue du Faisan

LOT 05

Ru e

ÉTUDE URBAINE - Q.P.V. ‘CÔTE DES ROSES’ - DÉFINITION DU SCHÉMA DIRECTEUR OPÉRATIONNEL /RPHASE 3 - SCHÉMA DIRECTEUR ue Sa in t-H ub e

19

rt

existing and proposed housings developments

Saint-Anne Square and its urban plaza


RÉSIDENTIALISATIONS ET LIMITES - PROFILS

main pathway and public spaces HIÉRARCHISATION DU VIAIRE - PROFILS

COUPE SUR NOUES

COUPE SUR RUE DE LA CAILLE / BÉCASSE

LIMITE CHR

COUPE RUE DU FAISAN / RUE DU CHEUVREUIL

RÉSIDENTIALISATION - COUPE DE PRINCIPE - BARRE DU RENARD ET DU SANGLIER

views from the central park The park is becoming an important place of socializCOUPE SUR LE CHEMIN DE SAINTE-ANNE ation with area for inhabitants to gather and play

street sections - rain water management and a new parking lot between a existing building COUPE RUE DU FAISAN / RUE DU CHEUVREUIL and new townhouses

28

ÉTUDE URBAINE - Q.P.V. ‘CÔTE DES ROSES’ - DÉFINITION DU SCHÉMA DIRECTEUR OPÉRATIONNEL / PHASE 3 - SCHÉMA DIRECTEUR

GROUPEMENT / UN1ON - DIGITALE PAYSAGE - INGEROP - URBANIS - VILLE DE THIONVILLE

30

GROUPEMENT / UN1ON - DIGITALE PAYSAGE - INGEROP - URBANIS - VILLE DE THIONVILLE

29


project - interior design

WESTMOUNT SQUARE ENTRANCE LOBBY MONTREAL - CANADA

Plantation and furniture plans for a residential building lobby Internship at Fauteux & Associates - 2019 - Montreal, Canada

The Mies Van Der Rohe building was lacking of common spaces for residents to gather. A preliminary project is proposing an exterior patio for residents, but its use is only possible during the summer months.

WESTMOUNT SQUARE - LOBBY 2018-10-17

PLAN TOUR 03

ARCHITECTES PAYSAGISTES

FAUTEUX ET ASSOCIÉS

Keeping Mies furniture, the interior design uses exterior patio planters to enforce the continuity between the two spaces. Their organic disposition aims to break the structural grid and add greenery around sitting areas.

WESTMOUNT SQUARE - LOBBY 2018-09-17

ARCHITECTES PAYSAGISTES

FAUTEUX ET ASSOCIÉS

two floor plans propositions

entrance seating area

VUE SUR LE SALON D’ACCUEIL

WESTMOUNT SQUARE - LOBBY 2018-10-17

side

WESTMOUNT SQUARE - LOBBY 2018-10-17

WESTMOUNT SQUARE - LOBBY 2018-09-17

PLAN TOUR 03 - VARIANTE 2

COULOIR NORD

back lounge area and exterior patio VUE DEPUIS L’ACCÈS AUX ASCENSEURS

ARCHITECTES PAYSAGISTES

FAUTEUX ET ASSOCIÉS

ARCHITECTES PAYSAGISTES

FAUTEUX ET ASSOCIÉS

FAU


D-06 Y062 D-06 Y062

SURFACE DE GAZON SYNTHÉTIQUE rue Chambord Échelle 1:20 - COUPE SURFACE DE GAZON SYNTHÉTIQUE boulevard Saint-Joseph Est

EN BÉTON EN BÉTON

Échelle 1:20 - COUPE

Caoutchouc recyclé 50mm compacté pour la dilatation

10 9 10 8 9

rue de Lanaudière gris gris foncé(fournir échantillon) GazonPierre synthétique Morceaux monolitique de 450 @ 600 mm (Voir fiche tecnique FT. 12.1-12.2-12.3)

Lit de plantation voir détail Y061 D-02

+/-700

Lit de plantation voir détail Y061 D-02

Drain voir civil

Gravier enrobé et fondation (Voir civil)

100

2019-04-25

A.B.

