Regional District Highlights: February 2023

Page 1

Polling Stations

Area C By-Election

Advance Voting: February 15 & 22

Pomeroy Sport Centre

9324 96 Street, Fort St. John, BC

Open 8am to 8pm

General Voting: February 25

Baldonnel Elementary School

5836 Baldonnel, Baldonnel, BC

Open 8am to 8pm

Charlie Lake Elementary School

12655 Charlie Lake Frontage Rd

Open 8am to 8pm

Electors in Area C head to the polls in February

A by-election is being held on February 25, 2023 for Electoral Area C Director. The position fell vacant after the BC Supreme Court ruled the October 15, 2022 vote invalid due to issuance of ballots to electors outside of Electoral Area C. The petition was submitted to the Court by the PRRD following a recount.

You may be eligible to vote in the by-election as a resident elector if you reside in Electoral Area C, or as a non-resident property elector if you own property within the voting jurisdiction but do not reside within it. The candidates for the by-election, in order of nomination filling, are Brad Sperling and Suzanne Haab.

Progress report on the new Chetwynd Public Library

For more information on voting eligibility, what to bring with you to vote and the candidates, please visit prrd.bc.ca/getoutandvote

Parcel tax roll review panel set

The PRRD will hold a parcel tax roll review panel meeting at 9:30am on February 23. The panel will review any proposed changes to the parcel tax rolls for a number of sewer and water services.

Parcel taxes are local government taxes levied on a unit, frontage or area of a property. Property owners have the right to review the rolls for accuracy and request a correction by February 21, to be considered by the panel. To learn more visit prrd.bc.ca or call 250-784-3200.

Much work has been done on the new Chetwynd Public Library since the groundbreaking event in May 2022. The 8,600 facility being constructed northeast of the Chetwynd & District Recreation Centre, is following a ‘living room of the community’ design concept while meeting the National Energy Code and BC Energy STEP Code.

The Chetwynd Library Advisory Committee, with members from the Library Board, District of Chetwynd Council, Library Director and Area E Director from the PRRD, are providing their recommendations and feedback to ensure the building will be designed according to the needs of the community.

The library will feature a children’s program room and reading/play area, teen reading and lounge area, adult reading and lounge area, public computer area, meeting space, makerspace and virtual reality room, multi-purpose spaces, cafe and open seating, outdoor patio, more storage and a storytelling space.

Work completed:

• Permitting

• Asphalt removal, installation of water/sewer/storm sewer

• Foundation work

• Blueskin (water-resistive barrier), tile and backfill

• Plumbing rough-ins, slab prep and slab poured

• Erection of glulam (engineered wood beam) structure

• Start of exterior framing

N ext PRRD

Board

eetings:

February 22, Special Budget Meeting 10:00am | Facebook Live, Dawson Creek

February 23 10:00am | Facebook Live, Dawson Creek

To view board and committee meeting dates and agendas, visit: prrd.bc.ca/agendas-minutes/

Work planned for next reporting period:

• Continue building framing of exterior and interior walls

• Installation of structural insulated roof panels

• Insulation and air barriers

• Window installation

• Exterior cladding and masonry work

Join the Discussion

Engage in the active consultations happening in the Peace River Regional District.

haveyoursay.prrd.bc.ca

Issue 2 | February 2023
Peace River Regional Distric t Of ficial Page

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.