2019-04-05 2019-04-25 2019-04-01 2019-04-05 2019-02-11 2019-04-01 2018-12-03 2019-02-11 2018-10-09 2018-12-03

A.B. A.B. A.B. A.B. A.B. A.B.

3 4 2 3 1 2

POUR 40%

2018-10-09

1

MONTREAL - CANADA

Membranede Fondation géotextile pierre concassée no.7609 de 0-20 Texel mm ouØéquivalent compactée approuvé à 98 % P.M. Jusqu'au roc existant ou sur une épaisseur minimum de 300 mm Sol existant non remanié ou terre de remblai compactée à 98% P.M. Membrane géotextile no.7609 de Texel ou équivalent approuvé

P R O J E T P R O F.

Architecture de paysage

F I C H I E R P R O F. P R O J E T P R O F.

Échelle 1:20 - COUPE

C C

D-09 Y062 D-09 Y062

10

B B

Sentier en pierre de silice Échelle 1:20 - COUPE Sentier en pierre de silice

7 6

Pierre de silice,

5

100 mm d'épaisseur, 8400

moy. 600 mm de Ø, +/- 200 mm, couleur bleu ciel et bleu foncé, mélangé 50% / 50% de la carrière Ducharme, ou équivalent approuvé

3

A.B.

A.B.

Pour permis 100% (Pour commentaires)

2

Joint de 20 mm, rempli de sable polymérique gris

1

2019-04-01

400

A.B.

2019-02-11 400

A.B.

POUR 80%

2018-12-03

POUR 40%

2018-10-09

min 300

805

25

100

2019-04-25

2019-04-05

4

805

Lit de sable granitique, 25 mm épais.

A P P R O B AT I O N

École Paul-Bruchési

1310 Blvd Saint-Joseph Est, Montréal, QC H2J 1M2

École Paul-Bruchési Ajout d'un gymnase

1310 Blvd Saint-Joseph Est, Montréal, QC H2J 1M2

Ajout d'un gymnase

106 404

159 014 010

106

Membrane géotextile no.7609 de Texel ou équivalent approuvé

Architecture de paysage

Sol existant non remanié ou terre de remblai compactée à 98% P.M.

P R O J E T P R O F. F I C H I E R P R O F.

Sentier en pierre de silice

D

MFA_M1805

Échelle 1:20 - COUPE

A P P R O B AT I O N

1:150

F É

159-Y000 1:150

F

159-Y000

DÉTAILS DE CONSTRUCTION

A.B.

ESSIN

V É R I F I C AT I O N

É

DÉTAILS DE CONSTRUCTION

C ONCEPTION

D-09 Y062

159 014 010

To achieve this goal, the schoolyard is sequenced in zones, alternating between resting shaded zones and active sports fields.

Fondation de pierre concassée 0-20 mm Ø compactée à 98 % P.M. Jusqu'au roc existant ou sur une épaisseur minimum de 300 mm

te de prise rchitecture) te de prise rchitecture)

Marc Fauteux

Service des ressources matérielles 3700, rue Rachel Est Montréal (Québec) H1X 1Y6 Service des ressources matérielles 3700, rue Rachel Est Montréal (Québec) H1X 1Y6

3981, Boul. Saint-Laurent, bur. 502 Montréal, Québec, H2W 1Y5 www.fauteux.ca

Bordure en alumimium Sure-Loc A18258M ou équivalent approuvé, installée selon les recommandations du fabriquant clouée aux 300 mm. Clous en aluminium de 300 mm

Géotextile voir civil

Marc Fauteux Marc Fauteux

1991

404

Lit de Mortier Bordure de béton arasé voir civil

A.B. MFA_M1805 PJ.B. A.B. Marc Fauteux PJ.B.

1991

ARCHITECTES PAYSAGISTES

Terre structurale (voir Y041 et fiche technique 13.1, 13.2)

MFA_M1805

About to be renovated, the Paul-Bruchési school will extension will include a gymnasium. The challenge of the project is to create a schoolyard that proposes as many games as before, on a smaller site, and keeping existing trees. FAUTEUX ET ASSOCIÉS

100% pour appel d'offres 100% pour appel d'offres

404

8400

A P P R O B AT I O N V É R I F I C AT I O N

404

350

V É R I F I C AT I O N D ESSIN

A A

8

es 350 gs'Gravier enrobé eset fondation (Voir civil) 11) gs' 11)

D ESSIN C ONCEPTION

Échelle 1:20 - COUPE

9

Lit de plantation voir détail Y061 D-02

C ONCEPTION F I C H I E R P R O F.

1719 1719

D D

ARCHITECTES PAYSAGISTES 3981, Boul. Saint-Laurent, bur. 502

FAUTEUX ET ASSOCIÉS 3981, Boul. Saint-Laurent, bur. 502 Montréal, Québec, H2W 1Y5 www.fauteux.ca

Sol existant non remanié ou terre de remblai compactée à 98% P.M.

Bollard de pierre Échelle 1:20 - COUPE Bollard de pierre

ARCHITECTES PAYSAGISTES

FAUTEUX ET ASSOCIÉS

######## Internship at Fauteux & Associates - 2019 - Montreal, Canadade paysage Architecture

ON SYNTHÉTIQUE D-08 Y062 D-08 Y062

As a part of the playfulness of the project, and to reduce the urban heat-island, sports field and game zones are painted.

PJ.B. Marc Fauteux

A1-C_csdm13-r2.0.dwg

Marc Fauteux

A1-C_csdm13-r2.0.dwg

B

A planted and resting areas junction between 1991

Service des ressources matérielles 3700, rue Rachel Est Montréal (Québec) H1X 1Y6

404

400

1719

1310 Blvd Saint-Joseph Est, Montréal, QC H2J 1M2

Ajout d'un gymnase

404

805

École Paul-Bruchési

159 014 010

106

A.B.

Montréal, Québec, H2W 1Y5 www.fauteux.ca

Bordure en alumimium Sure-Loc A18258M ou équivalent approuvé, installée selon les recommandations du fabriquant clouée aux 300 mm. Clous en aluminium de 300 mm Bordure en alumimium Sure-Loc A18258M ou équivalent approuvé, Fondation de pierre concassée 0-20 mm Ø compactée à 98 % P.M. installée selon les recommandations du fabriquant clouée aux 300 mm. Jusqu'au roc existant ou sur une épaisseur minimum de 300 mm Clous en aluminium de 300 mm

Géotextile voir civil

Enfouissement de 20% de la hauteur de la pierre ou 10 cm min

100% pour appel d'offres 100% pour appel d'offres 100% pour appel d'offres Pour permis 100% pour appel d'offres 100% (Pour commentaires) Pour permis POUR 80% 100% (Pour commentaires) POUR 40% POUR 80%

Lit de sable granitique, 25 mm épais. Lit de sable granitique, 25 mm épais.

Bordure de voir béton Géotextile civilarasé voir civil

Sol non-remanié ou remblai compacté manuellement

4 5

Joint de 20 mm, rempli de sable polymérique gris

Lit de structurale Mortier Terre (voir Y041 et fiche technique 13.1, 13.2) Bordure de béton arasé Lit Mortier voirdecivil

Sol non-remanié ou remblai compacté manuellement

5 6

PAUL-BRUCHÉSI SCHOOLYARD

100

Enfouissement de 20% de la hauteur de la pierre ou 10 Enfouissement de cm min 20% de la hauteur de la pierre ou 10 cm min Terre structurale (voir Y041 et fiche technique 13.1, 13.2)

Bordure en béton (Voir civil)

6 7

Pierre de silice, 100 mm d'épaisseur, moy. 600 mm de Ø, +/- 200 mm, Pierre silice, couleurdebleu ciel et bleu foncé, 100 mm d'épaisseur, mélangé 50% / 50% moy. 600 mmDucharme, de Ø, +/- 200 mm, de la carrière couleur bleu ciel et bleu foncé, ou équivalent approuvé mélangé 50% / 50% de la de carrière Ducharme, Joint 20 mm, ou équivalent approuvé rempli de sable polymérique gris

project - landscape architecture

Gravier enrobé et fondation (Voir civil)

25

300 @ 300 500 @ 500

+/-700

(Voir civil)

25 min 300 min 300

de hauteur. (Les pointes ou les arrêtes Pierre coupantes gris gris foncé(fournir échantillon) être enlevées) Panneau Eco-Smonolitique 55mmdevront Morceaux de 450 @ 600 mm de hauteur. (Les pointes ou les arrêtes de plantation voir être enlevées) Lit de pose coupantesLitdevront détail Y061 D-02

7 8

Lit de plantation voir détail Y061 D-02

É

1:150

F

159-Y000

DÉTAILS DE CONSTRUCTION

Y062 / 10 A1-C_csdm13-r2.0.dwg

plan of the schoolyard and details of resting areas

Y062 / 10 Y062 / 10


project - public

RECREATION CENTRE RIEDISHEIM - FRANCE

Competition for a municipal hall including a sport shooting center and practice rooms (orchestra) Internship at LPAA - 2017 - Riedisheim, France

The town of Riedisheim is having multiple associations that needed some space, such as practice rooms, storages, or a party room. The main element that guided the design is the 50m shooting range room. While for soundproof reasons this volume is in concrete, the rest of the building is offering views on the canal and its surrounding.

volumes and general composition

All theses modular spaces are conceived to be used by different groups of users for different occasions.

site access and sun diagram

programmatic diagram

ground, second and third floor plans


view from the bridge over the canal

view of the entrance from the parking lot

section - views on the canal

site plan

South-East facade


project - urban design

UPSIDE-DOWN CONTINUUM

TRANSIT INFRASTRUCTURES RENEWAL TORONTO - CANADA Master Thesis - Under the direction of Dr. Andreea Grigorovschi and Anne Jaureguiberry - Partner: ClĂŠmence Cottereau

Upside-Down Continium Requalification of mono-functional mobility infrastructures in support of urbanity

Upside-Down Continium

Upside-Down Continium

UPSIDE-DOWN CONTINUUM is an urban design project that focuses on transitoriented development, aiming to reconnect Toronto’s Old City to the lakefront. This was achieved by erasing gaps created by mono-functional infrastructure and giving them new functions, as well as using them to prepare the city core for the future doubling of its population. Using three strategies, which consider three axes: longitudinal, transversal, and vertical; the project focuses on the urban, neighbourhood, and architectural scales, to explore new uses for existing infrastructure.

Requalification of mono-functional mobility infrastructures in support of urbanity

Upside-Down Continium


longitudinal - transversal - vertical strategies

Raildeck Sherbourne

Exhibition

Lower Don River

Union

general master plan

general master plan 1/5000 - light rail train HUBs and developments


transit - programatic - public spaces loops

The architectural scale propose a living-HUB around UNION station. The concept of the loop aims to connect the new Park & Connect to the existing urban fabric. This HUB is not only for commuters but also aims to attract visitors, while providing daily amenities for the inhabitants. the loop and its developments - 1/1000


details 1/500 - rail deck park and the park&connect

beyond mobility, inside the living HUB and its equipments


project - urban strategy

DEVENIR UN QUARTIER NORTH GATEWAY OF OFFENBURG CITY

competition - Partner: Ă–zcan Belde winning project in the category: Concept and Implementation concept for re-qualification of a commercial and industrial area

Focusing on the urban scale, this project aims to transform a single-use area into a residential neighbourhood by converting the under-utilized spaces between buildings into livable spaces and community amenities.

potentials of in betweens


commercial streets - housings - market hall

example of one of the possible future of this area


project - light structure / detail drawings

OUTDOOR STAGE PARIS - FRANCE

Undergraduate 3 - Instructor: Benjamin Dubreu Outdoor stage, dressing rooms and storage

This outdoor stage uses a light structure having low impacts on the site. The monolithic aspect aims to enhance the focus on the art, minimizing the design to be functional and give importance to the stage. The symmetrical design allows the dressing rooms and the storage volumes to brace the whole wooden structure.

ure amovible transversal section on the dressing rooms Coupe transversale 1-50ème Coupe transversale 1-50ème

structural axonometry

Axonométrie éclatée

Système de la toiture amovible

Système de la toiture amovible

the stage in a field 18-05-2016 - UEL 323A - TECHNOLOGIE, CONCEPTION INTÉGRÉE ET SYNTHÈSE DU PROJET D’ARCHITECTURE

BLUMBERGER Pierre-Jean

PORRACCHIA Marie

SALLERIN Claire


2 3 4 5

1

12 2 13

2 3 4 5 6

9 10

14 11

15 4 8 19

4 16

7

12 26

23

4

6

27

8 17 9

4 24 25

28

10 11

29

16 18

4

30

12

19

Détail 3 - 1.10ème

Détail 1 - 1.10ème

cladding and roof detail - 1/10

Détail 2 - 1.10è

foundation detail - 1/10

18-05-2016 - UEL 323A - TECHNOLOGIE, CONCEPTION INTÉGRÉE ET SYNTHÈSE DU PROJET D’ARCHITECTUR

18-05-2016 - UEL 323A - TECHNOLOGIE, CONCEPTION INTÉGRÉE ET SYNTHÈSE DU PROJET D’ARCHITECTURE

BLUMBERGER Pierre-Jean

PORRACCHIA Marie

plan and longitudinal section 18-05-2016 - UEL 323A - TECHNOLOGIE, CONCEPTION INTÉGRÉE ET SYNTHÈSE DU PROJET D’ARCHITECTURE

BLUMBERGER Pierre-Jean

PORRACCHIA Marie

SALLERIN Claire

SALLERIN


project - landscape / urban design

COUPER A TRAVERS CHAMPS URBAN STUDIO - ILLZACH 2030

Master 1 - instructor: Jaureguiberry Anne partners: Foissotte Thomas - Vergobbio Robin

This project aims to preserve agricultural fields in an urban context by diversifying the monocultural production and make them beneficial for inhabitants. It takes into account the field transition process, the three zones to densify, and the periphery of the agricultural park. The areas between the farmlands and urbanized areas are transformed in public promenades, sports fields, shared gardens, and housing, to avoid sprawl on the preserved land. The overall goal is to invite local communities to recognize the value of the agricultural area as a place for nourishment and leisure.

extension

mutation transformation

densification

green corridor


concept models - to link, to turn the site toward the canal , to highlight local landmarks

the agricultural park, its major programs and livable margins - 1/5000

paysage ĂŠlectrique


transition process of culture diversifications

The urban strategy focuses on three zones to densify around future LRT stations. One is a university campus centred around the study of agriculture, which will aid in the agricultural transition of the area.

University plan and details


atmospheres along the canal quays

study model - University programs and volumes


project - mix-used building

VERTICAL DECELERATION MIXED USED BUILDING - CHIYODA - TOKYO

Master 2 - Instructor: Dominique Coulon metropolitan equipment dedicated to leisure, sport, culture and housing

As a connector between the Ginza Financial District and a residential area, this mixedused building proposes a leisure and cultural break in everyday life, proposing programs for a population of all ages, that could be used day and night.

housing school performing art center

This project led us to ask a question about the organizational principle of the programs: what if the program became more relaxing as you ascended the building, leaving the more frenetic experiences close to the ground level?

theater basketball field volleyball field

badminton field

The site responded heavily to its context and used the existing infrastructure to dictate the form and footprint.

mass plan 7,1m

2 trains/min

mass model in its context

200m ¥¥ ¥ ¥ ¥¥

40 km/h 40 km/h 40 km/h

60 km/h

¥

60 km/h

17,4m 170M

17,4m

urban context - elevated road, metro, financial district


sky-bar restaurant

spa

hostel brewery

library / learning center

housing

music rooms hall - theater

night club

the tower as a signal


the ground floor as an open public space - model 1/200


main section - vertical circulations tiering of programs from the fastest to the slowest

south west facade model - 1/200

inside view - badminton field - access to the walkway in the hall

process - volume studies


co-curricular activities - workshops organisation

LA FABRICASENS STUDENT WORKSHOP

Edition #04 - 2017 - Le vêtement (clothing) Edition #05 - 2018 - Le papier bulle (bubble wrap)

La Fabricasens is a workshop that invites students to explore the possibilities of a materials and produce an installation in a public space. The Fourth Edition focused on clothe, while the Fifth used bubble wrap as the medium. The installations were required to last three days.

28 30 AVRIL

WORKSHOP QUATRIÈME ÉDITION

28 30

AVRIL

E T U D I A N T S ARCHITECTURE U R B A N I S M E ART

PLACE D’AUSTERLITZ

3 JOURS, 5 SENS, 1 LIEU, 1 MATERIAU, DU FUN

AVRIL

WORKSHOP QUATRIÈME ÉDITION

AVRIL

E T U D I A N T S ARCHITECTURE U R B A N I S M E ART

PLACE D’AUSTERLITZ

3 JOURS, 5 SENS, 1 LIEU, 1 MATERIAU, DU FUN

posters, edition #04

screenshots of the second teaser for the #04 edition

personal photographs - edition #04 - clothing


㌀ 䨀伀唀刀匀 㔀 匀䔀一匀 ㄀ 䴀䄀吀䔀刀䤀䄀唀

㌀ 䨀伀唀刀匀 㔀 匀䔀一匀 ㄀ 䴀䄀吀䔀刀䤀䄀唀

㄀㄀ ⴀ ㄀㈀ ⴀ ㄀㌀ 䴀䄀䤀 ㈀ ㄀㠀

㄀㄀ ⴀ ㄀㈀ ⴀ ㄀㌀ 䴀䄀䤀 ㈀ ㄀㠀

匀䄀嘀䔀 吀䠀䔀  䐀䄀吀䔀

匀䄀嘀䔀 吀䠀䔀  䐀䄀吀䔀

䠀䄀一䐀䰀䔀

吀䤀䴀䔀

圀䤀吀䠀 䌀䄀刀䔀

吀伀 䴀䄀䬀䔀 䤀吀

倀伀倀 posters, edition #05 - the bubble paper

刀준唀一䤀伀一 䐀䔀 䰀䄀一䌀䔀䴀䔀一吀

刀준唀一䤀伀一 䐀䔀 䰀䄀一䌀䔀䴀䔀一吀

刀준唀一䤀伀一 䐀䔀 䰀䄀一䌀䔀䴀䔀一吀 圀伀刀䬀匀䠀伀倀 ⌀ 㔀

䰀䔀吀ᤠ匀 䠀䄀嘀䔀 䘀唀一

䘀䄀䈀刀䤀䌀䄀匀䔀一匀

䘀䄀䈀刀䤀䌀䄀匀䔀一匀 ⌀ 㔀 䘀䄀䈀刀䤀䌀䄀匀䔀一匀

圀伀刀䬀匀䠀伀倀 ⌀ 㔀

䤀一匀䄀 ⴀ 䴀䔀刀䌀刀䔀䐀䤀 ㈀㈀ 一伀嘀䔀䴀䈀刀䔀 ⴀ ㄀㤀㨀 䤀一匀䄀 ⴀ 䴀䔀刀䌀刀䔀䐀䤀 ㈀㈀ 一伀嘀䔀䴀䈀刀䔀 ⴀ ㄀㤀㨀

䤀一匀䄀 ⴀ 䴀䔀刀䌀刀䔀䐀䤀 ㈀㈀ 一伀嘀䔀䴀䈀刀䔀 ⴀ ㄀㤀㨀

poster - launching meeting to organize edition #05


2 2

0 0


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.